Loading...
HomeMy WebLinkAboutSEP2002-00022 FPA - SEP Determinations - 4/1/2002 ypN-STAr, MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT O A u o N Z Planning Division O N y o~ P O Box 279, Shelton, WA 98584 J � 1864 (360)427-9670 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2002-00022 Description of Proposal.- Brad Schauer Class IV G FPA: Note: There are no critical areas on or near the portion of this site that is to be cleared. However the terrain is uneven, and extensive filling and grading may be required in order to convert this site in to a parking lot for Continental Floral. Proponent: BRAD SCHAUER Site Address (If Assigned): Directions to Site: Hwy 3 almost to Kitsap County line. Site is located adjacent to SE corner of Continental Floral site. Parcel Numb 12321 4 0041 Legal Description: N�%2 SE TR 4 SW 1/2 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverser impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the pubic upon request. MITIGATED MEASURES ARE ATTACHED. Please contact TOtc 'Qt Y% sk- NS at ext. 7 i with any questions. This DNS is issued under 197-11-340(2), the Lead Agency will not act on this proposal for 14 days from the date below. Comments must be sumitted by 4116/2002. Authorized Local Government Official Date ✓DNR SEPA Review Anny Corps Fish& Wildlife d10 S L DNR S Puget Sound v Applicant Squaxin Tribe Dept of Ecology Contractor Skokomish Tribe Y'e' r Dept of Transportation CONDITIONS FOR SEPA 2002-00022 Brad Schauer FPA STORMWATER SITE PLAN A Stormwater Site Plan (SSP) shall be created and implemented prior to logging or development of any portion of this conversion. Contact Mason County Engineer (Alan Tahja) with any questions The Engineer will charge a fee of$36.50 per hour to review such plans. X LAND MODIFICATION PERMIT Informational: If the applicant's desire to turn the cut area into a parking lot involves the moving of more than 200 cubic yards of material, the applicant must apply for and receive an approved Land Modification Permit (from the Mason County Building Department). X 1 1'Y1613137'6 7"W CAW 161AaY THCnN10A M11V nkm NOTICE I N C1rN:,�a con t+ CAI.0 NA{CLYI L LDE CV T{E 937.01 339.r 1' "`r/EIg IEC 21 7� 1700.ri' \ \ KM MR"BY 3'Ell 170D Or A PORTION OF NC411"s. na Nc 1/4 f THE NE AND BE 1/ p�� MF 3 A' \ jy9j �n. LOY 0 �� PAREEt W 2723612006fM THE I9L t/Q/'V RJ t7L IJ4 �OCI.ti C 1B r. W'�I., r I �1 2180 AC al E'i CVERTOV 40 ASDJCIIRs RGE.I W. OF THE WK MASON COUNTY, AASHNGT'ON. f�1(1 6U Acr:ss B rl — Invlr/wNWI t I sww' lrN tazv/' LOTI{ GRAPHICv,e17 31 aM SCALE 7sr. F ]oE a rtn xx7 rto CpAA-L 03 r I EA ACAIS N/1 q C+A S 6316 Br1.1/ 1M76'3a'Y YE77 t 1.z 90Jt4 A'SET`A4A ( IN YETT I A CAP(CALGOIATED '1 LOT 7 1 10eh 20D /L Iafo�nE�tF sk�) IR if 217.001 SOf T, y BASIS OF BEARINQ ' sa AAT1Is SOUTH a0'3VIJ'EASI ALONS 11-C EAST UVE Cr Nt I -- ----L ------- - ACans_AST QUARTER D-' 9ECnoH 71, TOKUSNV' 73 LEGAL DESCRIPTION qp9 - _______ i6Aer D(RECTOI9'9APPf'TOYAL WATK RANGE 1 MST. W.M. R� I ------ -{---- AP�7 ID FCRMECT mcwtv rU'SAqwwT fO IlASt1r<L PARCEL C CF n1Ai Rf1UND/�Y LIawry NE MAF.181YO71 I 17IOflNitY NO.�--_ METHODS AND EQUIPMENT 0I-19. REC10RIIED IN WLUYE 26 OF SUNVEI3 AT �> bbbl I to'P.�9RC n SLOWY PEILFORYED VAIN A V TOTAt STATION, USNG rAGC 162 tWO:R REO:ROING KUMSM 1729771. Y f GSE�IWr q LOT y IRA16TRSE AND RADIAL SURNTV MET1Y_IOS. SURELY REOOROS DF YASCN CMNTY, WASTINOTOII I 6 {I+ limp,34/T. p VEETS OR EKCQ05 ACOURACY REOUIREWENTS Una 4.' !D Aotc7 j1 OACifA7/Ai OQt61'AN17 CEiflCPiLVf CW7AINED N WAC 33Z 130.090. I I 219,:96 30Z. WSA AMS A CA �..� DUE LEGEND vRUFY EA6CHpT'I ./� PAGE�Ia.1321LDDgU 8 �10. 3A0� ~Q� OEQARATM OT WIQ LOT 9M%UV(REiOMM LVDOI 1-0 MUNUMENT FWN3 AS KOTEO / ST -$NWTN vuOP lB1A Ccw ANr,nr SS0T3'N'Y � ACOMORI:AIIIHil / 1' s93qTf 'TM�9 W KUD VAIWIWAWE WiFFAdW PiWWO ntiO! s�� LOT 4 LJ Aromftwc RPM [ CPL.CILVITED x1ONJYEIAT POSITION / /- 162N 274'911 sort 4 q (( M• ---"-- ---__ NMl12'2617 siyt 6.)ACRES T}o • SET FEMAR & CAP LS.818902/151G6 p rOVYD RE13AR/IRON PPE AS NOTED / F,12'!L�1 / / LOT 2 WFIVEYOR'9 CERTIFICATE 9_AIME9 / %/ `\` / / / '�'o• \� TH5 LAP"MCILY FiFRESETITS A SIM MALE 1Y N°O4 L43ER Irr RAECPW N CaiOFV.%%:r MM RTr NFCUAFUENTS LOT 3 q,� `\ Or R!SIMTV F000SIC AG ACT AT M a'E FEWEST / `1811whi I ►u IOJOerAIdAY ,�T,,y 117.►10"FT -r` PARm_110.1231104COM � g ♦ ♦�/ l l 11.1! V1AW11 C 4,� / 1.0 ACM _r\ nvA R.wcs b \ PETR VffRRN N.Y3kUW."I 9 / �\ {{{ \♦ C,v�rav A�J/OOA7ES JOB NO. 19567 AT61 orrA W " 1232I1U.'OS1a r calrNL NHuusAAa 1uR1sn,era \ / / A /�... 226n �.� r t Atf ISO / rARra NO I237I1.KWRO �6 ; ( / / fgLl mnAa Roomr.a.aafi�r�1�"`Bw w7 My It AND Y£J1N LU DEO," � y s IL1»�FY/191 FAY 7f7 i7J-1a97 /Ib• ///`' \ ` 1 acAn w,I�A,itiii12ci1A A.A1sarAva .�'L // r1 AWTOR'8 CERTTFTCATr / b• ,3 k� �\ '• fA.�a� +,.. \ / FAEO I1ca.A1CQ6ll txs_T.fAY Cf_,2._. AT a M VOL Rro1CST n LWE AOr Furs Ar PA (S) Aevrn'v7E \ / A.> `�✓ / REDavo►+G Na / \ SDSL9LT / ARM1r __ \� ]144.94 (cTR ao c 11+carp PMCFL Jr0./ 17321AJ0007D !! \♦ (q - ---1317.E i` 606.31' A�c AMR Btm L rw caL�! \\\ ? LA `$�\ s / xc AUO zf MASON CO(A",WA8HINIWON / �it+�u' 4 � \0 �4rs �'k \ �v / F/WOC LARGE LOT .t'war A t1' ! � \ w�+ ��/// SA N OON NO. swim R u-,WAR 4 / t CAP IcA1.a OW omma/A/Ov�9[C n.) I \ / // W k NAAE OF APPL1CAM \ 0"fai Ma ASSoaM - P.A eat llsl ''u' DtWl.RA 9W7 FROV 3"WIS650 "A 31TA cF 8!LONE CF nIE Lo?3F1C n NR 1/1 0r THE SE 1/1 sm R tj wi V SM DTAY] Y I / / eEC. TNT, ANA hBPR1'J6'R 049 OE C041 JIM Elw.rr \ Ie3 / // ramvrx w I=762"113 OIOMAL TRACT L321 DDM \"`YYY M.lr go v 01 ASFF 890FIO PARCEL NO(S) EY3TRlo = ZOO ? - O GaZ Z MASON CO. ENVIRONMENTAL CHECKLIST Page 1 A. BACKGROUND 1. Name of proposed project, if applicable: 2: Name of applicant: 8r14':11 4 ww�/'q 'e - 3. Address and phone number of applicant and contact person: ge17':t Se-Ax-K %r vie 9, y 4. Date checklist prepared: 3`— /7— <f;>2 5. Agency requesting checklist: pJRiv%w� b�P� 6. Proposed timing or schedule (including phasing, if applicable): 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal? If yes explain. 6le 5 0'2�c oev�lep b� r�r��.,� � 12 '4c' s�"w'e ,day. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be needed for your proposal, if known. ' MASON CO. ENVIRONMENTAL CHECKLIST Page 2 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) 12. What is the location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the. agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. sf- Src . 02 l -' T�w•�s�, �YC�L J�/D. _ 1�32i-lNDoo�t S� ^4a 0C B. ENVIRONMENTAL ELEMENTS: 1. EARTH.- a. General description of the site (circle one): E)r olling, hilly, steep slopes, mountainous, other I( b. What is the steepest s1 pe on the site (approximate p slope)? 1` r� .t. ercentl ? S �a L c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. MASON CO. ENVIRONMENTAL CHECKLIST Page 3 d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. '! .Soeims If1(o 6j��rvts # 5rC'01 ,_h51� 6�_ requ two aw 1� f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. l C. g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? luowe_ h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. MASON CO. ENVIRONMENTAL CHECKLIST Page 4 b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. C. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. d, 3) Estimate the amount of fill and dredge material that would be place in ? or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. `/JOKI t 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. Al", Ca MASON CO. ENVIRONMENTAL CHECKLIST Page 5 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. wow b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. fir , 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example, Domestic sewage: industrial, containing the following chemicals . . .; agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. .g C. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. kJF1 �'�h �, ��5�1 r� �`rcJ 5��•-auKd�k �o hr5� 2) Could waste materials enter ground or surface waters? If so, generally describe. MASON CO. ENVIRONMENTAL CHECKLIST Page 6 d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any- �41 ".r, Cf 4. PLANTS: a- Check or circle types of vegetation found on the site: _ deciduous tree: a der, maple, aspen, other _ evergreen tree: fir, cedar, pine, other shrubs < _ grass pasture — crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other _ water plants: water lily, eelgrass, milfoil, other _ other types of vegetation b. What kind and amount of vegetation will be removed or altered? C. List threatened or endangered species known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: MASON CO. ENVIRONMENTAL CHECKLIST Page 7 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: �V0W,r_ birds: hawk, heron, eagle, songbirds, other . . . . . . . . . . . mammals: deer, bear, elk, beaver, other . . . . . . . . . . . . . fish: bass, salmon, trout, herring, shellfish, other . . . . . . b. List any threatened or endangered species known to be on or near the site. C. Is the site part of a migration route? If so, explain. to o d. Proposed measures to preserved or enhance wildlife, if any: ylow'e 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. X/o C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 16/0 g)e MASON CO. ENVIRONMENTAL CHECKLIST Page 8 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. it/v 1) Describe special emergency services that might be required. Wawa 2) Proposed measures to reduce or control environmental health hazards, if any: glo xl e b. Noise. 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? . "gl E 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site pe)g�e_ 3) Proposed measures to reduce or control noise impacts, if any: 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? MASON CO. ENVIRONMENTAL CHECKLIST Page 9 b. Has the site been used for agriculture? If so, describe. IVD C. Describe any structures on the site. d. Will any structures be demolished? If so, what? kUajv&- e. What is the current zoning classification of the site? ✓061v-t keo"-, f. What is the current comprehensive plan designation of the site?g. If applicable, what is the current shoreline master program designation of the site? yfio�e. h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. U i. Approximately how many people would reside or work in the completed project? j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacement impacts, if any: 141e;Ki r MASON CO. ENVIRONMENTAL CHECKLIST Page 10 I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: i'L'G'f�7 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. Wa�� b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. �vK, C. Proposed measures to reduce or control housing impacts, if any: A/awe- 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antehnas;_what is the principal exterior building material(s) proposed? �- b. What views in the immediate vicinity would be altered or obstructed? IV,,/r- c. Proposed measures to reduce or control aesthetic impacts, if any: MASON CO. ENVIRONMENTAL CHECKLIST Page 11 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? C. What existing off-site sources of light or glare may affect your proposal- d. Proposed measures to reduce or control light and glare impacts, if any: 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? yUmW b. Would the proposed project displace any existing recreational uses? If so, describe. �Okl C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: MASON CO. ENVIRONMENTAL CHECKLIST Page 12 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. W pk1e b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. WVWiF- c. Proposed measures to reduce or control impacts, if any:. IVo1u� 14. TRANSPORTATION: A. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. 1 �7�T� l`/�c"y .3 ui�`�� �arsv L. AKA� "�v Coci�u�r.�slL �Lv/►rlL � �'i rC b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system. Show on site plans, if any. ftlo C. How many parking spaces would the completed project have? How many would the project elite? No }'.c �I� hn �lc�eel d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). ti MASON CO. ENVIRONMENTAL CHECKLIST Page 13 e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. 1,.2 f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. g. Proposed measures to reduce or control transportation impacts, if any: 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? .If so, generally describe: L� i b. Proposed measures to reduce or control direct impacts on public services, if any: 16. UTILITIES: MASON CO. ENVIRONMENTAL CHECKLIST Page 14 a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: l;owe_ b..- Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed- C. Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: �ZXG' Date Submitted: ESA LISTED SALMONIDS CHECKLIST Applicant Information Project Information Name_'Sm� ell �,4 Sc6i�c�• Name Phone 36�-27s- "3ys--y,?6-070$ Location I--2,?- R-1 w -szc, 2/ Description /Z W6, c'A"- _A',VrC,c L 2 3 l yoao 41, This worksheet was designed to help project proponents and government agencies identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA listed salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the watershed where your project will be Iocated,your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two Questions 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? Yes No )k Please describe. 2 . Has there ever been an ESA listed salmonid stock present in this watershed? Yes No Uncertain Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. September 1999 1 PROJECT SPECIFICS: The Questions in this section are specific to the project and vicinity. 1. Name of watershed: 2 . Name of nearest waterbody: 3 . What is the distance from this project to the nearest body of water? Often a buffer between the project and a stream can reduce the chance of a negative impact to fish. 4 . What is the current land use between the project and the Potentially affected water body (parking lots, farmland, etc)? 5 . Is the project above a: • natural permanent barrier (waterfall) Yes No • natural temporary barrier (beaver pond) Yes • man-made barrier No (culvert, dam) Yes No • other (explain): 6. If yes, are there any resident salmonid Populations above the blockage? Yes No Don' t know 7. What percent of the project will be impervious surface (including pavement & roof area) ? September 1999 2 FISH MIGRATION: The following Questions will help determine if this project could interfere with migration of adult and Juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal of: i . Surface water? Yes No Amount Name of surface water body ii . Ground water? Yes No Amount From where Depth of well 2 . Will any water be rerouted? Yes No If yes, will this require a channel change? 3 . Will there be retention or detention ponds? Yes No If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? If to a surface water discharge, please give the name of the waterbody. 4 . Will this project require the building of new roads? Yes NO Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. 5 . Are culverts proposed as part of this project? Yes No 6. Will topography changes affect the duration/direction of runoff flows? Yes No If yes, describe the changes . 7 . Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage of flows? Yes No If yes, how will the loss of flood storage be mitigated by Your project? September 1999 3 WATER QUALITY: The following- questions will hel dete P mine if this Project could adversel Y impact water quality. Such impacts can cause Problem s for listed species. Water Quality can be made worse by temperature, disc runoff discharging contaminants, from impervious surfaces, altering water nants, st etc. 1. Do you know of any problems with water streams within this watershed? Yes quality in any of the If yes, describe. No 2 . Will your project either reduce or increase shade along or over a waterbody? Yes No Removal of-shading vegetation or the building of structures*such as docks or floats often result in a change in shade. 3 . Will the project increase nutrient loading or have the Potential to increase nutrient loading or contaminants (fertilizers, other waste discharges, or runoff) to the waterbody? Yes No 4 . Will turbidity be increased because of construction of the project or during operation of the project? Yes In-water or near water work will often increase turbidity. NO 5. Will your project require long term maintenance, i.e. bridge cleaning, highway salting, chemical sprays for vegetation management, clearing of parking lots? Yes No If yes, please describe . September 1999 -- 4 VEGETATION: The following Questions are designed if the project will affect riparian vegetation, the determine ' re adversely i=Pacting salmon. , I . Will the project involve the removal of any vegetation from the stream banks? Yes No If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. 2 . If any vegetation is removed, do you plan to re-plant? Yes No If yes, what types of plants will you use? September 1999 5 CONDITIONS FOR SEPA 2002-00022 Brad Schauer FPA STORMWATER SITE PLAN A Stormwater Site Plan(SSP) shall be created and implemented prior to logging or development of any portion of this conversion. Contact Mason County Engineer(Alan Tahja) with any questions The Engineer will charge a fee of$36.50 per hour to review such plan X LAND MODIFICATION PERMIT Informational: If the applicant's desire to turn the cut area into a parking lot involves the moving of more than 200 cubic yards of material, the applicant must apply for and receive an approved Land Modification Permit (from the Mason County Building Departme ). X MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: April 5', 2002 INTER-DEPARTMENTAL COMMUNICATIONS TO: Michael MacSems, DCD -Planner FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. SUBJ: Stormwater Facilities Review NAME: Schauer FPA & 1 acre clearing—Belfair FPS2002-00003 SEP2002-00003 Michael, Public Works has received and reviewed the site plan prepared by Mr. Schauer for his proposed timber harvest and acre of clearing in Belfair. I have also been in contact with Mr. Schauer regarding what was required for his proposal in regards to stormwater management. Because of the size of the whole Schauer parcel, and the relatively modest and favorable location of the proposed improvements (little or no chance of impacting neighboring properties), the site plan submitted is accepted in terms of stormwater management planning. The applicant is responsible to ensure that no mud or silt is tracked onto the State Highway, and that the State may need to be contacted (Larry Anderson (360) 3 5 7-2 7 0 9) if an access to the property does not already exist. In this situation,the owner's own undeveloped property can be viewed as providing a natural vegetative buffer between their development activities and adjacent neighboring properties. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel other issues need further attention. Sin e ely, Alah A. Tahja File: H:\WP\STRMWTR\REVIEWS\Schauer.doc RcqUeSt,ed 7 CC'2 -3, V UuMber.�! j Y) 1 Authorized by: 7 Type of Wodc vI ode: L CHARGE TO.- NME AGENCWCOMpANy BR-UNG ADDRESS PHONE p Pub. Works Person In Chame: t (C) Project Time line: (fro m -to dates) PrOloct Start date: To 715 1-cz Esftead Fkish Daft: App a hoxj: ESTIMATED TOTAL (D) COST ESTIMATE ------- Fri TOrTAL$ Z EMPMENT USED. MALM MATERIAL USED: colt (F) Act"Cost BARS: PROD : DATE &T40y" Ham Hours TOTAL S EQUtPMENT USED: � ateTOTA-L I's MATERIAL_USED: (G) 6ILLED DATE PAJO DATE TOTAL ALL REC5 CKS 1 0Z L-C e,V- • INQUIRY BY NAME Name Cd SCHA5350 SCHAUER, BRAD W & ANGELA R 3990 E MASON LK DR W GRAPEVIEW, WA 985469555 1 RP 12321 14 00041 S1/2 NE & N1/2 SE 272, 925 T TR 4 SW 1/2 9111 2 RP 22105 51 00010 MADINGS SUNNY SHORE ADD #3 317, 800 T TR 10 1872 Inquiry Type VL Select Line # 00 -or- Search for Parcel END OF DATA CMD 7 for EOJ HELP key Allowed ( ti_ LOT2 E \ ¢ LAT 3 �. / 217.0 in s*3 FT \ MICE- 110. 12l111IGOM Ady fiAolz-n ,� lldic C r- I / },p Acm El VA R .LILIES �. 1 PAr1Cf1 No. 22 \\ OITAT011 A.V) I FXIM No. 12k"114-'.ONa \ y / OL \\ , WAD y, N1to 11ID[l�'R.�(•WE]I C / LV Nbm yr \ iw"14' MR MO 1-0 [ 1/4 coo) fi / f2tMQ0?D � \ pJ_ i . °e+ tnrL si tu7.te' �+� r�� f 4. i J G+ oyOW - APR 0 ' 2002 I v � � E RN�� FJ ti"w PERMIT ASSISTANCE CENTER I: / 1Kfl( Cl IM G UN CF THE I �� AIN t/► or TNt Le 1/f S>EC Kemlasa inn+[c=��� Y I oly � �/ MEW NO it I" km "53 t7m.7O' 8 to Cif r csu. " WASHINGTON STATE DEPARTMENTOF DOUGSUTHERLAND Resources Natural R Commissioner of Public Lands vi RECEIVED DATE: April 9, 2002 [APR 10 2002 TO: Michael Mac Sems MCCD - PLANNING Mason County Department of Community Development Planning Division P.O. Box 279 Shelton, WA 98584 FROM: Susan Casey Resource Protection Specialist South Puget Sound Region SUBJECT REVIEW OF: SEP 2002-00022 ACTION SPONSOR: Brad Schauer PROJECT: timber harvest [] We do not have an interest in the above project and have no comments on the proposal. [X] We do have an interest in the above project and wish to make the following comments: A *forest practices permit will be required for the harvest of timber associated with this project. cc: Dave Dietzman - SEPA Center - SOUTH PUGET SOUND REGION 1 950 FARMAN AVE N 1 ENUMCLAW, WA 98022-9282 FAX(360)825-1672 1 TTY:(360)825-6381 1 TEL:(360)825-1631 Equal Opportunity/Affirmative Action Employer RECYCLED PAPER