Loading...
HomeMy WebLinkAboutBLD2024-00595 SFR - BLD Application - 7/25/2024 TCE =INSTALL TEMP. CONST. ENTRANCE BUILDING SERiACKS: 1fi0Nf:10' SDE•S' RUJi:10' TSS =INSTALL TEMP. SOIL STOCKPILE 51.12. / 29.17' 19.78' 3.46' j l l I /'/ `/........ 564'24'47'W 123.55' 20.02' / / / d n ............... �y - 2 If PROPOSED "r EAVE a / CONTOURS 10, BUILDING _ I L 52.22' ENVELOPE Q i 21J65' R�175.00' —J UE M17'05'S0' wo5A /' N ! g9 w .': HS 96 i PROPOSED ET, SINGLE FAMILY RESIDENCE x / .n SS ———————————— — ai } STUB INSTALL SILT FENCE, ti o ._. e�....... N • -S STRAW WATTLE, OR ........-.........._. FUNCTIONALLY EQUIVALENT BSBL �) STORM / / STUB .......... •-•'���"`�� 7.91 19.65 ' 1.MINIMUM DISTANCE FROM ANY POWER 46.48' TRANSFORMER TO ANY DOOR, WINDOW, ON ALL NON-COMBUSTIBLE MATERIALS SHALL BE / 8-FEET. B1 89 2.MINIMUM DISTANCE FROM ANY POWER TRANSFORMER TO ANY COMBUSTIBLE WALLS OR ROOF SHALL BE 10-FEET. SEPARATION NOTE: ANY PORTIONS OF STRUCTURES WITH LESS THAN 10-FEET OF SEPARATION SHALL BE FIRE RATED. LOT SIZE = 9,954 SF SOIL AMENDMENT NOTE: IMPERVIOUS SEE BMP T5.13 'POST CONSTRUCTION TOTAL IMPERVIOUS: 2,708 SF (27.2%) SOIL QUALITY AND DEPTH', WSDOE ROOF: 2,004 SF STORMWATER MANAGEMENT MANUAL DRIVEWAY: 556 SF FOR WESTERN WASHINGTON. WALK: 40 SF LOT COVERAGE 2,004 SF(20.1%) INCLUDES EAVES FLAT WORK NOTE: PATIO: 108 SF ( ) FLAT WORK IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY, FINAL CONDITIONS MAY VARY. Barghausen For: N N � R® Title' OLYMPIC RIDGE Job Number �`"' '�"�°� 21885 Consulting Engineers, Inc. RESIDENTIAL SITE PLAN 33455 6th Ave S, Unit 1-6, Federal Way,WA 98003 °ran 18215 72nd Avenue South (253)590-2236 LennarSeattle•Lennar.com HOMESITE 96 sheet 6/14/23 Kent,WA 98032 Everything's included by LENNAR PARCEL NO 12328-51-00096 [i] 425.251.6222 barghausen.com Leading homebui der of new homes 51 NE OLYMPIC RIDGE,BELFAIR,WA 1 1 o/ r6.:7210DD6\2t866\161\2166s-0"wk 111419-Plx rb, d" Dele/Ww..6/13/2023 12:58 PM DBRMS Name Lauren Fafnis,Agent for Lennar 12328-51-00096 BLD# Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 1 of 2) Per Mason County Code, Title 14,Chapter 14.48 a Stormwater site plan is required whenever a building application is made for residential development, or redevelopment', with more than 2,000 square feet of impervious surface'. 'Redevelopment means,on an already developed site,the creation or addition of impervious surfaces,structural development including construction,installation or expansion of a building or other structure,and/or replacement of impervious surface that is not part of a routine maintenance activity,and land disturbing activities associated with structural or impervious redevelopment. 'Common impervious surfaces include,but are not limited to,rooftops,walkways,patios,driveways,parking lots or storage areas, concrete or asphalt paving,gravel roads,packed earthen materials,and oiled,macadam or other surfaces which similarly impede the natural infiltration of Stormwater.Open,uncovered retention/detention facilities shall not be considered as impervious surfaces. To Calculate Impervious Surfaces Please Complete This Table Surface Type Length X Width = Area *All dimensions in feet Buildings X = X = Measurements for buildings are taken at the X _ perimeter of the farthest projections (example: eaves/gutters) X = —Driveways X = X = Length of drive begins at the right of way X = Parking Areas X = X = Any paved, gravel or packed area per definition above table X = Patios/Walks X = X = Any paved, gravel or packed area per definition above table X = Others X = X = If the total impervious area of the proposed site X = development is greater than 2000 square feet a Small Parcel Stormwater Site Plan is Required Total Impervious Surface Area (sum of all areas) If the Total Impervious Surface Area is LESS THAN 2000 Square Feet, please read,acknowledge and sign below. Based Upon the information you have provided a Stormwater Site Plan IS NOT required for this development activity. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described property for review and inspection as may be required. X /-G n�/4 Owner/Agent/Contractor(circle one)Date: 12/11/2023 If the Total Impervious Surface Area is GREATER THAN 2000 Square Feet,please read,acknowledge and sign the information provided on page 2 of 2. Page 1 of 2 A --1 Name Lauren Fafnis,Agent for Len nar Parcel# 12328-51-00096 _ BLD# d� — DDT �z U !o Mason County Department of Community Development Small Parcel Stormwater Management Application/Worksheet (page 2 of 2) Based Upon the information you have provided a Stormwater Site Plan IS Required for this development activity. Title 14,Chapter 14.48 of the Mason County Code(MCC)regulates compliance requirements for Stormwater Management in this jurisdiction.A complete copy of the ordinance can be found on the Mason County website: hq2Lwww.co.mason.wa—us/code/commissioners/index.htm Please follow the links to"Title 14,Chapter 14.48 Stormwater Management". Regulated activities shall be conducted only after Mason County Public Works approves a stormwater site plan (Mason County Code Title 14 Chapter 14.48 section 14.48.70).You will receive a copy of the Public Works document entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan".This document will assist you in preparing the necessary information and plans for Public Works to review and approve. Per Department of Public Works this document will constitute an approved plan if all of the relevant details*are to be installed in their entirety AND no part of the stormwater system adversely affects any septic system(see Environmental Health information below). If an alternative system is to be used a plan will need to be submitted to Public Works for approval. A design by a registered professional may be required for more complex sites. *These details are found in the document Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan on the pages that begin with"Handout" PLEASE INITIAL BELOW TO INDICATE THE STORMWATER MANAGEMENT PLAN FOR THIS SITE A) The relevant details from Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan will be installed in their entirety AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. B) X An alternative plan and/or professional design will be submitted to the Department of Public Works for approval AND the system will be located as not to adversely affect any septic systems on this,or any other,parcel. If you have further questions pertaining to parcel drainage and stormwater management Mason County's Public Works Department can provide additional instructions,guidance and examples.(Section 14.48.130)contact Public works at: Phone: (360)-427-9670 EXT.450 100 W PUBLIC WORKS DR SHELTON,WA 98584 If this development has,or will have,a septic/drainfield system you may need to contact Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this,or any other,parcel.You may also wish to consult with the septic design professional involved with the project. Mason County Division of Environmental Health can be reached at: Phone:(360)-427-9670 EXT.352 615 W ALDER ST SHELTON,WA 98584 A condition will be added to the building permit that states,in part,that all conditions the stormwater site plan will be met prior to a request for final inspection of the building permit. Owner/Builder/Agent Acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owner's legal representative,or the contractor.I further acknowledge that the information provided is accurate and employees of Mason County are granted access to the above- described property for review and inspection as may be required. X Lauren Fafnis,Agent for Lennar Owner/Agent/Contractor(circle one)Date: 12111/2023 Page 2 of 2 gooMASON COUNTY COMMUNITY SERVICES Permit No: 17) � (P59S PERMIT ASSISTANCE CENTER: RECEIVED •BUILDING•PLANNING•PUBLIC HEALTH•FIRE MARSHAL 615 W.Alder Street,Shelton,WA 9B5B4 Phone Shelton:360)2 5-4 670 ext.352•Fax:(360)42-52 98 Phone MAY 1 3 2024 00 Belfair(360)275-0467•Phone Elma:(360)482-5269 BUILDING PERMIT APPLICATION 615 W Airier S-- C PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: Lennar Northwest,LLC NAME: Lennar Northwest,LLC MAILING ADDRESS: 33455 6th ave S,Unit I-B MAILING ADDRESS: 33455 6th ave S,Unit 1-13 CITy: Federal Way STATE: WA ZIP: 98003 CITY:Federal Way STATE: WA ZIP: 98003 PHONE#1: (253)308-0265 PHONE: CELL: (253)308-0265 PHONE#2: EMAIL: LaurenTafais64I-ennar.com EMAIL:LaurenTafivsAl-ennar.com L&I REG#LENNANL783JO EXP. 03/18/24 PRIMARY CONTACT: OWNER❑ CONTRACTOR❑ OTHER NAME Lauren Fafnis,Agent for Lennar EMAIL Lauren.Fafnis@Lennar.com MAILING ADDRESS 33455 6th ave S,Unit 1-B CITY Fe erg STATE WA ZIP-28003 PHONE_253 08-0265 CELL PARCEL INFORMATION: r PARCEL NUMBER(12 Digit Number) 12328-51-00096 ZONING Q LEGAL DESCRIPTION(Abbreviated) Olympic Ridge FIRE DISTRICT Q SITE ADDRESS 51 NE Olympic Ridge CITY DIRECTIONS TO SITE ADDRESS 1 !� IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NO E SNOW LOAD:25_00psf IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Checkall rhar apply): SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ TYPE OF WORK: NEW® ADDITION❑ ALTERATION❑ REPAIR❑ OTHER tR USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc.) IS USE: PRIMARY J. SEASONAL❑ NUMBER OF BEDROOMS 5 NUMBER OF BATHROOMS 3 HEATED STRUCTURE? YES(noleBldg)❑ YES(Parr(slofBldg)R NO❑ DESCRIBE WORK New Single Family Residence heated and garage unheated (;6- _ SQUARE FOOTAGE: (proposed) (� 1 ST FLOOR 1137 sq.ft 2ND FLOOR_I485_sq.ft 3RD FLOOR sq.ft. BASEMENT sq.ft. J DECK sq.ft COVERED DECK sq.ft. STORAGE sq.ft OTHER sq.ft. (� GARAGE 594 sq.ft. Attached R Detached❑ CARPORT sq.ft Anached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED' MAKE MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER ENVIRONMENTAL HEALTH: SEWAGE/SEWER SOURCE: SEPTIC❑ SEWER® / NEW R EXISTING❑ PLUMBING IN STRUCTURE? YES® NO❑ Ifyes,attach completed Water Adequacy Form PERIMETER/FOUNDATION DRAINS PROPOSED? YES® NO❑ EXISTING SQ.FT.-2631 EXISTING BEDROOMS PROPOSED BEDROOMS _ TOTAL BEDROOMS 5 OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.1 have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null&void K work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) X Z-ae d.Q.lL ft�t 12/11/2023 Signature of OWNER(Must be signed by the OWNER) Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT Jrz- -7—k5 PLANNING DEPARTMENT FIRE MARSHAL PUBLIC HEALTH MASON COUNTY COMMUNITY SERVICES Permit No: PERMIT ASSISTANCE CENTER.- *BUILDING •PLANNING •FIRE MARSHAL 615 W. Alder St-Shelton, WA 98584 RECEIVED www.co.mason.wa.us Phone t. • Phone Be/fair:((60)2)75-4467o e Phone Elma: (360)482-52698 MAY 13 2024 PLUMBING & MECHANICAL PERMIT APPLICAT6®lIJW. Alder Sheet OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: Lennar Northwest,LLC NAME: Lennar Northwest,LLC MAILING ADDRESS: 33455 6th Ave S,Unit 1-13 MAILING ADDRESS: 33455 6th Ave S,Unit 1-B CITY:Federal Way STATE: WA ZIP: 98003 CITY: Federal Way STATE: WA ZIP: 98003 V PHONE: (253144-1322 PHONE: (253)308-0265 2nd PHONE: EMAIL :Lauren.Fafnis@Lennar.com EMAIL:Lauren.Fafnis@Letmar.com L&I REG# LENNANL783JO EXP. 03 /18 /24 PARCEL INFORMATION: PARCEL NUMBER(12 Digit Number): 12328-51-00096 Zoning: LEGAL DESCRIPTION(Abbreviated): Olympic Ridge SITE ADDRESS:51 NE Olympic Ridge CITY: DIRECTIONS TO SITE ADDRESS: TYPE OF JOB: NEW X ADD ALT REPAIR OTHER USE OF BUILDING New Single Family LOCATION OF FIXTURES/UNITS— IST FLOOR X 2ND FLOOR x BASEMENT GARAGE OTHER PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Type of Fixture No.of Fixtures Fees Fuel Type:Electric LPG Natural Gas Ductless_ Toilets 2 Type of Unit No.of Units Fees Bathroom Sink 2 Furnace Bath Tubs 2 Heat Pump Showers Z Spot Vent Fan 3 Water Heater 1 Propane Tank Clothes Washer 1 Gas Outlets Kitchen Sinks 1 Wood/Gas/Pellet Stove 1 Fireplace/stove Dishwasher 1 Kitchen Exhaust Hood 1 Hose bibs 1 Dryer Vent 1 Other Solar Panel Other Ductless heat pump 1 Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER acknowledge submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative,or contractor.I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OFTHIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. x 1_aZui��� 12/11/2023 Signature of ner Date DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL Rev: 1/27/2016 1 BN