Loading...
HomeMy WebLinkAboutCOM2008-00114 Final Demo of Sande's Boatworks - COM Permit / Conditions - 4/16/2008 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 IP14 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2008-00114 OWNER: BE FAIR LLC RECEIVED: 1/30/2008 CONTRACTOR: LICENSE: EXP: ISSUED: 3/26/2008 SITE ADDRESS: 23940 NE STATE ROUTE 3 BELFAIR EXPIRES: 9/26/2008 PARCEL NUMBER: 123294190190 LEGAL DESCRIPTION: TR 19 OF NE SE LOT: C OF SP#1059 PROJECT DESCRIPTION: DIRECTIONS TO SITE: Demolition of Sande's Boatworks for new Rite Aide Drug store. southease corner of the intersection of State Highway 3 and Clifton Lane in Belfair. General Information Construction&Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: Type of Use: PUB Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: DEM Fire Dist.: 2 No. of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: SEPA?: Model: Width: Ft. Rear: Ft. Slope: Ft. Shoreline Desi Side 1: Ft. g" Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Demolition Fee CMH 1/30/2008 $110.00 S22008000 Building State Fee CMH 1/30/2008 $4.50 S22008000 Total $114.50 BLD2008-00114 Please referto the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR r BLD2008-00114 CONDITIONS FOR BLD2008-00114 1) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 2) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X 3) The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. 4) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 5) THE DEMOLITION AND DISPOSAL OF DEMOLITION DEBRIS MUST MEET REQUIREMENTS AS PER MASON COUNTY REGULATIONS. IT IS UNLAWFUL FOR ANY PERSON TO CAUSE OR ALLOW THE DEMOLITION (OR MAJOR RENOVATION) OF ANY STRUCTURE UNLESS ALL ASBESTOS CONTAINING MATERIALS HAVE BEEN REMOVED FROM THE AREA TO BE DEMOLISHED. WORK SHALL NOT COMMENCE ON AN ASBESTOS PROJECT OR DEMOLITION UNLESS THE OWNER OR OPERATOR HAS OBTAINED WRITTEN APPROVAL FROM ORCAA, 2490 B LIMITED LANE NW, OLYMPIA WA 98502, 360-586-1044, 800-422-5623, WWW.ORCAA.ORG X 6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X 1 7) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X BLD2008-00114 Please refer to the following pages for conditions of this permit. 2 of 3 his pe,;nit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection. The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. OWNER OR AGENT DATE: PI refer t the following pages for conditions of this ermit._ easeo p 3 of 3 BLD2008 001149 P 9 co o CONCRETE MECHANICAL MANUFACTURED HOME W rn O Date By T w Footings/Setbacks Gas Piping Ribbons D C) Interior Date By Interior-Date By Date By - 0 Extergr Date By Exterior-Date By Set-up r Point Load!Isolated Footings INSULATION Date By 0 BG 1 SLAB INSULATION Date By Date By FIRE DEPARTMENT Foundation Walls Floors Date By Date By Data By DECKS FRAMING Walls Date By Date By Date By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Type Date By Date By D.W.v DRYWALL Type- Int Brace Wall Date By Date By Date By FINAL INSPECTION w Water Line Fire Separation N Date By Date By Date G •e:� BY 7 O 00 Pass or Request Inspect. c ° Type of Insp. Fail Date Date Done By Comments a s Ffly / v 0 8 _ a 0 N O to 0 M