HomeMy WebLinkAboutBLD2009-00341 Replace SFR - BLD Permit / Conditions - 5/29/2009 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
w Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
too Shelton, WA 98584
too RESIDENTIAL BUILDING PERMIT BLD2009-00341
OWNER: EDWARD BLAKE
CONTRACTOR: LICENSE: EXP: RECEIVED: 5/4/2009
SITE ADDRESS: 160 NE REDFISH LN BELFAIR ISSUED: 5/29/2009
PARCEL NUMBER: 123174291002 EXPIRES: 11/29/2009
LEGAL DESCRIPTION: N1/2 N1/2 NW SE EX TR 2 OF SP#2592 #606833 PCL 2 OF BLA#99-18
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
New residence to replace fire damaged structure. Old Belfair Hwy 1.5 miles to Redfish Ln. on the left, follow to address.
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: 3 Type of Constr.: V-B
Type of Use: SF Insp. Area: No. of Bathrooms: 3 Occ. Group: R-3 Lot Size: Deck:
Type of Work: NEW Fire Dist.: 2 No. of Stories: 2 Occ. Load: Building:2,774 Garage-Attached 1,211
Valuation: Building Height: Occ. Status: Primary Basement: cov. deck 288
Manufactured Home Information Setback Information Shoreline & Planning Information
Make: Length: Ft. Front: W 40.0 Ft. Shoreline: Ft. Water Body: manmade pond
Rear: E 214.0 Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Side 1: N 265.0 Ft. Shoreline Desig.: Not Applicable
Year: Serial No.: Side 2: S 40.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type City. Type By Date Amount Receipt
Dishwasher 1 Exhaust Hood 1 Plan Check Fee KKK 5/4/2009 $1,450.38 S22009000
Hosebibs 3 Furnace<100K 1 EH Plan Review KKK 5/4/2009 $41.00 S22009000
Kitchen Sink 1 Gas Outlets 3 Water Adequacy Plan Review KKK 5/4/2009 $41.00 S22009000
Lavatories 3 Propane Tank 1 Planning Review Fee KKK 5/4/2009 $205.00 S22009000
Showers 1 Ventilation Fan 5 Fire Warden Review KKK 5/4/2009 $73.00 S22009000
Water Closets (Toilets) 3 Woodstove 1 EH Plan Review ADR 5/6/2009 $62.00 S12009000
Water Heaters 1 Dryer Vent 1 Building State Fee RTB 5/26/2009 $4.50 512009000
Bath Tubs 1 Building Permit Fee RTB 5/26/2009 $2,231.35 S12009000
Clothes Washer 1 Mechanical Base Fee RTB 5/26/2009 $28.50 S12009000
Mechanical Permit Fee RTB 5/26/2009 $237.70 512009000
Plumbing Permit Fee RTB 5/26/2009 $110.60 S12009000
Plumbing Base Fee RTB 5/26/2009 $24.70 S12009000
Total $4,509.73
BLD2009-00341 Please referto the following pages for conditions of this permit. 1 of 6
CASE NOTES FOR
` BLD2009-00341
CONDITIONS FOR
BLD2009-00341
1) Approved per dimensions and setbacks on submitted site plan, including 40 feet from edge of pond to the south. Setbacks are measured from the furthest
projection of the structure.
X r ,
2) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered.
A. Drainfield/ Reserve requires a 1 Oft setback from all footing/foundations.
B. Septic tank(s) requires 5ft setback from all footing/foundations.
C. No foundation drains within 30ft, down gradient of drainfield/reserve area.
x .
3) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be
installed and maintained until upland vegetation has become established. X <- t"_-e>
4) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement,
inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the
owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel
prior to the commencement of any development activities. 'NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes
an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are
responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system
of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of
the building permit the owner/agent/contractor acknowledging that all components of the stormwater management system have been installed as
approved on the stormwater site plan. X
5) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
x 12
6) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approved Site Plan" to ensure these structures are shown and meet the setback conditions listed.
X -2 z 1
BLD2009-00341 Please referto the following pages for conditions of this permit. 2 of 6
7) Window in den may not meet minimum egress requirements. If window in den does not meet minimum egress requirements owner acknowledges den
will not be used as sleeping room.
X
8) All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and
construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X :z ;:Z
145
9) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. The pegson signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X :� _�_1J
10) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department pQgr tp any further inspections being performed or approvals granted.
X 16
11) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X , /;7
12) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved Documents will result in failure of required building inspections.
X !,
13) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X rl RJ
14) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
x Z
15) Washington State Energy Code Compliance has been approved using the following:
Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors
(Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab
Insulation R-10.
Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the
underside of the r9of sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation.
X _i 5 ./9
16) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X % _
BLD2009-00341 Please referto the following pages for conditions ofthis permit. 3 of 6
17) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
X
18) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
x �1
19) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project. ;
X
20) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
X �
21) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall bg madeyrior to requesting additional inspections.
X <. z ✓
22) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks filled
on site must be located a minimum of 10' from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system
air intake (direct vent appliance, ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane
tanks less than 125 gallons must also be located a minimum of 5' from any building opening (foundation vents, windows, doors etc). Setback to the public
way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be
the greater of 5-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective
bollards must be install,�d.
X
BLD2009-00341 Please referto the following pages for conditions of this permit. 4 of 6
2�i) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All Propane tanks
between 125 and 500 gallons must be located a minimum of 10' from any building, possible source of ignition (electrical outlets, electrical fixtures,
compressors, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Setback to the public way, or access easements
shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 10-ft or as
specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective bollards must be
installed.
X
24) All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks must
meet the installation requirements and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks.
X
25) Fuel piping shall be inspected after the installation of fuel piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the
time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall
not be used until the final inspection has been performed and approved by a Mason County building inspector.
Xi
26) The placement of small propane tanks are not normally subject to a permit review by the Planning Department, however, propane tanks are subject to
Planning Department regulations. Such regulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams,
wetlands, slopes, etc.) If you think such features exist on or nearby your property, please contact the Planning Department so that exact setback
requirements can be determined. X - %
27) All property lines shall be clearly identified at the time of foundation inspection. X '
28) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X <
29) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X ?6
30) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X
BLD2009-00341 Please refer to the following pages for conditions of this permit. 5 of 6
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described property and structure for review and inspection.
OWNER OR AGENT. -Cell Z; /, y DATE:_ �77 "<^'
BLD2009-00341 Please refer to the following pages for conditions of this permit. 6 of 6
r _ '
o CONCRETE MECHANICAL v MA,NUFACTURED HOME
C) __._. Date /— �I—f By D
1P Footings!Setbacks Ribbons m
Gas Piping �7�/�
Interior Date By Interior-Date / �j/� By /;� - Date 8y
Exterior DateC/ c BY Exterior-Date /- -/67 B c�-u 0
Point Load l Isolated Footings INSULATION Date By D
Date By �� SLAB INSULATION By FIRE DEPARTMENT X
v
Foundation Wails Floors Date By
Date 6 -��•!7 By/ Data By DECKS
FRAMING walls Date By
Dale — By Data / w p By PROPANE TANKS
PLUMBING vault Date By
Date BY l� OTHER
Groundwork Attic
Date BY Date By Date By
D.W.v DRYWALL Type.
Date , ) By InL Brace Wall Date By W
Date BY FINAL INSPECTION
CD water Line Fire Separation /y C
Dale By
V� Date By Dale "7� a BY(J'�'� O
CD
` Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments
CD
CD
8 �/j /r✓6- t� ,,t1�v9 - l �l/'�/,��- O/c -X
O ZP/
0 Cn
a
m
FRAM s�,P�>r
i 4-T
i�.xJ'c��io�
r'I v-,w l ass U 211 J L&
0
1
330.22'
N&7-52-23W
5EA50NALRUNOFF \
EXI5TING 36'X 40' \)
POLE BARN
U1
o 0 LOT 2
EXI5TI140 24'X 24'
+ GARAGE p
z o
O
4 �
50' z
oW
a �' W
s n � �/
o LL
I NG12'X12 I w o J
AZEBO
141.04'
POND U� EXI5TING
DRIVEWAY
LL I
1
0
N \ �O
r' LOT
i
�\ 339.17
� � � Um
i
EXISTING 36'X 40'
POLE BARN
t� 5EA5ONAL RUNOFF
N
LOT 2 N
oui
z EXISTING 24'X 24'
GARAGE
50'
1"=40'
50'
i
I PROP05ED /I
C�0 I RESIDENCE / I
� EXISTING
I/ I DRIVEWAY
ROOF LINE
EXISTING
` I DRAINFIELD
PATIO I I
/kILEXI5TING 12'X 12'
GAZEDO
141.04'
N6�BDoo. �
SAY
� o �
EXISTING pR1V�wgY I
WELL
MASON COUNTY PERMIT NO. . .,
BUILDING PERMIT APPLICATION
426 W. Cedar- P.O. Box 186, Shelton, WA 98584 �
Shelton (360) 427-9670 • Belfair (360) 275-4467 • Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner I rA h F TdLof Company Name
Mailing Address `- Mailing Address
City 10 tate LnJ.A Zip Code City State Zip Code
Phone ''` c �, 6 Other Ph. L/I S7 Phone Other Ph.
Lien/Title Holder ^' Contractor Reg. # Exp.
Email address 12" . SS37.5 (-�) M5A) &V"l E Mail Address
Drivers Lic. # DOB "° "7_ (, Drivers Lic. # DOB
SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic
Connect to Water System Name of Water System cK- LAX )e • Aw
Well Sewer System Name of Sewer System
PARCEL INFORMATION r- 12 Digit Parcel No. Fire District
Legal Description NW 114 `'X 2 of
Site Address (Please include street name street number and city) AAA n. 11 4.Al,_A °,644
Directions to site �'` ®iv OLD 4 -'-AEA
T 4 -s AI T'
Will timber be cut and sold in parcel preparation?Yes/ o
Is property within 200' of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No
TYPE OF JOB - New Add Alt Repair Other , ¢r. . PRIMARY RESIDENCE ❑ SEASONAL ❑
Use of Building Describe Work ,h A)FW
No. of Bedrooms No. of Bathrooms Square Footage- 1 st Floor 2nd Floor
3rd Floor Basement Deck— Covered Deck Other Sq. ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? Yes/ No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative, or the contractor. I further declare
that I am entitled to receive this permit and to do the work as proposed in the application. I declare that I have obtained the permission from all
the necessary parties. If permission is required from any easement holder or any other party in interest regarding this application or the work
proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or
agent on owners behalf, represents that the informaticn provided is accurate and grants employees of Mason County access to the above
described property and structure for review and inspection. This permit/application becomes null & void if work or authorized construction is
not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY
MEANS OFA PROGRESS INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
X � .. Date:
Owner/Owners RepresentativeItCantractor (indicate which one)
FOR OFFICIAL USE BEYOND THIS POINT Accepted b : Date
DEPARTMENTAL REVIEW ARPWVMZ ENIED NOTES
Building Department A
Planning Department
Environmental Health Department
Fire Marshal
FEES
Building Permit Fee 3 Site Inspection
Plan Review Fee 3 EH Review Fee
Plumbing & Base Fee f,& dy ?D Planning Review Fee
Mechanical & Base fee 16111 710, 10 )_ - Other
Wood /Gas/ Pellet Stove Fee - P 0 State Fee y ��
Violation Fee 5 - . --P2 Pre-Paid at Submittal
Valuation $ TOTAL FEES