Loading...
HomeMy WebLinkAboutCOM2001-00084 Cancelled Gas Tanks - COM Permit / Conditions - 3/17/2002 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line (360)427-7262 4 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670, ext. 352 Shelton, WA 98584 COMMERCIAL BUILDING PERMIT OWNER: SAFEWAY STORES, I COM2001-00084 CONTRACTOR: SAFEWAY STORES, INC. RECEIVED: 08/01/200 SITE ADDRESS: 141 NE CLIFTON LN BELFAIR ISSUED: 09/11/200 PARCEL NUMBER: 32941$89Z_ 900;t3 EXPIRES: 03/11/200 LEGAL DESCRIPTION: TR 2- F-NE TR B OF SP #423#351008 PCL 2 OF BLA#98-58#671493 PROJECT DESCRIPTION: DIRECTIONS TO SITE: GAS TANKS NORTH OF STATE RT 3 PE MIT NULL & M 7 EXPIRATION SATE By -- General Information Construction & Occupancy Information rTypeof se: COM Insp, Area: No. of Units: Type of Constr., rk: MEC Fire Dist.: No. of Bathrooms: Occ. Group: n: No. of Stories: Occ. Load: Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: odel: Lot Size: Year: Width: Building: Serial No.: Basement: Parking Spaces: Setback Information Front: Shoreline & Planning Information Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. ffWaterBodSide 1: FtY Shoreline Desig.: Side 2: Ft PA?: Comp. Plan Desig. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Auto Fire Sprinkler System?: Standpipe?: Fixed Fire Suppression System?: Access Road?: Fire Extinguishers?: + Fire Hydrants?: Fire Lanes?: COM2001-00084 Please refer to the folio,. wing pages for conditions of this permit. 1 of 3 Plumbing Fixtures Mechanical Fixtures FEES t Ype Qty. Type Qty. Type By Date Amoun Receipt Address Fee GMM 08/02/200 $15 00 57367 Planning Review Fee SAL 08/20/200 $38 00 57367 Plan Check Fee DLC 08/30/200 $84 00 57271 Total $137.00 CASE NOTES FOR COM2001-00084 CONDITIONS FOR COM2001-00084 1) This application is subject tq,Buffer and Landscaping requirements as established under Mason County Ordinance 1.03.036.X rt/� 2) Proposed structure or any portion thereof greater than 30" in height from grade line, must maintain a minimum of 5' setback from all property lines, easements and 10' from all County and State Road right of ways. X M6-4— 3) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that - ;office to review f turanned work which may affect your project. X //►►11 4) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. 5) )Water u lity is not to be degraded to the detriment of the aquatic environment as a result of this project. 6) Approved per dimensions and setbacks on submitted site plan. Xlr-�- 7) Applicant acknowledges that this development is subject to policies and regulations of Mason County Comprehensive Plan and Development Regulations.X 8) Subject to conditions of Aquifer Notification letter. X 'COM2001-00084 2 of 3 9) All Best Management Practices shall be employed during construction and during the continuing maintenance ,and operation of the proposed gasoline service station. X�� 10) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT,)N PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x /V/&-(- 11) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE.x dj&-L_ 12) Changes to approved building plans that affect compliance to the current non-residential Energy Code (NREC), ventilation and Indoor Air Quality Code (VIAQ) Uniform Building/PI mbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X /V(11_4 , 13) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$42.00 per hour (minimum 1 hour) will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X 14) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNE,R/C NTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X /V( t (� This permit becomes null and void if worts or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. OWNER OR AGENT: �`� ��" _ DATE: COM2001-00084 3 of 3 I CONCRETE MECHANICAL MOBILE HOME Foo*W-Setback date Ribbons date by Gas pl*Q date by Fax4abon Walls date by Set UP date by INSULATION date by BGISL.AB fr►sulation Floors Final date by date by date by FRAMING FIRE DEPT. date by Walls date by date OTHER PLUMBING Attic Groundwork date by date b WALLBOARD NAILING D.W.V. date by date by FINAL Line NAL INSPECTION date by date by date by V �Y