GEOTECHNICAL ENGINEERING REPORT
PREPARED BY:
THE RILEY GROUP, INC.
17522 BOTHELL WAY NORTHEAST
BOTHELL, WASHINGTON 98011
PREPARED FOR:
HARBOR CUSTOM DEVELOPMENT, INC.
11505 BURNHAM DRIVE, SUITE 301
GIG HARBOR,WASHINGTON 98332
RGI PROJECT No. 2020-200-1
OLYMPIC SUNSET VIEW APARTMENTS
81 NORTHEAST RIDGE POINT BOULEVARD
BELFAIR, WASHINGTON
JUNE 9, 2020
Corporate Otte
17522 Bothell Way Northeast
Bothell,Washington 98011
Phone 425.415.0551•Fax 425.415.0311
www.riley-group.com
r �
gem
LW
RILEYGROUP
June 9, 2020
Mr. Sterling Griffin
Harbor Custom Development, Inc.
11505 Burnham Drive,Suite 301
Gig Harbor, Washington 98332
Subject: Geotechnical Engineering Report
Olympic Sunset View Apartments
81 Northeast Ridge Point Boulevard
Belfair,Washington
Project No. 2020-200-1
Dear Mr. Griffin:
As requested,The Riley Group, Inc. (RGI)has performed a Geotechnical Engineering Report
(GER) for the Olympic Sunset View Apartments located at 81 Northeast Ridge Point
Boulevard, Belfair, Washington. Our services were completed in accordance with our
proposal 2020-200-PRP1 dated April 16,2020 and authorized by you on April 21, 2020.The
information in this GER is based on our understanding of the proposed construction, and
the soil and groundwater conditions encountered in the borings and test pits completed by
RGI at the site on May 15, 2020.
RGI recommends that you submit the project plans and specifications for a general review
so that we may confirm that the recommendations in this GER are interpreted and
implemented properly in the construction documents. RGI also recommend that a
representative from our firm be present on site during portions of the project construction
to confirm that the soil and groundwater conditions are consistent with those that form
the basis for the engineering recommendations in this GER.
If you have any questions or require additional information, please contact us.
Respectfully submitted,
THE RILEY GROUP, INC.
o{ Wash��
( � y
Q q, ,\
698 3 1
used Ggo�o I�I� o��ssrpNALG y I� ?'�
ERIC L.WOODS I
Eric L. Woods, LG Kristina M. Weller, PE
Project Geologist Principal Geotechnical Engineer
Corporate Office
17522 Bothell Woy Northeast
Bothell,Washington 98011
Phone 425.415.0551 4 Fax 425.415.0311
www.riley-group.com
Geotechnical Engineering Report June 9,2020
Olympic Sunset View Apartments,Belfair,Washington RGI Project No.2020-200-1
TABLE OF CONTENTS
1.0 INTRODUCTION...............................................................................................................................1
2.0 PROJECT DESCRIPTION...............................................................................................................1
3.0 FIELD EXPLORATION AND LABORATORY TESTING..........................................................1
3.1 FIELD EXPLORATION...................................................................................................................................1
3.2 LABORATORY TESTING................................................................................................................................2
4.0 SITE CONDITIONS...........................................................................................................................2
4.1 SURFACE..................................................................................................................................................2
4.2 GEOLOGY.................................................................................................................................................3
4.3 SOILS.......................................................................................................................................................3
4.4 GROUNDWATER........................................................................................................................................3
4.5 SEISMIC CONSIDERATIONS...........................................................................................................................4
4.6 GEOLOGIC HAZARD AREAS..........................................................................................................................5
4.6.1 Erosion Hazard Areas...................................................................................................................5
4.6.2 Geologically Hazardous Areas......................................................................................................5
4.6.3 Slope Reconnaissance..................................................................................................................5
4.6.4 Slope Stability...............................................................................................................................5
5.0 DISCUSSION AND RECOMMENDATIONS.................................................................................6
5.1 GEOTECHNICAL CONSIDERATIONS.................................................................................................................6
5.2 EARTHWORK.............................................................................................................................................6
5.2.1 Erosion and Sediment Control.....................................................................................................6
5.2.2 Stripping.......................................................................................................................................7
5.2.3 Excavations...................................................................................................................................7
5.2.4 Site Preparation...........................................................................................................................8
5.2.5 Structural Fill................................................................................................................................9
5.2.6 Cut and Fill Slopes......................................................................................................................11
5.2.7 Wet Weather Construction Considerations...............................................................................11
5.3 FOUNDATIONS........................................................................................................................................11
5.4 RETAINING WALLS...................................................................................................................................12
5.4.1 Site grading walls.......................................................................................................................12
5.4.2 Cast-in-place walls......................................................................................................................12
5.5 SLAB-ON-GRADE CONSTRUCTION...............................................................................................................13
5.6 DRAINAGE..............................................................................................................................................13
5.6.1 Surface.......................................................................................................................................13
5.6.2 Subsurface..................................................................................................................................14
5.6.3 Infiltration..................................................................................................................................14
5.6.4 Stormwater Detention Pond......................................................................................................14
5.7 UTILITIES................................................................................................................................................14
5.8 PAVEMENTS............................................................................................................................................14
5.8.1 Flexible Pavements....................................................................................................................15
5.8.2 Concrete Pavements..................................................................................................................15
6.0 ADDITIONAL SERVICES..............................................................................................................15
7.0 LIMITATIONS.................................................................................................................................16
1
1 L-
RILFYGRnUP
Geotechnical Engineering Report June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
LIST OF FIGURES AND APPENDICES
Figure1.....................................................................................................................Site Vicinity Map
Figure 2............................................................................................... Geotechnical Exploration Plan
Figure3................................................................................................................Slopes and Geology
Figure4.................................................................................................................. Cross-Section A-A'
Figure S...............................................................................................Retaining Wall Drainage Detail
Figure 6....................................................................................................Typical Footing Drain Detail
Appendix A..........................................................................Field Exploration and Laboratory Testing
AppendixB....................................................................................................................Slope Stability
1
1 LW
RII FYGROIIP
Geotechnicol Engineering Report June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
Executive Summary
This Executive Summary should be used in conjunction with the entire Geotechnical
Engineering Report (GER) for design and/or construction purposes. It should be recognized
that specific details were not included or fully developed in this section, and the GER must
be read in its entirety for a comprehensive understanding of the items contained herein.
Section 7.0 should be read for an understanding of limitations.
RGI's geotechnical scope of work included the advancement of two borings and 11 test pits
to approximate depths of 4.5 to 45 feet below existing site grades.
Based on the information obtained from our subsurface exploration,the site is suitable for
development of the proposed project. The following geotechnical considerations were
identified:
Soil Conditions: The soils encountered during field exploration include up to 16 feet of fill
comprised of loose to medium dense silty sand with some gravel over native deposits of
medium dense to very dense silty sand with gravel glacial till and loose to medium dense
outwash deposits comprised of sand with varying amounts of silt and gravel and gravel with
varying amounts of sand and silt.
Groundwater: Groundwater was encountered at a depth of 13 feet at Test Pit TP-9 in the
proposed pond location during our subsurface exploration.
Foundations: Foundations for the proposed buildings may be supported on conventional
spread footings bearing on medium dense to dense native soil or structural fill
Slab-on-grade: Slab-on-grade floors and slabs for the proposed buildings can be supported
on medium dense to dense native soil or structural fill.
Pavements: The following pavement sections are recommended:
➢ For access roadways areas: 3 inches of Hot Mix Asphalt (HMA) class
inch PG 581-1-22 over 2 inches of crushed surfacing top course (CSTC)over
6 inches of crushed surfacing base course (CSBC)
➢ For parking areas: 2 inches of HMA class % inch PG 581-1-22 over 4 inches
of CSBC or CSTC
➢ For concrete pavement areas: 5 inches of concrete over 4 inches of CSTC
or CSBC
now
I
i FURnIiP
Geotechnical Engineering Report Page 1 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
1.0 Introduction
This Geotechnical Engineering Report (GER) presents the results of the geotechnical
engineering services provided for the Olympic Sunset View Apartments in Belfair,
Washington.The purpose of this evaluation is to assess subsurface conditions and provide
geotechnical recommendations for the design and construction of an apartment complex
with associated parking and drive aisles. Our scope of services included field explorations,
laboratory testing, engineering analyses, and preparation of this GER.
The recommendations in the following sections of this GER are based upon our current
understanding of the proposed site development as outlined below. If actual features vary
or changes are made, RGI should review them in order to modify our recommendations as
required. In addition, RGI requests to review the site grading plan, final design drawings
and specifications when available to verify that our project understanding is correct and
that our recommendations have been properly interpreted and incorporated into the
project design and construction.
2.0 Project description
The project site is located at 81 Northeast Ridge Point Boulevard in Belfair, Washington.
The approximate location of the site is shown on Figure 1.
The existing property is undeveloped. RGI understands the site will be developed with an
apartment complex containing up to 12 structures, with associated parking and drive aisles.
Stormwater will be routed to a storm pond in the southern portion of the site. The site
grading will require the construction of several retaining walls to contain grades on the
perimeter of the site.
At the time of preparing this GER, building plans were not available for our review. Based
on our experience with similar construction, RGI anticipates that the proposed buildings
will be supported on perimeter walls with bearing loads of four to eight kips per linear foot,
and a series of columns with a maximum load up to 100 kips. Slab-on-grade floor loading
of 250 pounds per square foot (psf) are expected.
3.0 Field Exploration and Laboratory Testing
3.1 FIELD EXPLORATION
On May 15, 2020, RGI observed the drilling of two borings and excavation of 11 test pits.
The approximate exploration locations are shown on Figure 2.
Field logs of each exploration were prepared by the geologist that continuously observed
the excavation or drilling. These logs included visual classifications of the materials
encountered during excavation and drilling as well as our interpretation of the subsurface
1
1 LW
RII HUMP
1 �
Geotechnical Engineering Report Page 2 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
conditions between samples.The borings and test pit logs included in Appendix A represent
an interpretation of the field logs and include modifications based on laboratory
observation and analysis of the samples.
3.2 LABORATORY TESTING
During the field exploration, a representative portion of each recovered sample was sealed
in containers and transported to our laboratory for further visual and laboratory
examination. Selected samples retrieved from the borings and test pits were tested for
moisture content and grain size analysis to aid in soil classification and provide input for
the recommendations provided in this GER. The results and descriptions of the laboratory
tests are enclosed in Appendix A.
4.0 Site Conditions
4.1 SURFACE
The subject site is an irregular-shaped parcel of land approximately 14.87 acres in size. The
site is bound to the north and east by undeveloped forested land, to the south by
undeveloped forest and a post office, and to the west by State Route 3, Northeast Ridge
Point Boulevard, and a commercial development.
The existing site contains a waterline and access road that extend through the
southwestern portion and along the eastern property line. The remainder of the site is
undeveloped. Site topography is generally comprised of an upper west-facing slope, a
central south-facing steep slope, and a lower southwest-facing slope, with a west-facing
steep slope located in the southeast corner. A steep west-facing road cut for State Route 3
is located to the west of the property, with the top of slope located approximately on the
west property line.
Slope gradients in the west-facing slopes in the northern portion of the property are
generally 10 to 20 percent, with localized areas bordering small drainages about 40 to 50
percent. The south-facing slope in the central portion of the site contains gradients in the
range of 35 to 50 percent. The southwest-facing slopes in the southern portion of the
property are generally sloping at gradients of 10 to 20 percent, with small areas up to 30
percent. The southeast site corner has a steep slope with gradients of 40 to greater than
100 percent. The road cuts along the western property line descend to State Route 3 at
gradients of about 60 percent.
Based on site observations and explorations, and review of Lidar images of the area, the
northern portion of the site contains a large fill area that was placed on the natural slope,
extending from near the northeast property corner most of the way across the property to
near the western property line. The southeastern portion of the site along the access road
1 L-
RILFYGRnl1P
Geotechnical Engineering Report Page 3 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
has been graded with several feet of fill and bermed to retain surface water. Much of the
southern and southwestern portions of the property appear to have been mined for sand
and gravel.
The northern and central portions of the site are primarily vegetated with small- to
medium-diameter trees with a mixed brush undergrowth, except the fill areas which are
vegetated with grass, scotch broom, and localized blackberry brambles. The southern
portion of the property is vegetated with grass, scotch broom, and blackberry brambles,
with scattered small-diameter trees and brush. The southeast site corner is vegetated with
small-to medium-diameter trees and mixed brush.
4.2 GEOLOGY
Review of the Geologic Map of the Belfair 7.5-minute Quadrangle, Mason, Kitsap, and
Pierce Counties Washington, by Michael Polenz, etc. (2009) indicates that the soil through
most of the northern portion of the site is mapped as Vashon till (Qgt), which is a compact
mixture of clay, silt, sand, and gravel deposited at the base of the Vashon ice sheet. Areas
along the western property line in the northern portion, and the entire southern portion of
the property are mapped as Vashon advance outwash (Qga), which is stratified sand and
gravel deposited by meltwater streams issuing from the advancing Vashon ice sheet.These
descriptions are generally similar to the findings in our field explorations. Glacial till
deposits encountered in the southwestern portion of the property underlying the Vashon
advance outwash is likely Pre-Vashon till (Qpt), which has limited surface exposure in the
quadrangle.The general location of the geologic units from the geologic map are shown on
Figure 3. A geologic cross section is shown on Figure 4.
4.3 SOILS
The soils encountered during field exploration include up to 16 feet of fill comprised of
loose to medium dense silty sand with some gravel over native deposits of medium dense
to very dense silty sand with gravel glacial till and loose to medium dense outwash deposits
comprised of sand with varying amounts of silt and gravel and gravel with varying amounts
of sand and silt.
More detailed descriptions of the subsurface conditions encountered are presented in the
borings and test pits included in Appendix A. Sieve analysis was performed on eight
selected soil samples. Grain size distribution curves are included in Appendix A.
4.4 GROUNDWATER
Groundwater was encountered at a depth of 13 feet at Test Pit TP-9 in the proposed pond
location during our subsurface exploration. The groundwater is likely perched over the top
of a dense glacial till layer.
� 1 �
L-
Rll FYPROIIP
Geotechnical Engineering Report Page 4 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
It should be recognized that fluctuations of the groundwater table will occur due to
seasonal variations in the amount of rainfall, runoff, and other factors not evident at the
time the explorations were performed. In addition, perched water can develop within
seams and layers contained in fill soils or higher permeability soils overlying less permeable
soils following periods of heavy or prolonged precipitation. Therefore, groundwater levels
during construction or at other times in the future may be higher or lower than the levels
indicated on the logs. Groundwater level fluctuations should be considered when
developing the design and construction plans for the project
4.5 SEISMIC CONSIDERATIONS
Based on the International Building Code (IBC), RGI recommends the follow seismic
parameters for design.
Table 1 2012/2015 IBC
Parameter 2015 Value 2018 Value
Site Soil Class' CZ
Site Latitude 47.4554
Site Longitude -122.8183
Short Period Spectral Response Acceleration,Ss (g) 1.473 1.621
1-Second Period Spectral Response Acceleration,S1(g) 0.584 0.574
Adjusted Short Period Spectral Response Acceleration,SMs(g) 1.473 1.946
Adjusted 1-Sec Period Spectral Response Acceleration, Sm, (g) 0.76 0.819
Numeric seismic design value at 0.2 second; Sos(g) 0.982 1.297
Numeric seismic design value at 1.0 second; SMi(g) 0.506 0.546
1.Note:In general accordance with Chapter 20 of ASCE 7-10 and 7-16,the Site Class is based on the average characteristics of the upper
100 feet of the subsurface profile.
2.Note:ASCE 7-10 and 7-16 require a site soil profile determination extending to a depth of 100 feet for seismic site classification.The
current scope of our services does not include the required 100 foot soil profile determination.Borings extended to a maximum depth
of 45 feet,and this seismic site class definition considers that very dense soil continues below the maximum depth of the subsurface
exploration. Additional exploration to deeper depths would be required to confirm the conditions below the current depth of
exploration.
Liquefaction is a phenomenon where there is a reduction or complete loss of soil strength
due to an increase in water pressure induced by vibrations from a seismic event.
Liquefaction mainly affects geologically recent deposits of fine-grained sands that are
below the groundwater table. Soils of this nature derive their strength from intergranular
friction.The generated water pressure or pore pressure essentially separates the soil grains
and eliminates this intergranular friction, thus reducing or eliminating the soil's strength.
1
1 LU11
R F
Geotechnical Engineering Report Page S June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
RGI reviewed the results of the field and laboratory testing and assessed the potential for
liquefaction of the site's soil during an earthquake. Since the site is underlain by glacial till
and glacially consolidated deposits, and lacks an established shallow groundwater table,
RGI considers that the possibility of liquefaction during an earthquake is minimal.
4.6 GEOLOGIC HAZARD AREAS
Regulated geologically hazardous areas include erosion, landslide, earthquake, or other
geological hazards. Based on review of the Mason County Code, portions of the site meet
the criteria of erosion hazard areas and geologically hazardous areas.
4.6.1 EROSION HAZARD AREAS
The site is mapped as Alderwood gravelly sandy loam, 15 to 30 percent slopes, and meet
the criteria for an erosion hazard area. All of the site slopes are erosion hazards. An erosion
and sedimentation control plan should be established during construction as described in
Section 5.2.1 of this report.
4.6.2 GEOLOGICALLY HAZARDOUS AREAS
Portions of the site meet the criteria of geologically hazardous areas due to slopes with
gradients greater than 40 percent. This included the south-facing slope extending through
the central portion of the property, localized areas along the drainages and road cuts along
the western property line, and localized west-facing slope areas in the southeast corner of
the property.
4.6.3 SLOPE RECONNAISSANCE
A slope reconnaissance was performed on May 15, 2020 to assess the stability of the site
slopes. During the reconnaissance, no signs of recent slide activity were observed. No seeps
or springs were observed. Trees with curved trunks were observed on steeper slopes that
is indicative of surficial creep. The slopes are well vegetated and appear to be stable,
however, shallow debris-flow failures are possible during heavy rainfall events. Cut slopes
were lightly to moderately vegetated, and are cut primarily into dense glacial till and
advance outwash.
4.6.4 SLOPE STABILITY
Based on reviewing the Mason County GIS, no landslide activity is mapped within 500 feet
of the site. Based on the density of the subsurface soils and inclination of the slopes, the
slopes onsite are stable in their present condition and configuration. A quantitative slope
stability analysis was completed for proposed site cut slopes and retaining walls in the
northeastern and west-central portions of the site, showing stable conditions of 1.5 for
static conditions along slope stability profiles. The slope stability analysis is included in
Appendix B.
Rll FLM
Geotechnical Engineering Report Page 6 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
4.6.5 RECOMMENDATIONS
Review of the proposed development plans indicate the geologically hazardous areas are
generally going to be removed or modified with the exception of the road cuts along the
western property line. Cut slopes created by site grading will be stabilized on the surface
with erosion control measures and permanent plantings. The slopes above and between
blocks wall on the fill side of the site will be appropriately landscaped for surface erosion
control.
5.0 Discussion and Recommendations
5.1 GEOTECHNICAL CONSIDERATIONS
Based on our study, the site is suitable for the proposed construction from a geotechnical
standpoint. The site will be developed with 12 residential structures and storm water will
be routed to a detention pond in the southern portion of the site. The site development is
not expected to have an adverse impact to the site or surrounding site provided best
management practices for erosion control and construction techniques are implemented
during the development of the site.
Foundations for the proposed apartment buildings can be supported on conventional
spread footings bearing on competent native soil or structural fill. Slab-on-grade floors and
pavements can be similarly supported.
Detailed recommendations regarding the above issues and other geotechnical design
considerations are provided in the following sections. These recommendations should be
incorporated into the final design drawings and construction specifications.
5.2 EARTHWORK
The earthwork is expected to include grading the site for building and parking lot grades,
constructing the site retaining walls, installing site utilities, construction of the access road,
and excavating for stormwater facilities.
5.2.1 EROSION AND SEDIMENT CONTROL
Potential sources or causes of erosion and sedimentation depend on construction
methods, slope length and gradient, amount of soil exposed and/or disturbed, soil type,
construction sequencing and weather.The impacts on erosion-prone areas can be reduced
by implementing an erosion and sedimentation control plan. The plan should be designed
in accordance with applicable city and/or county standards.
RGI recommends the following erosion control Best Management Practices (BMPs):
➢ Scheduling site preparation and grading for the drier summer and early fall months
and undertaking activities that expose soil during periods of little or no rainfall
1
LW
RII EYGR011P
Geotechnical Engineering Report Page 7 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
➢ Retaining existing vegetation whenever feasible
➢ Establishing a quarry spall construction entrance
➢ Installing siltation control fencing or anchored straw or coir wattles on the downhill
side of work areas
Covering soil stockpiles with anchored plastic sheeting
➢ Revegetating or mulching exposed soils with a minimum 3-inch thickness of straw
if surfaces will be left undisturbed for more than one day during wet weather or
one week in dry weather
Directing runoff away from exposed soils and slopes
Minimizing the length and steepness of slopes with exposed soils and cover
excavation surfaces with anchored plastic sheeting (Graded and disturbed slopes
should be tracked in place with the equipment running perpendicular to the slope
contours so that the track marks provide a texture to help resist erosion and
channeling. Some sloughing and raveling of slopes with exposed or disturbed soil
should be expected.)
➢ Decreasing runoff velocities with check dams, straw bales or coir wattles
➢ Confining sediment to the project site
➢ Inspecting and maintaining erosion and sediment control measures frequently(The
contractor should be aware that inspection and maintenance of erosion control
BMPs is critical toward their satisfactory performance. Repair and/or replacement
of dysfunctional erosion control elements should be anticipated.)
Permanent erosion protection should be provided by reestablishing vegetation using
hydroseeding and/or landscape planting. Until the permanent erosion protection is
established, site monitoring should be performed by qualified personnel to evaluate the
effectiveness of the erosion control measures. Provisions for modifications to the erosion
control system based on monitoring observations should be included in the erosion and
sedimentation control plan.
5.2.2 STRIPPING
Stripping efforts should include removal of pavements, vegetation, organic materials, and
deleterious debris from areas slated for building, pavement, and utility construction. The
test pits encountered 2-6 inches of topsoil and rootmass. Deeper areas of stripping may be
required in forested or heavily vegetated areas of the site.
5.2.3 EXCAVATIONS
All temporary cut slopes associated with the site and utility excavations should be
adequately inclined to prevent sloughing and collapse. The site soils consist of dense to
very dense silty sand with some gravel, overlain by loose to medium dense sandy gravel. In
some areas dense sands with some silt and the occasional cobble were encountered.
1
1 L-
Rll FYPROIIP
Geotechnical Engineering Report Page 8 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
Accordingly,for excavations more than 4 feet but less than 20 feet in depth, the temporary
side slopes should be laid back with a minimum slope inclination of 1H:1V
(Horizontal:Vertical). If there is insufficient room to complete the excavations in this
manner, or excavations greater than 20 feet in depth are planned, using temporary shoring
to support the excavations should be considered. For open cuts at the site, RGI
recommends:
➢ No traffic, construction equipment, stockpiles or building supplies are allowed at
the top of cut slopes within a distance of at least five feet from the top of the cut
➢ Exposed soil along the slope is protected from surface erosion using waterproof
tarps and/or plastic sheeting
Construction activities are scheduled so that the length of time the temporary cut
is left open is minimized
➢ Surface water is diverted away from the excavation
➢ The general condition of slopes should be observed periodically by a geotechnical
engineer to confirm adequate stability and erosion control measures
In all cases, however, appropriate inclinations will depend on the actual soil and
groundwater conditions encountered during earthwork. Ultimately, the site contractor
must be responsible for maintaining safe excavation slopes that comply with applicable
OSHA or WISHA guidelines.
5.2.4 SITE PREPARATION
RGI anticipates that some areas of loose or soft soil will be exposed upon completion of
stripping and grubbing. Proofrolling and subgrade verification should be considered an
essential step in site preparation. After stripping, grubbing, and prior to placement of
structural fill, RGI recommends proofrolling building and pavement subgrades and areas to
receive structural fill. These areas should moisture conditioned and compacted to a firm
and unyielding condition in order to achieve a minimum compaction level of 95 percent of
the modified proctor maximum dry density as determined by the American Society of
Testing and Materials D1557-09 Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Modified Effort (ASTM D1557).
Proofrolling and adequate subgrade compaction can only be achieved when the soils are
within approximately± 2 percent moisture content of the optimum moisture content. Soils
which appear firm after stripping and grubbing may be proofrolled with a heavy compactor,
loaded double-axle dump truck, or other heavy equipment under the observation of an RGI
representative. This observer will assess the subgrade conditions prior to filling. The need
for or advisability of proofrolling due to soil moisture conditions should be determined at
the time of construction. In wet areas it may be necessary to hand probe the exposed
subgrades in lieu of proofrolling with mechanical equipment.
1 L-
Rll EYGROIIP
Geotechnical Engineering Report Page 9 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
If fill is placed in areas of the site where existing slopes are steeper than 5:1
(Horizontal:Vertical), the area should be benched to reduce the potential for slippage
between existing slopes and fills. Benches should be wide enough to accommodate
compaction and earth moving equipment, and to allow placement of horizontal lifts of fill.
Subgrade soils that become disturbed due to elevated moisture conditions should be
overexcavated to reveal firm, non-yielding, non-organic soils and backfilled with
compacted structural fill. In order to maximize utilization of site soils as structural fill, RGI
recommends that the earthwork portion of this project be completed during extended
periods of warm and dry weather if possible. If earthwork is completed during the wet
season (typically November through May) it will be necessary to take extra precautionary
measures to protect subgrade soils. Wet season earthwork will require additional
mitigative measures beyond that which would be expected during the drier summer and
fall months.
5.2.5 STRUCTURAL FILL
Once stripping, clearing and other preparing operations are complete, cuts and fills can be
made to establish desired building grades. Prior to placing fill, RGI recommends proof-
rolling as described above. RGI recommends fill below the foundation and floor slab,
behind retaining walls, and below pavement and hardscape surfaces be placed in
accordance with the following recommendations for structural fill.The structural fill should
be placed after completion of site preparation procedures as described above.
The suitability of excavated site soils and import soils for compacted structural fill use will
depend on the gradation and moisture content of the soil when it is placed. As the amount
of fines (that portion passing the U.S. No. 200 sieve) increases, soil becomes increasingly
sensitive to small changes in moisture content and adequate compaction becomes more
difficult or impossible to achieve. Soils containing more than about 5 percent fines cannot
be consistently compacted to a dense, non-yielding condition when the moisture content
is more than 2 percent above or below optimum. Optimum moisture content is that
moisture that results in the greatest compacted dry density with a specified compactive
effort.
Non-organic site soils are only considered suitable for structural fill provided that their
moisture content is within about two percent of the optimum moisture level as determined
by ASTM D1557. Excavated site soils may not be suitable for re-use as structural fill
depending on the moisture content and weather conditions at the time of construction. If
soils are stockpiled for future reuse and wet weather is anticipated,the stockpile should be
protected with plastic sheeting that is securely anchored.
Even during dry weather, moisture conditioning (such as, windrowing and drying) of site
soils to be reused as structural fill may be required. Even during the summer, delays in
1
1 LURIl F
Geotechnical Engineering Report Page 10 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
grading can occur due to excessively high moisture conditions of the soils or due to
precipitation. If wet weather occurs, the upper wetted portion of the site soils may need
to be scarified and allowed to dry prior to further earthwork, or may need to be wasted
from the site.
The site soils are moisture sensitive and may require moisture conditioning prior to use as
structural fill. If on-site soils are or become unusable, it may become necessary to import
clean, granular soils to complete site work that meet the grading requirements listed in
Table 2 to be used as structural fill.
Table 2 Structural Fill Gradation
U.S. Sieve Size Percent Passing
4 inches 100
No. 4 sieve 22 to 100
No. 200 sieve 0 to 5*
*Based on minus 3/4 inch fraction.
Prior to use, an RGI representative should observe and test all materials imported to the
site for use as structural fill. Structural fill materials should be placed in uniform loose layers
not exceeding 12 inches and compacted as specified in Table 3.The soil's maximum density
and optimum moisture should be determined by ASTM D1557.
Table 3 Structural Fill Compaction ASTM D1557
Minimum
Location Material Type Compaction Moisture Content
Percentage
Range
On-site granular or approved
Foundations 95 +2 -2
imported fill soils:
On-site granular or approved
Retaining Wall Backfill imported fill soils: 92 +2 2
Slab-on-grade On-site granular or approved 95 +2 -2
_ imported fill soils:
General Fill (non- I On-site soils or approved
structural areas) Limported fill soils: 90 +3 -2
Pavement—Subgrade On-site granular or approved
-2
and Base Course imported fill soils: 95 +2
Placement and compaction of structural fill should be observed by RGI. A representative
number of in-place density tests should be performed as the fill is being placed to confirm
that the recommended level of compaction is achieved.
LW
Rll FYGROUP
Geotechnical Engineering Report Page 11 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
5.2.6 CUT AND FILL SLOPES
All permanent cut and fill slopes should be graded with a finished inclination no greater
than 2H:1V. Upon completion of construction, the slope face should be trackwalked,
compacted and vegetated, or provided with other physical means to guard against erosion.
All fill placed for slope construction should meet the structural fill requirements as
described in Section 5.2.5.
Final grades at the top of the slopes must promote surface drainage away from the slope
crest. Water must not be allowed to flow in an uncontrolled fashion over the slope face. If
it is necessary to direct surface runoff towards the slope, it should be controlled at the top
of the slope, piped in a closed conduit installed on the slope face, and taken to an
appropriate point of discharge beyond the toe of the slope.
5.2.7 WET WEATHER CONSTRUCTION CONSIDERATIONS
RGI recommends that preparation for site grading and construction include procedures
intended to drain ponded water, control surface water runoff, and to collect shallow
subsurface seepage zones in excavations where encountered. It will not be possible to
successfully compact the subgrade or utilize on-site soils as structural fill if accumulated
water is not drained prior to grading or if drainage is not controlled during construction.
Attempting to grade the site without adequate drainage control measures will reduce the
amount of on-site soil effectively available for use, increase the amount of select import fill
materials required, and ultimately increase the cost of the earthwork phases of the project.
Free water should not be allowed to pond on the subgrade soils. RGI anticipates that the
use of berms and shallow drainage ditches, with sumps and pumps in utility trenches, will
be required for surface water control during wet weather and/or wet site conditions.
5.3 FOUNDATIONS
Following site preparation and grading, the proposed residential building foundations can
be supported on conventional spread footings bearing on competent native soil or
structural fill. Loose,organic, or other unsuitable soils may be encountered in the proposed
foundation footprints. If unsuitable soils are encountered, they should be overexcavated
and backfilled with structural fill.
Perimeter foundations exposed to weather should be at a minimum depth of 18 inches
below final exterior grades. Interior foundations can be constructed at any convenient
depth below the floor slab. Finished grade is defined as the lowest adjacent grade within 5
feet of the foundation for perimeter (or exterior) footings and finished floor level for
interior footings.
� 1 �
1 L-
RII FYGRnIIP
Geotechnical Engineering Report Page 12 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
Table 4 Foundation Design
Design Parameter Value
Allowable Bearing Capacity- Structural Fill 2,500 psf'
Dense native soils 5,000 psf
Friction Coefficient 0.30
I
Passive pressure (equivalent fluid pressure) 250 pcf2
Minimum foundation dimensions Columns: 24 inches
Walls: 16 inches
1.psf=pounds per square foot
2.pcf=pounds per cubic foot
The allowable foundation bearing pressures apply to dead loads plus design live load
conditions. For short-term loads, such as wind and seismic, a 1/3 increase in this allowable
capacity may be used. At perimeter locations, RGI recommends not including the upper 12
inches of soil in the computation of passive pressures because they can be affected by
weather or disturbed by future grading activity. The passive pressure value assumes the
foundation will be constructed neat against competent soil or backfilled with structural fill
as described in Section 5.2.5. The recommended base friction and passive resistance value
includes a safety factor of about 1.5.
With spread footing foundations designed in accordance with the recommendations in this
section, maximum total and differential post-construction settlements of 1 inch and 1/2
inch, respectively, should be expected.
5.4 RETAINING WALLS
Retaining walls are proposed for site grading and expected to be necessary for some of the
buildings. The following recommendations for retaining walls should be incorporated into
the plans for the project.
5.4.1 SITE GRADING WALLS
Several wall are proposed for the site grade changes and w3ill be designed as both cut
gravity wall and reinforced block walls. The current plans include up to 28 foot tall Redi-
Rock Retaining walls with multiple tiers of walls in some places. RGI is currently preparing
designs and plans for these walls to be used on the site.
5.4.2 CAST-IN-PLACE WALLS
If retaining walls are needed in the building area, RGI recommends cast-in-place concrete
walls be used. The magnitude of earth pressure development on retaining walls will partly
depend on the quality of the wall backfill. RGI recommends placing and compacting wall
1
L-
RII FYGRnIiP
Geotechnical Engineering Report Page 13 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
backfill as structural fill. Wall drainage will be needed behind the wall face. A typical
retaining wall drainage detail is shown in Figure 5.
With wall backfill placed and compacted as recommended, and drainage properly installed,
RGI recommends using the values in the following table for design.
Table 5 Retaining Wall Design
Design Parameter Value
Allowable Bearing Capacity - Structural Fill 2,500 psf
Dense native soils 5,000 psf
Active Earth Pressure (unrestrained walls) 35 pcf
At-rest Earth Pressure (restrained walls) : 50 pcf
For seismic design, an additional uniform load of 7 times the wall height (H) for
unrestrained walls and 14H in psf for restrained walls should be applied to the wall surface.
Friction at the base of foundations and passive earth pressure will provide resistance to
these lateral loads. Values for these parameters are provided in Section 5.3.
5.5 SLAB-ON-GRADE CONSTRUCTION
Once site preparation has been completed as described in Section 5.2, suitable support for
slab-on-grade construction should be provided. RGI recommends that the concrete slab be
placed on top of medium dense native soil or structural fill. Immediately below the floor
slab, RGI recommends placing a four-inch thick capillary break layer of clean, free-draining
sand or gravel that has less than five percent passing the U.S. No. 200 sieve. This material
will reduce the potential for upward capillary movement of water through the underlying
soil and subsequent wetting of the floor slab.
Where moisture by vapor transmission is undesirable, an 8- to 10-millimeter thick plastic
membrane should be placed on a 4-inch thick layer of clean gravel.
For the anticipated floor slab loading, we estimate post-construction floor settlements of
1/4- to 1/2-inch. For thickness design of the slab subjected to point loading from storage
racks and fork lift vehicle traffic, RGI recommends using a subgrade modulus (Ks) of 150
pounds per square inch per inch of deflection.
5.6 DRAINAGE
5.6.1 SURFACE
Final exterior grades should promote free and positive drainage away from the building
area. Water must not be allowed to pond or collect adjacent to foundations or within the
1
IRII FYGRnup
Geotechnicol Engineering Report Page 14 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
immediate building area. For non-pavement locations, RGI recommends providing a
minimum drainage gradient of 3 percent for a minimum distance of 10 feet from the
building perimeter. In paved locations, a minimum gradient of 1 percent should be
provided unless provisions are included for collection and disposal of surface water
adjacent to the structure.
5.6.2 SUBSURFACE
RGI recommends installing perimeter foundation drains. A typical footing drain detail is
shown on Figure 6. The foundation drains and roof downspouts should be tightlined
separately to an approved discharge facility. Subsurface drains must be laid with a gradient
sufficient to promote positive flow to a controlled point of approved discharge.
5.6.3 INFILTRATION
Infiltration may be feasible at the site but groundwater seepage was encountered at about
4 feet below the proposed grade for the bottom of the pond.
5.6.4 STORMWATER DETENTION POND
The stormwater detention pond is located as shown on Figures 3 and 4. Based on the
explorations, we expect sandy soils and groundwater at about 4 feet below the bottom of
the pond. The pond is not in close proximity to the top of steep slope areas.
5.7 UTILITIES
Utility pipes should be bedded and backfilled in accordance with American Public Works
Association (APWA) specifications. For site utilities located within the right-of-ways,
bedding and backfill should be completed in accordance with City of Belfair specifications.
At a minimum, trench backfill should be placed and compacted as structural fill, as
described in Section 5.2.5. Where utilities occur below unimproved areas, the degree of
compaction can be reduced to a minimum of 90 percent of the soil's maximum density as
determined by the referenced ASTM D1557. As noted, soils excavated on site may not be
suitable for use as backfill material. Imported structural fill meeting the gradation provided
in Table 2 should be used for trench backfill.
5.8 PAVEMENTS
Pavement subgrades should be prepared as described in Section 5.2 and as discussed
below. Regardless of the relative compaction achieved, the subgrade must be firm and
relatively unyielding before paving. The subgrade should be proof-rolled with heavy
construction equipment to verify this condition.
low
I �-
LFYGR011P
Geotechnical Engineering Report Page 15 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
J.8.1 FLEXIBLE PAVEMENTS
With the pavement subgrade prepared as described above, RGI recommends the following
pavement sections for parking and drive areas paved with flexible asphalt concrete
surfacing.
For access drive areas: 3 inches of Hot Mix Asphalt (HMA) class % inch PG 58H-22
over 2 inches of crushed surfacing top course (CSTC)over 6 inches of crushed
surfacing base course (CSBC)
For parking areas: 2 inches of HMA class% inch PG 58H-22 over 4 inches of CSBC or
CSTC
5.8.2 CONCRETE PAVEMENTS
With the pavement subgrade prepared as described above, RGI recommends the following
pavement sections for parking and drive areas paved with concrete surfacing.
y For concrete pavement areas: 5 inches of concrete over 4 inches of CSBC or CSTC
The paving materials used should conform to the WSDOT specifications for HMA, concrete
paving, and CSBC and CSTC (9-03.9(3) Crushed Surfacing).
Long-term pavement performance will depend on surface drainage. A poorly-drained
pavement section will be subject to premature failure as a result of surface water
infiltrating into the subgrade soils and reducing their supporting capability.
For optimum pavement performance, surface drainage gradients of no less than 2 percent
are recommended. Also, some degree of longitudinal and transverse cracking of the
pavement surface should be expected over time. Regular maintenance should be planned
to seal cracks when they occur.
6.0 Additional Services
RGI is available to provide further geotechnical consultation throughout the design phase
of the project. RGI should review the final design and specifications in order to verify that
earthwork and foundation recommendations have been properly interpreted and
incorporated into project design and construction.
RGI is also available to provide geotechnical engineering and construction monitoring
services during construction. The integrity of the earthwork and construction depends on
proper site preparation and procedures. In addition, engineering decisions may arise in the
field in the event that variations in subsurface conditions become apparent. Construction
monitoring services are not part of this scope of work.
1
1 LW
Rll FYGRnIIP
Geotechnical Engineering Report Page 16 June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
7.0 Limitations
This GER is the property of RGI, Harbor Custom Development, Inc., and its designated
agents. Within the limits of the scope and budget, this GER was prepared in accordance
with generally accepted geotechnical engineering practices in the area at the time this GER
was issued. This GER is intended for specific application to the Olympic Sunset View
Apartments project in Belfair, Washington, and for the exclusive use of Harbor Custom
Development, Inc. and its authorized representatives. No other warranty, expressed or
implied, is made. Site safety, excavation support, and dewatering requirements are the
responsibility of others.
The scope of services for this project does not include either specifically or by implication
any environmental or biological (for example, mold, fungi, bacteria) assessment of the site
or identification or prevention of pollutants, hazardous materials or conditions. If the
owner is concerned about the potential for such contamination or pollution, we can
provide a proposal for these services.
The analyses and recommendations presented in this GER are based upon data obtained
from the test exploration performed on site. Variations in soil conditions can occur, the
nature and extent of which may not become evident until construction. If variations appear
evident, RGI should be requested to reevaluate the recommendations in this GER prior to
proceeding with construction.
It is the client's responsibility to see that all parties to the project, including the designers,
contractors, subcontractors, are made aware of this GER in its entirety. The use of
information contained in this GER for bidding purposes should be done at the contractor's
option and risk.
now
LM
RII HUMP
lLJ —
o
LLJ
�2p _
Cl
USGS, 2017, Belfair, Washington Approximate Scale: 1"=1000'
7.5-Minute Quadrangle
0 500 1000 2000 N
Corporate Office Olympic Sunset View Apartments Figure 1
17522 Bothell Way Northeast RGI Project Number: Date Drawn:
-Bothell,Washington 98011 2020-200-1 Site Vicinity Map
Phone:425.415.0551 05�2020
RILEYGROUP Fax:425.415.0311 Address: 81 Northeast Ridge Point Boulevard, Belfair, Washington 98528
Z/xl
k"I
P-3 +-
10
/DTP-4
i -
T
p
p, B-2
/
I
lam_ v
-r
= Boring by RGI, 05/15/20 Approximate Scale: 1"=180'
6P =Test pit by RGI, 05/15/20
= Site boundary 0 90 180 360 N
Corporate Office Olympic Sunset View Apartments Figure 2
17522 Bothell Way Northeast RGI Project Number: Date Drawn:
-Bothell,Washington 98011 2020-200-1 Geotechnical Exploration Plan 05/2020
Phone:425.415.0551
RILEYGROUP Fax:425.415.0311 Address: 81 Northeast Ridge Point Boulevard, Belfair, Washington 98528
,
ON
Qgt
X
Qga NO
At
lilt
- = Cross section A-A'
= 10' Buffer from 40%or greater slopes
Qgt =Vashon till Approximate Scale: 1"=180'
Qga =Vashon advance outwash
=Site boundary 0 90 180 360 N
Corporate Office Olympic Sunset View Apartments Figure 3
17522 Bothell Way Northeast RGI Project Number: Date Drawn:
-Bothell,Washington 98011 Slopes and Geology
Phone:425.415.0551 2020-200-1 05/2020
RILEYGROUP Fax:425.415.0311 Address: 81 Northeast Ridge Point Boulevard, Belfair,Washington 98528
A A'
I �
300 t 300
? Qga
200 ? �— ? �— ? _� 7 200
?Qpt
0 100 200 300 400 500 600 700 800 900 1000 1100 1200
Qgt =Vashon till
Qga =Vashon advance outwash
Qpt = Pre-vashon till
Approximate Scale: 1"=150'
0 75 150 300 N
-Corporate Office Olympic Sunset View Apartments Figure 4
17522 Bothell Way Northeast RGI Project Number: Date Drawn:
-Bothell,Washington 98011 Cross Section A-A'
Phone:425.415.0551 2020-200-1 05/2020
RILEYGROUP Fax:425.415.0311 Address: 81 Northeast Ridge Point Boulevard, Belfair, Washington 98528
12" Minimum Wide
Free-Draining Gravel
Slope to Drain
I'
S°
12" min.
000
..per . —
°a
°o°. I'
CP
;o
Filter Fabric Material o0
° _ Excavated Slope
104
(See Report for
10
°° I
Appropriate
001 i Incliniations)
00
r Compacted Structural
Backfill (Native or Import)
000.
og .
CV0ao°o°°o° °oa,°°
° oo°°°°°000°o°Soao
12" Over the Pipe
� L
4 Diameter PVC p
3" Below the Pipe
Perforated Pipe
Not to Scale
Corporate Office Olympic Sunset View Apartments Figure 5
17522 Bothell Way Northeast RGI Project Number: Date Drawn:
,-Bothell,Washington 98011 Retaining Wall Drainage Detail
Phone:425.415.0551 2020-200-1 05/2020
RILEYGROUP Fax:425.415.0311 Address: 81 Northeast Ridge Point Boulevard, Belfair, Washington 98528
Building Slab
e••
\ a.. -Compacted":*,..''NI \\
• ' . �:. Structural `'
A.
\ I •ti M` Filter Fabric
4.
° • ' 0
• �. • . • ° \
4" Perforated Pipe
3/4" Washed Rock or Pea Gravel
Not to Scale
Corporate Office Olympic Sunset View Apartments Figure 6
17522 Bothell Way Northeast RGI Project Number: Date Drawn:
-Bothell,Washington 98011 2020-200-1 Typical Footing Drain Detail 05/2020
Phone:425.415.0551
RILEYGROUP Fax:425.415.0311 Address: 81 Northeast Ridge Point Boulevard, Belfair,Washington 98528
Geotechnical Engineering Report June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
APPENDIX A
FIELD EXPLORATION AND LABORATORY TESTING
On May 15, 2020, RGI performed field explorations using a Sonic drill rig and a tracked
excavator. RGI explored subsurface soil conditions at the site by observing the and drilling
of two borings and excavation 11 test pits to a maximum depth of 45 feet and 16 feet
respectively below existing grade. The boring and test pit locations are shown on Figure 2.
The boring and test pits location were approximately determined by measurements from
existing property lines and paved roads.
A geologist from our office conducted the field exploration and classified the soil conditions
encountered, maintained a log of each test exploration, obtained representative soil
samples, and observed pertinent site features. All soil samples were visually classified in
accordance with the Unified Soil Classification System (USCS).
Representative soil samples obtained from the explorations were placed in closed
containers and taken to our laboratory for further examination and testing. As a part of the
laboratory testing program, the soil samples were classified in our in-house laboratory
based on visual observation,texture, plasticity, and the limited laboratory testing described
below.
Moisture Content Determinations
Moisture content determinations were performed in accordance with ASTM D2216-10
Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil
and Rock by Mass (ASTM D2216) on representative samples obtained from the exploration
in order to aid in identification and correlation of soil types.The moisture content of typical
sample was measured and is reported on the boring and test pit Logs.
Grain Size Analysis
A grain size analysis indicates the range in diameter of soil particles included in a particular
sample. Grain size analyses was determined using D6913-04(2009) Standard Test Methods
for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis (ASTM D6913) on
eight of the samples.
� 1 �
Project Name: Olympic Sunset View Apartments
■ ■ � Boring No.: B-1
Project Number: 2020-200-1
Client: Harbor Custom Development, Inc.
RILEYGROUP Sheet 1 of 2
Date(s)Drilled: 5/15/2020 Logged By: CM Surface Conditions: Gravel
Drilling Method(s): Sonic Drill Bit Size/Type: 6" Total Depth of Borehole: 45 feet
Drill Rig Type: Sonic Drilling Contractor: Anderson Environmental ApproximateConsultin LLC Surface Elevation: N/A
Groundwater Level Not encountered Sampling Method(s): Continuous Hammer Data: N/A
and Date Measured:
Borehole Backfill: Cuttings Location: 81 Northeast Ridge Point Blvd
Belfair,Washington 98528
ai
CIL
U
C
A
N
QE qo
>. J
O N N C N U) U
76 LCL 7a O_(n > U) 7
O C y
w o in c� U) Q MATERIAL DESCRIPTION
0 Fill Brown silty SAND with some gravel,dry to moist,medium dense
1
2 B1-2 31
3 Becomes gray
4-1 81-4 39b
5-
6-
7— Fill
Dark gray/brown gravelly SAND with some silt,moist,loose to medium dense
8
9
10 B1-10 SM Dark brown to gray silty SAND with some gravel,moist,dense(Till) 6
11
12
13
14 61-14 69a
15
16
17
18
19
20
21
22 B1-22 6%
23
24 Becomes very dense
25
26
27
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments I M goring No.: B-1
Project Number: 2020-200-1 lkm
Client: Harbor Custom Development, Inc.
RILE,Roue Sheet 2 of 2
a;
U
crf
N _
Q) c O
C N a J
C U d
ro a E E E 3 $ U N
w i � c o i i c c7 MATERIAL DESCRIPTION
z7
2a
SP-SM.
ray SAND with some silt and gravel,moist,loose to medium dense
29
30
B 1-30 5
31
32
33 SM
Gray silty SAND with some gravel,moist,dense
34
B 1-34 5
35
36
37
38 SM
Gray silty gravelly SAND,moist,dense
39
40
41
42
43
B1-43 5%
44
45 Boring terminated at 45 feet bgs.
46
47
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments
• � � Boring No.: B-2
Project Number: 2020-200-1 1 LW
Client: Harbor Custom Development, Inc.
RILE,Roue Sheet 1 of 1
Date(s)Drilled: 5/15/2020 Logged By: CM Surface Conditions: Gravel
Drilling Method(s): Sonic Drill Bit Size/Type: 6" Total Depth of Borehole: 20 feet
Drill Rig Type: Sonic Drilling Contractor: Anderson Environmental Approximate
Consultin LLC Surface Elevation: N/A
Groundwater Level Not encountered Sampling Method(s): Continuous Hammer Data: N/A
and Date Measured:
Borehole Backfill: Cuttings Location: 81 Northeast Ridge Point Blvd
Belfair,Washington 98528
ai
c
m
0 0
CD
C I- m Z+ T J o
O N N S 4= N to U
7� 7a a Zj > U) O
a E E E 3 o U
w o in can ci M oc D c0 MATERIAL DESCRIPTION
SM Brown silty SAND with some gravel,moist,medium dense
1
2
3 B2-3 6
4-
5-
6- SM
Gray to light brown silty gravelly SAND,moist,medium dense
7
8
9 B2-9 4
10 SP-SM• Brown gravelly SAND with some silt,moist,medium dense
11
12
13
14 132-14 11
15
16 82-16 8
17 SM
Gray/brown silty SAND with some gravel,moist,medium dense
18 132-18 W 9%
1s
zo
Boring terminated at 20 feet bgs.
21
22
23
24
25
26
27
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments 1 M Test Pit No.: TP-1
Project Number: 2020-200-1 1 LW
Client: Harbor Custom Development, Inc.
RISE,Roue Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 11 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate 285
Surface Elevation
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard, Belfair,Washington
a
a75
E �c
a > E o
c F- Z >, -J
O =wO N U) U_
L a Cn L
a E E U N
w o in in D MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
285 0 TPSIL - -
4"topsoil
sM Reddish brown silty gravelly SAND,loose to medium
dense, moist 7%moisture
GP-GM Gray sandy GRAVEL with some silt, medium dense,moist
U
O
°
0,
4%moisture
°
0
° Contains west-dipping beds
0
280 5 ° Becomes medium dense to dense
0
°
0
°
0
° Becomes dense 5°%moisture
0
°
0
GW �! Gray GRAVEL with some sand and trace silt,dense,moist
ilie0 Occasional cobble
i.
Becomes moist to wet
i
275 10 .•.
4%moisture,4%fines
Test Pit terminated at 11'
270 15
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments
I I M Test Pit No.: TP-2
Project Number: 2020-200-1 , lk-
Client: Harbor Custom Development, Inc.
RILEYGROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,moss,scotch
broom
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 16 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate Surface Elevation 292
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard,Belfair,Washington
CD E n
E o
c m H Z >. —i
O N N Cn U_
ii L -a 7a Cn L
w p Un 0 Z) 0 MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
292 0 TPSL
4"topsoil
Fill Gray silty SAND with some gravel,medium dense,moist
(Fill)
8%moisture
287 5
5%moisture
282 to
-
—iron oxide staining
Becomes wet at 11.5'
10%moisture
Becomes moist to wet
277 15 pill
Dark brown silty SAND with some gravel,organics, and
>00
>00 roots,medium dense, moist(Fill)
Test Pit terminated at 16'
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments I W Test Pit No.: TP-3
Project Number: 2020-200-1 1 4-
Client: Harbor Custom Development, Inc.
RILEYGROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,mixed brush,
scotch broom
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 7 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate Surface Elevation 255
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard,Belfair,Washington
CD
a
a�CDi E 0 CL E J
C N � Z �.
O =wO O Cn U_
L _CLd to L
0) as M ca
w 0 cn cn D C7 MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
255 0 TPSL
2"topsoil
Fill >00 Gray silty SAND with some gravel,medium dense, moist
(Fill)
8°%moisture
sm Reddish brown silty SAND with some gravel,medium
dense,moist
12%moisture
GP o o Gray sandy GRAVEL with trace silt, medium dense, moist
250 5 Q o
',—Occasional cobble
01 5°%moisture
00
U o
0 0
0
Test Pit terminated at 7'
2as 10
2ao 15
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments
■ ■ M Test Pit No.: TP-4
Project Number: 2020-200-1 , L-
Client: Harbor Custom Development, Inc.
RILEYGROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,moss,mixed brush
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 11 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate 250
Surface Elevation
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard,Belfair,Washington
43
E
m :3 E o0
c d H Z >1 _J
O N N to U
L D_ to a
ro
w p� cn in D (D MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
250 0 TPSL
_ 6"topsoil
sm Reddish brown silty SAND with some gravel, loose to
medium dense,moist
Contains occasional boulder
9%moisture
GP o o Gray sandy GRAVEL,medium dense,moist
O.
Abundant cobbles
o.
Da
o° 4%moisture
a o
o.
0 o Becomes medium dense to dense
245 5—
0�
a p
O o
ago
o Becomes dense
Do
o�
ago
0.
0 o
00
SP Gray gravelly SAND with trace silt,dense, moist 5%moisture,2%fines
240 10
5%moisture
Test Pit terminated at 11'
235 15
The Riley Group,Inc.
17522 Bothell Way I Bothell,WA 98011
Project Name: Olympic Sunset View Apartments I W Test Pit No.: TP-5
Project Number: 2020-200-1
Client: Harbor Custom Development, Inc.
RILE,ROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,scotch broom
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 10 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate 276
Surface Elevation
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard,Belfair,Washington
E
:3 E o
d F Z >. �
O O N rn U
L D_ rn a
w o 0 cn D (D MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
276 0 TPSL
6"tOPS011
Fin Gray silty SAND with some gravel,medium dense, moist
(Fill)
9%moisture
GP-GM o Dark brown sandy GRAVEL with some silt,roots, and 9%moisture
sP-sM organics, medium dense, moist
Reddish brown gravelly SAND with some silt,medium
dense,moist 7%moisture
271
5-Sp
Gray SAND with trace silt and gravel,medium dense,moist 8%moisture
sM Gray silty SAND with some gravel,very dense, moist 8%moisture
Contains silt with gravel and sandy gravel interbeds
Well cemented
SP Gray gravelly SAND with trace silt,dense,moist
266 10 6%moisture
Test Pit terminated at 10'
261 1s
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments I M Test Pit No.: TP-6
Project Number: 2020-200-1 , L-
Client: Harbor Custom Development, Inc.
RILEYGROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,moss
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 10 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate 290
Surface Elevation
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard,Belfair,Washington
a�
m ° E n�
m
c d H Z _J
O Q) N U
ro L — a U Q
a E E 0 C
w o in cn D (D MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
290 0 TPSL
6"t0(JS011
sM Reddish brown silty SAND with some gravel,loose to
medium dense,moist
6%moisture
GP oUo Gray sandy GRAVEL with trace silt, medium dense,moist
O a
Do
O a
o' 3%moisture
0v
00
0.
�Qv
285 5-
0° Becomes medium dense to dense
UUo
0.
�o
O
O�v
O o
o v
O=
uoo Occasional cobble
0. 4%moisture
qUv
O=
�o
O
DUO
280 10 Test Pit terminated at 10'
27s 15
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments I W Test Pit No.: TP-7
Project Number: 2020-200-1 1 L-
Client: Harbor Custom Development, Inc.
RILEYGROUP Sheet 1 of 1
Dates)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,scotch broom
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 7.5 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate 230
Surface Elevation
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Methods)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard, Belfair,Washington
a�
a�0i E
a) H Z > —�
O y a) U) O_
L a CL
rn F
a E E U M
w o co Un E O MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
230 0 TPSL
2"topsoil
Fill Gray silty SAND with some gravel,medium dense, moist
(Fill)
Trace organics and wood debris
225 s SP-sM •• Reddish brown gravelly SAND with some silt,medium
dense,moist
GP •o o Brown sandy GRAVEL with trace silt,dense,moist 6%moisture
o•
Ow
o•
0
Test Pit terminated at 7.5'
220 10
21s 1s
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments
■ ■ M Test Pit No.: TP-8
Project Number: 2020-200-1 1 L-
Client: Harbor Custom Development, Inc.
RILEYGROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,scotch broom
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 9 feet bgs
Approximate
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Surface Elevation 215
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard, Belfair,Washington
N E
E m
c d H Z >, —.1
O O O U) U_
i0 t 1 U
a'� a E E U
w 0 in cn i) Cry MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
215 0 TPSL
6"topsoil
Fill Brown silty SAND with some gravel,loose to medium
dense, moist(Fill)
Trace organic and wood debris
210 s Becomes black,contains wood and organics
Fill Brown silty gravelly SAND, medium dense, moist(Fill)
Trace organics
Becomes brown to gray
sP Gray gravelly SAND with trace silt,dense, moist 5%moisture
Test Pit terminated at 9'
205 10
200 15
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments I W Test Pit No.: TP-9
Project Number: 2020-200-1 1 lk-
Client: Harbor Custom Development, Inc. RILEYGROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,moss
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 14 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate Surface Elevation 168
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard, Belfair,Washington
0
1 (D H Z >. J
O 0) O U) U
76 r ' a U) z
w o in U) D 0 MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
168 0 TPSL
00( 2"topsoil
FIII00< Brown silty sandy GRAVEL,medium dense, moist(Fill)
00<
00<
00< Contains asphalt debris
OCK
00<
sP Brown gravelly SAND with some silt,medium dense,moist
4%moisture
163 5 Becomes medium dense to dense
3%moisture
158 10
7%moisture,6%fines
Becomes wet at 12.5'
17
Becomes water bearing
11%moisture,8%fines
11%moisture,5%fines
Test Pit terminated at 14'
153 15
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments
� I M Test Pit No.: TP-10
Project Number: 2020-200-1 1 L-
Client: Harbor Custom Development, Inc.
RILEYGROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,scotch broom
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 9 feet bgs
Approximate
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Surface Elevation 169
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard,Belfair,Washington
a�
w — m E -0 m
c f— Z >. -J
O _� a) U_
76 L QL a U) �
1 c° `° MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
o cn cn � c7
169 0 TPSL
"topsoil
sM 2 Brown silty SAND with some gravel,loose to medium
dense, moist
GP o o Gray sandy GRAVEL with trace silt, medium dense,moist
OU17
0.
0 a
164 5—
0
0 0
O o
OU4
Q o
°o. Becomes wet
000 8%moisture
o-
0
SM Gray silty SAND with some gravel,dense,moist(Glacial
Till) 7%moisture
Test Pit terminated at 9'
159 10
154 15
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments I M Test Pit No.: TP-11
Project Number: 2020-200-1
Client: Harbor Custom Development, Inc.
RILE,ROUP Sheet 1 of 1
Date(s)Excavated: 5/15/2020 Logged By ELW Surface Conditions: Grass,scotch broom
Excavation Method: Test Pit Bucket Size: N/A Total Depth of Excavation: 4.5 feet bgs
Excavator Type: Tracked Excavator Excavating Contractor: Kelly's Excavating Approximate 176
Surface Elevation
Groundwater Level: Not Encountered Sampling Grab Compaction Method Bucket
Method(s)
Test Pit Backfill: Cuttings Location 81 Northeast Ridge Point Boulevard,Belfair,Washington
a
E �° rn
c a> H Z >. -J
O a) X U
(C Lcl a W L
> a E E U Q.
w o cn in D (D MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
176 0 TPSL
4"tOPS01i
sM Gray silty SAND with some gravel,very dense,moist
(Glacial Till)
5%moisture
Test Pit terminated at 4.5'
171 s
16s to
161 15
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
Project Name: Olympic Sunset View Apartments Key to Logs
Project Number: 2020-200-1
Client: Harbor Custom Development, Inc.
RILEYGRDUP Sheet 1 of 1
E
E o
c Q) I— Z a J
O O O _U
(V LCLfl L
> a E E V
w o cCo n c� 0 MATERIAL DESCRIPTION REMARKS AND OTHER TESTS
Li L2J3 L4J Lo Lo 7 8
COLUMN DESCRIPTIONS
1 Elevation(feet). Elevation (MSL,feet). B5 USCS Symbol: USCS symbol of the subsurface material.
2 Depth(feet):Depth in feet below the ground surface. 6 Graphic Log:Graphic depiction of the subsurface material
3 Sample Type:Type of soil sample collected at the depth interval encountered.
shown. 7❑ MATERIAL DESCRIPTION:Description of material encountered.
® Sample Number:Sample identification number. May include consistency, moisture,color,and other descriptive
text.
® REMARKS AND OTHER TESTS:Comments and observations
regarding drilling or sampling made by driller or field personnel.
FIELD AND LABORATORY TEST ABBREVIATIONS
CHEM:Chemical tests to assess corrosivity PI:Plasticity Index,percent
COMP:Compaction test SA:Sieve analysis(percent passing No.200 Sieve)
CONS:One-dimensional consolidation test UC:Unconfined compressive strength test,Qu, in ksf
LL:Liquid Limit,percent WA:Wash sieve(percent passing No.200 Sieve)
MATERIAL GRAPHIC SYMBOLS FJ�{
AF t•1ihl Silty SAND(SM)
IN
ov Poorly graded GRAVEL(GP) Poorly graded SAND(SP)
•oC Poorly graded GRAVEL with Silt(GP-GM) •'• Poorly graded SAND with Silt(SP-SM)
7:4
ll Well graded GRAVEL(GW) �� Topsoil
TYPICAL SAMPLER GRAPHIC SYMBOLS OTHER GRAPHIC SYMBOLS
Auger sampler X CME Sampler Pitcher Sample Water level(at time of drilling,A7D)
s 2-inch-OD unlined split Water level(after waiting)
Bulk Sample Grab Sample \ spoon(SPT) Minor change in material properties within a
stratum
3-inch-OD California w/ 2.5-inch-OD Modified Shelby Tube(Thin-walled, — Inferred/gradational contact between strata
brass rings ' California w/brass liners fixed head)
—? Queried contact between strata
GENERAL NOTES
1:Soil classifications are based on the Unified Soil Classification System.Descriptions and stratum lines are interpretive,and actual lithologic changes maybe
gradual.Field descriptions may have been modified to reflect results of lab tests.
2:Descriptions on these logs apply only at the specific boring locations and at the time the borings were advanced.They are not warranted to be representative
of subsurface conditions at other locations or times.
The Riley Group,Inc.
17522 Bothell Way NE,Bothell,WA 98011
THE RILEY GROUP, INC. PHONE: (425)415-0551,
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE B-1
PROJECT NO. 2020-200-1 SAMPLE DEPTH 30'
TECH/TEST DATE 1DH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hveroscooic Moisture
Wt Wet Soil&Tare(gm) (wl) 404.1 Weight Of Sample(gm) 386.7
Wt Dry Soil &Tare(gm) (w2) 386.7 Tare Weight (gm) 16.1
Weight of Tare(gm) (w3) 16.1 (W6) Total Dry Weight(gm) 370.6
Weight of Water(gm) (w4=wl-w2) 17.4 SIEVE ANALYSIS
Weight of Dry Soil(gm) (w5=w2-w3) 370.6 Cumulative
Moisture Content(%) (w4/w5)*100 5 Wt Ret Wt-Tare (%Retained) %PASS
+Tare iLw. ret/w61'100} 100-floret
%COBBLES 0.0 12.0" 16.1 0.00 0.00 100.00 cobbles
%C GRAVEL 0.0 3.0" 16.1 0.00 0.00 100.00 coarse gravel
%F GRAVEL 25.2 2.5" coarse gravel
%C SAND 10.7 2.0" coarse gravel
%M SAND 15.4 1.5" 16.1 0.00 0.00 100.00 coarse gravel
%F SAND 19.2 1.0" coarse gravel
%FINES 29.6 0.75" 16.1 0.00 0.00 100.00 fine gravel
%TOTAL 100.0 0.50" fine gravel
0.375" 66.9 50.80 13.71 86.29 fine gravel
D10(mm) #4 109.4 93.30 25.18 74.82 coarse sand
D30(mm) #10 149.0 132.90 35.86 64.14 medium sand
D60(mm) #20 medium sand
Cu #40 205.9 189.80 51.21 48.79 fine sand
Cc #60 fine sand
#100 258.8 242.70 65.49 34.51 fine sand
#200 277.0 260.90 70.40 29.60 fines
PAN 386.7 370.60 100.00 0.00 silt/clay
12' 3- 2- 1'.75' .375' #4 #10 #20 #40 #60 #100 #200
100
90
80
P 70
A 60
S 50
40 S
30
1 20
N 10
G 0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION Silty SAND with some gravel
USCS SM
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. KMW
I LW
RILEYGROUP
THE RILEY GROUP, INC. PHONE: (425)415-0551
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE B-1
PROJECT NO. 2020-200-1 SAMPLE DEPTH 43'
TECH/TEST DATE JDH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For HvQroscoaic Moisture
Wt Wet Soil&Tare(gm) (wl) 594.2 Weight Of Sample(gm) 567.5
Wt Dry Soil&Tare(gm) (w2) 567.5 Tare Weight (gm) 16.2
Weight of Tare(gm) (w3) 16.2 (W6) Total Dry Weight(gm) 551.3
Weight of Water(gm) (w4=wl-w2) 26.7 SIEVE ANALYSIS
Weight of Dry Soil (gm) (w5=w2-w3)1 551.3 Cumulative
Moisture Content(%) (w4/w5)*100 5 Wt Ret (Wt-Tare) (%Retained) %PASS
+Tare I(wtret/w61`100) (100-%ret)
•COBBLES 0.0 12.0" 16.2 0.00 0.00 100.00 cobbles
%C GRAVEL 21.0 3.0" 16.2 0.00 0.00 100.00 coarse gravel
%F GRAVEL 21.7 2.5" coarse gravel
•C SAND 7.1 2.0" coarse gravel
•M SAND 11.8 1.5" 16.2 0.00 0.00 100.00 coarse gravel
•F SAND 17.9 1.0" coarse gravel
•FINES 20.4 0.75" 132.0 115.80 21.00 79.00 fine gravel
•TOTAL 100.0 0.50" fine gravel
0.375" 209.1 192.90 34.99 65.01 fine gravel
D10(mm) #4 251.9 235.70 42.75 57.25 coarse sand
D30(mm) #10 291.0 274.80 49.85 50.15 medium sand
D60(mm) #20 medium sand
Cu #40 356.2 340.00 61.67 38.33 fine sand
Cc #60 fine sand
#100 430.9 414.70 75.22 24.78 fine sand
#200 455.1 438.90 79.61 20.39 fines
PAN 567.5 551.30 100.00 0.00 silt/clay
IT 3' 2- 1'.75' .375' #4 #10 #20 #40 #60 #100 #200
% 100
90
80
P 70
A 60
S 50
40
S 30
1 20
N 10
G 0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION Silty gravelly SAND
USCS SM
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. KMW
,-
RILEYGROUP
THE RILEY GROUP, INC. PHONE: (425)415-0551,
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE B-2
PROJECT NO. 2020-200-1 SAMPLE DEPTH 9'
TECH/TEST DATE JDH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil&Tare(gm) (wl) 350.4 Weight Of Sample(gm) 336.9
Wt Dry Soil&Tare(gm) (w2) 336.9 Tare Weight (gm) 16.8
Weight of Tare(gm) (w3) 16.8 (W6) Total Dry Weight(gm) 320.1
Weight of Water(gm) (w4=wl-w2) 13.5 SIEVE ANALYSIS
Weight of Dry Soil (gm) (w5=w2-w3) 320.1 Cumulative
Moisture Content(%) (w4/w5)*100 4 Wt Ret Wt-Tare (%Retained) °o/ PASS
+Tare flwt ret/w61'100} (101%re11
%COBBLES 0.0 12.0" 16.8 0.00 0.00 100.00 cobbles
%C GRAVEL 0.0 3.0" 16.8 0.00 0.00 100.00 coarse gravel
%F GRAVEL 31.4 2.5" coarse gravel
%C SAND 16.1 2.0" coarse gravel
%M SAND 20.6 1.5" 16.8 0.00 0.00 100.00 coarse gravel
•F SAND 17.5 1.0" coarse gravel
%FINES 14.5 0.75" 16.8 0.00 0.00 100.00 fine gravel
%TOTAL 100.0 0.50" fine gravel
0.375" 76.5 59.70 18.65 81.35 fine gravel
D10(mm) #4 117.3 100.50 31.40 68.60 coarse sand
D30(mm) #10 168.7 151.90 47.45 52.55 medium sand
D60(mm) #20 medium sand
Cu #40 234.5 217.70 68.01 31.99 fine sand
Cc #60 fine sand
#100 278.0 261.20 81.60 18.40 fine sand
#200 290.4 273.60 85.47 14.53 fines
PAN 336.9 320.10 100.00 0.00 silt/clay
12' 3' 2' 1'.75' .375' #4 #10 #20 #40 #60 #100 #200
100
90
80
P 70
A 60
S 50
40
S 30
1 20
N 10
G 0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION Silty gravelly SAND
USCS SM
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. KMW
,_
RILEYGROUP
THE RILEY GROUP, INC. PHONE: (425)415-0551
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE joiympic Sunset View Apartments SAMPLE ID/TYPE B-2
PROJECT NO. 2020-200-1 SAMPLE DEPTH 14'
TECH/TEST DATE JDH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil&Tare(gm) (WI) 558.2 Weight Of Sample(gm) 502.5
Wt Dry Soil&Tare(gm) (w2) 502.5 Tare Weight (gm) 16.2
Weight of Tare(gm) (w3) 16.2 (W6) Total Dry Weight(gm) 486.3
Weight of Water(gm) (w4=wl-w2) 55.7 SIEVE ANALYSIS
Weight of Dry Soil(gm) (w5=w2-w3) 486.3 Cumulative
Moisture Content(%) (w4/w5)*100 11 Wt Ret (Wt-Tare) (%Retained) %PASS
+Tare Uwt ret/wW1001 (100-%ret)
%COBBLES 0.0 12.0" 16.2 0.00 0.00 100.00 cobbles
•C GRAVEL 6.3 3.0" 16.2 0.00 0.00 100.00 coarse gravel
•F GRAVEL 29.7 2.5" coarse gravel
•C SAND 9.8 2.0" coarse gravel
%M SAND 18.3 1.5" 16.2 0.00 0.00 100.00 coarse gravel
•F SAND 27.1 1.0" coarse gravel
•FINES 8.8 0.75" 47.0 30.80 6.33 93.67 fine gravel
•TOTAL 100.0 0.50" fine gravel
0.375" 115.4 99.20 20.40 79.60 fine gravel
D10(mm) 0.09 #4 191.2 175.00 35.99 64.01 coarse sand
D30(mm) 0.31 #10 239.1 222.90 45.84 54.16 medium sand
D60(mm) 3.5 #20 medium sand
Cu 38.9 #40 328.2 312.00 64.16 35.84 fine sand
Cc 0.3 #60 fine sand
#100 441.9 425.70 87.54 12.46 fine sand
#200 459.9 443.70 91.24 8.76 fines
PAN 502.5 486.30 100.00 0.00 silt/clay
12" 3" 2" 1".75" .375" #4 #10 #20 #40 #60 #100 #200
100
90
80
P 70
A 60
S 50
40
S 30
20
N 10
Trl-
G 0
3-T-
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION Gravelly SAND with some silt
USCS SP-SM
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. KM W
,-
RILEYGROUP
THE RILEY GROUP, INC. PHONE: (425)415-0551
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE B-2
PROJECT NO. 2020-200-1 SAMPLE DEPTH 18'
TECH/TEST DATE 1DH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil&Tare(gm) (wl) 548.5 Weight Of Sample(gm) 504.4
Wt Dry Soil &Tare(gm) (w2) 504.4 Tare Weight (gm) 16.1
Weight of Tare(gm) (w3) 16.1 (W6) Total Dry Weight(gm) 488.3
Weight of Water(gm) (w4=wl-w2) 44.1 SIEVE ANALYSIS
Weight of Dry Soil(gm) (w5=w2-w3) 488.3 Cumulative
Moisture Content(%) (w4/w5)*100 9 Wt Ret Wt-Tare (%Retained) %PASS
+Tare f(wt reUw61i= 100-floret
%COBBLES 0.0 12.0" 16.1 0.00 0.00 100.00 cobbles
•C GRAVEL 2.8 3.0" 16.1 0.00 0.00 100.00 coarse gravel
%F GRAVEL 26.7 2.5" coarse gravel
•C SAND 8.1 2.0" coarse gravel
•M SAND 10.4 1.5" 16.1 0.00 0.00 100.00 coarse gravel
•F SAND 18.4 1.0" coarse gravel
%FINES 33.6 0.75" 29.8 13.70 2.81 97.19 fine gravel
%TOTAL 500.0 0.50" fine gravel
0.375" 100.4 84.30 17.26 82.74 fine gravel
DSO(mm) #4 160.3 144.20 29.53 70.47 coarse sand
D30(mm) #10 199.7 183.60 37.60 62.40 medium sand
D60(mm) #20 medium sand
Cu #40 250.5 234.40 48.00 52.00 fine sand
Cc 1 #60 1 1 1 fine sand
#100 317.5 301.40 61.72 38.28 fine sand
#200 340.3 324.20 66.39 33.61 fines
PAN 504.4 488.30 100.00 0.00 silt/clay
12" 3" 2" 1".75" .375" 84 910 #20 A40 #60 5100 8200
a� 100
90
80
P 70 NIL I
A 60
S SO 44.
40
S 30
1 20
N 10
G 0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION Silty SAND with some gravel
USCS SM
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. KMW
,-
RILEYGROUP
THE RILEY GROUP, INC. PHONE: (425)415-0551
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE TP-1
PROJECT NO. 2020-200-1 SAMPLE DEPTH 10,
TECH/TEST DATE JDH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil&Tare(gm) (wl) 821.0 Weight Of Sample(gm) 793.6
Wt Dry Soil&Tare(gm) (w2) 793.6 Tare Weight (gm) 16.0
Weight of Tare(gm) (w3) 16.0 (W6) Total Dry Weight(gm) 777.6
Weight of Water(gm) (w4=w1-w2) 27.4 SIEVE ANALYSIS
Weight of Dry Soil(gm) (w5=w2-w3) 777.6 Cumulative
Moisture Content(%) (w4/w5)'100 4 Wt Ret Wt-Tare (%Retained) %PASS
+Tare f(wtret/w61•1001 (100-%ret)
%COBBLES 0.0 12.0" 16.0 0.00 0.00 100.00 cobbles
•C GRAVEL 53.6 3.0" 16.0 0.00 0.00 100.00 coarse gravel
•F GRAVEL 21.1 2.5" coarse gravel
•C SAND 11.1 2.0" coarse gravel
•M SAND 8.1 1.5" 354.0 338.00 43.47 56.53 coarse gravel
•F SAND 2.4 1.0" coarse gravel
•FINES 3.7 0.75" 432.9 416.90 53.61 46.39 fine gravel
•TOTAL 100.0 0.50" fine gravel
0.375" 512.9 496.90 63.90 36.10 fine gravel
D10(mm) 0.85 #4 597.3 581.30 74.76 25.24 coarse sand
D30(mm) 6.2 #10 683.8 667.80 85.88 14.12 medium sand
D60(mm) 39 #20 medium sand
Cu 45.9 #40 746.4 730.40 93.93 6.07 fine sand
Cc 1.2 #60 fine sand
#100 761.2 745.20 95.83 4.17 fine sand
#200 765.0 749.00 96.32 3.68 fines
PAN 793.6 777.60 100.00 0.00 silt/clay
12" 3' 2' 1".75" .375' #4 #10 #20 #40 #60 #100 #200
% 100
90
80
P 70
A 60
50 S
40
S 30
1 20
Jill I
N 10 -
G 0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION GRAVEL with some sand and trace silt
USCS GW
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. KM W
,-
RILEYGROUP
THE RILEY GROUP, INC. PHONE: (425)415-0551,
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE TP-4
PROJECT NO. 2020-200-1 SAMPLE DEPTH 8.
TECH/TEST DATE JDH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil&Tare(gm) (w1) 788.2 Weight Of Sample(gm) 750.1
Wt Dry Soil&Tare(gm) (w2) 750.1 Tare Weight (gm) 16.0
Weight of Tare(gm) (w3) 16.0 (W6) Total Dry Weight(gm) 734.1
Weight of Water(gm) (w4=wl-w2) 38.1 SIEVE ANALYSIS
Weight of Dry Soil(gm) (w5=w2-w3) 734.1 Cumulative
Moisture Content(%) (w4/w5)*100 5 Wt Ret Wt-Tare (%Retained) %PASS
+Tare LWL t/w61.100} (100-%ret)
%COBBLES 0.0 12.0" 16.0 0.00 0.00 100.00 cobbles
%C GRAVEL 32.1 3.0" 16.0 0.00 0.00 100.00 coarse gravel
%F GRAVEL 13.5 2.5" coarse gravel
%C SAND 9.5 2.0" coarse gravel
%M SAND 31.8 1.5" 16.0 0.00 0.00 100.00 coarse gravel
%F SAND 11.3 1.0" coarse gravel
%FINES 1.9 0.75" 251.8 235.80 32.12 67.88 fine gravel
%TOTAL 100.0 0.50" fine gravel
0.375" 295.1 279.10 38.02 61.98 fine gravel
D10(mm) 0.3 #4 350.6 334.60 45.58 54.42 coarse sand
D30(mm) 0.95 #10 420.1 404.10 55.05 44.95 medium sand
D60(mm) 8.5 #20 medium sand
Cu 28.3 #40 653.4 637.40 86.83 13.17 fine sand
Cc 0.4 #60 fine sand
#100 730.9 714.90 97.38 2.62 fine sand
#200 736.3 720.30 98.12 1.88 fines
PAN 750.1 734.10 100.00 0.00 silt/clay
12" 3' 2' 1'.75' .375' #4 #10 #20 #40 #60 #100 #200
100
90
80
P 70
A 60
S 50
40
S 30
1 20
N 10
G 0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION Gravelly SAND with trace silt
USCS SP
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. K M W
,-
RILEYGROUP
THE RILEY GROUP,INC. PHONE: (425)415-0551
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE TP-9
PROJECT NO. 2020-200-1 SAMPLE DEPTH 10,
TECH/TEST DATE JDH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil&Tare(gm) (wl) 457.7 Weight Of Sample(gm) 429.2
Wt Dry Soil&Tare(gm) (w2) 429.2 Tare Weight (gm) 16.0
Weight of Tare(gm) (w3) 16.0 (W6) Total Dry Weight(gm) 413.2
Weight of Water(gm) (w4=wl-w2) 28.5 SIEVE ANALYSIS
Weight of Dry Soil(gm) (w5=w2-w3) 413.2 Cumulative
Moisture Content(%) (w4/w5)*100 7 Wt Ret Wt-Tare (%Retained) %PASS
+Tare Uwt ret/w61'100} 100-%ret
•COBBLES 0.0 12.0" 16.0 0.00 0.00 100.00 cobbles
•C GRAVEL 7.7 3.0" 16.0 0.00 0.00 100.00 coarse gravel
•F GRAVEL 24.0 2.5" coarse gravel
•C SAND 21.1 2.0" coarse gravel
%M SAND 20.1 1.5" 16.0 0.00 0.00 100.00 coarse gravel
•F SAND 21.2 1.0" coarse gravel
•FINES 5.9 0.75" 47.8 31.80 7.70 92.30 fine gravel
•TOTAL 100.0 0.50" fine gravel
0.375" 77.7 61.70 14.93 85.07 fine gravel
D10(mm) 0.17 #4 146.8 130.80 31.66 68.34 coarse sand
D30(mm) 0.52 #10 234.1 218.10 52.78 47.22 medium sand
D60(mm) 3.4 #20 medium sand
Cu 20.0 #40 317.1 301.10 72.87 27.13 fine sand
Cc 0.5 #60 fine sand
#100 391.0 375.00 90.76 9.24 fine sand
#200 404.7 388.70 94.07 5.93 fines
PAN 429.2 413.20 100.00 0.00 silt/clay
100 12' 3' 2' 1'.75' .375' #4 #10 #20 #40 #60 #100 #200
90
80
P 70
A 60
50 S
40
S 30
1 20
N 10 TTF
G 0 flm
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION Gravelly SAND with some silt
USCS SP-SM
Prepared For: Reviewed By:
Horbor Custom Homes,Inc. KMW
,-
RILEYGROUP
THE RILEY GROUP, INC. PHONE: (425)415-0551,
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE TP-9
PROJECT NO. 2020-200-1 SAMPLE DEPTH 13'
TECH/TEST DATE JDH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil&Tare(gm) (w1) 997.0 Weight Of Sample(gm) 898.5
Wt Dry Soil&Tare(gm) (w2) 898.5 Tare Weight (gm) 16.1
Weight of Tare(gm) (w3) 16.1 (W6) Total Dry Weight(gm) 882.4
Weight of Water(gm) (w4=w1-w2) 98.5 SIEVE ANALYSIS
Weight of Dry Soil(gm) (w5=w2-w3) 882.4 Cumulative
Moisture Content(%) (w4/w5)*100 11 Wt Ret Wt-Tare (%Retained) %PASS
+Tare LW ret/w61`100} (100-0Zret)
%COBBLES 0.0 12.0" 16.1 0.00 0.00 100.00 cobbles
•C GRAVEL 0.0 3.0" 16.1 0.00 0.00 100.00 coarse gravel
%F GRAVEL 20.5 2.5" coarse gravel
%C SAND 13.6 2.0" coarse gravel
%M SAND 29.3 1.5" 16.1 0.00 0.00 100.00 coarse gravel
%F SAND 28.7 1.0" coarse gravel
%FINES 7.9 0.75" 16.1 0.00 0.00 100.00 fine gravel
%TOTAL 100.0 0.50" fine gravel
0.375" 110.0 93.90 10.64 89.36 fine gravel
D10(mm) 0.11 #4 197.1 181.00 20.51 79.49 coarse sand
D30(mm) 0.32 #10 316.9 300.80 34.09 65.91 medium sand
D60(mm) 1.7 #20 medium sand
Cu 15.5 #40 575.6 559.50 63.41 36.59 fine sand
Cc 1 0.5 #60 1 1 fine sand
#100 793.9 777.80 88.15 11.85 fine sand
#200 828.9 812.80 92.11 7.89 fines
PAN 898.5 882.40 100.00 0.00 silt/clay
12• 3" 2" 1•.75" .375" #4 #10 #20 #40 #60 #100 #200
100
90
80
P 70
A 60
S SO
40
S 30
1 20
N 10
7-11
G 0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION SAND with some gravel and silt
USCS SP-SM
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. KMW
,-
RILEYGROUP
THE RILEY GROUP, INC. PHONE: (425)415-0551
17522 Bothell Way NE FAX: (425)415-0311
Bothell,WA 98011
GRAIN SIZE ANALYSIS
ASTM D421, D422, D1140, D2487, D6913
PROJECT TITLE Olympic Sunset View Apartments SAMPLE ID/TYPE TP-9
PROJECT NO. 2020-200-1 SAMPLE DEPTH 13.5'
TECH/TEST DATE JDH/EW 5/15/2020 DATE RECEIVED 5/15/2020
WATER CONTENT(Delivered Moisture) Total Weight Of Sample Used For Sieve Corrected For Hygroscopic Moisture
Wt Wet Soil&Tare(gm) (w1) 812.3 Weight Of Sample(gm) 734.0
Wt Dry Soil&Tare(gm) (w2) 734.0 Tare Weight (gm) 16,1
Weight of Tare(gm) (w3) 16.1 (W6) Total Dry Weight(gm) 717.9
Weight of Water(gm) (w4=wl-w2) 78.3 SIEVE ANALYSIS
Weight of Dry Soil(gm) (w5=w2-w3) 717.9 Cumulative
Moisture Content(%) (w4/w5)*100 11 Wt Ret Wt-Tare (%Retained) %PASS
+Tare f(wt ret/w6l*1001 (100-%ret)
•COBBLES 0.0 12.0" 16.1 0.00 0.00 100.00 cobbles
•C GRAVEL 1.9 3.0" 16.1 0.00 0.00 100.00 coarse gravel
•F GRAVEL 29.3 2.S" coarse gravel
%C SAND 19.0 2.0" coarse gravel
%M SAND 24.9 1.5" 16.1 0.00 0.00 100.00 coarse gravel
•F SAND 19.9 1.0" coarse gravel
•FINES 5.1 0.75" 29.5 13.40 1.87 98.13 fine gravel
%TOTAL 100.0 0.50" fine gravel
0.375" 103.6 87.50 12.19 87.81 fine gravel
D10(mm) 0.18 #4 239.9 223.80 31.17 68.83 coarse sand
D30(mm) 0.6 #10 376.5 360.40 50.20 49.80 medium sand
D60(mm) 3.1 #20 medium sand
Cu 17.2 #40 554.9 538.80 75.05 24.95 fine sand
Cc 0.6 #60 fine sand
#100 677.9 661.80 92.19 7.81 fine sand
#200 697.6 681.50 94.93 5.07 fines
PAN 739.0 722.90 100.70 -0.70 silt/clay
12" 3" 2" 1".75" .375" #4 #10 #20 #40 #60 #100 #200
% 100
90
80
P 70
A 60
S 50
40
S 30
1 20
N 10
G 0
1000 100 10 1 0.1 0.01 0.001
Grain size in millimeters
DESCRIPTION Gravelly SAND with some silt
USCS SP-SM
Prepared For: Reviewed By:
Harbor Custom Homes,Inc. KM W
0 ,
,-
RILEYGROUP
Geotechnical Engineering Report June 9,2020
Olympic Sunset View Apartments,Belfair, Washington RGI Project No.2020-200-1
APPENDIX B
SLOPE STABILITY
RGI performed the slope stability analysis by using a computer program, Slide version 6.0,
which was developed by Rocscience. The safety factor for the critical surfaces was
calculated by the Bishop Method. The analyses were performed for the slopes under post-
construction static conditions.
� 1 �
Safety Factor
0.000
0.250
0.500
0.750
1.000
1.250
u' 1.500
c') 1.750
2.000
2.250
2.500
2.750 Unit Weight Cohesion Water
3.000 Material Name Color (lbs/ft3) Strength Type (lb/ft2) Phi Surface Ru
0 3.250
3.500 Vashon Till ■ 130 Mohr-Coulomb 100 36 None 0
3.750
4.000 Vashon Advance Outwash _ 135 Mohr-Coulomb 50 38 None 0
4.250
4.500
4.750 .
m 5.000
5.250
5.500
5.750 1.612
6.000+.
0
co
n
N
o a
N T
-40 -20 0 20 40 60 80 100 120 140 160 180 200
Project
Olympic Sunset View Apartments
tip,
� Aff AnO-sDe-notion Northeast Wall -Static
�enc Drawn By ELW S`aie 1:300 Company Riley Group, Inc.
Date 5/27/2020, 9:39:41 AM File Name Northeast Wall -Static.slim
AIDEINTERPRET 6.009
c4 . Safety Factor
0.000 2.1.04
0.250
0.500
0.750
1.000
1.250
1.500 /
1.750
2.000
2.250 . . . . . .
2.500
2.750 Material Name Color Unit Weight Strength Type Cohesion Phi Water Ru
3.000 (lbs/R3) (lb/R2) Surface
3.250
3.500 Fill 125 Mohr-Coulomb 0 36 None 0
3.750
4.000 Vashon Advance Outwash 135 Mohr-Coulomb 50 38 None 0
4.250. . .
4.500
UI)� 4,750
a 5.000
5.250
5.500
5.750
6.000+
. . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . .
O . . . . . . . . . . .
. . . . . . . . . . . . . . .
N
.
. .
.
O
-50 0 50 100 150 200 250
Protect
Olympic Sunset View Apartments
- °-aWtao West-Central Wall-Static
Dram BY ELW Scale 1:400 C+?A_Y Riley Group, Inc.
m,mRpwr6009 °ate 5/27/2020, 9:39:41 AM RkAW m West-Central Wall-Static.slim