Loading...
HomeMy WebLinkAboutSEP97-0015 - SEP Determinations - 1/30/1997 STATg O yq� O 1989� STATE OF WASHINGTON DEPARTMENT OF ECOLOGY RACE/ V P.O. Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300 A/gsOH Co � ? 1997 January 30, 1997 .p�NN/pG A&P7 Mr. Allan Borden Mason County Department of Community Development PO Box 578 Shelton,WA 98584 Dear Mr. Borden: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the construction of a single-story, 5,832 square foot commercial office building to house possibly four businesses and will include 54 to 56 parking spaces, an on-site sewage system and bioswale and detention pond stormwater treatment(File No. SEP97- 0015), located at Northeast 71 Clifton Lane in Belfair as proposed by Ivan Davies. We reviewed the environmental checklist and have the following comments: Water Quality: The office building should be required to hook up to sewer when it becomes available. After completion of this project, stormwater runoff will likely contain increased levels of grease, oils, sediment, and other debris. Appropriate source controls,such as good housekeeping, should be used to prevent these substances from entering stormwater. Treatment devices should also be used to further reduce polluted runoff. On-site septic tank and drainfield systems are designed to treat and dispose of domestic wastewater or its equivalent only. Commercial and industrial operations discharging wastes other than domestic wastewater to on-site systems may result in ground water contamination and could cause the facility owner or operator to incur severe liabilities. Water Resources: The proponent is responsible for inspecting the site to determine the location of all existing wells. Any unused wells must be properly abandoned and abandonment reports submitted to Ecology as described in WAC 173-160-415. This includes resource protection wells and any dewatering wells installed during the construction phase of the project. If you have any questions regarding the Water Quality comments,please call Ms. Jeannette Barreca at(360) 407-6556. With questions regarding the Water Resources comments,please call Ms. Vicki Cline at(360)407-0278. Sin ely, Charles Gale Assistant to the Regional Director (360)407-6309 CG:alw(97-0291) cc: Abbe White, SWRO/Jeannette Barreca, SWRO/Vicki Cline, SWRO •oft SEP97-0015 MASON COUNTY �� DEPARTMENT OF COMMUNITY DEVELOPMENT Planning-Landfill-Utilities MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) W 1�3 • G} Description of Proposal : t�d% CONSTRUCTION OF SINGLE-STORY COMMERCIAL OFFICE BUILDING: POSSIBLY FOUR BUSINESSES, 5832 SQ. FT. FLOOR AREA, 54 TO 56 PARKING SPACES, ON-SITE SEWAGE SYSTEM, AND BIOSWALE AND DETENTION POND STORMWATER TREATMENT; SITED TO MEET "VILLAGE CONCEPT" WITH SIDEWALK AND LANDSCAPINQ OAD. N THE TOWUPT Proponent : IVAN DAVIES PARDE-11 ��� � Location of Proposal : NE 71 CLIFTON LN BELFAIR PARCEL#:123294190030 TR 3 OF NE SE NOW TR C OF SP #139 NE 51 CLIFTON LN IN BELFAIR ON NORTHEAST CORNER OF OLD BELFAIR HWY AND CLIFTON LANE. Lead Agency: MASON COUNTY The Lead Agency for this proposal has determined .that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATION MEASURES ARE ATTACHED. I ��" Please contact A haw ��Y at ext. 36-<' with any questions . This DNS is issued under 197-11-350 (2) , the Lead Agency will not act on this proposal for 15 days from the date below. Comments must be submitted by 01/30/97 . DATE: 01/15/97 Signature esponsible official Date Responsible Official : Gary Yando Director of Community Development 426 W. Cedar, PO BOX 578 Shelton, WA 98584 (360) 427-9670 MIS NS, r 3/96 5KuK6u_tSk Trio M&DPVV CTG��ja) Conditions of this Case are listed below: Case No.:SEP97-0015 1 ) 1 ) The applicant shall receive road access permit approval for commercial use from Mason County Public Works for ingress and egress from the property. X 2) The applicant shall implement the temporary and permanent stormwater management measures detailed in the stormwater site plan, that is approved by Mason County Public Works. X BELFAIR URBAN GROWTH AREA Ow 7 -t� L � 3 44 �t 0 - ��9- , � N � a T23N T23N T22N T 22 N 00 G 33 N � L MASON COUNTY COMPREHENSWE PLAN APRIL, 1998 LEGEND: co cOMMSSIONERS1 II MM n ■...r.y�wr,wwr �. �� URBAN GROWTH BOUNDARY '• •-•• j .. . • , � � r - } TO-- (NOT USED FOR THIS PROJECT) 12' To NATURAL DRMN -LANDSCAPE SCREENING I I .• tIOSVALE ?00 FT.;N LE TH 5 3.75 FT. BOTTOM VI TH SEE DE7,t1L. JAC DETENTI69 POND >x ._.''+ . .� FIELD 111 2320 CU.F7. z A eApo a 'A 'rt nRESERVE 1 — r t �nap• 42 41 40 39 38 37 36I 3@ .34 33 32 .T32 30 24 28 8 26 25 24 h DUMPSTER. S r: kI I LOADING RECYCLE I 3 44 45 46 47 IC g5roRY 1N f P�ST�2 I "jQ EMPLOYEE ORY SfIQU� U 55 � PARKING 54 53 52 51 50 49. '48 + £' o- 0 i 41, jp 4190 4190 030 F41902I0 229SP39 10005 401 . 4 • 0012O 41O0o6o so4 a - r g 0 • 21 ,+ 6 i 4 00 ?0 E im 30 Q r 64 . oo • 200 • 41 01 Al l - Q .. ' SP / S / 7 C► 1 1 c 001 fMz q i 4190 4190030 O1 229 4190,, SP /39 a 10005 401 . 4 � 40120 4100060 304 . 3�. t: 6 of 21 t � n 4 00 70 t^y 20m 10 A. to 64 00 . `1* 200 • .,, 41 O i 0 'a A0 SP o-A3 q S / s7 1 0 41 1