Loading...
HomeMy WebLinkAboutCertified Test-Adjust-Balance Report for COM2015-00035 - COM Engineering / Geo-Tech Reports - 7/1/2015 ACCURATE BALANCING AGENCY INC AIR AND WATER BALANCING • DUCT LEAKAGE TESTING CERTIFIED TEST • ADJUST • BALANCE REPORT Project: Davita - Belfair Facility Location: 23961 NE State Route 3 - Suite A - Belfair, WA Engineer: MME Engineers HVAC Contractor: Axiom HVAC NEBB# 3177 • CCB# 6475 • ESB# 3866 P❑ BOX 653 • BEAVE:pTON, OR 97075 • (503) 297-6594 • ABA@ABAINC.US • FAx (503) 292-4825 ACCURATE Table of Contents BALANCING AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Page# Table of Contents 1 Certification 2 Terms and Abbreviations 3 Instrument Calibration 4 General Remarks and Summaries 5 Fan Test Reports 6 Air Outlet Test Reports 11 Indexed Floor Plan Accurate Balancing Agency, Inc. Page 1 of 15 ACC U RATE Certification BALANCING AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. Any variances from design quantities, which exceed NEBB tolerances, are noted in the Test-Adjust-Balance Report Project Summary. Significant or noteworthy remarks are noted on the General Remarks or on individual test reports. Noted deficiencies are not the TAB firms responsibility to repair. Prior to issuance of this report, Deficiency Reports are forwarded to our contracted agent. Warranty is limited to one year from date of this report. Within that time, any descrepancies, ambiguities, or omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will be required. Submitted and Certified by NEBB TAB Firm: Accurate Balancing Agency, Inc. Certification: 3177 Expiration Date: March 31, 2017 Certification Date: July 1, 2015 Signed and Sealed by NEBB Supervisor: Edward M. May Jr. �a\ancin q r oil Q A IFICATION sin �a duo Accurate Balancing Agency, Inc. Page 2 of 15 ACCURATE Terms and Abbreviations BALANCING AGENCY INC Project-Location: Davita- Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA AC Air Conditioning Unit AH Air Handler AHU Air Handling Unit AK Area Factor or Flowhood Backpressure Compensation Factor BHP Brake Horsepower BMS Building Management System BTUH British Thermal Units per Hour CEF Ceiling Exhaust Fan CFM Cubic Feet per Minute CRU Computer Room Unit DB Dry Bulb DDC Direct Digital Control EAT Entering Air Temperature EWT Entering Water Temperature EF Exhaust Fan EG Exhaust Grille (Shown as Triangled number on indexed plans) ERU Energy Recovery Unit FPB Fan Powered Box (Terminal Unit which incorporates a fan) FSD Fire/Smoke Damper GPM Gallons per Minute Head Pressure Difference across the entering and leaving side of a pump HRU Heat Recovery Unit HVAC Heating Ventilation and Air Conditioning HZ Hertz Inches(") Inches of water gauge K Correction factor to the free area needed to calculate CFM LAT Leaving Air Temperature LWT Leaving Water Temperature N/A Not Applicable N/L Not Listed OBD Opposed Blade Damper OAD Outside Air Damper OD Outside Diameter OSA Outside Air Damper PSI Pounds per Square Inch RA Return Air RG Return Grille (Shown as a Circled number on indexed plans) RPM Revolutions Per Minute RTU Roof Top Unit SA Supply Air SG Supply Grille (Shown as a Standard number on indexed plans) SFA Service Factor Amperage TAB Test; Adjust; and Balance VAV Variable Air Volume (Terminal Unit which regulates airflow) VEL Velocity WB Web Bulb Accurate Balancing Agency, Inc. Page 3 of 15 ACCURATE Instrument Calibration Report BALANCING AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Instrument Manufacturer Model # Serial # Calibrated Cal. Due Type Tachometer UEI DPI S L420477 10/9/2014 10/9/2015 Rotation Thermometer UEI PDT550 N/A 10/9/2014 10/9/2015 Immersion Thermometer UEI PDT550 N/A 10/9/2014 10/9/2015 Air Temp Electrical UEI DL389 140306812 10/9/2014 10/9/2015 Multimeter Manometer Shortridge ADM-860 M91491 5/7/2015 5/7/2016 Air Pressure Hygro-Thermometer Extech RH490 10052806 10/6/2014 10/6/2015 Humidity Anemometer UEI DAFM3 9705374 10/9/2014 10/9/2015 Air Velocity Flowhood Shortridge ADM-860 M91491 5/7/2015 5/7/2016 Air Volume Thermometer UEI ATT47 probe 140306812 10/9/2014 10/9/2015 Contact Hydrometer Alnor/TSI HM680 70552168 4/13/2015 4/13/2016 Differential Pressure Accurate Balancing Agency, Inc. Page 4 of 15 �CCALAAMU RATE General Remarks and Summary NCINGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA 1) RTU-4 had no provision for outside air introduction. 2) EF-1 is a single speed direct drive fan and is reported as tested. Accurate Balancing Agency, Inc. Page 5 of 15 ACCURATE Air Handling Unit Test Report BALANCING /4 G E N CY I N C (Packaged/ Direct Drive) Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Technician: TT Test Date: Jun 2015 Submittal Data Unit Designation RTU-1 Service Training/Supply/Waiting Manufacturer Lennox Model Number LGH048H4ES4Y Serial Number 5615C10021 Test Data Item Design Actual Total Supply Airflow (CFM Design / Outlet) 1590/ 1590 1460 External Static Pressure (Inches water gauge) Not Listed 0.46" Total Return Airflow (CFM) 1440 1275 Minimum Outside Air (CFM) 150 156 @ 18%OAD Motor Horsepower 3/4 Motor Manufacturer Genteq Motor Frame Not Listed Motor Service Factor 1.0 Full Load Amperage(Ti /T2/T3) 6.1 3.5 Voltage(T1-T2 /Ti-T3 /T2-T3) 208-1-60 211-1-60 Operating Hz. 60 60 Speed Setting High Fan (RPM) N/A N/A Static Pressure Profile Component In(Suction SP) Out(Discharge SP) Differential Pressure Fan -0.47" 0.15" 0.62" Coil / Filter -0.31" -0.47" 0.16" Remarks: No Remarks were noted. Accurate Balancing Agency, Inc. Page 6 of 15 ACCURATE Air Handling Unit Test Report BALANCING (Packaged/Direct Drive) AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Technician: TT Test Date: Jun 2015 Submittal Data Unit Designation RTU-2 Service Water Treatment/Team Area Manufacturer Lennox Model Number LGH048H4ES4Y Serial Number 5615C10020 Test Data Item Design Actual Total Supply Airflow (CFM Design / Outlet) 1600/ 1625 1525 External Static Pressure (Inches water gauge) Not Listed 0.61" Total Return Airflow (CFM) 1475 1340 Minimum Outside Air (CFM) 150 144 @ 12%OAD Motor Horsepower 3/4 Motor Manufacturer Genteq Motor Frame Not Listed Motor Service Factor 1.0 Full Load Amperage(T1 /T2 / T3) 6.1 3.5 Voltage (T1-T2 /Ti-T3 /T2-T3) 208-1-60 212-1-60 Operating Hz. 60 60 Speed Setting High Fan (RPM) N/A N/A Static Pressure Profile Component In (Suction SP) Out(Discharge SP) Differential Pressure Fan -0.60" 0.18" 0.78" Coil / Filter -0.4 3" -0.60" 0.17" Remarks: No Remarks were noted. Accurate Balancing Agency, Inc. Page 7 of 15 ACCURATE Air Handling Unit Test Report BALANCING (Packaged/Direct Drive) . AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Technician: TT Test Date: Jun 2015 Submittal Data Unit Designation RTU-3 Service Procedure Rooms Manufacturer Lennox Model Number LGH036H4ES4Y Serial Number 5615C09740 Test Data Item Design Actual Total Supply Airflow (CFM Design / Outlet) 1200/ 1200 1150 External Static Pressure (Inches water gauge) Not Listed 0.42" Total Return Airflow (CFM) 1100 1029 Minimum Outside Air (CFM) 100 104 @ 10%OAD Motor Horsepower 1/2 Motor Manufacturer Genteq Motor Frame Not Listed Motor Service Factor 1.0 Full Load Amperage(Ti /T2 /T3) 4.3 3.0 Voltage(T1-T2 /Ti-T3 /T2-T3) 208-1-60 211-1-60 Operating Hz. 60 60 Speed Setting High Fan (RPM) N/A N/A Static Pressure Profile Component In (Suction SP) Out(Discharge SP) Differential Pressure Fan -0.38" 0.13" 0.51" Coil / Filter -0.29" -0.38" 0.09" Remarks: No Remarks were noted. Accurate Balancing Agency, Inc. Page 8 of 15 ACCURATE Air Handling Unit Test Report BALANCING . AGENCY I N C (Packaged/Direct Drive) Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Technician: TT Test Date: Jun 2015 Submittal Data Unit Designation RTU-4 Service Future/Wheelchair Manufacturer Lennox Model Number KGB03054DWIP Serial Number 5615DO2630 Test Data Item Design Actual Total Supply Airflow (CFM Design / Outlet) 1000/ 1000 940 External Static Pressure (Inches water gauge) Not Listed 0.28" Total Return Airflow (CFM) 900 960 Minimum Outside Air (CFM) 100 See Note Motor Horsepower 1/4 Motor Manufacturer Genteq Motor Frame Not Listed Motor Service Factor 1.0 Full Load Amperage (Ti /T2 / T3) 1.8 1.2 Voltage(T1-T2 /T1-T3 /T2-T3) 208-1-60 211-1-60 Operating Hz. 60 60 Speed Setting Tap 3 Fan (RPM) VA N/A Static Pressure Profile Component In (Suction SP) Out(Discharge SP) Differential Pressure Fan -0.19" 0.15" 0.34" Coil / Filter -0.13" -0.19" 0.06" Remarks: No Remarks were noted. Accurate Balancing Agency, Inc. Page 9 of 15 �AAGENOY CCURATE Fan Test Report LANCING (Direct Drive < 1/6HP) WC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Technician: TT Test Date: Jun 2015 Submittal Data Unit Designation EF-1 Service Toilet Manufacturer Nutone Model Number ATREN080 Test Data Item Design Actual Total Airflow (CFM Design / Outlet) 80/80 90 Submittal Data Unit Designation EF-2 Service Private Manufacturer Cook Model Number 100ACEH Test Data Item Design Actual Total Airflow (CFM Design / Outlet) 175, 17� 170 Submittal Data Unit Designation EF-3 Service Toilets/Janitor Manufacturer Cook Model Number 100ACEH Test Data Item Design Actual Total Airflow (CFM Design / Outlet) 225/225 220 Remarks: EF-1 is a single speed direct drive fan and is reported as tested. Accurate Balancing Agency, Inc. Page 10 of 15 D zIV 2� m > CD M CD CD fl, (A S' o CD � c C7 o 5 CI. c f D 7 O D WY ao d `� va -4 '* ao va ., cro , C O n b r L7 n CD �+' CD a 3 A rt m D C �. rt OJ O to o •'• ' nZD G. �c 00 J Cn W N :2 Z GI 00 o, N oc oc oe oc oc oc oc oo � �• n w O O O O O C C O O O O O O O O O O C O C N L N c '� '✓' � `fl p �' v�i N O W � O � Cn � cn c� � N W to Z1 '. O O v, O O O c.n cn C O O O O O O c.n O 3 O C N v0i 00 O O cwi, O O c�iicNii 3 �• o (.A o °A v w oo o 00 :h N W 00 00N i. A •-+ W �p '� J� J ~ W W T V1 �. �A O `^ O ^ n vA O C ' cn vi O t" O O c" O Oto cn 3 rt rt CD o � OC 00 00 00 � I � "0 � O w �1 00 w IC N O O O O O W W O tJ Q�l O v, w r ? o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c o 0 0 Ul ACCURATE Air Outlet Test Report BALANCING . AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair,WA Technician: TT Test Date: Jun 2015 System / Unit Design Preliminary Final Test Area Served # Size Type AK VEL CFM VEL CFM VEL CFM 0/6 RTU-2 Supply Water Treatment 1 10"R SG 1.00 325 325 250 250 300 300 92% Water Treatment 2 10"R SG 1.00 325 325 250 250 290 290 89% Supply 3 10"R SG 1.00 275 275 210 210 260 260 95% Team Toilet 4 6"R SG 1.00 50 50 75 75 50 50 100% Corridor 5 8"R SG 1.00 150 150 160 160 150 150 100% Janitor 6 6"R SG 1.00 75 75 150 150 70 70 93% Biomed 7 8"R SG 1.00 150 150 150 150 140 140 93% Team Lounge 8 12"R SG 1.00 275 275 310 310 265 265 96% Totals 1625 1555 1525 94% RTU-2 Return Supply 1 16"R RG 1.00 940 940 210 210 845 845 90% Biomed 2 8"R RG 1.00 155 155 260 260 140 140 90% Team Lounge 3 12"R RG 1.00 280 280 425 425 255 255 91% Corridor 4 10"R RG 1.00 100 100 225 225 100 100 100% Totals 1475 1120 1340 91% RTU-2 1 32x14 Inlet 3.06 49 150 47 144 47 144 96°b Outside Air Totals 150 144 144 96% Remarks: No remarks were noted. Accurate Balancing Agency, Inc. Page 12 of 15 ACCURATE Air Outlet Test Report BALANCING AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Technician: TT Test Date: Jun 2015 System / Unit Design Preliminary Final Test Area Served ## Size Type AK VEL CFM VEL CFM VEL CFM 0/6 RTU-3 Supply Private 1 8"R SG 1.00 120 120 110 110 120 120 100% Room 2 2 8"R SG 1.00 200 200 190 190 195 195 98% Room 3 3 8"R SG 1.00 200 200 190 190 185 185 93% Room 4 4 8"R SG 1.00 200 200 225 225 190 190 95% Room 5 5 8"R SG 1.00 240 240 160 160 225 225 94% Patient Prep 6 8"R SG 1.00 240 240 1 205 1 205 235 235 980% Totals 1200 1080 1150 96'Y, RTU-3 I 16"R RG 1.05 1048 1100 860 903 980 1029 94% Return Totals 1100 903 1029 94% RTU-3 1 32x14 Inlet 3.06 33 100 34 104 34 104 1040 Outside Air Totals 100 104 104 1041%, Remarks: No remarks were noted. Accurate Balancing Agency, Inc. Page 13 of 15 ACCURATE Air Outlet Test Report BALANCING AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Technician: TT Test Date: Jun 2015 System / Unit Design Preliminary Final Test Area Served ## Size Type AK VEL CFM VEL CFM VEL CFM RTUA Supply Lab Prep 1 8"R RG 1.00 120 120 125 125 110 110 92% Patient Toilet 2 8"R RG 1.00 50 50 70 70 50 50 100% Future 3 8"R RG 1.00 200 200 150 150 185 185 93% Future 4 8"R RG 1.00 190 190 130 130 175 175 92% Future 5 8"R RG 1.00 190 190 140 140 180 180 95% Wheelchair 6 8"R RG 1.00 125 125 150 150 120 120 96% Med Prep 7 8"R RG 1.00 125 125 150 150 120 120 96% Totals 1000 915 940 94% RTU4 1 16"R RG 1.00 900 900 960 960 960 960 1070 b Return Totals 900 960 960 107% RTU-4 Outside Air See Note Remarks: RTU4 had no provision for outside air introduction. Accurate Balancing Agency, Inc. Page 14 of 15 ACCURATE Air Outlet Test Report BALANCING . AGENCY INC Project-Location: Davita-Belfair Facility-23961 NE State Route 3 -Suite A-Belfair, WA Technician: TT Test Date: Jun 2015 System / Unit Design Preliminary rN Final Test Area Served ## Size Type AK VEL CFM VEL CFM VEL i CFM L -1 1 CEF EG 1.00 80 80 90 90 90 90 113% Toilet Totals 80 90 90 113% EF-2 1 CEF EG 1.00 175 175 170 170 170 170 97% Private Totals 175 170 170 971%, EF-3 Patient Toilet 1 8"R EG 1.00 75 75 75 75 75 75 100% Patient Toilet 2 8"R EG 1.00 75 75 75 75 75 1 75 100% Janitor 3 8"R EG 1.00 75 75 70 70 70 70 93% Totals 225 220 220 98% Remarks: EF-1 is a single speed direct drive fan and is reported as tested. Accurate Balancing Agency, Inc. Page 15 of 15 MARCH 13.2015 F PIUCNG&PERMU 4 HVAC GENERAL NOTES--�� 75E LAU 11, —a 6 0 EPA .7 all 14 70� 2�5R CFM ��FM Sys a veal veer la otrr W�m 4 "T M K 80 4. u mi-I I 47 I-VAT 12-0$A >< ,• - 6 J ( sr�wl�AAsoa a�na b�. �'" ,s nm"axw, shim w�oirial 7. 1r.cal—An W L T-STAl �?M 21 1 3 1 I 1 1 I � I it I `�" AI.dlxlal IAlaolri N u. Ji YN FM DRAWING RT�5 �6V KEY NOTES THIS r4 (D g/o= 2 1 -1 I QD 30 CFM 3 -A TA 7 fRo er P, '3"oRm id W m 75 'F M 310 p 3-.jij� u! F� MN3 r —T. FIVAC FLOOR PLAN WACFLOO— m 1 4D EXISTING RTU D e BACK O / 2QEXISTING GUTTER AND DOWNSPOUTS TO REMAIN. PRICING&PERMIT Q PROVIDE NEW HVAC UNIT AND CURBS.SEE MECHANICAL / Q NEW EXHAUST FAN•SEE MECHANICAL OS NEW CONDENSING UNIT-SEE MECHANICAL ©EXISTING ROOF HATCH TO REMAIN 07 PROVIDE CRICKETS AS REQUIRED AT NEW MECHANICAL UNITS,TYP. RTU-2 / MDL: LGH048H4C34Y SN: 5615C10024, e ��__mil RT11-e NOTES TO SHEET 4 w i 0/��,1 EF-3o�i��122SCFM ii w!, , wNnrvuousseAUNT EF-2 ��175 CFM`'o' Hall b�Janitor Closet COUNTERFLASHING SPCURED WI \ T EPDM MEMBRANE SHALL GAS D FASTENERS •O.C. At Water Treatment Room AC" / MECHANICAL UNIT PrrNUe°c"n°fiDREDCURB PR A EXTEND OVER CURB WALL PRHMANUFACNRED a INSULATED METAL CONTINUOUS SEALANT n CURB Z 61MEPl�G BEYOND SEALANT OVER Zpp QUICK9EAM SEAM TAPE GGGa f- TU-3 r___�_—rv-1 / / FASITNEASI2.O.0 6� EPDM MEMBRANE NN I ��-1 RIGID INSULATION V a °x^ WIDL: LGHOMMEUY i Rxr ii r'y'—}-ESN: 561SCIO021 RTU 1 y } , DECK FL e MDL: LGH048H4ES4Y fTl P.T.WOODBLO(xING MMW SHALL EXTEND BEYOND W SN: 5615C10020 FLANG INALLDNECITON9 C/ DETAIL-MECHANICAL UNIT CURB No scuE 3 �H P } MDL RTU-4KG803084DW1 P / NOTE:SEE MECHANICAL SHEETS FOR RTU (W I / SIZE'S AND WEIGHTS. SN: 5615002630 a NOTE:STRUCTURAL CALCULATIONS FOR RTU'S = SLOPE ROOF TO BE DONE WITH DEFERRED SUBMITTAL. 1/4" j FT., TYP, c� EF- Nut utone QTR EN080 Front Patient Bathroom // Rojal Niwba Id01I.0 smnna SLOPE RWF PUN FRONT ROOF PLAN — A3.0 scALE:w•-ry I x OKEY NOTES: 1Gr EDUUSL ur ro ROV YOIMTED ElONST FNl pNNAsr FAN s+AI1 l`�� rc IDLAU ON ROOF A MINI M IC-OF C"FROY I1L Q119�NI _ Np0 *TAKE OPENINGS. /•r E)SW UP TO ROOF 11"M ELIMIST FNL ELUUST FAR WW1 BE LOCATED ON ROOF A WRM 11-T OENO FROM ALL OUTSIDE AA INTAKE OPENINGS c' \ y 1 I'r MALST PENETRATION ROOF MN STOW CAP.ROOF SD t� \ PENETRATION SHALL SELOCATED A MINIMUM 1O-O`DIM FROM ALL R MEAT —c �,� ION 1MI 27S WIWI AN INTAKE OPENINGS. t • ID .. 1. FLUE/CONBUSTON NR RPMG 10V RATER NEATER WW1 BE ROUTED LP TNUUOI RDOF AND DISCHARGE NA CONCENTRIC VENT T. ROOF ` �.. r• FENE1RAiICN SHALL BE A MN WII 10'-0`CLEAR FROM ALL OUTSIDE AA ®Y r L�HI� INTAKE OKNR sS F� ,�q' °�\fir -f /Jl�` !"IFR DOR y. CONDENSATE AC-1 SHALL BE WED UP M10 CF]LNc SPAR AND 7�o� pUNttNN DR PER FA P LNS 6. S CONDENSATE D(NM CONGEALED M WALL AND p501ARE LOIN AT JAMiCK 1 CU-i AC-1 �SC SW MN AIR CAP. T_ __ I I^ ) iN1 7. IrO SIAPLY AND Ir RETUIO UP TO RN-I. PROVIDE SAIIIFAD TEE FITTING IM FINDING VANES ON ETD OF SPRY DUCT DROP WIN FROM I EF-3 75 LINE 1RN9TION DUCrKRK ro WT OPENING AS REOINIED. I I I 1°Y SUPPLY AND IEr REPRl1 LP TO RTU-2. PROVIDE BUUEAD TEE l j `_. _. FITTING Itm TUMD VANES OR pD OF STPPIr DUCT DROP WHIT FROM EF-2 r- 5A WT. TRANSITION DUCTWORK TO MT ORD"AS REOAND. / - REF -.EC SO ■ /. IIPr APPLY AND WO KAM W TO RTU-1 TRANSITION OIDTWMK TO LINT OPM AS RE3m. SC 150 10. fro WILY AVID IrO RETURN UP TO RTU-1. PROVIDE N U EAD TEE FITTING MN TINNING NO ON DID OF SUPPLY OUCT DROP DON FROM 1': 1 Nw 135 WT. TAAN9NM DIIMORK ro UNIT OPENING AS REWIRED. LAB PREP �! 5A 11. ROOF TOP WT SIUIL RE/WAILED N DISRKG ROOF CURB. PROVIDE®I � ..I \_.SD IS NEW ROOF M ADAFT TQ AS NECESSARY ro FAKwTATE INSTALLATION OF SC TOP ' I 20 0 — ___-1 _ T_ DEMOLITION NOTES: AT! „Rn-11 IV, I a CONTRACTOR SINLL AEYOSf EtaSPNG(2)R06 TOP WIS NIN Jr I t J T- ASSOCIATED OL'CTYRIIL pELES.NERYOSTA7$CONTROL NIR1N'GAS L PPNa ECG RDDf m DECTRN.LL DRAY S FOR IOMR DENUTION RE"DENTS EDSINO ROOF DABS SIIAIL ROM 27 !. PER MECHANICAL AL D IOMT CONY ROOF TOP TAR EL EOSIFY O CLAIM D MELIIAAM OVINE. CONTRACTOR SHALL FIELD VERIFY LOSING NEW W 1. DIENSIOM AID PROVIDE OURB AD/RIFA As REGALED ro NLOW FOR NEW Rro-A 31 WT NSTALLAIICI i � r——— --— 1 120 L� ref—l JZ_J. SA ® ——— - 10 is 1lART\ ■ Iw IRO 5p SC SEOIFIICf OF OPERATOR FOR MOTORIZED 150 UAAPFR YRNNG Po TRAINING ROOT 105 uPON IIPVT FROM TNER SNITCH ON WAIL,DAM SHALL L DID OR L 1'A aCOPLM. ITW SIN N POS M FIND( )SIW1 CLOSE ONE(OFF)SHALL OPEN DWER omm SIS crym 13 SIOLL PROVIDE 00"mm TRAMSOMR r.,, ,Sp■ AID ALL U/OR AID WIDENS NECESSARY TO ACCOMM THE ADM SEOIENCE 41 T J �LJ�IJRE ——IL ! �EOO �0 RN-0 `J 'Ip /00 /�09 - �i•STAr I . 5 ;SCALE In _ RIc PATIENT p G H.C. TLT.T SO 12 I ] 1111-1 MECHANICAL FLOOR PLE r 0' e w