Dear Mr. Borden:
Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the construction of a
single-story, 5,832 square foot commercial office building to house possibly four businesses and will include 54 to 56
parking spaces, an on-site sewage system and bioswale and detention pond stormwater treatment(File No. SEP97-
0015), located at Northeast 71 Clifton Lane in Belfair as proposed by Ivan Davies. We reviewed the environmental
checklist and have the following comments:
Water Quality:
The office building should be required to hook up to sewer when it becomes available.
After completion of this project, stormwater runoff will likely contain increased levels of grease, oils, sediment, and
other debris. Appropriate source controls,such as good housekeeping, should be used to prevent these substances
from entering stormwater. Treatment devices should also be used to further reduce polluted runoff.
On-site septic tank and drainfield systems are designed to treat and dispose of domestic wastewater or its equivalent
only. Commercial and industrial operations discharging wastes other than domestic wastewater to on-site systems
may result in ground water contamination and could cause the facility owner or operator to incur severe liabilities.
Water Resources:
The proponent is responsible for inspecting the site to determine the location of all existing wells. Any unused wells
must be properly abandoned and abandonment reports submitted to Ecology as described in WAC 173-160-415.
This includes resource protection wells and any dewatering wells installed during the construction phase of the
project.
If you have any questions regarding the Water Quality comments,please call Ms. Jeannette Barreca at(360)
407-6556. With questions regarding the Water Resources comments,please call Ms. Vicki Cline at(360)407-0278.
Sin ely,
Charles Gale
Assistant to the Regional Director
(360)407-6309
CG:alw(97-0291)
cc: Abbe White, SWRO/Jeannette Barreca, SWRO/Vicki Cline, SWRO
•oft
SEP97-0015
MASON COUNTY ��
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning-Landfill-Utilities
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350) W
1�3 • G}
Description of Proposal : t�d%
CONSTRUCTION OF SINGLE-STORY COMMERCIAL OFFICE BUILDING: POSSIBLY FOUR
BUSINESSES, 5832 SQ. FT. FLOOR AREA, 54 TO 56 PARKING SPACES, ON-SITE
SEWAGE SYSTEM, AND BIOSWALE AND DETENTION POND STORMWATER TREATMENT; SITED
TO MEET "VILLAGE CONCEPT" WITH SIDEWALK AND LANDSCAPINQ OAD. N THE
TOWUPT
Proponent : IVAN DAVIES PARDE-11
��� �
Location of Proposal : NE 71 CLIFTON LN BELFAIR
PARCEL#:123294190030
TR 3 OF NE SE NOW TR C OF SP #139 NE 51 CLIFTON LN
IN BELFAIR ON NORTHEAST CORNER OF OLD BELFAIR HWY AND CLIFTON LANE.
Lead Agency: MASON COUNTY
The Lead Agency for this proposal has determined .that it does not have a
probable significant adverse impact on the environment. An Environmental
Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This
decision was made after review of a completed Environmental Checklist and
other information on file with the Lead Agency. This information is
available to the public upon request. MITIGATION MEASURES ARE
ATTACHED. I ��"
Please contact A haw ��Y at ext. 36-<' with any
questions .
This DNS is issued under 197-11-350 (2) , the Lead Agency will not act on
this proposal for 15 days from the date below. Comments must be
submitted by 01/30/97 .
DATE: 01/15/97
Signature esponsible official Date
Responsible Official : Gary Yando
Director of Community Development
426 W. Cedar,
PO BOX 578
Shelton, WA 98584
(360) 427-9670
MIS NS, r 3/96
5KuK6u_tSk Trio M&DPVV CTG��ja)
Conditions of this Case are listed below:
Case No.:SEP97-0015
1 ) 1 ) The applicant shall receive road access permit approval for
commercial use from Mason County Public Works for ingress and
egress from the property.
X
2) The applicant shall implement the temporary and permanent
stormwater management measures detailed in the stormwater site
plan, that is approved by Mason County Public Works.
X
BELFAIR
URBAN GROWTH AREA
Ow 7 -t� L
� 3
44 �t 0 -
��9- ,
� N �
a
T23N T23N
T22N T 22 N
00
G
33
N � L
MASON COUNTY COMPREHENSWE PLAN
APRIL, 1998
LEGEND:
co cOMMSSIONERS1
II MM n ■...r.y�wr,wwr �. �� URBAN GROWTH BOUNDARY
'• •-•• j
.. . • ,
� � r
- } TO--
(NOT USED FOR THIS PROJECT) 12'
To NATURAL DRMN -LANDSCAPE SCREENING I
I
.•
tIOSVALE ?00 FT.;N LE TH 5 3.75 FT. BOTTOM VI TH SEE DE7,t1L.
JAC
DETENTI69 POND >x ._.''+ . .�
FIELD
111 2320 CU.F7. z
A
eApo
a 'A 'rt nRESERVE 1 —
r t
�nap•
42 41 40 39 38 37 36I 3@ .34 33 32 .T32 30 24 28 8 26 25 24 h
DUMPSTER.
S r: kI I
LOADING RECYCLE I
3 44 45 46 47 IC g5roRY 1N f
P�ST�2
I
"jQ
EMPLOYEE ORY SfIQU� U 55 �
PARKING
54 53 52 51 50 49. '48 + £'
o-
0
i
41,
jp
4190 4190
030 F41902I0
229SP39
10005
401 . 4 •
0012O
41O0o6o
so4 a -
r g 0 •
21 ,+
6 i
4 00 ?0
E
im 30 Q r 64 .
oo •
200 •
41 01
Al
l -
Q ..
' SP /
S / 7
C► 1 1 c
001
fMz q
i
4190 4190030
O1 229 4190,,
SP /39
a
10005
401 . 4 �
40120
4100060
304 . 3�.
t: 6 of
21
t � n
4 00 70
t^y 20m 10 A.
to 64
00 .
`1* 200 •
.,, 41 O i 0
'a
A0 SP
o-A3 q
S / s7 1
0 41 1