Resource Lands & Critical Area Site Evaluation
August 14, 2002
HARRY EVANS
22226 S.R. 3
BELFAIR WA 98528
Case No.: RLC2002-00064
Parcel No.: 123294100160
Proiect Description To determine resource-related issues relevant to building a
new espresso stand and storage building.
Dear Applicant:
As part of this department's review of your permit application, a Resource Lands and
Critical Areas (RLC) site inspection was performed on your property. Below you will find
comments made regarding the proposed development and its critical values.
This information is based on County and State regulations as they exist to date. These
regulations may change and may affect the requirements for development of the subject
property.
Please contact me at (360) 427-9670, ext. 577 if you have questions.
Si pcerely,
t.
Riok Mraz
Land Us
Mason County Planning Department
8/14/2002 1 of 3 RLC2002-00064
Resource Lands & Critical Area Site Evaluation
8/14/2002 Case No.: RLC2002-00064
Comments: A field inspection of the suject property was conducted pursuant
to a request for a pre-inspection to determine resource-related
issues pertinent to the reconstruction of an espresso stand and
the construction of a new storage building.
The parcel contains frontage on Belfair Creek, a Type III stream
per Washington Department of Natural Resources stream typing
criteria. Research subsequent to the site inspection has
determined Belfair Creek is a fish-bearing stream. The Mason
County Resource requires buffers and setbacks from streams; the
size of the buffer depends on the stream type. Type III streams
require a 150' undisturbed vegetative buffer + a 15' building
setback. Legal pre-existing structures and activities are
grandfathered. Based upon field approximation it appears that the
entire area proposed for redevelopment is within the stream
buffer. Most construction activities within the buffer require a
variance from the Resource Ordinance. A Habitat Management
Plan (HMP), prepared by a qualified biologist, would be required
to support the variance request. The HMP addresses impacts to
the buffer and offers measures to preserve and protect the buffer
or mitigate impacts. A copy of the Fish and Wildlife Habitat
Conservation Areas chapter is enclosed. It includes details on
the contents of an HMP. It also contains information about the
variance procedure.
The also contains a riparian wetland associated with the creek.
Most of the wetland area was located in the northern portion of
the parcel but no authoritative delineation or typing was
conducted during the site inspection. Wetlands are also
regulated by the Resource Ordinance and have buffers that are
based upon the category of wetland.
The Resource Ordinance allows for the remodel, repair, or
change of use of an existing building within its existing footprint,
plus or minus 10%, and provided the expansion does not increase
any intrusion into the aquatic management area or stream buffer.
This type of expansion does not require a variance.
Removal of any native vegetation from the buffer also requires a
variance and HMP. Removal of exotic vegetation, such as the
Himalayn Blackberry, is allowed provided no disturbance to native
plants occurs.
To expedite development review, please include measured
setbacks on any site plans presented to accompany building
8/14/2002 2 of 3 RLC2002-00064
Resource Lands & Critical Area Site Evaluation
8/14/2002 Case No.: RLC2002-00064
permit applications. If you have questions or require clarification
on these issues, please contact me.
I
8/14/2002 3 of 3 RLC2002-00064
7/28/2008
Case Activity Listing 11:12:43AM
Case#: RLC2002-00064
i�
Assigned hone
Activity Description Date 1 Date 2 Date 3 Hold Disp To By updated l pdated By
RLCA250 RLC Letter-Field Review 8/14/2002 None 8/14/2002 RAM
A field inspection of the suject property was conducted pursuant to a request for a pre-inspection to determine resource-related issues pertinent to the reconstruction of an espresso stand and the construction
of anew storage building.
The parcel contains frontage on Belfair Creek,a Type III stream per Washington Department of Natural Resources stream typing criteria. Research subsequent to the site inspection has determined Belfair
Creek is a fish-bearing stream. The Mason County Resource requires buffers and setbacks from streams;the size of the buffer depends on the stream type. Type III streams require a 150'undisturbed
vegetative buffer+a 15'building setback. Legal pre-existing structures and activities are grandfathered.Based upon field approximation it appears that the entire area proposed for redevelopment is within
the stream buffer. Most construction activities within the buffer require a variance from the Resource Ordinance. A Habitat Management Plan(HMP),prepared by a qualified biologist,would be required to
support the variance request. The HMP addresses impacts to the buffer and offers measures to preserve and protect the buffer or mitigate impacts. A copy of the Fish and Wildlife Habitat Conservation
Areas chapter is enclosed. It includes details on the contents of an HMP. It also contains information about the variance procedure.
The also contains a riparian wetland associated with the creek. Most of the wetland area was located in the northern portion of the parcel but no authoritative delineation or typing was conducted during the
site inspection. Wetlands are also regulated by the Resource Ordinance and have buffers that are based upon the category of wetland.
The Resource Ordinance allows for the remodel,repair,or change of use of an existing building within its existing footprint,plus or minus 10%,and provided the expansion does not increase any intrusion
into the aquatic management area or stream buffer. This type of expansion does not require a variance.
Removal of any native vegetation from the buffer also requires a variance and HMP. Removal of exotic vegetation, such as the Himalayn Blackberry,is allowed provided no disturbance to native plants
occurs.
To expedite development review,please include measured setbacks on any site plans presented to accompany building permit applications. If you have questions or require clarification on these issues,
please contact me.
RLCA600 Site Inspection 7/26/2002 8/9/2002 None DONE RAM RAM 8/14/2002 RAM
See RLC letter.
Page 1 of 2 CaseActivity-rpt
Case Activity Listing �7/28/2008
11:12:43AM
Case#: RLC2O02-00064
P14
Assigned Done
Activity Description Date I Date 2 Date 3 hold Disp To By Updated Updated By
RLCA250 RLC Letter-Field Review 7/26/2002 8/14/2002 None DONE RAM RAM 8/14/2002 RAM
A field inspection of the suject property was conducted pursuant to a request for a pre-inspection to determine resource-related issues pertinent to the reconstruction of an espresso stand and the construction
of a new storage building.
The parcel contains frontage on Belfair Creek,a Type III stream per Washington Department of Natural Resources stream typing criteria. Research subsequent to the site inspection has determined Belfair
Creek is a fish-bearing stream. The Mason County Resource requires buffers and setbacks from streams;the size of the buffer depends on the stream type. Type III streams require a 150'undisturbed
vegetative buffer+a 15'building setback. Legal pre-existing structures and activities are grandfathered.Based upon field approximation it appears that the entire area proposed for redevelopment is within
the stream buffer. Most construction activities within the buffer require a variance from the Resource Ordinance. A Habitat Management Plan(HMP),prepared by a qualified biologist,would be required to
support the variance request. The HMP addresses impacts to the buffer and offers measures to preserve and protect the buffer or mitigate impacts. A copy of the Fish and Wildlife Habitat Conservation
Areas chapter is enclosed. It includes details on the contents of an HMP. It also contains information about the variance procedure.
The also contains a riparian wetland associated with the creek. Most of the wetland area was located in the northern portion of the parcel but no authoritative delineation or typing was conducted during the
site inspection. Wetlands are also regulated by the Resource Ordinance and have buffers that are based upon the category of wetland.
The Resource Ordinance allows for the remodel,repair,or change of use of an existing building within its existing footprint,plus or minus 10%,and provided the expansion d oes not increase any intrusion
into the aquatic management area or stream buffer. This type of expansion does not require a variance.
Removal of any native vegetation from the buffer also requires a variance and HMP. Removal of exotic vegetation, such as the Himalayn Blackberry,is allowed provided no disturbance to native plants
occurs.
To expedite development review,please include measured setbacks on any site plans presented to accompany building permit applications. If you have questions or require clarification on these issues,
please contact me.
RLCA010 Application Received 7/26/2002 8/14/2002 None DONE RAM RAM 8/14/2002 RAM