HomeMy WebLinkAboutCOM2001-00084 Cancelled Gas Tanks - COM Permit / Conditions - 3/17/2002 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line (360)427-7262
4 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670, ext. 352
Shelton, WA 98584
COMMERCIAL BUILDING PERMIT
OWNER: SAFEWAY STORES, I COM2001-00084
CONTRACTOR: SAFEWAY STORES, INC. RECEIVED: 08/01/200
SITE ADDRESS: 141 NE CLIFTON LN BELFAIR ISSUED: 09/11/200
PARCEL NUMBER: 32941$89Z_ 900;t3 EXPIRES: 03/11/200
LEGAL DESCRIPTION: TR 2- F-NE TR B OF SP #423#351008 PCL 2 OF BLA#98-58#671493
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
GAS TANKS
NORTH OF STATE RT 3 PE MIT
NULL & M 7 EXPIRATION
SATE By --
General Information Construction & Occupancy Information
rTypeof
se: COM Insp, Area: No. of Units: Type of Constr.,
rk: MEC Fire Dist.: No. of Bathrooms: Occ. Group:
n: No. of Stories: Occ. Load:
Building Height:
Pre-Manufactured Unit Information
Square Footage Information
Make: Length:
odel: Lot Size:
Year: Width: Building:
Serial No.: Basement:
Parking Spaces:
Setback Information
Front: Shoreline & Planning Information
Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. ffWaterBodSide 1: FtY Shoreline Desig.:
Side 2: Ft PA?: Comp. Plan Desig.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?:
Auto Fire Sprinkler System?: Standpipe?:
Fixed Fire Suppression System?: Access Road?: Fire Extinguishers?:
+ Fire Hydrants?: Fire Lanes?:
COM2001-00084 Please refer to the folio,. wing pages for conditions of this permit.
1 of 3
Plumbing Fixtures Mechanical Fixtures FEES
t Ype Qty. Type Qty. Type By Date Amoun Receipt
Address Fee GMM 08/02/200 $15 00 57367
Planning Review Fee SAL 08/20/200 $38 00 57367
Plan Check Fee DLC 08/30/200 $84 00 57271
Total $137.00
CASE NOTES FOR
COM2001-00084
CONDITIONS FOR
COM2001-00084
1) This application is subject tq,Buffer and Landscaping requirements as established under Mason County
Ordinance 1.03.036.X rt/�
2) Proposed structure or any portion thereof greater than 30" in height from grade line, must maintain a minimum
of 5' setback from all property lines, easements and 10' from all County and State Road right of ways.
X M6-4—
3) Provisions for surface/subsurface drainage control must be implemented with new construction or development
on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or
prior approval will be granted to use an existing utility and drainage easement dedicated for that specific
purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS
PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road,
Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction
which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that
- ;office to review f turanned work which may affect your project.
X //►►11
4) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10
gallons is not allowed without the approval of the Mason County Fire Marshal.
5) )Water u lity is not to be degraded to the detriment of the aquatic environment as a result of this project.
6) Approved per dimensions and setbacks on submitted site plan. Xlr-�-
7) Applicant acknowledges that this development is subject to policies and regulations of Mason County
Comprehensive Plan and Development Regulations.X
8) Subject to conditions of Aquifer Notification letter. X
'COM2001-00084 2 of 3
9) All Best Management Practices shall be employed during construction and during the continuing maintenance
,and operation of the proposed gasoline service station. X��
10) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS AND
OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF
USE OR OCCUPANCY WOULD RESULT,)N PERMIT REVOCATION. CHANGE OF USE MUST BE
APPROVED PRIOR TO CHANGE. x /V/&-(-
11) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE.x dj&-L_
12) Changes to approved building plans that affect compliance to the current non-residential Energy Code (NREC),
ventilation and Indoor Air Quality Code (VIAQ) Uniform Building/PI mbing/Mechanical Codes and/or Mason
County Regulations shall be approved prior to construction. X /V(11_4 ,
13) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are
not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$42.00 per hour
(minimum 1 hour) will be charged and must be collected by this department prior to any further inspections
being performed or approval granted. X
14) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR
ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE
STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES
THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE,
BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL
BE ASSESSED IF OWNE,R/C NTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECTIONS. X /V( t (�
This permit becomes null and void if worts or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period
of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection
must be approved before building can be occupied.
OWNER OR AGENT: �`� ��"
_ DATE:
COM2001-00084 3 of 3
I CONCRETE MECHANICAL MOBILE HOME
Foo*W-Setback date Ribbons
date by Gas pl*Q date by
Fax4abon Walls date by Set UP
date by INSULATION date
by
BGISL.AB fr►sulation Floors Final
date by date by date
by
FRAMING FIRE DEPT.
date by Walls date by
date OTHER
PLUMBING Attic
Groundwork date by
date b WALLBOARD NAILING
D.W.V. date by
date by
FINAL Line NAL INSPECTION
date by date by date by
V
�Y