Loading...
HomeMy WebLinkAboutCOM2006-00128 Final Plumbing Starbucks - COM Permit / Conditions - 11/9/2006 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)t27-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext.352 Shelton, WA 98584 COMMERCIAL BUILDING PERMIT COM2006-00128 OWNER: QFC/STARBUCKS RECEIVED: 10/23/200E CONTRACTOR: WILLIAMS MECHANICAL 425-303-0828 LICENSE: WILLIM1088PA EXP: 9/30/2007 ISSUED: 10/27/200E SITE ADDRESS: 201 NE STATE ROUTE 300 BELFAIR EXPIRES: 4/27/2007 PARCEL NUMBER: 123294290001 LEGAL DESCRIPTION: TR 10 OF NW SE - LOT: B EX OF SP#591 LOT: 1 OF SP#2938 PROJECT DESCRIPTION: DIRECTIONS TO SITE: PLUMBING FOR STARBUCKS ESPRESSO NE ST RT 300 HWY AT NE CLIFTON LANE, BELFAIR General Information Construction &Occupancy Information No. of Units: Type of Constr.: Type of Use: Insp.Area: No. of Bathrooms: Occ. Group: Type of Work: MEC Fire Dist.: 2 No. of Stories: Occ. Load: Valuation: Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline& Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft, Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp.Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2006-00128 Please refer to the following pages for conditions of this permit. 1 of 4 Plumbing Fixtures Mechanical Fixtures FEES � ype Qty. Type Qty. Type By Date Amount Receipt Kitchen Sink 1 Plumbing Fee ni r` lniq�ivno U9 nn g99nnrnn Lavatories 1 Plumbing Base Fee ni r. 1ni?,ii9nn 09n nn e?gnnrnn Water Heaters 1 EH Plan Review MAH 1ni?Fi?nn nn g99nnrnn Backflow Devices 1 F Total $s7.00 Floor Sink 2 CASE NOTES FOR COM2006-00128 CONDITIONS FOR COM2006-00128 1) This permit is approved for plumbing preparation only and is subject to review and approval of kiosk permit number COM2006-00125. Additional requirements may be added as a result of the kiosk permit approval. X 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647- The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X . 3) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour w e iarged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X 4) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF R OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 5) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned w. whi h may affect your project. X 6) Changes to approvV d building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation and Indoor Air Quality Pocle (V Q), Building/Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X COM2006-00128 / 2 of 4 7) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason unty Building Inspector shall be made prior to requesting additional inspections. X 8.) All buildin, iermits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-co liant with Mason County ordinances and building regulations. X r This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspectio . OWNER OR AGENT: _ DATE: O C� COM2006-00128 3 of 4 0 N CONCRETE MECHANICAL MANUFACTURED HOME , A rn Footings!Setbacks Date By Ribbons Cl) CD Piping I o Interior Date By Interior-Date By Date By > w Exterior Date By Exterior-Date B -gyp W Point Load!Isolated Footings INSULATION Rate By 0Date By BG BLAB INSULATION Data By FIRE DEPARTMENT N Foundation Walls Floors Date By Date By Data By DECKS FRAMING walls Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Type: Date /_ L -�v By / _ Date By D.W.V DRYWALL Type: n Int.Brace Wall Date O Date By Date B By ic y FINAL INSPECTION c Water Line Fire Sape ration O Date By Data By Data By T O Pass or Request Inspect. o Type of Insp. Fail Date Date Done By Comments co 0