Loading...
HomeMy WebLinkAboutMOR2024-00001 Forestry Waiver 2 parcels - MOR Permit / Conditions - 8/14/2024 MOR2024-00001, SEP2024-00017 Spear August 28, 2024 FINDING OF FACT MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Building Vlll—615 W Alder Street;Shelton, WA 98584—360-427-9670 TO: Kell Rowen, Director of Community Development FROM: Luke Viscusi, Planner; LViscusi@MasonCountVWA.gov; 360-427-9670 ext. 282 RE: Finding of Fact for MOR2024-00001, including SEP2024-00017. APPLICANT: Logan Spear APPLICATION DATE:June 10, 2024 PARCEL#'S: 31902-41-90003 and 31902-41-90004. Mason County has reviewed the above referenced application for a 2-Acre Forest Practices Moratorium Waiver and finds it in conformance with all applicable County land use regulations in effect at the time of application. FINDINGS The proponent has filed a complete,signed application. Yes. The proponent has submitted a site plan appropriately depicting the area to be waived from the development moratorium. Yes, the waived area(approximately 1.75 acres)is outlined in red/pink on the applicant's site plan. That the development moratorium is the result of: The WA Department of Natural Resources issued a Class Ill Forest Practices Activity, known as FPA/N#2421461, effective on 0311212020. The resulting six-year development moratorium (MCC 11.04.010) will expire on 0311212026. That this Moratorium Waiver is in conformance with Mason County Code 11.04.090: (a) The director of the department of community development shall have the authority to approve, approve with conditions, or deny a request for a 1 MOR2024-00001, SEP2024-00017 Spear waiver of the moratorium, pursuant to the procedures and requirements of this chapter. Yes, this signed Finding of Fact constitutes approval, or approval with conditions, for the moratorium waiver. That this Moratorium Waiver is in conformance with Mason County Code 11.04.100: (a) The request will be made to the department of community development on the application form provided by that department and accompanied by a completed county environmental checklist and any established fees. Yes. (b) The application shall be reviewed as a Type II, administrative decision with notice, as provided for in the Mason County Title 15 Development Code. Yes, the Type 11 review(with public notice)procedures of MCC 15.09.040 were followed. The Notice of Development Application was posted on-site on July 12, 2024, in accordance with MCC 15.07.010. The Notice of Administrative Final Decision will be sent, in accordance with MCC 15.07.040,following the signing of this Finding of Fact. (c) Standards for waiving the moratorium: (1) The development area shall be no larger than two acres in size. Yes, the development area waived, which includes both tax parcels 31902-41-90003 and 31902-41-90004, is approximately 1.75 acres. (2) The harvest and reforestation of the property shall be completed as specified in the approved forest practices application/notice.That portion of property subject to the waiver application shall be excepted from reforestation. Yes. (3) There shall be no damage to a critical area or its associated vegetation area nor to the shoreline area or that any damage to those areas is repairable with restoration. Yes no damage to critical areas or their buffers has occurred. (4) The proposed development shall be consistent with the county comprehensive plan and development regulations. Yes, the proposed development is limited to residential use per the criteria of the waiver process. The land use zoning for the properties are Rural Residential5, which is consistent with residential development. The activity proposed for the site affected by this waiver from a six-year Z MOR2024-00001, SEP2024-00017 Spear moratorium is compatible with the Mason County Comprehensive Plan and Development Regulations. (5) Mitigation shall be required for impacts to critical areas, stormwater, and shorelines. Other mitigation shall be required to prevent significant adverse environmental impacts, pursuant to M.C.C.Chapter 8.04 to 8.40. No mitigation is required because no damage to critical areas or their buffers has occurred. Mason County Resource Ordinance The issuance of this permit will not result in a violation of the Mason County Resource Lands and Critical Areas Ordinance. The site was inspected on July 12, 2024, by Luke Viscusi, of the Mason County Planning Department, who determined that any critical area buffer issues have been sufficiently documented.All project activities are outside of wetland, stream, and landslide hazard area buffers. Geotechnical Report/Geological Assessment Review N A the proposal does not require additional geological documentation. Shoreline Master Program N A the proposal is not within shoreline jurisdiction. State Environmental Policy Act This application for MOR2024-00001 has been reviewed for SEPA compliance under case #:SEP2024-00017. The SEPA record number is 202403519. (a) Is SEPA exempt. No. (b) DNS Yes, issued by Luke Viscusi of the Mason County Planning Department on August 14, 2024. The SEPA Determination of Non-Significance was posted on-site and emailed to the appropriate agencies on August 14, 2024. Two comments were submitted during the 14-day comment period, which closed on August 28, 2024. One comment was submitted by the Squaxin Island Tribe and the other comment was submitted by Mason PUD 3. (c) MDNS No. 3 MOR2024-00001, SEP2024-00017 Spear Stormwater Management An engineered stormwater plan for Mason County Public Works is N/A. The project requires Minimum Requirements#1 through#5 of the 2019 Stormwater Management Manual for Western Washington due to land-disturbing activities greater than 7,000 sqft. Narratives for Minimum Requirements#1 through#5 were submitted and meet the standards of the Manual. CONCLUSION In conclusion,this application for a 2-Acre Forest Practices Moratorium Waiver, associated with FPA/N#2421461, is consistent with the above criteria and Mason County has fulfilled its statutory obligations. Per MCC 11.04.110, the following permits may be issued and conditioned as necessary to be consistent with Mason County Code prior to 03/12/2026 under this waiver: (1) Building permits for the single-family residence and for residential outbuildings; (2) Single-family on-site septic system permit; (3) Road access permits; (4) Earth modification permits; (5) Shoreline master program approvals; (6) Well or potable water permits; (7) Other approvals necessary the development of a single-family residence and outbuildings. RECOMMENDATIONS I, being the Director of the Mason County Department of Community Development, hereby attest to and certify that appropriate provisions have been made for this Forest Practices Moratorium Waiver and hereby recommend approval. Signed, 2 q Kell Rowen, Director, Dept Community Development Date l t�a PM — 911191qlx q Luke Viscusi, Forest Practices Reviewer Date 4 Community Development MASON COUNTY (Permit Assistance Center/Building/Planning) 615 W.Alder Street—Shelton,WA 98584 COMMUNITY DEVELOPMENT 36masoncoun Ext.352 masoncountywa.Rov Permit Assistance Center,Building,Planning Notice of Administrative Final Decision for 2-Acre Moratorium Waiver Approval MOR2024-00001 Notice is hereby given that Logan Spear, who is the applicant for the above referenced permit, has been granted approval for a 2-Acre Forest Practices Moratorium Waiver to waive a 6-year development moratorium, which was incurred as a normal condition of a Class III Forest Practices Application (#2421461) issued by the WA DNR,on Mason County tax parcels 31902-41-90003 and 31902-41-90004. The waived area is approximately 1.75 acres across the two parcels. The applicant intends to develop both lots with single-family residences in the future. A SEPA Determination of Non-Significance (DNS) was issued on 08/24/2024.The formal 14-day comment period though SEPA ended on 08/28/2024 and included one comment from the Squaxin Island Tribe and one comment from Mason County PUD 3. Mason County retained the SEPA Determination of Non-Significance (DNS). The SEPA record number for the project is 202403519. Mason County's file number for the projects is SEP2024-00017. This 2-Acre Forest Practices Moratorium Waiver Approval decision is final and subject to appeal to the Mason County Hearings Examiner(per Mason County Code Title 15, Chapter 15.11—Appeals)within 14 days from date of decision (the date at the bottom of this notice).Appeal deadlines are short, and procedures strictly construed.Anyone wishing to file an appeal of this decision should consult with an attorney to ensure that all procedural requirements are satisfied. Time Limit for Action. Per Mason County Code 15.09—Review and Approval Process—this administrative final decision will become effective at the expiration of the 14-day appeal period (09/13/2024) if no appeal is submitted. If a written notice of appeal is received during the 14-day appeal period, this project will be referred to the Hearings Examiner for an open record public hearing and the decision will not become effective until the Hearings Examiner renders a decision on the appeal. No permitted activities (ie.construction, harvesting, etc.) may begin until the aforementioned deadlines have passed. Notice is given pursuant to RCW 36.7013.130 that property owners who are affected by this decision may request a change in valuation for property tax purposes notwithstanding any program of revaluation. Please contact Luke Viscusi of the Mason County Department of Community Development at(360) 427- 9670, ext. 282 or LViscusi@masoncountywa.gov, with any questions or to request any documents related to the project. 8/30/2024 Mason County WA GIS Web Map pox . 0 to ► y I �»or'io.�COr�u�• • per' 65%A C)Q" z 1 T 1.1136 acre 19024190003 �'P#319024190004 #3 +EVE. SITE PLAID REQUIRED TO BE ON SITE A CAN`'iEq SUBJECT TO APPROVAL By DateDate 5/17/2024, 9:21:17 AM 1:1,537 0 0.01 0.03 0.05 mi I County Boundary 0 0.02 0.04 0.08 km No Filled ° Site Address (Zoom in to 1:3,000) Esri, HERE, Garmin, (c) OpenSlreetMap contributors, and the GIS user community, Source: Esri,Maxer, Earthstar Geographics, and the GIS User Tax Parcels (Zoom in to 1:30,000) Community Mason County WA GIS Web Map Application Mason County disclaims accuracy,reliability,or timeliness of website info,not liable for losses from reliance on it.https./twww.masoncountywa.gov/disclaimer.php Mason County WA GIS Web Map AIL Aw " ( � i' is ,� � �'"'T" ""? }WFx` '�+,6�• �", s .r A • r• 1 . 4.0 � ' ,,. � n ;�� •K+. '�+4,. fir: fir'; ft If 5 i -'..:; � �. .� • a i apt � i �.. w b.. •9 � t SE LYNCH RD 11/29/2023, 9:00:09AM 1:3,075 _ 0 0.03 0.05 0.1 mi County Boundary Roads Green Diamond r—I I I—t f � Federal 0 0.04 0.08 0.16 km LJ No Filled - - US Forest Service Tax Parcels(Zoom in to 1:30,000) State -- Contours 5 ft Road Name Labels(Zoom to 1:100,000) County Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community, Source: Esri, Maxar, Earthstar Geographics.and the GIs User Railroads(Zoom to 1:200,000) City Community Private Mason County WA GIS Web Map Application Esri,HERE,Garmin,iPC I Maxar I Mason County WA GIS Web Map ---...._---� f/ 4y IL ! Atli , �ltl r , � * r , A a w 315'-8" r '+ ,537 o• �:T F .jay ti`y '"+•\ � _ _ 7/1212024,9:03:22 AM --W po 1: 0 0.01 0.03 _ 0.05 ml 13 County Boundary I Tax Parcels(Zoom in to 1:30,000) —Pv5sh- 0 0.02 0.04 0.08 km C� No Filled — Contours 5 t2 Esn HERE, Garrnrn. {cl GparStr"Wap crrnributws, anti he GIs user rornmunfly,Sow*: Esr,Maxa,, Earthetai Crw)qKaptws,and me Ols Use • Site Address(Zoom into 1:3,000) Li Landslides- DNR 2010 Maw Goun,r tiVAGIS N'eb MepApplkaucn Mason Crwnly 4iscsairns accuracy,fellabildy,of lilnefiness of websile ir4o.net liable for lasses front reliance on it.htlps.61www nasonc n;ywa.gaa'ldestintrir..php Community Development (Permit Assistance Center/Building/Planning) MASON COUNTY 615 W.Alder Street—Shelton,WA 98584 COMMUNITY DEVELOPMENT 36masoncoun Ext.352 masoncountywa.Roip v Permit Assistance Center,Building,Planning Notice of Development Application Notice is hereby given that Logan Spear,who is the applicant for the following proposal, has filed an application for a Forest Practices Moratorium Waiver(MOR2024-00001)through Mason County. Location: Lots B and C of Short Plat#1946, SE%of Sec 2,Twp 19N, Ring 3W,W.M., along SE Lynch Rd, Lat/Long:47.1602/-123.0151 and 47.1602/-123.0138. Tax Parcel Numbers: 31902-41-90003 and 31902-41-90004 Date of Application:June 10, 2024 Date of Complete Application:July 9,2024(Statutory) The project will include waiving a 6-year development moratorium, which was incurred as a normal condition of a Class III Forest Practices Application (#2421461) issued by the WA DNR.The moratorium became effective on the harvested portions of the lot(s) on March 12, 2020.The moratorium would otherwise expire on March 12, 2026.The waived area is approximately 1.7S acres.The applicant intends to develop both lots with single-family residences in the future. The project requires no additional permits from other government agencies that Mason County is aware of. A SEPA Checklist and Stormwater Plan were submitted with the application for the project. All documents relevant to this project can be requested by contacting the County staff member below. This Forest Practices Moratorium Waiver will require a SEPA threshold determination and a formal 14- day comment period through SEPA at a date yet to be determined. Public comments during the SEPA comment period are welcome.Any comments or questions should be directed to the County staff member listed below: Mail Email and Phone Luke Viscusi, Planner LViscusi@masoncountVwa.gov Mason County Community Development 360-427-9670 ext. 282 615 W. Alder St., Shelton, WA 98584 No public meetings are required for this project. This Forest Practices Moratorium Waiver is subject to administrative approval or denial from the Mason County Department of Community Development under Title 8,Title 11, and Title 15. A decision on this application will be made within 120 days of the Date of Complete Application and copies of the decision may be obtained by contacting Luke Viscusi. Any person aggrieved by the decision of the administrator to approve or deny this proposal may appeal the decision to the Mason County Hearing Examiner within 14 days following issuance of the decision. This Notice of Development Application is required by Mason County Code 15.07.010. Posted: 7/12/2024 AFFIDAVIT OF POSTING NOTICE STATE OF WASHINGTON ) ) ss: COUNTY OF MASON ) RE: (Parcel#or Address of Site):Tax Parcel#'s 31902-41-90003 and 31902-41-90004, along SE Lynch Rd I, Luke Viscusi , Planner for Mason County, do hereby certify that I have posted 2 copies of the attached: Notice of Development Application On this 12th day of July, 2024, in 2 conspicuous places as follows: o One at Tax Parcel#31902-41-90003, Lot C of Short Plat#1946 o One at Tax Parcel#31902-41-90004, Lot D of Short Plat#1946 In witness whereof,the party has signed this Affidavit of Posting Notice this 12th day of July, 2024. l � Signed by Luke Viscusi Mason County Community Development Department 615 W. Alder St, Shelton,WA 98584 Subscribed and sworn before me this day of , 20 �k I certify that fined this document. NOrARy '�N; TARY PUBLIC in and fo th State of Wash' ton, 23038426 ° Printed Name of Notary: PUBLIC ;��; residing at: 0�WASH�r;G° My Commission Expires: —41 '0911 a]n WOO (Nott r y SP7�) CO& MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES Masan County Bldg. 8,615 W.Alder Street, Shelton,98584 (360)427-9670 Belfair(360)275-4467 Elrna(360)482-5269 sa Www.co.masou.wa.us FOREST MORATORIUM WAIVER/REI_,EASE APPLICATION This application is to be used to waiver a portion of a parcel for development permits or to release the entire tract from the six year moratorium for development permits.This process was created under the guidance of RCW 76.09,060.This application needs to be filled out completely,so that we have all the information to process this in an expedient manner. Which are you requesting fi•om the Moratorium? X Waiver C3 Release Applicant's Name: Logan Spear Operator's Name:Manke Lumber CO. INC. Applicant's Address: 1661 W Shelton Valley Rd Operator's Address: 826 Fairmount Ave. Shelton, WA 98584 Shelton, WA 98584 Applicant's E-mail: Lspearconstruction@gmail.com Applicant's Phone number: 360-239-1541 31902-41--90003 — 1.86 acres Effected Parcel Number: Parcel size(in acres): 3T02�4T-90O0-4-- acres Identify what type of timber was removed,ie Douglas Fir, esters Red Cedar,Alder,Maple,etc: Was the timber harvest done under an approved forest practice application: 56Yes ❑No Was there an enforcement action taken by the Department of Natural Resources(DNR): ❑Yes No Forest Practice Application Number:2421461 Forest Practice Application date of approval: 3/18/2020 What is your intention to do with the effected parcel: Install a septic and well. Construct a single family residence on each parcel in the furture. Have you attached a site plan to show the area of the requested waiver or release: XYes ❑No Are there any critical areas on your site?ie:wetlands,streams,creeks, �(stteepp slopes,etc.: ❑Yes �No If yes,identify the type of critical area(s):"PcA\e. 4%wn G.ttm+eAL iwq on__TW sli wl-+0000o. Please list conditions of approvals by DNR for your forest practice application: ^� None known other than replanting with conifer seedlings. sub IOU-ws for�^is WC:►ma. P 9 9 Were any of the buffer areas effected by the timber harvest?: ❑Yes XNo Identify if you harvested any timber in the critical areas on your site: ❑Yes XNo None/N/A Did you replant per DNR standards: XYes ❑No Application Signature 1) I certify that I am the forest land owner, as that term is defined in RCW 76.09.020 and WAC 222-16-010,and that I am familiar with the requirements of the Forest Practices Act, RCW 76.09 and the forest practice rules,WAC Title 222.I am specifically familiar with RCW 76.09.460(e)and its effects. 2) I certify and declare under penalty of perjury under the laws of the state of Washington that the foregoing is true and correct. Signed this _day of a -___ ,20 Z1 at (Month) (City) (State) (Si ature) STATE OF WASHINGTON) ) SS COUNTY OF MASON } On this r day of_ 4 20 Zubefore me, the undersigned,a Notary Public in and for the State of Washington, duly commissioned and sworn,personally appeared LIDCA Cj;7C;O�C to me known to be the individual described in and who exechied the_ witbin and foregoing instrument, and acknowledged that 2 signed the same as O2, pC-- free and voluntary act and deed,for the uses and purposes therein mentioned. GIVEN under my hand and official seal this day of 20 Zd . KELSEY TWIDWELL Notary Public State of Washington License Number 22037379 My Commission Expires O WRY . BLIC m and for th State of January 20, 2027 Washington esiding at hti� LrJ L -JGS— S� FPA Construction SWPPP Elements -Template Project description Include the following information 1. Project location and any associated permit numbers TP#319024190003 and 319024190004 Xxx SE Lynch rd FPA#2421461 Dated 3/1812020 2.Total site acreage and the acreage to be disturbed (logged) Approximately 1.25 acres logged on subject parcels under this permit 3. Description of any new road construction (length,width, materials) or if existing roads are to be used note this. Existing roads used 4. General description of soils, topography and drainage including where surface water enters and leaves the property Site has type 4/5 soil. The site gradually slopes to the north. No surface water entering or leaving the subject property 5. Anticipated start and end date and any other project timing considerations Logging was completed before Aug 2022,future septic, single family residence with moratorium waiver approval 6. Description of logging method and expected use after logging Shovel logging was done, no further logging planned. Subject property proposed to be used for single family residences Element 1: Mark Clearing Limits To protect adjacent properties and to reduce the area of soil exposed to construction the limits of construction will be clearly marked before land disturbing activities begin Trees that are to be preserved,as well as all sensitive areas and their buffers. shall be clearly delineated, both in the field and on the plans. In general, natural vegetation and native topsoil shall be retained in an undisturbed state to the maximum extent possible. Applicant should describe how clearing limits will be marked prior to logging and note on the site plan. Clearing limits were flagged. No further clearing planned Element 2: Establish Construction Access Construction access shall be established and access points shall be stabilized to minimize the tracking of sediment onto public roads If sediment is tracked off site public roads shall be cleaned by shoveling or sweeping at the end of the day to prevent sediment from entering surface waters Applicant should describe where the construction access will be obtain a Road Access Permit if it is a new location and construct access to minimize sediment tracking. See site map for existing access locations. Element 3:Control Flow Rates Downstream properties and waterways shall be protected from erosion due to increases in stormwater runoff volume,velocity and peak flow rate The applicant needs to clearly identify where runoff will leave the site so potential downstream impacts can be evaluated.This element will be"not applicable (NIA)for most FPAs because the increase in runoff and/or erosion due to logging will be negligible. If no BMPs are proposed,the applicant needs to describe rationale: e.g., flat topography highly permeable soils, large vegetated buffers at site perimeter, logging method, or others. N/A,vegetative buffers around perimeter of property. Element 4:Install Sediment Controls Stormwater runoff from disturbed areas shall pass through a sediment removal Best Management Practice (BMP)before leaving the site or prior to being discharged to an infiltration facility. In most cases, an FPA will not require the construction of an infiltration facility. Whenever possible sediment laden water shall be discharged into onsite, relatively level,vegetated areas. If no BMPs are proposed,the applicant needs to describe rationale. No further logging taking place, Large vegetative buffers More complex sediment control/treatment BMPs, such as infiltration facilities should be used if sediment controls are not(or not anticipated to be)adequate for the site-specific construction activities These BMPs are primarily used on: Larger sites(i.e. greater than 5 acres), or, Sites that have continual soil disturbance and are difficult to temporarily stabilize, or. Sites at higher risk of erosion (i.e. slopes), or, Sites where the downstream environment is particularly sensitive and more stringent discharge controls are required Element 5:Stabilize Soils Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent erosion throughout the life of the project. In general,cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be temporarily covered with plastic sheeting All stockpiled soils shall be stabilized from erosion, protected with sediment trapping measures, and where possible be located away from storm drain inlets,waterways and drainage channels. This element will be "not applicable" (NIA)for most FPAs unless there is new road construction that includes cuts and fills.If no BMPs are proposed,the applicant needs to describe rationale NIA no cuts,fills, or new road construction took place Element:Protect Slopes All cut and fill slopes will be designed, constructed, and protected in a manner that minimizes erosion This element will be "not applicable" (N/A)for most FPAs unless there is new road construction that includes cuts and fills. If no BMPs are proposed,the applicant needs to describe rationale. NIA no cuts, fills, or new road construction took place Element 7: Protect Drain Inlets All storm drain inlets and culverts made operable during construction shall be protected to prevent unfiltered or untreated water from entering the drainage conveyance system. However, the first priority is to keep all access roads clean of sediment and keep street wash water separate from entering storm drains until treatment can be provided. Storm Drain Inlet Protection (BMP C220)will be implemented for all drainage inlets and culverts that could potentially be impacted by sediment laden runoff on and near the project site. This element will be "not applicable" (N/A)for most FPAs unless there is new road construction that includes cuts and fills. If no BMPs are proposed, the applicant needs to describe rationale. NIA no cuts,fills, or new road construction took place Element 8: Stabilize Channels and Outlets Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural drainage point, efforts will be taken to prevent downstream erosion. The general project description and site plan should identify where runoff will leave the site at natural drainage points. This element will be "not applicable (NIA)for most FPAs unless there is new road construction, existing roads with culverts and conveyances, resource protection areas, steep slopes, and/or highly erosive soils.If no BMPs are proposed,the applicant needs to describe rationale. N/A, No run off to leave the site Element 9: Control Pollutants All onsite pollutant sources shall be handled and disposed of in a manner that does not cause contamination of stormwater Good housekeeping and preventative measures will be taken to ensure that the site will be kept clean, well organized, and free of debris. Applicant should describe all potential pollution sources and how they will be managed. Equipment and Vehicles, Spill kits, reporting of spills People, Provide proper waste containers Element 10: Control De Watering This element will be "not applicable" (N/A)for most FPAs. N/A Element 11. Maintain BMPs All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. Maintenance and repair shall be conducted in accordance with each particular BMPs specifications.Visual monitoring of the BMPs will be conducted at least once every calendar week and within 24 hours of any stormwater or non- stormwater discharge from the site If the site becomes inactive and is temporarily stabilized; the inspection frequency will be reduced to once every month. All temporary erosion and sediment control BMPs shall be removed within 30 days after the final site stabilization is achieved or after the temporary BMPs are no longer needed This element will be"not applicable" (N/A)for most FPAs if Element 3's 3-8 are NIA or very minimal. N/A Element 12_Manage the Project Erosion and sediment control BMPs for this project have been designed based on the following principles(not all will be applicable): Design the project to fit the existing topography, soils, and drainage patterns. Emphasize erosion control rather than sediment control. Minimize the extent and duration of the area exposed Keep runoff velocities low Retain sediment on site Thoroughly monitor site and maintain all ESC measures Schedule major earthwork during the dry season. In addition, project management will incorporate the key components listed below(again not all will be applicable): Seasonal Work Limitations From October 1 through April 30, clearing,grading, and other soil disturbing activities shall only be permitted if shown to the satisfaction of the local permitting authority that silt laden runoff will be prevented from leaving the site through a combination of the following: Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and Limitations on activities and the extent of disturbed areas; and Proposed erosion and sediment control measures. Based on the information provided and/or local weather conditions the local permitting authority may expand or restrict the seasonal limitation on site disturbance The following activities are exempt from the seasonal clearing and grading limitations: Activities where there is 100 percent infiltration of surface water runoff within the site in approved and installed erosion and sediment control facilities. Coordination with Utilities and Other Jurisdictions Care has been taken to coordinate with utilities, other construction projects, and the local jurisdiction in preparing this SWPPP and scheduling the construction work Inspection and Monitoring All BMPs shall be inspected maintained and repaired as needed to assure continued performance of their intended function Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP are inadequate due to the actual discharge of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. FPA Storm Water Minimum Requirements Minimum Requirement#3 See element#9 of SWPPP Minimum Requirement#4 MR#1(Site has type 4/5 soil. The site Gradually slopes to the north. No surface water entering or leaving the subject property.) Maintain vegetative buffers Minimum Requirement#5 Stormwater to be managed on site through dispersion and infiltration on site in vegetated buffers to the maximum extent feasible. Start Here Does the site have 35% Yes See Redevelopment Minimum or more of existing —D Requirements and Flow Chart impervious coverage? (Figure 1-2.4.2). No Does the project convert 3/a acres or more of vegetation to Does the project result in lawn or landscaped areas, or 5,000 square feet, or convert 2.5 acres or more of greater, of new plus native vegetation to pasture? replaced hard surface area? No Yes Yes/ \1 Does the project result in 2,000 NY square feet, or greater, of new plus All Minimum Requirements ec�v i; replaced hard surface area? apply to the new and replaced Q,,-1 hard surfaces and converted �,�q ,-?�e t/, vegetation areas. .J Yes No Does the project have land Minimum Requirements #1 disturbing activities of 7,000 through ##5 apply to the new Yes square feet or greater? and replaced hard surfaces and the land disturbed. No ti q Minimum Re uirement#2 l'�G< �.o applies. �1.i� ?.tJ� 1-1' r �l�J c GO,Itt I'IUII oftbaft Figure 1-2.4. 1 �vv�ci; t c1�c. Flow Chart for Determining Requirements for New Development DEPARTMENT OF Revised June2015 ECOLOGY Please see Iittp:ll�vw�v.ecy.wa.gov/copyright.hfml for copyright notice including permissions, State of Washington limitation of liability,and disclaimer.