Loading...
HomeMy WebLinkAboutFPA2007-00003 - FPA Letters / Memos - 3/28/2007 �e°N CoOtr MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Mason County Bldg.1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 854 Davin Miller GDG Construction P.O. Box 331 Belfair, WA 98528 March 28, 2007 Re: 12321-21-00000 Dear Mr. Miller, This letter is follow up to my recent site inspection for your logging permit application on the above referenced 40-acre parcel. On March 26`h I walked the property and have the following comments. Steep Slopes: The slopes on your property are greater than 15%(measured 20 to 25%) and therefore fall under the jurisdiction of the section 17.01.100 (Landslide Hazard Areas) of the Mason County Critical Areas Ordinance. You need to hire a qualified (per section 17.01.100.E.3)professional to prepare a geo-technical assessment (conforming to section 17.01.100.E.4). This assessment should be delivered to my attention. I will then forward it to an engineer in Public Works for review. There will be a fee of approximately$50/hr for his time. This fee would be payable at the time of permit issuance. Wetland Buffer and Habitat: I found the wetland just west of the NW corner of the property. However I didn't see the buffer flagging that Lee Boad placed in February 2006. In the time since Mr. Boad did his field investigations and wrote his report, Mason County's wetland regulations (17.01.070) have changed considerably. No doubt the buffer has changed from the 85' feet described in the 2006 Boad report. You will need to have Mr. Boad up date the wetland report and flag the current buffer. While on site (northern portion) I found several old snags that show evidence of recent foraging by Pileated Woodpeckers. Pileated habitat is protected under section 17.01.110 of the Critical Areas Ordinance. Per the Critical Areas Ordinance you need to hire a qualified professional to identify the snags requiring protection and to come up with a plan that either protects them, or proposes compensating mitigation for their removal. If you go with a mitigation plan to remove the snags, a Mason Environmental Permit (MEP) and a Habitat Management Plan(HMP)will be required. Please let me know how you plan to proceed. Flagging I noticed a lot of flagging on the property and it wasn't always clear to me what it was for. Some of it appeared to be r/w flagging for your proposed access easements for your future subdivision proposal. I assume that the white flagging along the west and south property line is your buffer/tree retention area(although the area between the flags and the property line looked deeper than the 20' indicated on your map). I saw similar white flagging on your north property line, although your site plan does not suggest that you are planning a tree retention area on that line. Please clarify this. Stormwater&Erosion Control I noticed that on the two portions of the site where all the vegetation has already been stripped that the soil is very sandy with evidence of siltation having occurred during recent rain events. I noted your silt fencing on the adjacent five acre parcel to the south and how in at least one place,the flow of silt breached the silt fence. Dry grass had been spread over the cleared area,but probably not enough of it to be very effective. For this reason I think is important that you take aggressive measures to ensure minimal amounts of soil movement. John Sliva will be reviewing your site plan and geo-technical assessment for stormwater and erosion control issues too. Land Modification Permit Looking at your easement off of Riverhill Lane,it looks like a fair amount of cut and fill will be required. I suspect that the creation of that access road will require a Land Modification Permit. Please call Tami Griffey in the Building Department at extension 356 for more information. Please feel free to contact me if you have any questions. I can be reached at ext. 571 or by e-mail at mms(@co.mason.wa.us. Sincerely, Pichael MacSems FPA& Subdivision Reviewer cc: Lee Boad John Sliva Tami Griffey Aso BOOM MASON COUNTY � �A Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Elma (360) 482-5269 Mason County Bldg.1 411 N.5th P.O.Box 279 Shelton,WA 98584 54 Davin Miller GDG Construction P.O. Box 331 Belfair, WA 98528 March 12, 2007 Letter of Incompleteness RE: 12321-24-00000 Dear Mr. Miller, I recently received your application for a forest practices application(FPA). I know that you worked hard to prepare a complete application but unfortunately it is incomplete and can not be processed in its current condition. Below is a list of the item(s)that need more attention before the application can be deemed complete: (1) Thank you for the site map included with the application. I appreciate that it shows property lines, contours and the small wetland. However the map needs to be revised to be consistent with the requirements of 11.05.120.A (below). I have highlighted the items that most concern me. If you have not done so already please be sure that the flagging requirements of 11.05.120.B are also established on the ground. A map requirements of 11.05.120.A: (1) Harvest boundaries and tree retention areas. (II) The approximate location of any structures. (III) The location of all existing and proposed streets, right-of-ways, easements, skid roads, haul roads, and landings within the proposal. (IV) The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space, wildlife habitat, screening, and/or buffers. (V) Site topography at contour intervals of 40 feet. (VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. (VII) Drainage ways and culverts. (VIII) Site area targeted for further harvest including proposed timing. (IX) North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. 1 (2) The information on your application was a little sparse. Specifically for Section 6, please let me know the yarding methods and net acreage for each unit. Your SEPA checklist does not contain any directions. I am assuming that access is on Katchmack Lane, please confirm this. (3) Your SEPA checklist should have contained something called a Salmonids Checklist. I am enclosing one for your use, please fill it out (to the extent necessary) and return it to me. I expect that when I visit the site I may find that I will need to ask for a geological assessment, but that determination can wait for my filed visit. What I have written above is only what I need to consider your application complete and begin the review. In order to keep this case open, please respond within 180-days. If you have any questions, please contact me at extension 571 or by e-mail at: mms@co.mason.wa.us. Thank you. Sincerely, i 1 J Michael MacSems FPA Planner FINDINGS OF FACT FPA Case #2007-09001 APPLICANT: Riverhill Park LLC APPLICATION DATE: March 9, 2007 Mason County has reviewed the above referenced application for Class IV General Forest Practices and finds it in conformance with all applicable County land use regulations in effect at the time of application. FINDINGS The proposed FPA is compliant with the following conditions: The proponent has paid the prescribed fees. The proponent has filed a complete, signed application. A map has been received that complies with the requirements of 11.05.120: (I) Harvest boundaries and tree retention areas. (II) The approximate location of any structures. (IIn The location of all existing and proposed streets,right-of-ways, easements, skid roads,haul roads,and landings within the proposal. (IV) The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space,wildlife habitat, screening, and/or buffers. (V) Site topography at contour intervals of 40 feet. (VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. (VI1) Drainage ways and culverts. (VIII) Site area targeted for further harvest including proposed timing. (IX) North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. That this FPA is in conformance with the following Mason County ordinances: 11.05 That the proposed FPA involves 40 acres. That the notifications required by 11.05.060 have been made if applicable. Note:Not applicable in this case. Mason County Resource Ordinance That at the issuance of this permit will not result in a violation of the Mason County Resource Lands and Critical Areas Ordinance. The site was inspected by Michael MacSems of the Mason County Planning Department who determined that any critical area buffer and/or steep slope issues have been resolved. A Habitat Management Plan as been written by The Wetlands Corps and shall be recorded with the Auditor prior to issuance of the FPA. Geo-Technical Report/Assessment Review A Geo-Technical _X_ Assessment_Report(check one)was written by GTL approved by Todd Parkington of Alkai Consultants on 6/18/07. A second geo- assessment for the off site road access from Riverhill Drive was written by GTL and approved by Russell LaForce of Vector Engineering on 7/23/07. Washington State Department of Transportation X A DOT Access Permit is not required for this proposal. A DOT Access Permit is required for this proposal. Date Approved by DOT: N/A Shoreline Master Program That, if applicable, all activity under this application are in conformance with the Mason County Shoreline Master Program and has a shore line designation of N/A. State Environmental Policy Act This application for FPA#2007-00003: Has been reviewed for SEPA compliance under case#: SEP 2007-00031. Is SEPA exempt. _DNS X MDNS Stormwater Management This application was reviewed for stormwater and erosion control by John Sliva and approved o ` .nr 10 2 CONCLUSION In conclusion, this application for Class IV General Forest Practices is consistent with the above criteria and that the public uses and Mason County has fulfilled its statutory obligations. RECOMMENDATIONS I,being the Manager of the Mason County Planning Department, hereby attest to and certify that appropriate provisions have been made for this Class IV General Forest Practices Application and hereby recommend approval. In addition these facts evidenced by the contents of the file for this Forest Practice Application. Signed, Robert Pink, Planning Manager Date `7jv ichael MacSems, Subdivision Planner Date 3 GRAPHIC SCALE �---cal.--------- caarm a am o-a v (n 4 W i �.��r ♦ � r. i i /J T7__�7 go� SEPTIC ORA/NF/EZO NO7F.. COWA##� MP By rS7BdD AWX105 AAV LVS7R6VnCNro BE oar sn rAu a acT X�:z ro Be P wto wa o� I I I b i0 PfR 9mVC c A^nW XSe AND PLAN$AAO 1 I LU f ' RMED M APA.N'Xf0 a57.6uIDY 5)'5n I I Irl a \ I� W�� �� wi � GPA VEL PATHVAY I>uj g IZ a � 1Y 'i yr mr M. ATy �� `l.•- \\\ ./y, \r\\r �+gpp ls^ ! M \� \ _-f!.•�... ... .�"i w.r'' ' wi' ".,;'« n 1' uw. �f V p a 2 a. \,•atep 3 �so Gi .. �� C-2a c1 - r'n COU MASON COUNTY tvA �00� DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. III, 426 West Cedar Street PO Box 186, Shelton, WA 98584 �8c1 www.co.mason.wa.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 FOREST PRACTICES APPLICATION/NOTIFICATION Type IV General This application should be accompanied with an Environmental Checklist(SEPA) as well as an activity map/site plan which addresses items listed below. TYPE OR PRINT IN INK: 1. Landowner,Timber Owner and Operator information. Legal Name of LANDOWNER Legal Name of TIMBER OWNER Legal Name of OPERATOR RUC-fV, -ero erfie4 -to -5 .SA>� Mailing Address- Mailing Address: Mailing Address: l City,State,Zip City,State,Zip City,State,Zip ZF-,—FA%A, WASaq P _ Phone( ) Phone( ) C3do)Z7S'�j-i(�D Email: Email: Email: 2. Contact person information. Contact Person �CtLK S LtSo Phone f a -- ;ly 3®</ 32 Z75"$-v C3 Email: ), �C}C,COtM 3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: 250—CU F,-7— 6 S 7 For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829. 4. Legal description where the forest practices will occur. Parcel Number Sub Division ''G'/. Section Township Range E/W gx0000v " LO W 5. Answer each question as it applies to your proposed forest practice. a. []No. [ Yes. Is the activity within an urban growth area? b. KNo. [] Yes. Is the activity within a public park? C. [)I.No. [] Yes. Is the activity within 500 feet of a public park? Park name: d. []No. Yes. Is the activity located on lands platted after January 1, 1960? e. []No. K Yes. Is the activity within 200 feet of saltwater lake river/creek/stream pond wetland seasonal runoff slopes which exceed 150/o?_� f. What is the expected duration of FPA? &iT7t( Proposed start date: �-w;j 1 moo Proposed end date: 73 Q T 1. goo•7 Page ] of 4 6. Are you cutting or removing timber? []No. Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the activity map. Volume to be in Unit# Harvest T net Harvested mb 1t v I=' f a. GJ a o\ &ewvinc e Q 7. Are you constructing or abandoning roads? -pi,No. [] Yes. Complete the table below. Show locations and identify all road activities on the activity map. Total Length Steepest Side Slope Abandonment Date Type of Activity feet % Mo/Yr Road Construction Does Not Apply Temporary Road Construction Road Abandonment Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife (WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.gov/habitat.htm. 8. Are you installing or replacing water-crossings? KNo. [] Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map. Crossing Crossing Dimensions Crossing Crossing Dimensions Identifier T width x length) Identifier T width x length) 9. Mark the following activities that will be done in or over typed water. Activity in or over: Type I Stream Type II Stream Type III Stream Type IV Stream Type V Stream Removing culverts of bridges Equipment crossing Ground skidding Suspending cables Cable yarding Falling and bucking Other 10. Is any activity in a wetland or wetland buffer? .FA No. [] Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map. Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area Identifier (I,II,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres) other 11. Describe how the following are identified on the ground. • Harvest boundaries/unit corners: s r ✓ `� • Right-of-way limits and centerlines for road work,culverts and bridges: • Critical areas and critical area buffer boundaries: Page 2 of 4 12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American cultural resources? []No. D,Yes. 13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance does not ensure compliance with the Endangered Species Act or other federal state or local laws. of L Signature of TIMBER OWNER Signature of OPERATOR (if different than landowner) (If different that landowner) Print name: ' �ir' Print name: Print name: Date Date: Date: Additional information: (Optional) Per Mason County Ordinance 11.05,Section 11.05.120,a site map shall accompany this application which includes the following information. I Harvest boundaries and tree retention areas. II The approximate location of any structures. III The location of all existing and proposed streets,right-of-ways,easements,skid roads,haul roads,and landings within the proposal. IV The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping,open space,wildlife habitat,screening,and/or buffers. V Site topography at contour intervals of 40 feet. VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. VII Drainage ways and culverts. VIII Site area targeted for further harvest including proposed timing. IX North arrow and scale shall be shown on all site plans.The scale shall be no smaller than one inch to 2 100 feet. Staff asks that,at a minimum,the corners of the harvest unit(s)be flagged for clear identification. Page 3 of 4 1 FPA FEE: $200.00 with SEPA SEPA FEE: 0-9.99 Acres$510 $300.00 without SEPA 10 to 20 Acres$610 Over 20 Acres$765 10 to 20 Acres$610 EIS(DS)$2040+55/hr Departmental Review (For Office Use Only) Site visit: Da rove Mason County Community Development 05-02-2006 Page 4 of 4 �goN CO MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Mason County Bldg.1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 1854 Jack Johnson Riverhill Properties LLC P.O. Box 3119 Belfair, WA 98528 February 20, 2008 Re: Riverhill FPA Dear Mr. Johnson, This letter is a follow up on the status on the FPA application for the Riverhill Park site. The SEPA comment period closed on February 12'h, with one comment received, from WSDOE (you should have received a copy too). To be clear, if an NPDES is required, you will be responsible for getting one; it is not a precondition for issuance of the FPA. I just talked to Roberta Woods at DOE and she explained that a NPDES is only required when a FPA is disturbing more than one acre AND the site as has offsite drainage (natural or otherwise). As far as Mason County is concerned the following items are needed before the FPA can be issued: 1. The Lee Boad prepared HMP needs to be recorded with the County Auditor. The cost for this will depend on the number of pages involved. I estimate the cost will be about $60 (1 do not think that it is necessary to record every page of exhibits). On 1/28 I sent an e-mail to Lee asking for a new copy of the HMP text with some minor changes. 2. We also need the paper work in place (contracts and performance bonds or other securities) for 150% of the (market rate) cost of implementing the HMP and providing five years of monitoring reports. 3. John Sliva of Public Works needs to approve the engineered stormwater plan(he is using the one submitted with plat applications). I have no idea how long this will take. Some of the neighbors to this site have made comments to me regarding your current access. My understanding is that the road you are using is essentially a prescriptive easement that you can use for access until you develop the plats. My understanding is not a legal opinion and for the FPA phase of this project I am counting on you to know what your access rights are and are not. Once these items have been taken care of, the County can issue the FPA. One complication is the SEPA condition that prohibits the logging of the property between March 25`h and July 5`h. I would very much like to see all of the above wrapped up by mid-June, so that you can have your permit in hand by the time the work restriction ends on July 61h If you have any need to contact me, I can be reached at ext. 571 or by e-mail at mms@co.mason.wa.us. Thank you. Sincerely, Michael MacSems FPA Reviewer CC: John Sliva Thomas Sharp Lee Boad °N °oO� MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Mason County Bldg. 1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 1854 To: Whom It May Concern From: Michael MacSems,Mason County Planning Dept 10 ,S Date: May 4, 2007 Re: Mason Environmental Permit for GDG Construction(MEP 2007-00048) Comment Period: In accordance with section 17.01.120.0 of the Mason County Resource Lands and Critical Areas Ordinance, a copy of the GDG Construction Mason Environmental Permit (MEP) is being made available to all stipulated parties. Mason County officials have until May 25th, to respond and outside agencies need to respond by June 1st. In the event that no comments are received from a particular department or agency, within the comment window, the Planning Department will assume that there are not any concerns. Written comments should be sent to the address listed above. Project Background: GDG Construction has applied for a Class IV G logging permit(FPA) for a forty-acre parcel that they own adjacent to the subject parcel of this application. GDG has purchased an ingress/egress easement across the subject parcel in order to reach their property. The location of the easement contains slopes as steep as 25% for which a geo- technical assessment has been prepared and delivered to the County. At the time of this notice, the assessment is awaiting assignment to a contract engineer for review. Because the applicant wishes to develop this access prior to the expected issuance of the FPA and because the applicant expects to move less than 200 cubic yards of material(therefor not requiring a Land Modification Permit) a MEP becomes,by default,permit vehicle to review the geo-technical assessment under. I have inspected the site and found no other critical area issue at this location. If you have any questions,please call me at ext 571 or e-mail at mms@co.mason.wa.us. Thank you. Contact List: Mason County Department of Community Development Director Mason County Public Works Director Mason County Department of Environmental Health Director Mason County Fire Marshal Mason County Building Official Olympic Region Clean Air Agency Skokomish Tribe Wash Dept of Fish&Wildlife BON co MASON COUNTY Shelton (360) 427-9670 DEPARTMENT OF COMMUNITY DEVELOPMENT Belfair (360) 275-4467 Planning Mason County Bldg.1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 1854 NOTICE OF APPLICATION MASON ENVIRONMENTAL PERMIT May 2,2007 This is a Notice of Application as required by the Mason County Development Code 15.07.010.Notice to be posted on site and mailed to all property owners of record within 300 feet of subject property. Applicant Name: G D G Construction Date of Application: May 1,2007 Date of Finding of Completeness: May 2,2007 Parcel Number(s) 12321-20-94120 Location of Project: Lot A of SP 475,TR 12 E %2,NE&W ''/z,NW,Section 21,Township 23N., Range 1 W.,WM. Description of Project: The purpose of this MEP is to remove grade a road over a 25%slope. The road will be built within an existing 50'wide access.The MEP is being used as permit to review a geo-technical assessment. Approvals,Actions and Required Studies: This MEP is subject to administrative approval from the Mason County Department of Community Development. Public Comment Period: Fourteen days from the date of this notice.Any comments should be directed to the staff member listed below. Existing Environmental Documents: Geo-technical Assessment by Geotechnical Testing Laboratory County Staff Contact: Michael MacSems,360-427-9670 ext 571 or mms@co.mason.wa.us Date,Time&Place of Scheduled Public Meeting:No public meetings required. Timeline for Final Action: Final action shall follow within (the standard) 120 days from date of a Finding of Completeness(plus stays-clock stops—for preparation and review of any required studi ). �0 Signed By: fit. Date: /z PERMIT NO.: MASON COUNTY DATE RECEIVED: DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE ORDINANCE (Chapter 17.01 MCC) 411 N. 5TH Street/P.O. Box 279, Shelton, WA 98584 ENVIRONMENTAL PERMIT APPLICATION MASON ENVIRONMENTAL PERMIT/ CONDITIONAL USE ❑ The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. Owner: f Aectc9,�1ivt ,(� O er Ma g Address: _6)2wSite Address: - City: t �"`"- State: O A Zip:fZV-? City:-&0iVa l <— State WA Zip:W06_ieDjTitle Holder Phone: Daytimec-�j�6 -71 _ 22� Address: p`. Fire District#: State: 1A A Zip:_Mfig Signature: - - 2. Parcel Number: j 2 ► 2 off- yr _ Legal description: I r, 4_ ( Parcel Size: 7d� 3. Directions to site: State what sections require a permit: In-Holding Lands, Chapter 17.01.062 ❑ 4' Long-Term Commercial Forest, Chapter 17.10.060 0 Wetlands, Chapter 17.01.070 0 Mineral Resource Lands, Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 0 Aquifer Recharge Areas, Chapter 17.01.080 ❑ Landslide Hazard Areas, Chapter 17.01.100 Uk-' Erosion Hazard Areas, Chapter 17.01.104 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Fish and Wildlife Habitat Conservation Areas, Chapter 17.01.110 0 5. Ide tify current}use of p perty with existing improvements: I1/71 6. Identify and describe the proposed project,including the type of materials to be used, construction methods,principle dimensions and other pertinent information(Attach additional sheets if needed): ,��a� ,t nc r—:5 7. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No j 8. Any water on or adjacent to property: Saltwater ❑ Lake ❑ River ❑ Pond ❑ Wetland 0 Seasonal Runoff ❑ Other 0,6 9. If septic is located on project site, include records. Connect to septic? ❑ Community Septic? ❑ Public Water Supply? 0 Well? ❑ 10. Type of Job: New add ❑ Alt ❑ Repair 0 Demolition ❑ Other This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. M VOS MASON ENVIRONMENTAL PERMIT: $560.0 $335.00 ith another permit) MASON CONDITIONAL USE ENVIR.PERMIT: .00 ' HABITAT MANAGEMENT PLAN: $395.00 1APLANNING\C&R\ENVIR0NMENTAL REVISED 01-16-07 Show the following on the site plan Lot Dimensions Flood Zones Existing Structures Fences Water Lines Driveways Drainage Plans Shorelines Septic System Topography Indicate Directional by(N,S,E,W,etc.) Proposed Improvements Easements In relation to plot plan Name if Flanking Street APPLICANT TO DRAW SITE PLAN BELOW: i Q�✓�^kll APPLICANT TO DRAW TOPOGRAPHY BELOW: FILTER FABRIC MATERIAL 80`WIDE ROLLS USE STAPLES OR VARE RING TO ATTACH G e o t e c h n i c al FABRI FABRIC TO 4MRE 14 GAUGE WIRE FABRIC OR EQUIVALENT z.o• Testing Laboratory 7E' 2-X4 WOOD POSTS,STANDARD OR BURY BOTTOM OF FILTER BETTER OR EQUAL ALTERNATE: MATERIAL IN MI Z"TRENCH STEEL FENCE POSTS 41// FILTER FABRIC B' r FABRIC GAUGE WIRE ( /1 FABRIC OR EQUIVALEM 1 1 zv I ; GROUND SURFACE 5'(F 11 I PROVIDE 34'-1 1?WASHED ;1 GRAVEL BACKFILL IN TRENCH Ir AND BOTH SIDES OF FILTER 11 II' 1 1 FENCEE FABRIC ON THE SURFACE 8'MI 1 1 1 1 Z"W WOOD OSTS 1 1 1 1 11 ALT:STEEL FENCE POSTS 1 Geotechnical Services FILTER FABRIC FENCE NOTES: QA/QC Services 1.FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUTJOINTS THE LENGTH OF THE BARCLOTHS AVOID LBESPLICEDTS. THERONLYA Testing Services ARE NECESSARY,FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT 1 A SUPPORT POST`H EN A MINIMUM BJNCN OVERLAP AND SECURELY FASTENED AT BOTH ENDS TO THE POST. 1 1 1 1 I 2.POSTS SHALL BE SPACED A MAXIMUM OF 8 FEET APART AND DRIVEN SECURELY INTO THE GROUND(MINIMUM OF 3010HES). I 3.A TRENCH SHALL BE EXCAVATED APPROXIMATELY 8 INCHES WIDE AND 12 10011 Blomberg St.SW INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. It 1 Olympia,WA 98512 li 4.WHEN STANDARD STRENGTH FILTER FABRIC IS USED,A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE Phone:(360)754-4612 1 I OF THE POSTS USING NAVY S. HE STAPLES AT LAST 1 INCH Fax:(360)754-4848 LONG,TIE WIRES OR HOG RINGS.THE WIRE SHALL EXTEND IMOTHE LONG, ` / L ORIGINAL GROUND SURFACE TEND MORE THAN 38 -- ..------ -------------- ` 11KENESHABOVEMUM Of 41NCHES AND SHALL NOT EX _ 1 I /' 1 S.THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED Date: 04/19/2007 1 TO THE FENCE AND 20 INCHES OF FABRIC SHALL BE EXTENDED 1 / 1 INTO THE TRENCH.THE FABRIC SHALL NOT EXTEND MORE THAN3B Designed b LL ' O' EASEMENT,` I I INCHES ABOVE THE ORIGINAL GROUND SURFACE.FILTER FABRIC SHALL g y' / I /� NOT BE STAPLED TOTHE EXISTING TREES. Drawn by: LL I 11 8.WHEN EXTRA-STRENGTH FILTER FABRIC AND CLOSER POST SPACING IS Checked by: LL USED,THE WIL I 1 MESH SUPPORT FENCE MAP BE EMITED,IN A CASE,THE FIILLTER FABRIC IIS STAPLED ORVAREDUDIRECTLYTOTHEH Dwg#:04-19-07-039 _ R I V E R H I L L DRIVE / ' ; SILT FENCE 1' POSTS R WITH ALL OTHER CES HALLPROVISIONS OR ABOVE NOTES APPLYING. I 7 AREA HAS BEIEN PERMANENTLY NTLY STABILIZ NOT BE ED BEFORE THE UPSLOPE ` `O' 1 8.FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH Y I RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL,ANY 1 111` REWIRED REPAIRS SHALL BE MADE IMMEDIATELY. 1 GENERAL EROSION CONTROL NOTES: O' EASEMENT ``ICI 1 BEGINNING EROSION COOF CONSTRUCTION NTROL MEASURESSHALL .THE PBE IN ROJECTT ACE PRIOR IORTOER THE COUNTY S LL INSPECT EROSION C BEGINNING MEASURES PRIOR TO GINNING CONSTRUCTION. 1 A 2.EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS ON THIS PLAN.THE CONTRACTOR OFALLEROSIOS RESPONSIBLE FORTHE PROJECT NAME: INSTALLATION F EX STING AINANCE OF ALL DRAINAGE CONTROL MEASURES. 1 {/`♦/ NO SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES SHALL BE ALLOWED.CARE SHALL BE TAKEN TO PREVENT MIGRATION GDG CONSTRUCTION 1 OF SILTS TO OFF SITE PROPERTIES, 1 336'EASEMENT SITE 3,THE CONTRACTOR SHALL MAKE DAILY SURVEILLANCE OF ALL EROSION � I CONTROL MEASURES AND MAKE ANY NECESSARY REPAIRS OR ADDITIONS TO THE EROSION CONTROL MEASURES,THE CONTRACTOR SHALL PROVIDEAD 512 RIVERHILL DRIVE ' ._ �O MEASURES AS THEPROJ ECT ENGINEER FAILURE BSARY ECE BELFAIR,WASHINGTO N 1 __ ----------------------- TO COMPLY WTH ALL LOCAL AND STATE EROSION CONTROL NORTH %� RVTHEC ER RED IREMENTS MAY RESULT IN CIVIL PENALTIES BEING LEVIEO PARCEL 123212094120 1 AGAINST THE CONTRACTOR AND/OR PROJECT OWNER. SCALE =5� 4.DU RING THE WET SEASON(NOVEMBER TO MARCH)ALL DISTURBED SOILS �% SHALL BE STABILIZED WATHIN 48 HOURS AFTER STOP OF WORK EROSION qq�n��yT C.I._5' CONTROL MEASURES SHALL INCLUDE,BUT NOT BE LIMITED TO, ReAsi HIS. DATUM ASSUMED PLASTICSHEETING STRAWMATTINGTHE EFFECTED AREA UJUTEMATTINGCXNG SPOIL LSTRAWES MULCH, THIS IS NOTA SURVEY ;` = �65 UCEASS WEATHERPERMITS FTMEDISTURBED AREAS SHALL TAKE 5 5.ALL SEEDED OR SODDED AREAS SHALL BE CHECKED REGULARLY 0 10 20 30 90 50 __-�-- _ TO MAKE SURE VEGETATIVE COVERAGE IS COMLETE.AREAS SHALL SE _ - REPAIRED,RESEEDED,AND FERTILIZED AS REQUIRED. 8.TRACKING OF SOIL OFFSITE WILL NOT BEALL i ANY SOIL IS BE RE 1�' TRACKED ONTO A COUNTY STREET,IT SHALL BE REMOVED BY THE END OF THAT WORKING DAY.ANY FURTHER TRACKING OF MUD WLL THEN iJ 1 j BE PREVENTED BY SWEEPING OR WASHING OF THE VEHICLES TIRES BEFORE DRIVING ON A COUNTY STREET. 7.NO MORE THAN 500 LF OF TRENCH ON A DOWNSLOPE OF MORE THAN 5 1 PERCENT SHALL BE OPENED AT ONE TIME. 8.i EXCAVATED TERAL SHALL SE PLACED ON THE UPHILL SIDE OF TRENCHES.t � MA 9.TRENCH DEVOTERING DEVICES SHALL BE DISCHARGED IN A MANNER THAT WILL 1 NOT ADVERSELY AFFECT FLOWING STREAMS.DRAINAGE SYSTEMS OR OFFSITE PROPERTIES. SCALE:1 inch=50 feet 10.ALL STORM SEWER INLETS RECEIVING RUNOFF FROM THE PROJECT DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER 1 WILL BE FILTERED BEFORE ENTERING THE CONVEYANCE SYSTEM. 11.ALL OFFSITE CATCH BASINS KAMEDATELY ADJACENT TO THE SITE ROM SHALL BERBEDAR A SHALL EN. FIGURE ^ 12.ALL DISTURBED AREAS SHALL BELB SEEDED S SODDED TON COMPLETION L OF NARK THE COVERAGE F THE SMALL BE RESPONSIBLE O ENSURE THAT COMPLETE THE VEGEATIEDI STUBBED AREAS IS PROVIOE08THAT GROWTH OF THE VEGETATION IS ESTABLISHED. SITE 13. S I T E PLAN CATCH BASINS SHALL TRAP SEDIMENT OR FILTER FABRIC MUST BE i/ PLACED UNDER GRATE UNTIL VEGETATION IS ESTABLISHED. FILTER FABRIC MATERIAL 80 WIDE ROLLS USE STAPLES OR HARE RING TO ATTACH G e o t e c h n i c a l FABRIC FABRIC TO WIRE HAR 1{GAUGE E \ FABRIC OR EQUIVALENT Testing \ U FACE /T\\ ra Laboratory r ' 7XC WOOD POSTS,STANDARD OR SARI'BOTTOIA OF FILTER BETTER OR EQUAL ALTERNATE: MATERIAL IN B-XI2'TRENCH STEEL FENCE POSTS FILTER FABRICAE K \` 2-A2-X14 GAUGE WIRE FABRIC OR EQUIVALE �\ I GRO 5'-0' \\ I PROVIDE 3W-I I?WASH \ I GRAVEL BACIO=ILL IN TRE 2 \ AND ON BOTH SIDES OF F FENCE FABRIC ON THE SU \ \ t \\ t 2'X4--WOW t ALT.STEEL FENCE POSTS Geotechnical Services j II It FILTER FABRIC FENCE NOTES: 1 1 I.FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO QA/QC Services 1 THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS WHEN JOINTS Testing Services 1 ARE NECESSARY,FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT I ASUPPORT POST WITH A MINIMUM 61NCH OVERLAP AND SECURELY j I FASTENED AT BOTH ENDS TO THE POST. I1 1 2.POSTS SHAILL BE SPACED A MAXIMUM a FEET APART AND DRIVEN SECURELY WO THE GRGROUNDND(MINIMUMM OF 30 INCHES) . I �1 3.ATRENCHSHALLBEEXCAVATED"PROXIMATELY8 INCHES WIDEAND 12 10011 Blomberg St.SW INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. Olympia,WA 9851 Z I 1.BURR STANDARD STRENGTH FILTER FABRIC IS USED,A WIRE MESH SUPPoFIT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE Phone:(360)754-4612 OF THE POSTS USING HEAVY-OUTY WIRE STAPLES AT LEAST I INCH LONG,TIE WIRES OR HOG RINGS.THE WARE SHALL EXTEND INTO THE Fax:(360)754-4848 TRENCH A MINIMUM OF 41NCHES AND SHALL NOT EXTEND MORE THAN W _ _____ I ---`` i % I , , INCHES ABOVE THE ORIGINAL GROUND SI/RfACE. 5.THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE AND 201NCHES OF FABRIC SHALL BE EXTENDED Date: 04/19/2007 I INTO THE TRENCH,THE FABRIC SHALL NOT EXTEND MORE THAN 38 Designed b LL 5 0 EASEMENT INCHES ABOVE THE ORIGINAL GROUND SURFACE FILTER FABRIC SHALL y. y NOT BE STAPLED TO THE EXISTING TREES. Drawn b LL j 8.WHEN EXTRA-STRENGTH FILTER FABRIC AND CLOSER POST SPACING IS Checked by: LL USED,THE WIRE MESH SUPPORT FENCE MAP BE EUMINATED,IN SUCH R I V L DRIVE V A CASE,THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE DWg#:04-19 07-039 E R H I L E /�� ' S f LT F E N C E I�� i POSTS WITH ALL OTHER PROVISIONS OR ABOVE NOTES APPLYING. 7.FtLTEAREA FABRIC FENCES SHALL NOT BI REMOVED BEFORE THE UPSLOPE I w/ AREA HAS BEEN PERMANENTLY STABILIZED B.FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL.AM REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. \ J J GENERAL EROSION CONTROL NOTES: 'I 50' EASEMENT 1. EROSION CONTROL MEASURES SHALL BE IN PUCE PRIORTO THE I 1 BEGINNING OF CONSTRl1CTI0N.THE PROJECT ENGINEERINEER ANO THE COUNTY SHALLINSPECTANDAPPROVETHEINSTALLATIONOF ERO CONTROL MEASURES PRIOR TO BEGINNING CONSTRUCTION A 2 . EROSIONION CONTROL MEASURES ARE NOT RESPONSIBLE FOR HEMS IN THIS PLAN,THE CONTRACTOR OFALLERIONCON R PROJECT NAME: INSTALLATION AND MAINTAINANCE OF ALL EROSION CONTROL MEASURES. N)SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES ,I SHALL BE ALLOWED.CARE SHALL BE TAKEN TO PREVENT MIGRATION GDG CONSTRUCTION OF SILTS TO OFF SITE PROPERTIES. 1 336 EASEMENT SITE 3.THE CONTRACTOR SHALL MAKE DAILY SURVEILLANCE OF ALL EROSION CONTROL MEASURES AND MAKE ANY NECESSARY REPAIRS ORADDITIONS'/ Y✓\ _/ TO THE EROSION CONTROL MEASURES.THE CONTRACTOR SHALL PROVIDE 512 RIVERHILL DRIVE j '-' ADDITIONAL EROSION CONTROL MEASURES AS DETERMINED NECESSARY _-___-_ _ // ��O- r BY THE COUNTY INSPECTOR AND/OR THE PROJECT ENGINEER.FAILURE BELFAIR,WASHINGTON I ' ------- ,�"-� TO COMPLY WTH ALL LOCAL AND STATE EROSION CONTROL NORTH RED UIREMENTS MAY RESULT IN CIVIL PENALTIES BEING LEVIED PARCEL 123212094120 // AGAINST THE CONTRACTOR ANDIOR PROJECT O'WNER. SCALE 1"=50' % / 4 DURING THE WET SEASON INOVEMSER TO MARCH)ALL DISTURBED SOILS SHALL BE STABILIZED WATHIN 48 HOURS AFTER STOP OF WORK EROSION �/I �/�FI C.I.=5' f' CONTROL MEASURES SHALL INCLUDE,BUT NOT BE LIMITED TO, R�T ISM IS: COVERING THE EFFECTED AREA INCLUDING SPOIL PILES WITH DATUM ASSUMED / / PLASTIC SHEETING,STRAW MATTING,JUTE MATTING,STRAW MULCH, /� �� ORWOODCHIPS.SEEDING OF THE DISTURBED AREAS SHALL TAKE THIS IS NOT ASURVEY 4 ,-1 PLACE AS WEATHER PERMITS. I �!� /// 0 10 20 30 40 50 5.ALL AEDEO OR SODDEDAREAS COVERAGE BE CHECKED REGULARLY ` TF _���-�� TO MAKE SURE VEGETATIVE COVERAGE IS GdALETE.AREAS SMALL BE -- REPAIRED.RESEEDED,AND FERTILIZED AS REQUIRED. I TRACKING OF SOIL OFFSITE WILL NOT BE ALLOWED.IF AM SOIL IS TRACKED ONTO COUNTY STREET,IT SHALL BE REMOVED BY THE END OF THAT WORKING DAY.ANY FURTHER TRACKING WILL THEN V ; BE PREVENTED BY SWEEPING OR WASHING OF THE VEHICLES TIRES I BEFORE DRIVING ON A COUNTY STREET. 1 1 7.NO MORE THAN 500 LF OF TRENCH ON A DOWMSLOPE OF MORE THAN 5 1 PERCENT SHALL BE OPENED AT ONE TIME. B.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES 9.TRENCH ADVERSELY AFFECT DEVICES STALL BE DISCHARGED IN A MANNER THAT VNLL , NOT ADVERSELY AFFECT FLOWING STREAMS.DRAINAGE SYSTEMS OR I OFFSTTE PROPERTIES. I SCALE:finch=50 feet 10.ALL STORM SEWER INLETS RECEIVING RUNOFF FROM THE PROJECT DURING j CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER ,+ WILL BE FILTERED BEFORE ENTERING THE CONVEYANCE SYSTEM. j 11.ALL OFFSITE CATCH BASINS IMMEDIATELY A04ACENT TO THE SITE \\\\ SHALL BE PROTECTED FROM DISTURBEDSHAL SILTATION. FIGURE ^ 12,ALL DIST URBED AREAS SMALL BE SEEDED OR SODDED UPON COMPLETION Of WORK.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT j \\ COMPLETE COVERAGE OF THE DISTURBED AREAS IS PROVIDED A THAT j GROWTH OF THE VEGETATION IS ESTABLISHED. SITE PLAN 13,CATCH BASINS SHALL TRAP SEDIMENT OR FILTER FABRIC MUST BE `11 PLACED UNDER GRATE UNTIL VEGETATION IS ESTABLISHED. 1 14.44.050 Permits--Required when. Page 1 of 1 Title 14 BUILDINGS AND CONSTRUCTION Chapter 1444 E..X.CAVATION .AN.D GRADIN.G 14.44.050 Permits--Required when. (a) Permits Required. Except as specified in subsection (b)of this section, no person shall do any grading without first having obtained a grading permit from the official. A grading permit shall be required for a project involving excavation or fill that totals two hundred or more cubic yards of graded material and is not exempted below. Grading activities not requiring a grading permit shall comply with the standards listed in Sections 14.44.170 through 14.44.210. (b) Exempted Work. A grading permit is not required for the following: (1)When approved by the official, grading in an isolated, self-contained area if there is no danger or hazard to adjacent private/public property or other improvements; (2)An excavation below finished grade for basements and footings of a building, retaining wall or other structure authorized by a valid building permit. This shall not exempt any fill made with the material from such excavation or exempt any excavation having an unsupported height greater than five feet after the completion of such structure; (3)An excavation which: (a) is less than two feet in depth, or(b)which does not create a cut slope greater than five feet in height and steeper than one and one-half horizontal to one vertical; (4)A fill less than one foot in depth and placed on natural terrain with a slope flatter than five horizontal to one vertical, or less than three feet in depth, not intended to support structures, which does not exceed two hundred cubic yards on any one lot and does not obstruct a drainage course; (5)Cemetery graves; (6) Refuse disposal sites controlled by other regulations; (7) Excavations for wells or tunnels or utilities; (8) Mining, quarrying, excavating, processing, stockpiling of rock, sand, gravel, aggregate or clay where established and provided for by law, provided such operations do not affect the lateral support or increase the stresses in or pressure upon any adjacent or contiguous property; (9) Exploratory excavations under the direction of a soil engineer or engineering geologist; (10)Grading on public rights-of-way done by or under the supervision or construction control of a public agency that assumes full responsibility for the work; (11) Grading necessary for agricultural operations, unless it causes hazards to property or public road, or obstructs a watercourse or drainage; (12) Maintenance of existing fire breaks and roads; (13) Performance of emergency work necessary to protect life and property when urgent necessity arises. The official shall be notified promptly and the person performing the work shall apply for a permit within ten calendar days. (14)Grading associated with a logging operation under a current forest practice permit. Exemption from the permit requirements of this chapter shall not be deemed to grant authorization for any other work to be done in any manner in violation of the provisions of this chapter or any other laws or ordinances of Mason County. (Res. 141-96 (part), 1996). << previous I next>> http://www.co.mason.wa.us/code/commissioners/_DATA/TITLE 14/Chapter_14_44_EXCA... 4/2/2007 FOREST APPRAISAL FOR GLENN MILLER �R�� OWNERSHIP IN TOWNSHIP 23 NORTH - RANGE 1 WEST, W.M. SECTION 21 MASON COUNTY, WASHINGTON JUNE 2006 A `ice TABLE OF CONTENTS Page 1 Introduction Page 1 Present Market Value Page 1 Volume Page 1 Stumpage Page 2 Valuation Page 3 Valuation by Log Grades Page 4 Markets Page 4 Reproduction Page 4 Land Page 4 Cruise Standard Page 5 Disclaimer Page 5 Certification Page 6 Appendix: Map Stand Description Log Prices Reproduction Value Data Forester's background 4S TREE/NORTHWEST, INC. AQ 1606 Cowlitz Way SINCE 1948 Kelso, Washington 98626 Phone: (360) 636-3906 Richard I. Woods FAX: (360) 425-5779 Forest Manager riw((iteleport.com June 13, 2006 Mr. Glenn M. Miller P.O. Box 331 Belfair, WA. 98528 RE: FOREST APPRAISAL Dear Glenn; As instructed by you I have made a timber cruise and evaluation of the standing trees on your ownership in Township 23 North - Range 1 West, W.M.; Section 21 . The date of this value determination is based on the date of the field inspection which was June 9, 2006. In my opinion the timber value, stumpage and volume determination on this 40 acre ownership is as follows: PRESENT MARKET VAI [IF_ Merchantable Timber ..................................................... $41 ,1 5 6.00 Reproduction ................................................................. $ 8 4 0.0 0 Total .............. $41 ,996.00 FORTY TWO THOUSAND DOLLARS ($42,000.00 rounded) VOI LIME Douglas-fir ................................................................ 101 MBF Western hemlock ....................................................... 36 MBF Western Red cedar ..................................................... 66 MBF Total ................ 173 MBF ST IMPAGIF Douglas-fir ................ 101 M @ $256/M = $ 25,856.00 Western hemlock ....... 36 M @ $275/M = $ 9,900.00 Western Red cedar ..... 36 M @ $150/M = 1.t 5,400.00 Totals ............. 173 M $ 41 ,156.00 Stumpage is the net return to the landowner based on log delivered prices less the harvesting cost and forest excise (timber) tax. Member Association of Consulting Foresters of America, Inc. -1 - VALUATION AS OF JUNE 912006 TIMBER VALUE: $ VALUE $ VALUE PER MBF PER $ SPECIES AGE M'BD FT. (Stumpage) L ACRES ACRE TOTAL Douglas fir 46-52 101 256.00 25,856.00 Western Red cedar 45 36 275.00 9,900.00 Western hemlock 40 36 150.00 5,400.00 REPRODUCTION VALUE Douglas fir 6 50% tocked (9) 140.00 840.00 LAND VALUE Not valued in this report TOTALS 41,996.00 173 or rounded 42 000.00 No buildings _2_ VALUATION BY LOG GRADES 1) Douglas fir camp run or average price is based on delivery to Tacoma and Belfair log yards and is computed as follows: Delivered To: Weyco 9% 12"+ J Sort-export @ 770.00/M 69.30/M Weyco 6% 9-11" J Sort-export @ 710.00/M 42.601M Manke 65% 5"+ Sawlog @ 420/00/M 273.00/M N.Mason Fiber 20% 3"+ Pulpwood @ 28.00/Ton or 224.00/M 44.80/M 429.70/M Average delivered price or 430.00/M Less logging costs 160.00/M Less 5% timber tax 14.00/M (174.00/M) Douglas fir stumpage 256.00/M 2) Western Red cedar camp run or average price is based on delivery to Tacoma log yard and is computed as follows: Delivered To: Manke 25% 6'+ Long logs @ 600.00/M 150.00/M Manke 75% 6"+ Short logs @ 400.00/ M 300.00/M Average delivered price 450.00/M Less logging costs 160.00/M Less 5% timber tax 15.00/M (175.00/M) Western Red cedar stumpage $275.00/M 3) Western hemlock camp run or average price is based on delivery to Tacoma and Belfair log yards and is computed as follows: Delivered To: Manke 0.75 8+ Sawlogs-Domestic @ 350.00/M 262.50/M N.Mason Fibre 0.25 3+ Pulpwood @ 28.00/Ton or 224.00/M 56.00/M 318.50/M Average delivered price or 318.00/M Less logging costs 160.00/M Less timber tax 8.00/M (168.00/M) Western hemlock stumpage 150.00M -3- MARKETS Log markets used in this report are as follows: Douglas-fir; Export sawlogs - Weyerhaeuser Co. delivered at their Tacoma sort yard; Domestic sawlogs- Manke Lumber Co.delivered to their sawmill in the Tacoma port area industrial park, Pulpwood N. Mason Fiber sort yard approximately one mile east of subject tract (see map). Western hemlock; Domestic sawlogs- Manke Lumber Co., Tacoma Pulpwood -N. Mason Fiber, BeIfair Western Red cedar sawlogs to Manke Lumber, Tacoma. RFPRODLJCTION The old field in the middle of this tract has been planted with Douglas-fir seedlings. There is also established a fair scattering of natural Doug fir seedlings. On the average these young trees are about six years old and the stand is about 50% of normal stocking. Their value is minimal until they get to be about ten years old and hopefully the stand stocking level increases. LAND This report is basically a timber appraisal and the value stated reflect the net value of the trees standing on the land. The method used to value the trees is referred to as, in appraisal terminology, as the "income approach". However, the land under the trees or determination of the bare land value involves a different procedure commonly referred to as the "market approach". Because the value the land and buildings, if any, will in all likelihood exceed the value of the standing trees, the bare land should be appraised by a state certified real estate appraiser. The land value determination will involve a separate report. CRILISF STANDARD A variable plot prism method was used to make field determination on the standing timber. A total of sixteen (16 ) plots were taken at random locations spread across the thirty-one (31 ) stocked acres in the two timber types. Trees were tallied based on a twenty (20) Basal Area Factor prism. Tree diameters were measured at diameter breast high (DBH) or at a point 4.5 feet above the ground. Coverage consists of a 10.3 percent cruise. -4- DISCI AIMFR This timber cruise report is based on the income approach to appraising property. The market place for standing timber and forestland is influenced by a myriad of constantly changing factors. To use this report as a basis for sale of forest real estate is not recommended. Timber cruising is an art form at best and is meant to provide information on standing trees. Data collection is based on industry wide timber cruising procedures which includes only a percentage of the timber stand actually being measured. As a forest appraiser I can not guarantee that actual harvest cut-out totals will equal the cruise information provided in this report. CERTIFICATION I HEREBY CERTIFY THAT I HAVE PERSONALLY INSPECTED THIS SUBJECT PROPERTY AND THAT NO IMPORTANT FACTORS WERE KNOWINGLY OVERLOOKED OR WITHHELD; THAT THE FEE FOR THIS REPORT WAS NOT BASED ON THE VALUE OF THE PROPERTY, AND THAT I HAVE NO UNREVEALED INTEREST THEREIN; AND THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF, THE STATEMENTS AND OPINIONS CONTAINED HEREIN ARE TRUE AND CORRECT. Respectfully submitted, Richard 1. Woods, ACF Forest Appraiser -5- APPENDIli -6- -T-- .z 3 �! - i2 1 t.J, t,,1,l✓1, S€c�-to,v Z.t MAS4^1 ryf UJA Gr, M L L E R -raA t r Li F r , ��� � .MASdrsJ /�f3C/•- • SP Ell lk r ❑ i r P EC rAOroe N ELOXIS14 -ri mICA - 31 l r Q� 7 131 ewA-rt I TOWNSHIP 2 3 1 w SCALE I" = 400' (6 2l '4 FOLLOWING 12321 21 00000 1001000 VF v � 1001070 0 S 3/109 d S 4/9 4 S 26/162 2400020 2490050 2490060 1 1 / 175-OOOZC S- 15/175 ( �300010 1 � 1300000 / SP 625_ I 1 �� A S 8/59 1 to RIVER 2490070 2490080,w HILL � in 1400000 1 / / 't DIV. I f 1 p-,L g / / 7 5 RIVER i 1 HILL D I V. 2 2490010 1 i 2490 1 020 1 VOL. 8 1 1 � 29 S 1 1 //76 2400010 2400000 1390051 FHRU 31 VOL. l O , p 1390052 PG. 75 SP 1 224 p THRU 77 I S lO/ 2490040 1 2490 96 (0 SP 2696 QO 1 i 030 0� rk RoadcL M OILL 3100020 1 3190011 _ `ACRF N5 4200070 ►-N 4200060 SI ; 4/2 1'g7I 3101 S 5/122 113190012 3190010 000 5 3190051 1 3190 '00031 3200010 r 070 4200080 3101 010 1 3101020 3190 1� SP- 1 980" 040 SP 635 3190052 i QO SP 1421 �O 3190 3100031 060 3190031 1/92 ---- - -- 3192 nnnnnon VOLUME IN THOUSAND BOARD FEET OF MERCHANTABLE LIVE TREES TOWNSHIP: 23 RANGE: 1 West, W.M. SECTION: 21 COUNTY: Mason TRACT Glenn Miller STAND DESCRIPTION VOLUME GROWTH Periodic Stand No Site Class % % Volume Net Volume Annual Total & Species Acres Age Height & Index D&B Stocking Per Acre in MBF BF M Yrs in MBF ONE 7.00 52 75 IV si 105 68 (7,256) (50) 340 2 5 10 Douglas fir 10 4,237 29 W.Red cedar 15 1,783 12 W.hemlock 15 1,236 9 TWO 24.00 46 70 IV si 105 63 (5,091) (123) 315 8 5 40 Douglas fir 10 2,996 72 W.hemlock 15 1,110 72 W.Red cedar 15 985 24 Red alder Scattered, pre-merchantable, REPROD 9.00 6 10 50 Douglas fir seedlings Douglas fir 101 W. Red cedar 36 W.hemlock 36 TOTAL 40.00 1 173 1 10 50 A Weyerhaeuser PRICE LIST EFFECTIVE January 2, 2006 Price are Subject to Change at any Time Without Prior Notice. Tacoma Export Facility -Smith Island Prices are less $20 Tacoma Prices Listed below" Douglas Fir Sort Price/Net MBF Diarneter Length 4 GCO $520.00 12 "- + 26 ' - 35 ' 4 GCO $550.00 12 "- + 36 ' - 40 ' 5 GC $545.00 12 "- + 26 ' - 35 ' 5 GC $575.00 12 "- + 36 ' - 40 ' 9 SLC $710.00 __r _ ._.. ..- `'f,t to 26' - 35 ' 9 SLC $740.00 9 "- 11 36 ' - 40 ' 13 Quad $575.00 8 "- 20 " 16 ' - 40 ' 16CNS $0.00 5 "- 7 " 16 ' - 40 ' 20 Reman $700.00 9 "- + 26 ' - 50 ' 24 Domestic $520.00 5 "- + 12 ' - 40 ' 25 IS $740.00 12 "- + 26 ' - 35 25 IS $770.00 12 "- + 36 ' - 40 ' 27 SSOS $740.00 39 "- + Butts 26 ' - 35 ' 27 SSOS $770.00 39 "- + Butts 36 ' - 40 ' 55 GCJ $650.00 12 "- + 26 ' - 35 ' 55 GCJ $680.00 121 - + 36 ' - 40 ' Hemlock 2 SS $300.00 12 "- 18 " 26 ' - 40 ' 3 SL $300.00 8 "- 11 " 26 ' - 40 ' 5 GC $300.00 12 "- + 26 ' - 40 ' 6 SC $300.00 8 "- 11 26 ' - 40 13 Quad $300.00 8 "- 20 " 16 ' - 40 ' 16 CNS $300.00 5 "- 7 " 16 ' - 40 20 Reman $300.00 8 "- + 26 ' - 50 24 Domestic $300.00 5 "- + 12 ' - 40 ' Preferred Lengths: 26',36',&40' Acceptable Lengths: 30',33',34'&39'. Logs should maintain a 36'Length average for each export sort per week.. Unacceptable Lengths: 28%32'and 38' Minimum Length: Export is 26'+trim. Trim Requirements:Logs should be well manufactured. All lengths should include 11"trim. Ends should be flush(no hinges&cut straigf and square),limbs should be bucked flush with the log. A$10.00 per log charge may be applied fo logs needing additional trimming. Maximum Butt Diameter:(Large end)Diameter on DF Sorts 25 and 55 is 39" Unacceptable Material:Pine, Spruce,cedar,larch,hardwood or pulp.logs are not acceptable&are not paid for or retumpd. Logs over 41'/with hooked or excessively flared butts or containing metal,are paid at'Sort 20'price, Other Specifications:All logs must be from PRIVATE lands,and free from export restrictions and any liens or encumbrances. Note: Sort#4 specs are the same ame as#5 Specs but are being trucked to Weyerhaeuser Aberdeen Yard. S%l t,(- C'r)11-1?-FA `T (4/O 0 MANKE LUMBER COMPANY, INC. Tacoma (253)572-E 1717 Marine View Drive Seattle (206)624-� MANKE Tacoma, Washington 98422 Shelton (360)426 LOG PRICE LIST EFFECTIVE 2-oo6 LOGS DELIVERED TGAVAMILL LOG YARD DOUGLAS FIR: 36' & LONGER, 12" TOPS & LARGER, #2 TYPE SAW & BTR, 6 TON/MBF. . . . . . . . . . .$600M/$100 PER T( 32' & 34', 12" TOPS & LARGER, #2 TYPE & BTR, 6 TON PERMBF. . . . . . . . . . . . . . . $570M/$95 PER TO 20' TO 26', 12" TOPS & LARGER, #2 TYPE & BTR, 5.7 TON/MBF. . . . . . . . . . . . . . . . . .$515M/$90 PER TO 16' TO 18', 12" TOPS AND LARGER, #2 TYPE SAW & BTR, 5.7 TON/MBF . . . . . . . . . .$485M/$85 PER TO 36' & LONGER, 12" TOPS & LARGER, #3 TYPE SAW, 6 TON/MBF. . . . . . . . . . . . . . . . $420M/$70 PER TO -- 20' T0,34', 12" TOPS & LARGER, #3 TYPE & BTR, 5.8 TON/MBF NO 28' -30.. . . . . . . .$410M/$71 PEP TO ALL 12''TOPS & LARGER NOT LISTED-ABOVE=,-5;8-TON/Mt BF—. ...,f..:., . ; ;:.::: :-$40-0M/$6J-PER TO! 32' & LONGER, 8" TO 11" TOPS, #2 TYPE SAW LOG, TTON/M[H.F .: . :. :.: . . $560M/$80 PER TOI 5" AND UP, 12' & LONGER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . $70 PER TON HEMLOCK AND WHITE FIR: 32' & LONGER, 12" TOPS & LARGER, #2 TYPE SAW & BTR, 6 TON/MBF. . . . . . . . . . .$410M/$68 PER TOI 20' TO 30', 12" TOPS & LARGER, #2 TYPE SAW & BTR, 5.7 TON/MBF. . . . . . . . . . . . . $360M/$63 PER TOI 26' & LONGER, 12" TOPS & LARGER, #3 TYPE SAW,, 7 TON/MBF. . . . . . . . . . . . . . . . $315M/$45 PER TOI 12' TO 24',12"TOPS & LARGER, #3 TYPE SAW & BTR, 6 TON/MBF. . . . . . . . . ... . . . $300M/$50 PER TOP 32' & LONGER, 8" TO 11" TOPS, #2 TYPE SAW LOG, 7 TON/MBF. . . . . . . . ... . . . . . . $400M/$57 PER TOP 5"AND UP, 12' & LONGER. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4&PER TON PINE AND SPRUCE: ALL DIAMETERS AND LENGTHS, 5" MINIMUM TOP. . . . . . . . . . . . . . . . . . . . . . . . :.. $35 PER TON EFFECTIVE IMMEDIATELY, WE WILL BE CURTAILING PURCHASE OF CEDAR LOGS UNTIL FURTHER NOTICE. PENDING APPROVAL, SMALL AMOUNTS OF CEDAR MUST BE DELIVERED ON A MIXED LOAD. CEDAR LOGS WILL BE PURCHASED AT FIR PRICES. PLEASE CUT CEDAR TO DESIRED LENGTHS: 16'AND<32' WORMY CEDAR WILL BE CULLED PAY SCHEDULE: ONE WEEK AFTER DELIVERY, WEEK ENDING FRIDAY REQUIRED LOG LENGTHS: 24' & longer must have 11"trim; 20' & shorter must have 6" trim. BUTT SIZES: NO MINIMUM OR MAXIMUM BUTT SIZE ALL LOGS ARE ASSUMED TO BE BUCKED PROPERLY AND REASONABLY FREE OF DEFECT. IF NOT, IT MAY BE NECESSARY TO MAKE DEDUCTIONS. LOGS 26'AND SHORTER THAT MUST BE CUT IN TWO BEFORE PROCESSING IS POSSIBLE WILL BE PAID AT LOWER PRICES. LOGS NOT SUITABLE FOR THE MANUFACTURE OF MARKETABLE LUMBER WILL BE REJECTED, BUTTS MUST BE WITHIN 1"OF SQUARE. NO BUTT SHOT. NO PISTOL BUTTS. UNDERCUTS MUST BE REMOVED FROM STUMP PORTION OF TREE. LOGS CONTAINING METAL WILL BE CULLED. IN ORDER TO MAKE PRICE SEPARATIONS ON MIXED SPECIES AND MIXED DIAMETERS IN GIVEN LOADS,THE SELLER HAS THE OPTION OF MUTUAL AGREEMENT ON AN ESTIMATE OR PIECE SCALING, OR A COMBINATION OF AN ESTIMATE AND PIECE SCALING. ON PARTIALLY SCALED LOAD, FOR REASON OF PRICE SEPARATION, SCALED FOOTAGE WILL BE CONVERTED TO WEIGHT BY THE ABOVE FIELD-TESTED GENERALLY ACCURATE RATIOS. THE SELLER HAS THE OPTION OF USING PACIFIC RIM SCALING BUREAU. PRICES APPLY TO FRESH CUT TIMBER,AND SUBJECT TO CHANGE WITHOUT NOTICE. S %! &1- Oul?_12,ti7- ///a( March 1, 2005 SITE CLASS III 4- tY VALUE OF DOUGLAS FIR REPRODUCTION PER ACRE Fully Stocked Acre = 400 Trees+ Market Volume Value Age Top Diameter Per Acre Per Ton Per M Total 25 3" 5 M'BF $50 $350 1 ,750 Value of Trees Age _Bef A.cm 5 $ 200.00 6 $ 277.50 7 $ 355.00 8 $ 432.50 9 $ 520.00 10 $ 587.50 11 $ 665.00 12 $ 742.50 13 $ 820.00 14 $ 897.50 k 15 $ 974.00 16 $ 1,052.50 17 $ 1,130.00 18 $ 1,207.50 19 $ 1,285.00 20 $ 1,361.50 21 $ 1,440.00 22 $ 1,517.50 ' 23 $ 1,594.00 24 $ 1,672.50 25 $ 1.750.00 1 Western hemlock and Red alder have one-half the value of Douglas-fir. So when more then one species occupy the stand the total value per acre is less. These figures refer to the value of the young trees only. The bare land under the trees must be valued separately. 4S TREE/NORTHWEST, INC. 1606 Cowlitz Way SINCE 1948 Kelso, Washington 98626 Phone: (360) 636-3906 Richard 1. Woods FAX: (360) 425-5779 Forest Manager riwO)teleport.com FXPFRIFNC F Forty-seven years of timber harvesting, marketing and appraising. Thirty-four years forest manager and consultant. President, 4S TREE/NORTHWEST, Inc. Six years forest appraiser 1965-71, Federal Land Bank of Spokane. Member, Washington State Forest Practices Board 1 974-77 & 1984-87. FDIIC'ATIC)N Washington State University, B.S. in Forest Management 1958 Continuing Education: Practicing Foresters Institute (Ass'n of Consulting Foresters-ACF): University of Washington - Course VIII 1983 and Course IX 1985 University of Nevada @ Reno - Course X 1987 and Appraiser's workshop 1992 University of Oregon - Course XI 1989 Atterbury Consultants - Timber Cruising Seminar 1992 Society of American Foresters CE certificates 1991,1993,1996,1998, 2002 PRC)EESSIn AI President, Association of Consulting Foresters of America, 1990-1992. President, Washington Farm Forestry Association, 1973-74. Director, Industrial Forestry Association Nurseries, Inc. 1992 to present. Member, Society of American Foresters Task Force on Endangered Species Act Re-authorization, 1992. SAF Certified Forester #12 Recipient-WSU Alumni Achievement Award for Forestry, 2002 M F M R F R S H I P S Association of Consulting Foresters of America since 1983. Society of American Foresters since 1960. Fellow 2001 Washington Farm Forestry Association since 1963. rQVFRNMFNT Eighteen years Kelso City Council, 1974-1992. Served eight years as Mayor. Cowlitz County Boundary Review Board 1993 to 2000, Chairman 1999-2000 Kelso Planning Commission 2001-2004 OTHER Kelso-Longview Salvation Army Board since 1981, Chairman. 1983-84. Kelso Kiwanis Club; President 1997-98, Sec'y 1998-2004, Hixson Fellow 2001 Member- St. Stephen's Episcopal Church Private pilot license since 1963, currently inactive January, 2006 Member Association of Consulting Foresters of America, Inc. Michael, I think I have provided the additional information you need for my FPA. We are no longer going to develop the 40 acre property into 120 lots. We are unable to obtain public water. According to Environmental Health the property is only allowed 5,000 gallons of water per day, so we plan on short platting the property to what that allows. At this time I'm not sure how that would layout. If it is necessary for the permit I'll have our surveyor draw something up for you. When you visit the 40 acres, I would like to be there to show you the flagged corners. If you have any questions or need any further info,please give me a call at 360-271-2304. A 211, RECE��E� MAR 1 20Q1 426 W• CEDAR ST., 4140 3 Nolt MIM id► "+ N *ai�X� _ -, NE RNERHILL DR .... ...,.• ^" hn _ .�, ' �'� .�� ., � � s `. NE HILL IT 0 NE YAEGE N44 R ; O ' NE RIVf RHILL LN toOL ak. . 40 fr- J}��II ` Y fin- ., w J _ __ ..,. al.' L� a • r 4 Vvr �� +,L Aar YA S k i'"� y4 � .. ^__ ._... .s'.._ � r .!"-,rim• .,r:��.� . - NE KATCHEMAK Ve - r�J�'' � ._i+ f ...., ,'/'y1�t�'l;• Tom• ._�V • i t • •alb w ti N i •` -h ArclMS Viewer Page 1 of 2 t i I c t Aall V m J z V J J J rLU = Y Z g� a Y I � I NE TIMBERLINE OR NE p e,►MVS(k4 P(_ x 0 http://mapmason.co.mason.wa.us/website/mason/MapFrame.htm 3/16/2007 oo MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Shelton (360) 427-9670 Belfair (360) 275-4467 Planning Mason County Bldg.1 411 N.5th Elma (360) 482-5269 P.O.Box 279 Shelton,WA 98584 >as4 David Miller GDG Construction P.O. Box 331 Belfair, WA 98528 November 15, 2006 Dear Mr. Miller, Last month you asked me about a potential regulatory conflict that had been identified in your June pre-application meeting for your proposed residential subdivision in the Belfair UGA. The question had to do with minimum lots sizes and whether or not your proposal would need to conform to the minimum size prescribed by the Department of Environmental Health for lots dependent on septic systems or whether you could design small lots that are consistent with urban design principles. I followed up by speaking with Planner Steve Goins who had a recent discussion with Environmental Health Manager Debbie Riley and DCD Director Emmett Dobey on this topic. The result of the meeting was a determination that projects such as yours do not need to conform to the Environmental Health minimum lots size so long as these lots are serviced by a community drainfield until such time as sewer is available. (However such community drainfields do need to be abandoned as soon as sewer is available). Please feel free to contact me at ext. 571 or at mms�yco.mason.wa.us with any questions. Thank you. Sincerely, Michael MacSems Subdivision Planner cc: Steve Goins Debbie Riley (7/11/2007) Michael MacSems- GDG Construction Permit Page From: "Sandi Miller" <gsmiller@wavecable.com> To: <mms@co.mason.wa.us> Date: 7/7/2007 9:03 PM Subject: GDG Construction Permit Michael, Please put all permit requests on our 40 ac tract parcel# 123212100000 on hold. We are currently negotiating a proposal to purchase the property. This process will not take longer than 90 days. Thank you. Davin Miller, GDG Construction. GEOTECHNICAL TESTING LABORATORY FACSIMILE TRANSMITTAL SHEET T<): Michael macscrns BbiseJeluiek COMPANY- DAI'E: Mason County P6nning Department 6/26/2007 FAX NUMBER: TO'I'Al,NO.OF IMAGES INCU:I)INC;COVER- (360) 427-8425 2 PHONE NUMBER: SENDER'S RETHRUNCE NUMBUR: (360) 427-9670 extension 571 RE: YOUt KEFEkENC ,NUMBER: GTL Project#07-204 11 URCE-N-l- X FOR RF.VlrW ❑PUEASL COMMEN-l' El PJ,f--,A.qF.PF.PT.Y El I'Ll",AS); Rl"CYCLE NOTT-E-S/COMMENTS: Attached is the addendum letter you requested for the GDG project. TJ WHOF-:TT z00?- 97- *unf 8t78Vt7S2-092 : 'ON DNOHd 9b-11S81039 WOa.J (1/24/2008) Craig Haugen - Fwd: RR Xing at Katchemak Lane Page 1 s From: Michael MacSems To: Butros, Charles; Fink, Robert; Haugen, Craig; Johnson, Jack; Robinso... Date: 1/24/2008 4:26 PM Subject: Fwd: RR Xing at Katchemak Lane FYI -- Re: Riverhill Estates Michael MacSems Subdivision & FPA Reviewer j 3 a o` 200 0/ Mason County DCD �/ 360-427-9670 ext.571 >>> "Read, Dan L CIV NAVFAC NW"<dan.read(@navy.mil> 1/24/2008 3:41 PM >>> Mr. McSems- This is to follow-up on our discussion today regarding a proposed development near Belfair on Katchemak Lane. Apparently a 132 unit development is being planned that would utilize the existing crossing on the Navy Railroad at Katchemak Lane. This crossing has been a concern to the Navy for several years, and has been discussed with Charlie Butros and several other Mason County managers regarding the need for improvements. During recent discussions with WSDOT and Mason County regarding the proposed Belfair Bypass on SR3 one of the proposals was to 0 connect SR3 to Old Belfair Highway at Katchemak Lane and Newkirk Road. D W If this connection becomes a reality then improvement of this crossing ;0 M can be included in the work. If it turns out that the Belfair Bypass 0 ;R project does not construct a new roadway the concerns at this crossing M remain to be addressed by the County and the Navy. These improvements rn -0 are necessary regardless of any future development, but become more r —I critical if there is a possibility of expanded use. In order to assist 'n Z you with your review of the proposed development I have listed several of the Navy's concerns regarding this crossing. rn = 1. The existing timber crossing is in the process of being repaired for m vehicle and train safety. Further development of the area using this crossing may require widening of the travel surface or an upgrade to concrete or rubber. 2. The design and geometry of the crossing as a whole is very poor, and the roadway profile does not meet current standards. There should be a safe stopping distance for crossing vehicles to allow train passage, and intersecting frontage roads or driveways should not be so close to the crossing. 3. There are no signals for the crossing at this time, but addition of a large residential development may require installation of crossing lights at a minimum. 4. The existing frontage roads encroach onto Navy property as easements have not been issued for them. This includes Katchemak Lane where it turns northerly after crossing the railroad, as evidenced by a recent aerial photo. These have been there for several years, and we recognize that it would be a difficult process to have them removed. Our hope was that these could be addressed during reconfiguration of the crossing. Ultimately, it would be our desire to remove all of these from Navy property unless there is justification for issuing easements. 5. Upgrades to the crossing due to private development should be funded by the developer, not by the County or the Navy. Additional maintenance, especially of new signals, must also be agreed on. 0.124/2008)Craig Haugen - Fwd: RR Xing at Katchemak Lane Page 2 j A The Navy is certainly willing to assist in any way possible to maintain the safety and integrity of the Navy Railroad and the County road. Please let me know if you have any further questions or need additional information. R/Dan Read NAVFAC NW PRB211 (360)476-8148