Loading...
HomeMy WebLinkAboutBLD2012-00802 SFR - BLD Permit / Conditions - 12/14/2012 .0' Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 279 Shelton, WA 98584 i� RESIDENTIAL BUILDING PERMIT BLD2012-00802 OWNER: DAVID NAVARRO RECEIVED: 10/18/2012 CONTRACTOR: ADAIR HOMES INC (360) 352-8571 LICENSE: ADAIRH"262RZ EXP: 1/9/2013 ISSUED: 12/14/2012 SITEADDRESS: 3937 NE OLD BELFAIR HWY BELFAIR EXPIRES: 6/14/2013 PARCEL NUMBER: 1230914000101 LEGAL DESCRIPTION: TR 1 OF SE NE PROJECT DESCRIPTION: DIRECTIONS TO SITE: NEW SFR ST RT 3 TO BELFAIR, L ON ST RT 300/FOLLOW TO OLD BELFAIR HWY, THEN TO SITE ADDRESS ON THE LEFT, SHARED DRIVEWAY WITH 3931,3933,3935 General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: NEW Fire Dist.: 2 No. of Stories: Occ. Load: Building: Valuation: $ 365,788.60 Building Height: Occ. Status: Basement: Manufactured;Home Information Setback Information Shoreline& Planning Information Make: Length: Ft. Front: N 215.0 Ft. Shoreline: Ft. Water Body: Rear: S 180.0 Ft. Slope: Ft. SEPA?: Model: Width: Ft. Shoreline Desig.: Not Applicable Side 1: E 565.0 Ft. Year: Serial No.: Side 2: W 690.0 Ft. I omp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Water Closets (Toilets) 4 Ventilation Fan 5 Plan Check Fee GMM 10/18/201 $ 1,509.78 S1201200000001 Lavatories 7 Exhaust Hood 1 Plan Check Fee GMM 10/18/201 $68.00 S2201200000001 Bath Tubs 3 Dryer Vent 1 Planning Review Fee GMM 10/18/201 $205.00 S2201200000001 Showers 2 Fire Warden Review GMM 10/18/201 $73.00 S2201200000001 Water Heaters 1 EH Plan Review KKK 10/18/201 $ 103.00 S6201200000001 Clothes Washer 1 Water Adequacy Plan Revi KKK 10/18/201 $ 103.00 S1201200000001 Kitchen Sink 1 Building State Fee DLC 11/16/201' $4.50 S2 2 0 1 2 00000001 Dishwasher 1 Building Permit Fee DLC 11/16/201: $99.50 S2201200000001 Hosebibs 2 Building Permit Fee DLC 11/16/201: $2,383.85 S1201200000001 Laundry Tray 1 ADJUST--Plan Check Fee DLC 11/16/201: $36.40 S1201200000001 Mechanical Permit Fee DLC 11/16/201: $67.20 S1201200000001 Mechanical Base Fee DLC 11/16/201: $28.50 S1201200000001 Plumbing Permit Fee DLC 11/16/201' $ 188.90 S1201200000001 Plumbing Base Fee DLC 11/16/201: $24.70 S1201200000001 Total $4,895.33 BLD2012-00802 Please refer to the following pages for conditions of this permit. Page 1 of 5 CASE NOTES FOR BLD2012-00802 CONDITIONS FOR BLD2012-00802 1) PER TITLE 14 MASON COUNTY BUILDING CODE- CHAPTER 14.17, STANDARDS FOR FIRE APPARATUS ACCESS ROADS- 14.17.110: A fire apparatus access road in excess of 14%grade and more than 150'to new residential or commercial structures will require an automatic fire sprinkler system installed. Contact the Mason County Fire Marshal at(360)427-9670, extension 352, for further information. x ;V!l 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800 982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X /f/ S 3) All approved plans are required to be on-site for inspectiori�purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Depa Y for to any further inspections being performed or approvals granted. X 4) Owned,//d(ge t is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. 5) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or rr(emo a f�pproved documents will result in failure of required building inspections. S 6) The"approved"site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Xuildir� p'egartment prior to any further inspections being performed or approvals granted. BLD2012-00802 Please refer to the following pages for conditions of this permit. Page 2 of 5 31 Washington State Energy Code Compliance has been approved as follows: Heat Type: Electric wall mount heaters, Compliance Method: Prescriptive option III, with table 3A upgrades: Window(Max U-Factor):0.28, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-38, Ceiling Insulation R-38 advanced or R-49 standard.. In addition the following credit from Table 9-1 shall be completed: Option 3A: insulation upgrades listed above, and Option 55A: Water heating, Electric min. EF 0.93 X �/ 8) A permanent certificate, completed by the builder or registered design professional, shall be posted within three feet of the electrical distribution panel. The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, wails, foundation (slab, basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the solar heat gain coefficient(SHGC) of fenestration. Where there is more than one value for each component, the certificate shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service water heating equipment, duct leakage rates including test conditions as specified in WSEC Section 503.10.2, and air leakage results if a blower door test was conducted. Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 0.00030 Specific Leakage Area (SLA) when tested with a blower door at a press of 50 Pascals (0.2 inch w.g.). Testing shall occur at any time after rough in and after installation of penetrations of the building envelope, including penetrations for utilities, piumbing.,�electrical, ventilation, and combustion appliances and sealing thereof. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 750 square feet. Reference WSEC 105.4 Certificate and 502.4.5 Building Air Leakage Testing. Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2009 Certificate" and are available in %or The Mason County Permit Center will also have some available. X 9) A minimum of 50 percent of all luminaires shall be high efficacy luminaries unless lighting compliance was approved using the options available in WSEC Section 1520 or 1530. Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaries unless permanently installed outdoor luminaires are controlled by a motion sensor(s)with integral photocontrol photosensor or installed in or around swimming pools or water features. All fluorescent fixtures must be fitted with T-8 or smaller lamps (but not T-10 or T-12 lamps). Refer���c�ilV�C 505. X 10) WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. X �/' 11) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. X �� BLD2012-00802 Please refer to the following pages for conditions of this permit. Page 3 of 5 "12) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. "NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor i �k wledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. XQJ, , 13) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged ar» I collected by the Building Department prior to any further inspections being performed or approvals granted. X /� J 14) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permiati�. 15) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use as existing utility and drainage easement dedicated for that specific purpose. For further infon-nation regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project.X 5/J� ' 16) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance a ujation, must be reviewed and approved by Mason County prior to construction. X 17) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspe s all e made prior to requesting additional inspections. X //� 18) All property lines shall be clearly identified at the time of foundation inspection. X BLD2012-00802 Please refer to the following pages for conditions of this permit. Page 4 of 5 119) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with MasL ordinances and building regulations. X 20) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder l 7 vented action from being taken. No more than one extension maybe granted. X 21) ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITEAND SHALL NOT ADVERSLY AFFECT ANY ADJACENT PROPERTIES NOR INCREASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ANY STATE OR COUNTY CULVERTING/DITCHING SYSTEM 0R� AY. X 22) Approved a dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X �^ 23) Prior to final approval, all upland areas disturbed or newly reat�d by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X /S 24) Temporary erosion control measures must be implemented to prevent water qu adation of adjacent waters or properties. Silt fencing must be installed and maintained until upland vegetation has become established. X 25) All construction and demolition debris must be removed from the site after project completion.-Propf sposal of construction debris must be on land in such a manner that debris cannot_enter or cause water quality degradation of State waters. X 26) Xppli�t�ac,{�nowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is Rural Residential 5 zone. This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County-access to a above described property and structure for review 4nd inspection. -- S /a / /� OWNER OR AGENT: DATE: 117'I"•4�y SLrp, BLD2012-00802 Please refer to the following pages for conditions of this permit. Page 5 of 5 00T�O� Z CRETE MECHANICAL MANUFACTURED HOME D p Date By Footings I Setbacks Gas piping Ribbons > o Interior Date�j�7 By � Interior-Date By Date By � o Exterior Date By Exterior-Date B Se#-tp 0 N Point Load I lsola Footings INSULATION Date By y BG I SLAB INSULATION C Date BY Data By FIRE DEPARTMENT v Foundation Walls Floors Date By Date BY Data By DECKS FRAMING Wails Date By Date 2 By Data Z�- By Z PROPANE TANKS PLUMBING J vault Date By PLUMBING Date 10 ey OTHER Groundwork Attic Date By Type. Date By Date By DRYWALL RYWALL Type- Int.Brace Wall Date By � Date _ _ BY Date r' By FINAL INSPECTION v Cn Water Line Fire Separation N Date y By Date By �/ Date )Z a` By Uf CDC N Pass or Request Inspect. c 5 Type of Insp. Fail Date Date Done By Comments o0 Q o o 0 CL s CD 3OAS- _ — - /�/� y �U 1041 tis op jT / z L D J- oL (c L GC 1=-/mac ,AIL :,/�•!3 c3 Y � - i /,S 1, �P O Buil 9g.Permit # Z 2_—Le-5VZ MASON COUNTY • BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location ,3W7 d&e�7 e%GCjq!7/� �-wY This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items Listed below must be corrected to gain code compliance it n/!y /ice' G:o.�ivsc_cr-i®•✓ � 8t�.r ,,-,.� US/�= �� L✓.�,f3 lwl� i.-/� Er 722 /'&/10 roc. 'C/*-Tj//i' �y.�r3 ,y.t�L�" y T, J c✓� ,� LAQ MeW NG G C �.T/GSiv vj/C p , ou are hereby notified that the above corrections shall be made BEFT ROCEEDING WITH ANY FURTHER WORK �7 Callection when corredtions are macfe KeTore continuing /ZL Make corrections, items will be checked on next inspection l�o> �'' Q POC41L OV" j OK to 40z> — d- iY ,� i- A'i:4-v 4e'." J�C, §(T '' is not a complete inspection Department \. Date (� — 7-1-3 Inspector moos NOT ', MO OV ; THIS T A 'U Perm4# MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location 3�1 This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items listed below must be corrected to gain compliance a a nn - 3 — 1 Z " no 4 cl W, GQ -.t, oec t t C• � L 410 d` kJ l C—t— te J fnc You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ please contact our office ❑ Make corrections, items will be checked on next inspection regarding possible structural ❑ OK to damage incurred by recent "natural/man made" ❑This is not a complete inspection disasters.This is NOTa Date Department CORRECTION NOTICE. Inspector ��✓ . o* 4 NOT i ' 'I•fo, A* ` THIm4h, T'Arm * mff Permit#- L MASON COUNTY • BUILDING III 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location_ .3 '�73 7 060 This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items listed below must be corrected to gain compliance WIC ia<CCZe �7-Z o c Goo w!f — - .s T 124 7-o You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ please contact our office ❑ Make corrections, items will be checked on next inspection regarding possible structural ❑ OK to damage incurred by recent "natural/man made" ❑This is not a complete inspection disasters.This is NOT Date — l CORRECTION NOTICE. ? Department C� Inspector 7-7 7 at ,$ NOOT , 'MOOV T Tmh, TA rnff ���1 "►� �� �:�. ,,�� �.^'�� �v BuildingPermit # jL ��" I . MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location ;cz37 �?cam? This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been found: Items Listed below must be corrected to gain code compliance 5,OieC/sc F c. o ZE/ a y ON TdyT' ,e'3r/7" H 41,L Gib/2 rrc>R /3- lz!!f /,fir :f T l ,f A ryL5 /6 G/ Tiv�!- - e3dT i is Tft6 �v / i .✓ G✓9s i /17G�.yT' - -CT /C/9-✓ /� c�-/%iT ��iF�,--.►/r ,t30Y i O.OXV Ls/�'fL�� G 'eeOK .9 'Ooy r— ,� • —0 G � J You are ere tified that the above corrections shall be made'0'? �7, EFORE PROCEEDING WITH ANY FURTHER WORK— . ��iv/� W()Call for re-inspection when corrections are made before continuing ❑ Make corrections, items will be checked on next inspection p' O K to 6 c XE /�L' p� �'-/,�: `1� �_^ `S ❑ This is not a complete ins ection Department Date -t Inspector "= moos NOT MOOV THI , T ALOR e c From: Debbera Coker To: cbinder@adairhomes.com; hslipper@adairhomes.com; thayes@adairhomes.com CC: Larry Kelly; Ryan, Terry; Waters, Larry; cschmidt@adairhomes.com Date: 4/25/2013 9:31 AM Subject: WSEC 502.1.4.5, ceiling insulation Attachments: BLD2012-00802, photo taken 4.24.2013 by TFR, #4 of 5.jpg; BLD2012-00802, photo taken 4.24.2013 by TFR, #2 of 5.jpg Hello Adair Homes Staff, During a recent discussion concerning WSEC compliance one of our inspectors brought up his concern that the way baffles are being installed in Adair Homes does not comply with WSEC 502.1.4.5. A copy of the code text is copied and pasted below. According to the inspector OSB baffles are being installed and placed at the interior side of the top plate as opposed to the correct placement, beginning at the exterior of the top plate so that the required 1-inch ventilation space is maintained. The inspector also expressed concern that the baffles do not extend as required to maintain the required space between the baffle and insulation, 6-inches or 12-inches depending upon the type of insulation. This message is sent to you because the inspector said that he has seen the improper installation on occasion and we wanted to bring it to your attention for future reference. Two photos that depict the scenario taken at the Navarro job on April 24, 2013 are attached to this email. Let me know if you have questions. 2009 Washington State Energy Code Section 502.1.4.5 Roof/Ceiling Insulation: Where two or more layers of rigid board insulation are used in a roof assembly, the vertical joints between each layer shall be staggered. Open-blown or poured loose fill insulation may be used in attic spaces where the slope of the ceiling is not more than 3 feet in 12 and there is at least 30 inches of clear distance from the top of the bottom chord of the truss or ceiling joist to the underside of the sheathing at the roof ridge. When eave vents are installed, baffling of the vent openings shall be provided so as to deflect the incoming air above the surface of the insulation. Baffles shall be rigid material, resistant to wind driven moisture. Requirements for baffles for ceiling insulation shall meet the International Building Code Section 1203.2 for minimum ventilation requirements. When feasible, the baffles shall be installed from the top of the outside of the exterior wall, extending inward, to a point 6 inches vertically above the height of non-compressed insulation, and 12 inches vertically above loose fill insulation. Debbera Coker Mason County Building Department Building Inspector IV/Code Enforcement Phone: (360)427-9670 ext 510 FAX.- (360) 427-7798 e-Mail:DLC@co.mason.wa.us PO Box 279 426 West Cedar Street Shelton, WA 98584 � � . . � . � � � . . � r \ : -. - ° . . » § 2 . � . . ~\ \ , - g�x ,y� �, � « �� - " � .\ � , « w%«« «a.�w2a . \ .� � ^ . � � � a . � ` . �ƒy\ � \, \ � � > \ \���ƒ yy . . .. :. ..� � 2y« . � � . . ; . . , � . �y >r � \ . � � � r . . w � . \ p. a +: , � . - » / . m, / M� � ` . ~ �y, 2. . . _ - . . ��l � z �d2 «» '/\� m . . , � � � ;� ® %}���� � � � )/� } , . y:�z�> /\�/;\ . . ` . , � . � . � ` - , + /� ° » ® . . . . - -�\�.a \ ��\ , a :} : . ���\\\-\;>+ > � � �2 �:\ :>� y,- , . . . m>&, � � . . . �\/ \®x � � 2�w. \ � . . � y ��% x . . � . . � % m y/zzn\ ^ . � � t ! � \ � � \ \ \§ � m \®��-\ � � Z � � � , .% ` » ? . � � � y . .. . - -\\ «� , � � , � . . . . . - , � . . . . \�� � . . , }&y� � � ,_, v . ��< \ . :��� �\ f�\ . � 22/�} 2 � . �. \ . ��\�!\ _ _�~� ®� � � f d%� . �` : � . . � . �,��\�\ , . � � y. � �v~ -7 � - 2� �ƒ:/` . � � ^ � � �� \� ^ � ` \ y • I� • V y . x u 11 try.; x >r S s Kai•. � Ay'I r Y� �: V 1' ..,:. 4 I From: Heath Slipper<hslipper@adairhomes.com> To: Debbera Coker <Dlc@co.mason.wa.us> Date: 4/25/2013 3:20 PM Subject: Re: WSEC 502.1.4.5, ceiling insulation Hi Debbera, It sounds like the baffles still may not be 100% installed correctly. I went ahead and had the plywood baffles removed from this home and the insulators are installing the type that the inspectors are accustomed to seeing. Thanks On Thu, Apr 25, 2013 at 9:31 AM, Debbera Coker<Dlc@co.mason.wa.us>wrote: > Hello Adair Homes Staff, > During a recent discussion concerning WSEC compliance one of our > inspectors brought up his concern that the way baffles are being installed > in Adair Homes does not comply with WSEC 502.1.4.5. A copy of the code > text is copied and pasted below. >According to the inspector OSB baffles are being installed and placed at > the interior side of the top plate as opposed to the correct placement, > beginning at the exterior of the top plate so that the required 1-inch > ventilation space is maintained. The inspector also expressed concern that > the haffles ran nn+extend 2s required t0 maintain the requircd apace • behveen the baffle and insulation, 6-inches or 12-inches depending upon the > type of insulation. > This message is sent to you because the inspector said that he has seen > the improper installation on occasion and we wanted to bring it to your > attention for future reference. Two photos that depict the scenario taken > at the Navarro job on April 24, 2013 are attached to this email. Let me > know if you have questions. > 2009 Washington State Energy Code > Section 502.1.4.5 Roof/Ceiling Insulation: Where two or more layers of > rigid board insulation are used in a roof assembly, the vertical joints > between each layer shall be staggered. Open-blown or poured loose fill > insulation may be used in attic spaces where the slope of the ceiling is > not more than 3 feet in 12 and there is at least 30 inches of clear > distance from the top of the bottom chord of the truss or ceiling joist to > the underside of the sheathing at the roof ridge. When eave vents are > installed, baffling of the vent openings shall be provided so as to deflect > the incoming air above the surface of the insulation. Baffles shall be > rigid material, resistant to wind driven moisture. Requirements for baffles > for ceiling insulation shall meet the International Building Code Section > 1203.2 for minimum ventilation requirements. When feasible, the baffles > shall be installed from the top of the outside of the exterior wall, > extending inward, to a point 6 inches vertically above the height of > non-compressed insulation, and 12 inches vertically above loose fill > insulation. > Debbera Coker I �� N o r tlzwe st Irifra.re d LLC_ ,_..I..... �--a �: rt.�e ..�M.. L..__ 1 t�✓a[ .off..r'�-a, [ Nt +c.'a Building envelope air leakage testing Date: 06/17/2013 Builder: Adair Homes Owner: Nicole Navarro Address: 3937 NE Old Belfair Hwy Belfair, WA 98528 Pass (x) Fail ( ) Tested Leakage: SLA 0.00014 SLA Leakage Target 0.00030 Blower door data: CFM50 1164 ACH50 2.62 EQLA 116.4 Square Ft 3136 Technician: Brent Foster Northwest Infrared LLC Brent Foster 1910 Kempton St.SE,Olympia,WA 98501 Tel.: (360)786-6850 brent(a,northwestinfrared.com www.northwestinfrared.com R ECEIV13DREVISED FIRE 102012 �_DATELIA1 z- MARSHAL MA$W GOUT 1aYawo Farms BUILDING L-occu4:ny\ -689'1 5IB' R 1'7 11/16" R31' 1 3/16" 1 '7 5/8" 330' ■ �-131'4 11/16" LI) 0(02�02- 2n2)1 K�6 Ou�> br/L-P� 9)�- 44-�v- s ACCESS & GRADE INSPECTION BLD Za 1 a - � ADDRESS: nE o i(,--i Li - IPA INSPECTOR: DATE OF INSPECTION: FIRE SPRINKLER REQUIRED? (circle) NO YES IF fire sprinkler required, was notification letter mailed? DATE MAILED: DRIVEWAY ACCESS ( ) need post at access of driveway with reflective address numbers Length: Width: Surface: Size of turn-around: Condition of shoulders: Vertical clearance: GRADE OF DRIVEWAY %, OF ROAD ROAD ACCESS Length: Width: Surface: Condition of Shoulders: Vertical clearance: ( ) BURN PERMIT REQUIRED FOR LAND CLEARING FIRE. (_) LOT INSIDE UGA-NO OUTDOOR BURNING PERMITTED. LOT TOO SMALL FOR: BURN PERMITS 4 X 4 FIRES 2 X 3 FIRES PASSED ( ) FAILED ( ) ON HOLD ( ) --245)iL RE a� O K� U� Lv L .3�13 �i 3 �L 3 Z 'dr sr?�s`. ray �„/� 8-uy.; �, ���Y �.ra-9v�T ir►'a f�� '� �j=P-,4 �-W�4 �►'l�ts T-o�'��..� ,p,��vr�,,,�� ���1lt�r✓a� RX ��PL !-oafs ���� T h` '� �/�G�i�T- �'/'► '4 Gf�/�✓ /�i T'4•� �vG=�,�-r7-0 �Sv�P�y,��� n.Pair u,�✓ i�d�../1 .,7( Op�iQ f--&/r h`/ fl c,-