HomeMy WebLinkAboutCOM2012-00128 Cancelled Signs for Restaurant - COM Permit / Conditions - 5/14/2013 ` MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext. 352
Shelton, WA 98584
i�
COMMERCIAL BUILDING PERMIT COM2012-00128
OWNER: FIRST OLYMPIC HOLDINGS LLC RECEIVED: 10/22/2012
CONTRACTOR: LICENSE: EXP: ISSUED: 11/14/2012
SITE ADDRESS: 51 NE STATE ROUTE 300 STE A BELFAIR EXPIRES: 5/14/2013
PARCEL NUMBER: 123294200190
LEGAL DESCRIPTION: PCL 4 OF BLA#01-21 PTN OF NW SE SURVEY 26/167 & 168
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
SIGNS FOR RESTRAUNT(VARIOUS) DAIRY QUEEN IN FAIR
General Information Con ructi Occupancy Information
No. of nits: Type of Constr.:
Type of Use: SIGN Insp.Area:
Type of Work: NEW Fire Dist.: 2 o. f Bat oom Occ. Group:
Valuation: o. of ri Exit Design. Load:
ildi Height:
Pre-M nufactured nit Informatio Square Footage Information
Make: Length: Lot Size:
Model: Width: Building:
Year: Serial No.: Basement: Parking Spaces:
tback Informati
Shoreline 8 Planning Information
Front: horeline: Ft.
Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.:
Side 1: Ft. SEPA?: Comp. Plan Desig.:
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2012-00128 Please refer to the following pages for conditions of this permit. Page 1 of 4
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type 9y Date Amount Receipt
Total
CASE NOTES FOR
COM2012-00128
CONDITIONS FOR
COM2012-00128
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-.0�8&/41—r-S
on signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
2) Owner/Agent is r s onsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title
14.28.
X
3) Approve p signs and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
4) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are n t on site, Approval WILL NOT be
granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour ill be c and collected by the Mason County
Building Department prior to any further inspections being performed or approvals granted. X �
5) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site, Approval WILL
NOT be granted., ddition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason
Co n �uil partment prior to any further inspections being performed or approvals granted.
6) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY
IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF U OCCUPANCY WOULD RESULT IN PERMIT
REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x
7) Changes to appr building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilation requirements),
Build'nlu echanical Codes and/or Mason County Regulations shall be approved prior to construction.
X
COM2012-00128 Page 2 of 4
-8) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIREID PER MASON COUNTY BUILDING DEPARTMENT AND THE
ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Xasgn Coup_*,ding Inspector shall be made prior to requesting additional inspections.
9) All property lilines shall be clearly identified at the time of foundation inspection. X
10) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The
failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being
non-com I' County ordinances and building regulations.
11) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the
time for action for a eriod not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control
of the permit h ave prevented action from being taken. No more than one extension may be granted.
X
12) All construction and demolition debris must be removed from the site area after project completion. Proper disposal,,o nstruction debris must be
on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X
13) Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is Festival Retail
x n
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or,if construction or work is suspended for a period of 180 days at any
time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be
occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent omthe owners behalf, represents that the information provided is accurate
and grants employees of Mason County/ c .� o the above described property and structure for review'and inspection.
OWNER OR AGENT: C� C/`-✓ DATE:
COM2012-00128 Page 3 of 4
-n
0
CONCRETE MECHANICAL MANUFACTURED HOME 56
cn
O Date By
Footings I Setbacks Gas Piping Ribbons
0
0 Intertof Date By Interior Dole By Date By
r1j Exterior Date By Exterior-Date By
00 Set-up
Point Load I Isolated Footings INSULATION Dale Br
BG I SLAB INSULATION 0
Date By Data FIRE DEPARTMENT
By x
Foundation Walls Floors Da w 0
Date BY Data By DECKS
FRAMING Walls Date try Z
Data By G)
Date By PROPANE TANKS
Vault Date
PLUMBING
Date By OTHER 0
Groundwork Attic
Typ-
U a 1. Date By
i___1___1_11______ I Data 13Y
D.W.'V !DRYWALL Type- 0
0
Int.Brace Wall Date By
Da;P, By fJale By
FINAL INSPECTION CD
Water Line Fire Seperatim
Date 13 y Date By D@w Ly
CD
Pass or Request Inspect. C?
Type of Insp. Fail Date Date Done By Comments N)co
(D
_N
0
A