Rebecca Ernst
InFonn
12330 1201h Ave. NE
Kirkland, WA 98034
Dear Ms. Ernst:
Enclosed is a NOC (Notice of Construction) application packet for a new gas station, as well as
the information and form needed to obtain a demolition permit.
Depending on the estimated annual gasoline throughput for this new facility, there are different
requirements for vapor control. In summary, all gas stations with an annual gasoline throughput
greater that 100,000 gallons are required to install Stage I vapor recovery. Gas stations in Mason
county with an annual gasoline throughput greater than 1,500,000 gallons are required to install
Stage II vapor recovery if a lot with a permanent residence is within the distance and throughput
specifications listed in WAC 173-491-040(5)(c). Please see Chapter 173-491 WAC for more
details.
Please return Fonn 1, Forni 16, and a NOC fee of$400 for each new gas station. OAPCA has 60
days from receipt of a complete application to finish the review and approval process. This
process can take place simultaneous with SEPA proceedings or after provided that the NOC is
approved prior to beginning construction at the proposed site. In addition, please read and
complete all procedures for performing a demolition of an existing structure.
If you have any questions, please call me ai (360) 438-8768 extension 1 13.