Loading...
HomeMy WebLinkAboutFIR2008-00062 Final AFA - FIR Permit / Conditions - 10/20/2008 PMASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352 Shelton, WA 98584 FIRE PROTECTION PERMIT FIR2008-00062 APPLICANT: NICHOLSON INVESTMENT PROP RECEIVED: 7/30/2008 CONTRACTOR: CHECKPOINT SYSTEMS 800-457-6298 LICENSE: CHECKSIOOOLH EXP ISSUED: 9/23/2008 SITE ADDRESS: 23960 NE STATE ROUTE 3 BELFAIR EXPIRES: 3/23/2009 PARCEL NUMBER: 123294190190 LEGAL DESCRIPTION: TR 19 OF NE SE LOT: C OF SP#1059 PROJECT DESCRIPTION: Rite Aide Project GENERAL INFORMATION System Information Type of Use: COMM Fire District: 2 Sprinkler Heads: Audible Switches: Pull Stations: Hood& Duct t: N Flow Switches: Visual Devices: Door Releases: Pressure Switches:: Smoke Detectors: Duct Detectors: Dry Chemical?: N 10 Wet Chemical?: N Zones: Heat Detectors: Sprinkler?: N Standpipe?: N SQUARE FOOTAGE FEES Monitoring Company: Checkpoint Security Sys First Floor: Type Amount Due Amount Paid Monitoring Phone No.:(800)451-6298 Second Floor: Auto Fire Alarm?:Y Third Floor;: Auto. Fire Alarm Plan $172.41 $172.41 Auto. Fire Alarm Permit $265.25 $265.25 Total: $437.66 $437.66 FIR2008-00062 Please refer to the following pages for conditions of this permit. 1 of 4 CASE NOTES FIR2008-00062 CONDITIONS FOR FIR2008-00062 1.) Before requesting final approval of the installation the installing contractor shall furnish a written statement to the fire code offical, the subject fire protection system has been installed in accordance with the approved plans and has been tested in accordance with the manufactures specifications and the appropriate installation standards. An deviations from the design standards shall be noted and copies of the approvals for such deviation shall be Y 9 P PP attached tp the written statement. X 92 The syst 'i required to be designed and installed per NFPA 72. This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner orthe agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and stru 1tulrle for review and inspection. o� OWN ER OR AGENT: DATE: ` O� FIR2008-00062 Please refer to the following pages for conditions of this permit. 2 of 4