HomeMy WebLinkAboutMOR2024-00001 Forestry Waiver 2 parcels - MOR Permit / Conditions - 8/14/2024 MOR2024-00001, SEP2024-00017 Spear
August 28, 2024
FINDING OF FACT
MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
Building Vlll—615 W Alder Street;Shelton, WA 98584—360-427-9670
TO: Kell Rowen, Director of Community Development
FROM: Luke Viscusi, Planner; LViscusi@MasonCountVWA.gov; 360-427-9670 ext. 282
RE: Finding of Fact for MOR2024-00001, including SEP2024-00017.
APPLICANT: Logan Spear
APPLICATION DATE:June 10, 2024
PARCEL#'S: 31902-41-90003 and 31902-41-90004.
Mason County has reviewed the above referenced application for a 2-Acre Forest Practices
Moratorium Waiver and finds it in conformance with all applicable County land use regulations
in effect at the time of application.
FINDINGS
The proponent has filed a complete,signed application.
Yes.
The proponent has submitted a site plan appropriately depicting the area to be
waived from the development moratorium.
Yes, the waived area(approximately 1.75 acres)is outlined in red/pink on the
applicant's site plan.
That the development moratorium is the result of:
The WA Department of Natural Resources issued a Class Ill Forest Practices Activity,
known as FPA/N#2421461, effective on 0311212020. The resulting six-year
development moratorium (MCC 11.04.010) will expire on 0311212026.
That this Moratorium Waiver is in conformance with Mason County Code 11.04.090:
(a) The director of the department of community development shall have the
authority to approve, approve with conditions, or deny a request for a
1
MOR2024-00001, SEP2024-00017 Spear
waiver of the moratorium, pursuant to the procedures and requirements of
this chapter.
Yes, this signed Finding of Fact constitutes approval, or approval with conditions,
for the moratorium waiver.
That this Moratorium Waiver is in conformance with Mason County Code 11.04.100:
(a) The request will be made to the department of community development on
the application form provided by that department and accompanied by a
completed county environmental checklist and any established fees.
Yes.
(b) The application shall be reviewed as a Type II, administrative decision with
notice, as provided for in the Mason County Title 15 Development Code.
Yes, the Type 11 review(with public notice)procedures of MCC 15.09.040 were
followed. The Notice of Development Application was posted on-site on July 12,
2024, in accordance with MCC 15.07.010. The Notice of Administrative Final
Decision will be sent, in accordance with MCC 15.07.040,following the signing of
this Finding of Fact.
(c) Standards for waiving the moratorium:
(1) The development area shall be no larger than two acres in size.
Yes, the development area waived, which includes both tax parcels
31902-41-90003 and 31902-41-90004, is approximately 1.75 acres.
(2) The harvest and reforestation of the property shall be completed as
specified in the approved forest practices application/notice.That
portion of property subject to the waiver application shall be
excepted from reforestation.
Yes.
(3) There shall be no damage to a critical area or its associated
vegetation area nor to the shoreline area or that any damage to
those areas is repairable with restoration.
Yes no damage to critical areas or their buffers has occurred.
(4) The proposed development shall be consistent with the county
comprehensive plan and development regulations.
Yes, the proposed development is limited to residential use per the
criteria of the waiver process. The land use zoning for the properties are
Rural Residential5, which is consistent with residential development.
The activity proposed for the site affected by this waiver from a six-year
Z
MOR2024-00001, SEP2024-00017 Spear
moratorium is compatible with the Mason County Comprehensive Plan
and Development Regulations.
(5) Mitigation shall be required for impacts to critical areas,
stormwater, and shorelines. Other mitigation shall be required to
prevent significant adverse environmental impacts, pursuant to
M.C.C.Chapter 8.04 to 8.40.
No mitigation is required because no damage to critical areas or their
buffers has occurred.
Mason County Resource Ordinance
The issuance of this permit will not result in a violation of the Mason County Resource
Lands and Critical Areas Ordinance. The site was inspected on July 12, 2024, by Luke
Viscusi, of the Mason County Planning Department, who determined that any critical
area buffer issues have been sufficiently documented.All project activities are outside of
wetland, stream, and landslide hazard area buffers.
Geotechnical Report/Geological Assessment Review
N A the proposal does not require additional geological documentation.
Shoreline Master Program
N A the proposal is not within shoreline jurisdiction.
State Environmental Policy Act
This application for MOR2024-00001 has been reviewed for SEPA compliance under case
#:SEP2024-00017. The SEPA record number is 202403519.
(a) Is SEPA exempt.
No.
(b) DNS
Yes, issued by Luke Viscusi of the Mason County Planning Department on August
14, 2024. The SEPA Determination of Non-Significance was posted on-site and
emailed to the appropriate agencies on August 14, 2024. Two comments were
submitted during the 14-day comment period, which closed on August 28, 2024.
One comment was submitted by the Squaxin Island Tribe and the other
comment was submitted by Mason PUD 3.
(c) MDNS
No.
3
MOR2024-00001, SEP2024-00017 Spear
Stormwater Management
An engineered stormwater plan for Mason County Public Works is N/A. The project
requires Minimum Requirements#1 through#5 of the 2019 Stormwater Management
Manual for Western Washington due to land-disturbing activities greater than 7,000
sqft. Narratives for Minimum Requirements#1 through#5 were submitted and meet the
standards of the Manual.
CONCLUSION
In conclusion,this application for a 2-Acre Forest Practices Moratorium Waiver, associated with
FPA/N#2421461, is consistent with the above criteria and Mason County has fulfilled its
statutory obligations. Per MCC 11.04.110, the following permits may be issued and conditioned
as necessary to be consistent with Mason County Code prior to 03/12/2026 under this waiver:
(1) Building permits for the single-family residence and for residential
outbuildings;
(2) Single-family on-site septic system permit;
(3) Road access permits;
(4) Earth modification permits;
(5) Shoreline master program approvals;
(6) Well or potable water permits;
(7) Other approvals necessary the development of a single-family
residence and outbuildings.
RECOMMENDATIONS
I, being the Director of the Mason County Department of Community Development, hereby
attest to and certify that appropriate provisions have been made for this Forest Practices
Moratorium Waiver and hereby recommend approval.
Signed,
2 q
Kell Rowen, Director, Dept Community Development Date
l
t�a PM —
911191qlx q
Luke Viscusi, Forest Practices Reviewer Date
4
Community Development
MASON COUNTY (Permit Assistance Center/Building/Planning)
615 W.Alder Street—Shelton,WA 98584
COMMUNITY DEVELOPMENT 36masoncoun Ext.352
masoncountywa.Rov
Permit Assistance Center,Building,Planning
Notice of Administrative Final Decision for
2-Acre Moratorium Waiver Approval MOR2024-00001
Notice is hereby given that Logan Spear, who is the applicant for the above referenced permit, has been
granted approval for a 2-Acre Forest Practices Moratorium Waiver to waive a 6-year development
moratorium, which was incurred as a normal condition of a Class III Forest Practices Application
(#2421461) issued by the WA DNR,on Mason County tax parcels 31902-41-90003 and 31902-41-90004.
The waived area is approximately 1.75 acres across the two parcels.
The applicant intends to develop both lots with single-family residences in the future.
A SEPA Determination of Non-Significance (DNS) was issued on 08/24/2024.The formal 14-day
comment period though SEPA ended on 08/28/2024 and included one comment from the Squaxin Island
Tribe and one comment from Mason County PUD 3. Mason County retained the SEPA Determination of
Non-Significance (DNS). The SEPA record number for the project is 202403519. Mason County's file
number for the projects is SEP2024-00017.
This 2-Acre Forest Practices Moratorium Waiver Approval decision is final and subject to appeal to the
Mason County Hearings Examiner(per Mason County Code Title 15, Chapter 15.11—Appeals)within 14
days from date of decision (the date at the bottom of this notice).Appeal deadlines are short, and
procedures strictly construed.Anyone wishing to file an appeal of this decision should consult with an
attorney to ensure that all procedural requirements are satisfied.
Time Limit for Action. Per Mason County Code 15.09—Review and Approval Process—this
administrative final decision will become effective at the expiration of the 14-day appeal period
(09/13/2024) if no appeal is submitted. If a written notice of appeal is received during the 14-day appeal
period, this project will be referred to the Hearings Examiner for an open record public hearing and the
decision will not become effective until the Hearings Examiner renders a decision on the appeal. No
permitted activities (ie.construction, harvesting, etc.) may begin until the aforementioned deadlines
have passed.
Notice is given pursuant to RCW 36.7013.130 that property owners who are affected by this decision may
request a change in valuation for property tax purposes notwithstanding any program of revaluation.
Please contact Luke Viscusi of the Mason County Department of Community Development at(360) 427-
9670, ext. 282 or LViscusi@masoncountywa.gov, with any questions or to request any documents
related to the project.
8/30/2024
Mason County WA GIS Web Map
pox
. 0 to ►
y I
�»or'io.�COr�u�•
• per' 65%A C)Q"
z
1
T
1.1136 acre
19024190003 �'P#319024190004
#3
+EVE.
SITE PLAID REQUIRED TO BE ON SITE A
CAN`'iEq SUBJECT TO APPROVAL
By DateDate
5/17/2024, 9:21:17 AM 1:1,537
0 0.01 0.03 0.05 mi
I County Boundary
0 0.02 0.04 0.08 km
No Filled
° Site Address (Zoom in to 1:3,000)
Esri, HERE, Garmin, (c) OpenSlreetMap contributors, and the GIS user
community, Source: Esri,Maxer, Earthstar Geographics, and the GIS User
Tax Parcels (Zoom in to 1:30,000) Community
Mason County WA GIS Web Map Application
Mason County disclaims accuracy,reliability,or timeliness of website info,not liable for losses from reliance on it.https./twww.masoncountywa.gov/disclaimer.php
Mason County WA GIS Web Map
AIL
Aw
" ( � i' is ,� � �'"'T" ""? }WFx` '�+,6�• �", s
.r A
•
r•
1
.
4.0
� ' ,,. � n ;�� •K+. '�+4,. fir: fir';
ft
If
5
i
-'..:; � �. .� • a i apt � i �..
w
b.. •9 � t
SE LYNCH RD
11/29/2023, 9:00:09AM 1:3,075
_ 0 0.03 0.05 0.1 mi
County Boundary Roads Green Diamond r—I I I—t
f � Federal 0 0.04 0.08 0.16 km
LJ No Filled - - US Forest Service
Tax Parcels(Zoom in to 1:30,000) State -- Contours 5 ft
Road Name Labels(Zoom to 1:100,000) County Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user
community, Source: Esri, Maxar, Earthstar Geographics.and the GIs User
Railroads(Zoom to 1:200,000) City Community
Private
Mason County WA GIS Web Map Application
Esri,HERE,Garmin,iPC I Maxar I
Mason County WA GIS Web Map
---...._---�
f/ 4y IL
!
Atli
,
�ltl
r ,
� * r ,
A
a w
315'-8"
r '+
,537
o•
�:T F
.jay ti`y '"+•\ � _ _
7/1212024,9:03:22 AM --W po 1:
0 0.01 0.03
_ 0.05 ml
13 County Boundary I Tax Parcels(Zoom in to 1:30,000) —Pv5sh-
0 0.02 0.04 0.08 km
C� No Filled — Contours 5 t2 Esn HERE, Garrnrn. {cl GparStr"Wap crrnributws, anti he GIs user
rornmunfly,Sow*: Esr,Maxa,, Earthetai Crw)qKaptws,and me Ols Use
•
Site Address(Zoom into 1:3,000) Li Landslides- DNR 2010 Maw Goun,r tiVAGIS N'eb MepApplkaucn
Mason Crwnly 4iscsairns accuracy,fellabildy,of lilnefiness of websile ir4o.net liable for lasses front reliance on it.htlps.61www nasonc n;ywa.gaa'ldestintrir..php
Community Development
(Permit Assistance Center/Building/Planning)
MASON COUNTY
615 W.Alder Street—Shelton,WA 98584
COMMUNITY DEVELOPMENT 36masoncoun Ext.352
masoncountywa.Roip v
Permit Assistance Center,Building,Planning
Notice of Development Application
Notice is hereby given that Logan Spear,who is the applicant for the following proposal, has filed an
application for a Forest Practices Moratorium Waiver(MOR2024-00001)through Mason County.
Location: Lots B and C of Short Plat#1946, SE%of Sec 2,Twp 19N, Ring 3W,W.M., along SE Lynch Rd,
Lat/Long:47.1602/-123.0151 and 47.1602/-123.0138.
Tax Parcel Numbers: 31902-41-90003 and 31902-41-90004
Date of Application:June 10, 2024
Date of Complete Application:July 9,2024(Statutory)
The project will include waiving a 6-year development moratorium, which was incurred as a normal
condition of a Class III Forest Practices Application (#2421461) issued by the WA DNR.The moratorium
became effective on the harvested portions of the lot(s) on March 12, 2020.The moratorium would
otherwise expire on March 12, 2026.The waived area is approximately 1.7S acres.The applicant intends
to develop both lots with single-family residences in the future. The project requires no additional
permits from other government agencies that Mason County is aware of.
A SEPA Checklist and Stormwater Plan were submitted with the application for the project. All
documents relevant to this project can be requested by contacting the County staff member below.
This Forest Practices Moratorium Waiver will require a SEPA threshold determination and a formal 14-
day comment period through SEPA at a date yet to be determined. Public comments during the SEPA
comment period are welcome.Any comments or questions should be directed to the County staff
member listed below:
Mail Email and Phone
Luke Viscusi, Planner LViscusi@masoncountVwa.gov
Mason County Community Development 360-427-9670 ext. 282
615 W. Alder St.,
Shelton, WA 98584
No public meetings are required for this project.
This Forest Practices Moratorium Waiver is subject to administrative approval or denial from the Mason
County Department of Community Development under Title 8,Title 11, and Title 15.
A decision on this application will be made within 120 days of the Date of Complete Application and
copies of the decision may be obtained by contacting Luke Viscusi. Any person aggrieved by the decision
of the administrator to approve or deny this proposal may appeal the decision to the Mason County
Hearing Examiner within 14 days following issuance of the decision.
This Notice of Development Application is required by Mason County Code 15.07.010.
Posted: 7/12/2024
AFFIDAVIT OF POSTING NOTICE
STATE OF WASHINGTON )
) ss:
COUNTY OF MASON )
RE: (Parcel#or Address of Site):Tax Parcel#'s 31902-41-90003 and 31902-41-90004, along SE Lynch Rd
I, Luke Viscusi , Planner for Mason County, do hereby certify that I have posted 2 copies
of the attached:
Notice of Development Application
On this 12th day of July, 2024, in 2 conspicuous places as follows:
o One at Tax Parcel#31902-41-90003, Lot C of Short Plat#1946
o One at Tax Parcel#31902-41-90004, Lot D of Short Plat#1946
In witness whereof,the party has signed this Affidavit of Posting Notice this 12th day of July,
2024.
l �
Signed by Luke Viscusi
Mason County Community Development Department
615 W. Alder St, Shelton,WA 98584
Subscribed and sworn before me this day of ,
20 �k I certify that fined this document.
NOrARy '�N; TARY PUBLIC in and fo th State of Wash' ton,
23038426 ° Printed Name of Notary:
PUBLIC ;��; residing at:
0�WASH�r;G° My Commission Expires:
—41
'0911 a]n WOO
(Nott r y SP7�)
CO& MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES
Masan County Bldg. 8,615 W.Alder Street, Shelton,98584
(360)427-9670 Belfair(360)275-4467 Elrna(360)482-5269
sa Www.co.masou.wa.us
FOREST MORATORIUM WAIVER/REI_,EASE APPLICATION
This application is to be used to waiver a portion of a parcel for development permits or to release the entire tract from
the six year moratorium for development permits.This process was created under the guidance of RCW 76.09,060.This
application needs to be filled out completely,so that we have all the information to process this in an expedient manner.
Which are you requesting fi•om the Moratorium? X Waiver C3 Release
Applicant's Name: Logan Spear Operator's Name:Manke Lumber CO. INC.
Applicant's Address: 1661 W Shelton Valley Rd Operator's Address: 826 Fairmount Ave.
Shelton, WA 98584 Shelton, WA 98584
Applicant's E-mail: Lspearconstruction@gmail.com
Applicant's Phone number: 360-239-1541
31902-41--90003 — 1.86 acres
Effected Parcel Number: Parcel size(in acres):
3T02�4T-90O0-4-- acres
Identify what type of timber was removed,ie Douglas Fir, esters Red Cedar,Alder,Maple,etc:
Was the timber harvest done under an approved forest practice application: 56Yes ❑No
Was there an enforcement action taken by the Department of Natural Resources(DNR): ❑Yes No
Forest Practice Application Number:2421461 Forest Practice Application date of approval: 3/18/2020
What is your intention to do with the effected parcel:
Install a septic and well. Construct a single family residence on each parcel in the furture.
Have you attached a site plan to show the area of the requested waiver or release: XYes ❑No
Are there any critical areas on your site?ie:wetlands,streams,creeks,
�(stteepp slopes,etc.: ❑Yes �No
If yes,identify the type of critical area(s):"PcA\e. 4%wn G.ttm+eAL
iwq on__TW sli wl-+0000o.
Please list conditions of approvals by DNR for your forest practice application: ^�
None known other than replanting with conifer seedlings. sub IOU-ws for�^is WC:►ma.
P 9 9
Were any of the buffer areas effected by the timber harvest?: ❑Yes XNo
Identify if you harvested any timber in the critical areas on your site: ❑Yes XNo None/N/A
Did you replant per DNR standards: XYes ❑No
Application Signature
1) I certify that I am the forest land owner, as that term is defined in RCW 76.09.020 and
WAC 222-16-010,and that I am familiar with the requirements of the Forest Practices Act,
RCW 76.09 and the forest practice rules,WAC Title 222.I am specifically familiar with
RCW 76.09.460(e)and its effects.
2) I certify and declare under penalty of perjury under the laws of the state of Washington that
the foregoing is true and correct.
Signed this _day of a -___ ,20 Z1 at
(Month)
(City) (State) (Si ature)
STATE OF WASHINGTON)
) SS
COUNTY OF MASON }
On this r day of_ 4 20 Zubefore me, the undersigned,a Notary Public
in and for the State of Washington, duly commissioned and sworn,personally appeared
LIDCA Cj;7C;O�C to me known to be the individual described in and who
exechied the_ witbin and foregoing instrument, and acknowledged that 2
signed the same as O2, pC-- free
and voluntary act and deed,for the uses and purposes therein mentioned.
GIVEN under my hand and official seal this day of
20 Zd .
KELSEY TWIDWELL
Notary Public
State of Washington
License Number 22037379
My Commission Expires O WRY . BLIC m and for th State of
January 20, 2027 Washington esiding at hti� LrJ L -JGS— S�
FPA Construction SWPPP Elements -Template
Project description Include the following information
1. Project location and any associated permit numbers
TP#319024190003 and 319024190004 Xxx SE
Lynch rd
FPA#2421461 Dated 3/1812020
2.Total site acreage and the acreage to be disturbed (logged)
Approximately 1.25 acres logged on subject parcels under
this permit
3. Description of any new road construction (length,width, materials) or if existing roads are to be
used note this. Existing roads used
4. General description of soils, topography and drainage including where surface water enters and
leaves the property
Site has type 4/5 soil. The site gradually slopes to the north. No surface water entering or
leaving the subject property
5. Anticipated start and end date and any other project timing considerations
Logging was completed before Aug 2022,future septic, single family
residence with moratorium waiver approval
6. Description of logging method and expected use after logging
Shovel logging was done, no further logging planned.
Subject property proposed to be used for single family
residences
Element 1: Mark Clearing Limits
To protect adjacent properties and to reduce the area of soil exposed to construction the limits of
construction will be clearly marked before land disturbing activities begin Trees that are to be
preserved,as well as all sensitive areas and their buffers. shall be clearly delineated, both in the field
and on the plans. In general, natural vegetation and native topsoil shall be retained in an undisturbed
state to the maximum extent possible. Applicant should describe how clearing limits will be
marked prior to logging and note on the site plan.
Clearing limits were flagged. No further clearing planned
Element 2: Establish Construction Access
Construction access shall be established and access points shall be stabilized to minimize the tracking
of sediment onto public roads If sediment is tracked off site public roads shall be cleaned by shoveling
or sweeping at the end of the day to prevent sediment from entering surface waters Applicant should
describe where the construction access will be obtain a Road Access Permit if it is a new
location and construct access to minimize sediment tracking.
See site map for existing access locations.
Element 3:Control Flow Rates
Downstream properties and waterways shall be protected from erosion due to increases in stormwater
runoff volume,velocity and peak flow rate The applicant needs to clearly identify where runoff will
leave the site so potential downstream impacts can be evaluated.This element will be"not
applicable (NIA)for most FPAs because the increase in runoff and/or erosion due to logging
will be negligible. If no BMPs are proposed,the applicant needs to describe rationale: e.g., flat
topography highly permeable soils, large vegetated buffers at site perimeter, logging method,
or others.
N/A,vegetative buffers around perimeter of property.
Element 4:Install Sediment Controls
Stormwater runoff from disturbed areas shall pass through a sediment removal Best Management
Practice (BMP)before leaving the site or prior to being discharged to an infiltration facility. In most
cases, an FPA will not require the construction of an infiltration facility. Whenever possible
sediment laden water shall be discharged into onsite, relatively level,vegetated areas.
If no BMPs are proposed,the applicant needs to describe
rationale.
No further logging taking place, Large vegetative buffers
More complex sediment control/treatment BMPs, such as infiltration facilities should be used if sediment
controls are not(or not anticipated to be)adequate for the site-specific construction activities These
BMPs are primarily used on:
Larger sites(i.e. greater than 5 acres),
or,
Sites that have continual soil disturbance and are difficult to temporarily stabilize, or.
Sites at higher risk of erosion (i.e. slopes), or,
Sites where the downstream environment is particularly sensitive and more stringent
discharge controls are required
Element 5:Stabilize Soils
Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent erosion
throughout the life of the project. In general,cut and fill slopes will be stabilized as soon as possible and
soil stockpiles will be temporarily covered with plastic sheeting All stockpiled soils shall be stabilized
from erosion, protected with sediment trapping measures, and where possible be located away from
storm drain inlets,waterways and drainage channels.
This element will be "not applicable" (NIA)for most FPAs unless there is new road
construction that includes cuts and fills.If no BMPs are proposed,the applicant needs to
describe rationale
NIA no cuts,fills, or new road construction took place
Element:Protect Slopes
All cut and fill slopes will be designed, constructed, and protected in a manner that minimizes erosion
This element will be "not applicable" (N/A)for most FPAs unless there is new road
construction that includes cuts and fills. If no BMPs are proposed,the applicant needs to
describe rationale.
NIA no cuts, fills, or new road construction took place
Element 7: Protect Drain Inlets
All storm drain inlets and culverts made operable during construction shall be protected to prevent
unfiltered or untreated water from entering the drainage conveyance system. However, the first
priority is to keep all access roads clean of sediment and keep street wash water separate from
entering storm drains until treatment can be provided. Storm Drain Inlet Protection (BMP C220)will
be implemented for all drainage inlets and culverts that could potentially be impacted by
sediment laden runoff on and near the project site.
This element will be "not applicable" (N/A)for most FPAs unless there is new road
construction that includes cuts and fills. If no BMPs are proposed, the applicant needs to
describe rationale.
NIA no cuts,fills, or new road construction took place
Element 8: Stabilize Channels and Outlets
Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural
drainage point, efforts will be taken to prevent downstream erosion. The general project description
and site plan should identify where runoff will leave the site at natural drainage points.
This element will be "not applicable (NIA)for most FPAs unless there is new road
construction, existing roads with culverts and conveyances, resource protection areas, steep
slopes, and/or highly erosive soils.If no BMPs are proposed,the applicant needs to describe
rationale.
N/A, No run off to leave the site
Element 9: Control Pollutants
All onsite pollutant sources shall be handled and disposed of in a manner that does not cause
contamination of stormwater Good housekeeping and preventative measures will be taken to ensure
that the site will be kept clean, well organized, and free of debris.
Applicant should describe all potential pollution sources and how they will be
managed.
Equipment and Vehicles, Spill kits, reporting of spills
People, Provide proper waste containers
Element 10: Control De Watering
This element will be "not applicable" (N/A)for most
FPAs.
N/A
Element 11. Maintain BMPs
All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as
needed to assure continued performance of their intended function. Maintenance and repair shall be
conducted in accordance with each particular BMPs specifications.Visual monitoring of the BMPs will
be conducted at least once every calendar week and within 24 hours of any stormwater or non-
stormwater discharge from the site If the site becomes inactive and is temporarily stabilized; the
inspection frequency will be reduced to once every month.
All temporary erosion and sediment control BMPs shall be removed within 30 days after the final site
stabilization is achieved or after the temporary BMPs are no longer needed
This element will be"not applicable" (N/A)for most FPAs if Element 3's 3-8 are NIA or very
minimal.
N/A
Element 12_Manage the Project
Erosion and sediment control BMPs for this project have been designed based on the following
principles(not all will be applicable):
Design the project to fit the existing topography, soils, and drainage patterns.
Emphasize erosion control rather than sediment control.
Minimize the extent and duration of the area exposed
Keep runoff velocities
low
Retain sediment on
site
Thoroughly monitor site and maintain all ESC
measures
Schedule major earthwork during the dry
season.
In addition, project management will incorporate the key components listed below(again not all will be
applicable):
Seasonal Work
Limitations
From October 1 through April 30, clearing,grading, and other soil disturbing activities shall
only be permitted if shown to the satisfaction of the local permitting authority
that silt laden runoff will be prevented from leaving the site through a
combination of the following:
Site conditions including existing vegetative coverage, slope, soil
type, and proximity to receiving waters; and
Limitations on activities and the extent of disturbed areas; and
Proposed erosion and sediment control
measures.
Based on the information provided and/or local weather conditions the local permitting
authority may expand or restrict the seasonal limitation on site disturbance
The following activities are exempt from the seasonal clearing and grading
limitations:
Activities where there is 100 percent infiltration of surface water runoff within the site in approved
and installed erosion and sediment control facilities.
Coordination with Utilities and Other Jurisdictions
Care has been taken to coordinate with utilities, other construction projects, and the local
jurisdiction in preparing this SWPPP and scheduling the construction work
Inspection and Monitoring
All BMPs shall be inspected maintained and repaired as needed to
assure continued performance of their intended function
Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP are
inadequate due to the actual discharge of or potential to discharge a significant
amount of any pollutant, appropriate BMPs or design changes shall be
implemented as soon as possible.
FPA Storm Water Minimum Requirements
Minimum Requirement#3
See element#9 of SWPPP
Minimum Requirement#4
MR#1(Site has type 4/5 soil. The site Gradually slopes to the north. No surface water entering or leaving
the subject property.)
Maintain vegetative buffers
Minimum Requirement#5
Stormwater to be managed on site through dispersion and infiltration on site in vegetated buffers to the
maximum extent feasible.
Start Here
Does the site have 35% Yes See Redevelopment Minimum
or more of existing —D Requirements and Flow Chart
impervious coverage? (Figure 1-2.4.2).
No
Does the project convert 3/a
acres or more of vegetation to
Does the project result in lawn or landscaped areas, or
5,000 square feet, or convert 2.5 acres or more of
greater, of new plus native vegetation to pasture?
replaced hard surface
area? No
Yes Yes/ \1
Does the project result in 2,000
NY square feet, or greater, of new plus
All Minimum Requirements ec�v i; replaced hard surface area?
apply to the new and replaced Q,,-1
hard surfaces and converted �,�q ,-?�e t/,
vegetation areas. .J Yes No
Does the project have land
Minimum Requirements #1 disturbing activities of 7,000
through ##5 apply to the new Yes square feet or greater?
and replaced hard surfaces
and the land disturbed. No
ti q
Minimum Re uirement#2
l'�G< �.o
applies.
�1.i� ?.tJ� 1-1' r �l�J c GO,Itt I'IUII
oftbaft Figure 1-2.4. 1
�vv�ci; t c1�c.
Flow Chart for Determining Requirements for
New Development
DEPARTMENT OF Revised June2015
ECOLOGY Please see Iittp:ll�vw�v.ecy.wa.gov/copyright.hfml for copyright notice including permissions,
State of Washington limitation of liability,and disclaimer.