TECHNICAL INFORMATION REPORT
FOR
Safeway Store No. 1571
Fuel Facility Addition
S.R.3 and Clifton Lane
Belfair,WA
for
Safeway Stores,Inc.
by
Bush,Roed&Hitchings,Inc.
2009 Minor Avenue East
Seattle,WA 98102
BRH Job No.2000289.01
March 16,2001
Revised
June 13,2001
Q`+�D G. G
�, 20703�0 '01
s`SIONALE�� f'o /3•�/
EXPIRES 12/1/oj 1
•
TABLE OF CONTENTS
I. Project Narrative
II. Core Requirements
III. Special Requirements
IV. Holding Tank Required Operations
I. PROJECT NARRATIVE
This proposal is for the construction of a fuel facility(gas station)on an existing pad within the
existing Belfair Valley Plaza/Safeway development. Sewage disposal and site storm drainage
detention and water quality was provided for the overall development in off-site facilities and have
been sized and constructed to accommodate development of this pad. (See plans and
specifications prepared by West Sound Engineering for Belfair Valley Plaza,prepared November,
1998). The proposed development will involve the construction of a kiosk structure,canopy
covered pump islands,underground fuel storage tanks,new asphalt paving and landscape
plantings. The pad is plumbed with all necessary utilities and will involve the following utility
connections;
SANITARY SEWER:A sewer stub and grease interceptor connection is plumbed for the
anticipated construction of this facility. The kiosk sewage effluent disposal will be connected to
the existing sewer stub but the facility will not utilize the existing grease interceptor connection as
no food preparation is being proposed.
DOMESTIC WATER:A water meter is present for the proposed building but will be relocated
to facilitate the proposed layout.A water service will extend to the kiosk and from the kiosk to an
air/water unit for customer use. An approved backflow preventor will be installed inside of the
kiosk.
STORM DRAINAGE:This proposal will involve the construction of approximately 19,964
square feet of impervious surfacing(paving and structures). Site storm runoff will be conveyed to
a series of existing catch basins,which ultimately connect to the above mentioned storm detention
and water quality facility. Those areas subject to potential fuel spills will be segregated and
disposed of in accordance with Washington State Department of Ecology(DOE)Best
Management Practices and are further explained in the following Core Requirements section.
II. CORE REQUIREMENTS
Core Requirement#1:Discharge at natural location.
Surface runoff from this development will be contained within the existing drainage basin. No
drainage pattern modification will result from this activity.
Core Requirement#2:Offsite analysis.C q
No off-site storm runoff will migrate through the facility. The proposed canopy covered pump island
area will be raised in grade so that no adjacent storm runoff will pass over the facility.
Core Requirement#3: Flow Control
The existing flow control facilities will not be affected by this development.
Core Requirement#4:Conveyance System
A new storm conveyance system will be constructed in the area of the new fueling facility
Core Requirement#5: Erosion and Sediment Control
Erosion and sediment control(ESC) shall be provided for the duration of construction. For this
development,ESC measures will include,but not be limited to,the installation of a temporary rock
construction entrance,silt protection at all adjacent existing catch basins(with potential of receiving
storm runoff from the construction area)and perimeter filter-fabric fencing. It shall be the contractors
responsibility to maintain all ESC facilities during all phases of construction. Maintenance shall
include replacement of the ESC measure upon first signs of failure,periodic top dressing of rock and
any additional measures deemed necessary by City of Belfair inspection staff.
Core Requirement 86: Maintenance and Operations
Drainage facility maintenance will continue as specified under agreements of the previous design
development documents. The oil/water separator which serves the under canopy area will be
maintained by the owner on a semi-annual basis. The holding tank will be maintained on an as-needed
basis.
Core Requirement#7: Financial Guarantees and Liability
Bonding will be provided as required by the City of Belfair.
Core Requirement#8: Water Quality
Water quality for that area disturbed by these improvements will be provided for in a coalescing plate
oil/water separator.
r
III. SPECIAL REQUIREMENTS
Special Requirement#1 -Other Adopted Area-Specific Requirements
Not applicable. There are no known Area-Specific Requirements.
Special Requirement 42-Flood plain/FloodwaV Delineation
Not applicable. The site is not located within a floodplain or floodwa< ,.
Special Requirement#3-Flood Protection Facilities
Not applicable. The site is not located within a floodplain or floodway.
Special Requirement#4-Source Control
The proposed commercial use is considered a significant source pollution generator. The
proposed fueling facility is covered and that area lying beneath the canopy drains a 5000-gallon
capacity holding tank. The tank slab runoff will be isolated and discharged to the 5000-gallon
capacity holding tank as well. No other source controls are applicable.
Special Requirement#5-Oil Control
The site is classified as a high-use site,therefore oil control is required. A holding tank is being
prodded to contain all runoff from all areas of potential oil and fuel runoff.
IV. HOLDING TANK REQUIRED OPERATIONS
HOLDING TANK REQUIRED OPERATIONS
To address any potential fuel spill,this facility is equipped with a 5000-gallon capacity holding tank,
which receives surface runoff from that area lying beneath the canopy and the tank slab area. An
internal alarm will be activated upon this tank being filled to 80%capacity. At that time,the operator
shall contact the appropriate pump-out firm(see contacts list)for disposal.
Runoff from the canopy slab will be limited,primarily,to that water runoff generated from periodic
washdown of the fueling area. (Dry sweeping is recommended to maintain pump-out activities to a
minimum).
To minimize surface runoff from the tank slab,discharge is controlled by a gate valve on the outlet
pipe adjacent to the receiving catch basin This gate valve shall remain CLOSED at all times except
during times of product delivery. During product delivery,the operator shall:
1. Open the gate valve. The gate valve shall remain OPEN for the duration of product delivery
activities.
Z. Close gate valve immediately upon conclusion of product delivery activities.
In the event of a fuel spill during delivery,product will be directed to the holding tank. The operator
shall immediately notify the pump-out firm for disposal.