HomeMy WebLinkAboutResidential Subdivision Hearing - BLD Letters / Memos - 3/26/1996 March 26, 1996
To: Mason County Board of Commissioners
From: Mason County . Planning Staff
Subject: Rick Krueger proposed Subdivision comprised of 24 '
residential lots and two undeveloped tracts
STAFF REPORT
I . INTRODUCTION. This report evaluates a proposal to create a
residential subdivision in Belfair, Washington.
II . APPLICANT. Rick Krueger.
III. PROPERTY LOCATION. The proposal area is located in Belfair
approximately 1.5 miles north of the intersection of Highway
3 and Highway 106 . At mile marker 26 on Highway 3 the
proposal area is located directly east approximately 500
feet. Legal Description: A portion of the NE 1/4 of the NE
1/4 of Section 32, Township 23 North, Range 1 West, W.M.
IV. AREA DESCRIPTION. The proposal site is located in the
southern portion of the community of Belfair. The site is
surrounded by small commercial developments and some
residences . The parcel to the east of the site is in
classified forestry. The parcel directly south of the
proposal site has recently been logged and will likely be
converted to another use. The proposal site is located in
an area that has been identified in recent drafts of the
unfinished Mason County Comprehensive Plan as a growth area.
V. PROJECT DESCRIPTION. Proposal is to subdivide 40 acres
into 24 residential lots, 2 undeveloped tracts, and open
space.
Lots - The average lot size is approximately
g pp oximately 3/4 acre
(approx. 32 , 000 sq. ft. ) , with lots ranging from .39 acre
(approx. 17, 000 sq. ft. ) to 1.24 acres (approx. 54, 000
sq. ft. ) .
Roads - From Highway 3 to just beyond the proposed plat
boundary the Main Road will be constructed to Primary
Collector Standards .
Within the Boundaries of the proposed subdivision the Main
Road will be constructed at a minimum to Secondary Collector
standards .
Each of the spur roads in the proposed subdivision - the
North Spur Road, the South Spur Road, and the Top Spur Road
- will be constructed to Local Access standards .
The applicant and the Mason County Department of Public
Works have reached an agreement that the main road serving
this proposed subdivision will be dedicated to the public
and accepted into the County's road system. The County has
agreed to share in the construction of this road in
accordance with the conditions that are attached to this
report (ATTACHMENT A)
Stormwater Facilities - The applicant has prepared a
stormwater drainage plan that has been reviewed by the Mason
County Public Works Department. Public Works has reviewed
the construction details for the stormwater facilities and
finds them acceptable with the provision that the conditions
titled "Embankment Notes" that are listed on sheet C3-2 of
the construction drawings submitted by the applicant
(conditions attached - ATTACHMENT C) are adhered to. In
addition, the Public Works has requested further conditions
for review of stormwater facilities both during and
following construction (also attached - ATTACHMENT B) . The
Department of Community Development recommends that these
conditions be made conditions of preliminary plat approval .
Septic - The soils in the proposal area have been reviewed
by the Mason County Environmental Health Department for
suitability to accept septic treatment systems . 26 soil
logs were inspected and the area was found to be acceptable
for enhanced septic treatment:
• Lots 1-14 were found to need shallow (8" deep) pressure
distribution systems.
• Lot 15 may require a sand filtration system.
• Lot 16 will require a shallow pressure distribution
system.
• Lot 17 may require a mounded system.
• Lots 18-24 were found to have steep enough contours to
require attention to control of surface drainage, with
siting of drainfields to be in "most protected area of
the lots. "
Fire Marshall - The proposal has been reviewed by the Mason
County Fire Marshall . Road standards (greater than 20'
width and grade less that 140) and fire flow requirements of
the Fire Marshall (1000 GPM for 1 hour) have been agreed to
by the applicant.
Water Supply - The applicant proposes to supply water to the
subdivision by hooking into the Belfair Water District. The
Belfair Water District has supplied a letter stating that
they can provide water for the proposed lots .
Open Space - The applicant .currently proposes 2 open space
areas for use by the residents. Tracts C & D will be open
to all residents on an equal basis. Tract D will offer
limited recreation opportunities on either side of a 25'
setback from the drainage ravine.
VI . ENVIRONMENTAL CHARACTERISTICS - The chief environmental
characteristics of the site are the presence of steep
slopes, a drainage ravine with year-round flow that bisects
the site and carries runoff due west to Highway 3, and the
presence of a water supply system in the ravine, just west
of the proposal site:
Steep Slopes - The project area contains several slopes that
are in excess of 150. The presence of steep slopes presents
difficulties with respect to road construction and any
future plans to construct residences . The ravine that
bisects the proposal area is particularly steep and requires
special consideration.
The applicant retained the services of a geotechnical
consultant to evaluate whether the site could be
characterized as a Landslide Hazard Area under the Mason
County Interim Resource Ordinance. The consultant has
determined that while the site contains steep slopes, soil
stability is such that it does not present a landslide
hazard. However, the consultant proposes grading and
construction standards for the site as well as the
recommended conditions for future devlopment. These
recommended conditions are attached to this report as
conditions for approval of the proposal (ATTACHMENT D) .
The recommended grading specifications from the geotechnical
consultant' s report will be included in the Homeowners
Association Covenants as minimum construction standards to
be followed by individual purchasers of the proposed lots or
by the applicant if he chooses to construct residences on
the lots himself.
Ravine - The ravine that bisects the proposal site is very
steep and is unsuited for building. The geotechnical
consultant states that a 50' foot building setback should be
required from the top of the ravine. The applicant has
agreed to comply with this condition.
Water system - There is a water system located west of the
proposal site in the ravine that bisects the parcel . The
water system is supplied by a year round flow from the
springs in the area. The water system is owned by the
Belfair Water Company. The water system is used for
irrigation of farmland, water for livestock, and domestic
use on occasion.
VII. PERMITS . The following permits either have been obtained or
will be required for the applicant to proceed with the
proposal :
SEPA - SEPA review has been completed on the proposal and a
Mitigated Determination of Nonsignificance [MDNS] has been
issued. Many of the conditions that were attached to the
MDNS specifically address issues and concerns that have been
outlined in previous sections of this report. A copy of the
SEPA conditions is attached to this report for your review
(ATTACHMENT E) .
In addition to the regular SEPA review process the applicant
the applicant held a special meeting at the Theler Center in
Belfair to discuss the proposal with concerned residents .
The meeting was published in the newspaper and approximately
10 citizens were in attendance. No significant objections
to the proposal were raised at this meeting.
The applicant also included a statement in a notice to
adjacent property owners that development of this site would
result in a new set of existing conditions for future
environmental review under SEPA that could result in later
proposals being required to undergo more extensive review,
owing in part to the increased development density that will
result from completion of this project.
Grading Permit - The applicant will be required to obtain a
grading permit to complete the road and stormwater
facilities construction for the site.
VIII.OPERATION & MAINTENANCE AND HOMEOWNERS' ASSOCIATION. The
applicant has prepared Operation & Maintenance [O&M]
Agreements for the site to address the necessity of
maintaining all private roads and stormwater facilities on
the site.
A Homeowners' Association document has been prepared by the
applicant and will be recorded following preliminary
approval of subdivision. The Homeowners' Association will
be responsible for implementing the O&M agreements and for
maintaining all Open Spaces in the subdivision.
IX. PLANNING COMMISSION APPROVAL. The Mason County Planning
Commission considered this proposal at a Public Hearing on
February 26, 1996 and recommended preliminary approval with
the following three conditions:
1. That the applicant comply with all the mitigation
conditions that were agreed to between the applicant
and Mason County as part of State Environmental Policy
Act [SEPA] review.
2 . That the following statement appears on the face of the
final plat :
"This notification is to inform property owners
that the property described herein is adjacent to
or within 300 feet of land managed for commercial
forestry. Residents of this property may be
subject to inconvenience or discomfort associated
with the uses, including, but not limited to,
occasional dust, noise, and odor from commercial
thinning, clear cutting, slash burning, blowdowns,
and/or chemical applications . "
X. SUMMARY AND RECOMMENDATIONS .
The applicant has worked with the various departments within
Mason County to craft a proposal that meets all County
standards . The Department of Community Development
recommends preliminary approval with all the conditions that
have been detailed herein.
ATTACHMENT A
CONDITIONS FOR SHARED DEVELOPMENT OF HOOD CANAL HEIGHTS MAIN ROAD
BETWEEN MASON COUNTY DEPARTMENT OF PUBLIC WORKS AND RICK KRUEGER:
1 . Rick Krueger will be responsible for the drainage and
subgrade preparation of all roads from the state highway
throughout the subdivision, These will be constructed to
the Standard Specifications . The County will be responsible
for inspection of the subgrade. Any deficiencies that are
identifies during this subgrade preparation will be
corrected by Rick Krueger.
2 . Rick Krueger will be responsible for the final surface
materials of all cul-de-sacs within his subdivision.
3 . Mason County will chip seal the main road from the state
highway through Krueger' s subdivision no later than the
construction season - 1997.
4 . All Washington Department of Transportation conditions, as
specified in their letter dated March 6, 1996 (attached) ,
must be met before final approval of the proposed
subdivision. These conditions include that the Mr. Krueger
provide approximately 20 feet of right-of-way for needed
drainage improvements and that Mr. Krueger be responsible
for paving the access approximately 75 feet from the
centerline of State Route 3 .
5 . At the time of final inspection and acceptance by the County
of all work, including that done by Mr. Krueger, the County
will accept dedication of the through roadway from Krueger
and Cady at no cost to the County.
Washington State Olympic Region Headquarters
Department of Transportation 5720 Capitol Boulevard,Tumwater
Sid Morrison P.O.Box 47440
Secretary of Transportation Olympia,WA 98504-7440
(360)357-26W
Fax(360)357-2601
March 6, 1996
Jerry W Hauth PE
Director of Public Works
Mason County
P O Box 1850
Shelton, WA 98584
SR 3, MP 26.35 Rt, Vicinity
Canal Heights Drive
E C File# 94451-M
Dear Mr. Hauth:
We have reviewed the subject proposal as amended and have the following comments.
A 24 lot subdivision with Single Family homes would have approximately 240 trips per day,
with the peak hour considered to be 24 trips. As such, a right-turn pocket going into the
development would not be required. We would request that the proponent construct a Type
D Access Connection per Department standards for Type SU vehicles.
The Department normally requires accesses to be paved up to the Right-of-Way line. The
purpose of this requirement is to prevent gravel surfacing from encroaching onto the
highway. In this case, the Right-of-Way line.is only 30 feet from the centerline of SR 3.
There is also an apparent need for drainage stuctures outside of the Department's existing
Right-of-Way. Therefore, we request that the proponent donate approximately 20 feet of
Right-of-Way, needed to include these drainage improvements. We also request the access
be paved approximately 75 feet from the centerline of SR 3, due to the slope of the proposed.
roadway.
Thank you for the opportunity to review this proposal. If there are any questions regarding
our comments, please contact John Heinley at (360) 357-2709.
Sincerely,
DALE C. SEVERSON, P.E.
Development Services Engineer
DCS :jch
cc: Rick Krueger/P O Box 548 /Belfair, WA 98528
Olympic Engineering/3472 NW Byron St. /Suite 202/Silverdale, WA 98383
ATTACHMENT B
STORMWATER FACILITIES CONTSTRUCTION CONDITIONS
1 . Prior to final approval, the engineer will be required
to submit one complete set of as-built plans for the
completed stormwater facilities.
2 . Prior to final project approval, the person or persons
holding title to the subject property for which the
stormwater drainage facilities were required shall
provide Mason County Public Works with a recorded copy
of the Operation and Maintenance Covenant which
guarantees the County that the system will be properly
maintained. Mason County will provide the applicant
with a blank copy of the required covenant form.
3 . To ensure quality control of the stormwater facilities
construction, Public works requests that the
geotechnical engineer be required to sign and stamp the
final stormwater facilities designs, and certify that
the detention ponds as shown on the plans complies with
their recommendations and standards of good
engineering/geotechnical practices .
ATTACHMENT C
STORMWATER RUNOFF CONTROL PONDS
EM13ANKMENT NOTES
(From "Storm Pond Details" plan sheet C3-2)
1 . All embankments for storm runoff control ponds shall be
certified by a licensed professional engineer in the State
of Washington duly qualified to provide such certifications .
The certification engineer shall provide a report, stamped
and signed, upon completion of the embankments stating the
work was completed as per the requirements . As an
alternative, the certifying engineer may sign and stamp the
as-built drawings using a statement describing the
satisfactory construction of the embankments .
2 . Prior to embankment construction for storm runoff ponds, the
contractor shall excavate test pits at the pond locations to
a depth of one foot below finished grade. From the test pit
the certification engineer shall determine the quality of
existing materials for constructing embankments .
3 . If materials at the pond site do not meet the requirements
for embankment materials, the contractor shall identify and
uncover other possible sources of embankment materials for
inspection by the engineer.
4 . Sources of embankment materials will be tested for gradation
conformance and maximum density. No embankment construction
shall begin until materials are approved for use by the
certification engineer.
5 . When actual embankment construction commences, the
contractor shall provide an area, along with the necessary
equipment, to establish the compaction sequence for the
work. The certification engineer shall be present during
the procedure, and shall establish the: maximum lift
thickness, moisture content, type of compactor, and number
of passes by the compactor, to achieve the required
compaction. All embankments shall be constructed and
compacted according to the approved compaction sequence.
6 . The contractor shall conform to any additional requirements
of the certification engineer not listed in these notes and
shall provide access to the embankment work as deemed
necessary by the engineer for inspection and additional
testing.
ATTACHMENT D
GRADING AND CONSTRUCTION STANDARDS
(FROM BRADLEY NOBLE GEOTECHNICAL SERVICES REPORT - 2/10/95)
1 . Site grading is to conform to the Recommended Grading
Specifications (attached) .
2 . Setback of structures (50 feet) from the steeper ravine
slopes should be observed.
3 . The areas where logging has removed the surface
vegetation should be replanted to control sheet
washing. Planting used should consist of native,
drought-resistant varieties .
4 . Point discharge of storm water on slopes should be
addressed by the project' s civil engineers.
5 . Only minimal disturbance to the ravine slopes should be
allowed.
6 . Site development and stormwater disposal will need to
address water quality issues of the year around creek
in the ravine. We understand that this water is used
for irrigation purposes by a downslope property owner.
Bradley-Noble Geotechnical Services
A Division of The Bradley Group, Inc.
2401 Bristol Court SW, PO Box 10267, Olympia WA 98502
Phone 206-357-7883 FAX 206-754-4240
RECOMMENDED GRADING SPECIFICATIONS
In areas under structures , paving sections, and
sidewalks, strip all topsoil and organic material.
For structural fill in areas under footings and slabs
on grade, we recommend that all soils be compacted to
a minimum density of 90% of ASTM D-1557 . This
includes proof-rolling native soils exposed in the
bottom of the excavation prior to placement of fill .
Materials under the paving section should also be
compacted to the minimum density by proof-rolling
prior to placement of the paving section. This
includes proof-rolling in-place soils, soils that have
been disturbed during construction, and all structural
fill materials .
For imported structural fill we recommend that a
clean, six-inch minus , well graded gravel or gravelly
sand (classifying as GW or SW as determined by
ANSI/ASTM test method D-2487) be used. On site
material proposed for use to construct structural fill
sections will require the approval by the soils
engineer or engineering geologist prior to placement.
We also recommend that no more than 7% by weight pass
the #200 screen as tested by ANSI/ASTM D-1140 test
procedure. Other material may be substituted with
prior approval for use.
Backfill for walls restraining earth should conform to
WSDOT 9-03 . 12 (3) gravel backfill for wall to ensure
drainage.
All fill should be placed in uniform horizontal lifts
of six to eight inches loose thickness, conditioned to
the optimum moisture content, and compacted to the
specified minimum density before placing the next
lift. It is the contractor's responsibility to ensure
that sufficient density tests or field verification of
the fill has been performed to ensure that the
required minimum density has been uniformly achieved
prior to placement of additional structural fill
material . We further recommend that all utility
trench backfill be compacted as specified above.
Earthwork should be performed under the continuous
supervision and testing of Bradley-Noble Geotechnical
Co. to ensure compliance with the compaction
requirements .
Recommended Grading Specifications
Page 1 of 2
Recommended Grading Specifications
Page 2 of 2
Placement of fill sections on slopes greater than 4 : 1
(horizontal to vertical) will be benched as directed
into native soils . Height and width of the bench will
be determined in the field by the soils engineer or
engineering geologist.
Unrestricted slopes shall not exceed 2 : 1 (horizontal
to vertical) for fill embankments and cuts that expose
native soils without written approval by Bradley-Noble
Geotechnical Co. All fill slopes will be rolled. The
project's civil engineer is responsible for the
protection of the constructed fill slopes from
uncollected runoff. We recommend that all
cut-and-fill slopes be seeded as soon as possible
after construction to allow the establishment of
vegetation to protect the slope from sheet washing.
Placement of fill will be suspended during periods of
unfavorable weather. No fill is to be placed while
the fill is frozen or thawing. When work is stopped
by rain, the placement of fill will not resume until
the soils engineer or engineering geologist determines
that the moisture content is suitable for compactive
effort and that the previously placed fill has not
been loosened. The contractor will take appropriate
measures during unfavorable weather to protect the
fill already in place. Measures that may be required
include the limiting of wheeled traffic and grading to
provide temporary drainage of the fill. At the
direction of the soils engineer or engineering
geologist, the contractor will be responsible for the
removal or reworking of fill that has softened to less
than the required compaction.
ATTACHMENT E
SEPA CONDITIONS
SEP95-0126
RICK KRUEGER - SUBDIVISION PROPOSAL (PLT95-003)
The following mitigation conditions have either been completed
already by the applicant or must be completed before the
subdivision proposal will be recommended for approval . These
conditions have been agreed to by the County and the applicant :
1 . Public Water Supply - The applicant shall provide a community
water system that is connected to the Belfair Water District.
2 . School Mitigation Fees - The applicant shall enter into a
mitigation agreement with the North Mason School District for the
anticipated impacts to the district stemming from this proposal .
Once an agreement has been completed, the applicant will supply a
copy of the agreement to the Planning Department.
3 . Restoration of Stream Area - The proposal site currently has
an area where an old logging road cuts through a Class V stream.
Current plans are to abandon this road. Vegetation on either
side of the stream must be replanted and a 25 foot protective
buffer established.
4 . Stormwater Facilities - Stormwater retention and treatment
facilities must be completed by an engineer licensed in the State
of Washington. Final location and engineering of the proposed
stormwater facilities are subject to the approval- of the Mason
County Department of Public Works.
5 . Fire Flow Requirements - Fire flow requirements shall be met
per Mason County Standards. The minimum fire flow and duration
for one and two-family dwellings is 1000 gpm for 1 hour at 20 psi
residual pressure.
The minimum fire flow and flow duration for buildings other than
one and two-family dwellings shall be 1500 gpm for 2 hours at 20
psi residual pressure.
Large multi-family and commercial buildings may require a fire
flow volume that exceeds the capacity of the system. In that
event, options to reduce the fire flow demand will be applied,
including reduced square footage, up-graded fire resistive
construction, fire alarm systems and sprinkler systems. The
formula for determining fire flow will be found in Mason County
Guidelines for The Determination of Required Fire Flow.
Required fire flow shall be in place and serviceable prior to the
start of any combustible construction.
6. Side Slope Correction on Logging Roads - Construction of
logging roads has created artificially steepened slopes in areas
(See Bradley-Noble report, p.2) . Side slope angles must be
corrected to a level that is acceptable to the Mason County
Department of Public Works as part of its approval of the
engineering for the road.
7. Setbacks from Ravine - Building sites must be a minimum of
50' from the top of the ravine. The final plat must show the
setback line on each side of the ravine.
8 . Effort to Share Access - Because of the congestion that
already exists in the Belfair area, the Department of
Transportation is encouraging the applicant to share an existing
access to Highway 3 if at all possible. The Department of
Transportation is requiring the applicant to provide proof that a
good faith effort has been made to share access with Verlie
Williams, who already has an access connection permit, before the
Department will approve the applicant' s request (See letter from
Dale C. Severson, dated 12/5/94) . Proof of this good faith
effort must also be presented to the Department of Community
Development . In any event, the applicant must obtain an access
connection permit from the Department of Transportation.
9 . Coordination with Mason County Public Works - The applicant
must coordinate development plans with the Mason County
Department of Public Works to ensure that proposed roadways and
stormwater facilities are constructed in accordance with Mason
County subdivision standards .
10 . Homeowners' Association - Before preliminary approval a
Homeowners' Association must be established for the maintenance
of open space, private roads, and stormwater facilities . The
Homeowners' Association must -be recorded by the applicant with
the Mason County Auditor. The auditor' s file number will be
recorded on the final plat.
11. Operation and Maintenance Agreements - Operation and
maintenance agreements must be drafted for the private roads and
stormwater facilities. Samples are available at the Department
of Community Development. The O&M agreements must first be
approved by the Department, then recorded by the applicant with
the Mason County Auditor. The auditor' s file number will be
recorded on the final plat.
12 . Erosion and Sedimentation Control - A temporary erosion and
sedimentation control plan for the construction phase of the
project must be approved by the Mason County Department of Public
Works before any work at the site may proceed.