HomeMy WebLinkAboutCOM2018-00091 Historic Oyster House Restoration - COM Application - 7/25/2018 PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: a NAME: Port of Allu NAME: Sun Path Custom Construction,Inc. MAILING ADDRESS: P.O. Box 1 MAILING ADDRESS: 3460 N Mission Rd W CITY: Allyn STATE: WA ZIP: 98524 CITY: Bremerton STATE: WA ZIP: 98312 PHONE#1: 360-275-2430 PHONE: (360) 275-0774 CELL: (360) -710-3758 PHONE#2: EMAIL: sunpath@tscnet.com EMAIL: lfc@portofallyn.com L&I PEG# SUNPAPC941 CC EXP. 12/31 /2018 PRIMARY CONTACT: OWNER N CONTRACTOR❑ OTHER n NAME Judy Scott- Port Commission Chair EMAIL lscott@porto yn.com MAILING ADDRESS P.O. Box 1 CITY Allyn STATE W_ ZIP 98524 PHONE 360-275-2430 CELL 360-731-5298 PARCEL INFORMATION• PARCEL NUMBER(12 Digit Number) 122205008001 ZONING 76- Recreational-- Parks LEGAL DESCRIPTION(Abbreviated) Range: 1W;Township:22N; Section: 20 FIRE DISTRICT District 5 SITE ADDRESS 18618 East State Highway 3 CITY Allyn DIRECTIONS TO SITE ADDRESS From Shelton: Hig way 3 to Allyn;Turn right at Drum Street; Go to end. IS THE PROJECT WITHIN 300 FT OF SLOPE(S)GREATER THAN 14%: YES❑ NO IS PROPERTY WITHIN 200 FT OF THE FOLLOWING: (Check all that apply): SALTWATER]M LAKE❑ RIVER/CREEK❑ POND ❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ TYPE OF WORK: NEW❑ ADDITION❑ ALTERATION❑ REPAIR❑ OTHER N Restoration USE OF STRUCTURE(Residence,Garage,Commercial Bldg,Etc.) Education;Historical Working Museum IS USE: PRIMARY N SEASONAL❑ NUMBER OF BEDROOMS NUMBER OF DA HROOMS� Cat— HEATED STRUCTURE? YES(WholeBldg) N YES(Parr14ofBW❑ NO❑ 5-�-r tnt.-Ivo i'�l ��Qa,�rS DESCRIBE WORK Historical restoration of a working oyster house GO o r - ' oA f 4 PLL. W V)� SOUARE FOOTAGE: (propose+existing) rtca Ssa_V J' It I ST FLOOR 1200 sq. ft. 2ND FLOOR 992 sq.ft. 3RD FLOOR sq. ft. BASEMENT sq. ft. DECK 816 sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq. ft. GARAGE sq.ft. Attached❑ Detached❑ CARPORT sq.ft. Attached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED* MAKE MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER -C E I V E D ENVIRONMENTAL HEALTH: JUL 2 5 2018 SEWAGE/SEWER SOURCE: SEPTIC ❑ SEWER❑ / NEW ❑ EWSWGjI fired PLUMBING IN STRUCTURE? YES ® NO ❑ If yes,attach completed Water Adequacy Form PERRAETER/FOUNDATION DRAINS PROPOSED? YES ❑ NO❑ EXISTING SQ.FT. EXISTING BEDROOMS PROPOSED BEDROOMS TOTAL BEDROOMS 0 OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner and I further declare that 1 am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project. The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permitlapplication becomes null&void if work or authorised construction is not commenced within 180 days or d construction work is suspended for a period of 180 days. V" .'AA /Y ' ,/,gyp 1 r �_ , ]Lk 2T1 PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE TH PPLI ATION T�rBE_EZCPIRED. (MASON COUNTY CODE 14.08.42j+(A,k1&J V1q .���'Tw`�',) B-2 _ ) Qj x h� May 22, 2018 Sig#ture ER(Must be signed by the OWNER) Date ��T♦ TTILTITT�? T1TT1TT�t) • T/a/a�aii � T♦'ar Tnw*/�� T,min T• /'['/�t/1TT[a/I�AITTTT�AIT[a SUN PATH CUSTOM CONSTRUCTION INC EXHIBIT "B" 3460 N Mission Rd W SUMMARY COST BREAKDOWN, Estimate Bremerton, Wa. 98312 Oyster SUNPAPC941BC A=Allowance Floor S=Specification Structure fTl 1/15/2018 T=Time & Materials JOB #1626 my PRELIMINARY COST: LOW Eatimate Sigh Estimate r -� A. Plans, Architect Fees, Specs S $310.00 $460.00 -n z B. Survey / Lot layout $0.00 $0.00 C. Building/Impact Fees, Banking S $0.00 $0.00 r D. Utilities SA $100.00 $100.00 rn r71 E. Water meter S $0.00 LQ..00 SUB TOTAL $410.00 $560.00 SITE WORK: 1. Excavate, Backfill $0.00 $0.00 1A. Demolition SA; $4,340,00 $7,480.00 2. Foundation-Poured/Forms $0.00 $0.00 3. Framing: Labor & Materials _ SA _ $6,860.00 $11,340.00 4. Roofing SA $0.00 $0.00 5. Windows/Sash _ $0.00 $0.00 6. Porches/Patios $0.00 $0.00 7. Sewer/Septic Tank/Portable S $0.00 $0.00 8. Plumbing Rough-in $0.00 $0.00 9. Chimney/Fireplace/Masonry $0.00 $0.00 10. Sheetmetal (gutters) $0.00 $0.00 11. Doors/Jambs-Exterior $0.00 _ $0.00 12. Electrical Rough in �- $0.00 $0.00 13. Heating/Cooling $0.00 $0.00 14. Concrete Flatwork (int) $0.00 $0.00 15. Insulation $0.00 $0.00 16. Walls/Drywalls (int) $0.00 $0.00 17. Underlayment _ $0.00 $0.00 18. Tilework $0.00 $0.00 19. Vinyl Floor Covering _- $0.00 $0.00 20. Garage Doors $0.00 $0.00 21. Cabinets _ $0.00 $0.00 22. Counter tops/Plastic Laminate $0.00 $0.00 23. Finish:Hdwr,trim,int.doors $0.00 $0.00 24. Electrical Fixtures $0.00 $0.00 25. Siding/Trim $0.00 $0.00 26. Plumbing Fixtures _ _ $0.00 $0.00 27. Interior:paint $0.00 $0.00 --� 28. Painting/Decor (ext) _ $0.00 $0.00 29. Driveway,Walk,Finish $0.00 $0.00 D 30. Carpets/Hardwood Floors _ _ _t $0.00 $0.00 M 31. Misc:Sh doors,fan ducts,etc. $0.00 $0.00 32. Clean-up _ S $540.00 $710.00 M m 33. Appliances _ $0.00 $0.00 r Preliminary costs $410.00 $560.00 z Site work $11,740.00 $19,530.00 r' -{ Total $12,150.00 $20,090.00 rn = Overhead @20% $2,430.00 54,018.00 m Total $14,580.00 $24,108.00 Tax @ 8.7% $1,26 46 12,097.40 Total $15,848.46 $26,205.40 9 r )?AX6F.L #/Z Z Z 6S6 Q 8oa r R ��� Ig2010 ART 615 W• P4dler meet ANDERSON wff ■as® PORT OF ALLYN - SARGENT OYSTER HOUSE RENOVATION ESTIMATE ASSUMPTIONS: BUILDING WORK TO BE PERFORMED AT EXISTING STORAGE LOCATION. PORT TO PROVIDE TEMPORARY UTILITIES NEEDS. FOR THE PURPOSE OF THE ESTIMATE, A CONCEPTUAL SEQUENCE OF WORK WAS ASSUMED AS FOLLOWS: • ATTACH LIFTING BEAMS AND BRACING AT UPPER EXTERIOR AND INTERIOR LOAD- BEARING WALLS AT APPROXIMATE UPPER FLOOR LEVEL AND JACK/LIFT STRUCTURE UP TO ALLOW REMOVAL OF ROTTED FLOOR FRAMING AND LOWER WALLS. • DEMO/REMOVE FLOOR BEAMS/FRAMING AND LOWER EXTERIOR ROTTED WALL FRAMING. • INSTALL TEMPORARY SUPPORTS FOR NEW FLOOR/FLOOR BEAMS AND INSTALL NEW 12"x 12"TREATED LONGITUDINAL BEAMS. • INSTALL NEW 4"x 12"TREATED TRANSVERSE FRAMING WITH PLYWOOD SEISMIC DIAPHRAGM/SHEATHING. • REBUILD/REPLACE THE LOWER WALL FRAMING AND SILL PLATES. • LOWER THE UPPER STRUCTURE TO THE NEW FLOOR AND ANCHOR WALLS TO NEW FLOOR FRAMING. • EXTERIOR WALLS-REMOVE ANY ORIGINAL SIDING,REPLACE ROTTED SHIPLAP WITH NEW AND INSTALL EXTERIOR RATED PLYWOOD SHEATHING OVER ALL EXTERIOR WALLS AND COVER WITH TYVEK OR EQUAL. INSTALL PLYWOOD DIAPHRAGM SHEATHING AT INTERIOR TRANSVERSE WALL FOR SHEAR STRENGTH. DUE TO HISTORICAL NEED TO HAVE EXPOSED STRUCTURE AT INTERIOR SIDE OF WALLS, WILL NEED TO ADD FURRING AND THERMAL RIGID INSULATION TO THE EXTERIOR SIDE OF PLYWOOD SHEATHING(AND COVER WITH NEW SIDING). • ROOF-REMOVE EXISTING ROOFING,REPLACE ANY ROTTED/MISSING SHIPLAP AND INSTALL EXTERIOR RATED PLYWOOD SHEATHING OVER ALL ROOF SURFACES AND COVER WITH ICE/WATER SHIELD. DUE TO HISTORICAL NEED TO HAVE EXPOSED STRUCTURE AT INTERIOR SIDE OF THE ROOF,WILL NEED TO ADD FURRING AND INSULATION TO THE EXTERIOR SIDE OF PLYWOOD SHEATHING (AND COVER WITH NEW ROOFING). • FLOOR-INSTALL PLYWOOD DIAPHRAGM SHEATHING AT ALL OF UPPER FLOOR (OVER EXISTING SHIPLAP). PRIOR TO STRUCTURE MOVE,INSTALL FRAMING BETWEEN 12"x 12" BEAMS,ADD PLASTIC-WRAPPED BATT INSULATION OR EQUAL, AND INSTALL MARINE GRADE PLYWOOD AT BOTTOM OF FRAMING. NOTE: INTERIOR CONCRETE FLOOR TO BE INSTALLED AFTER MOVING THE STRUCTURE TO MINIMIZE MOVE WEIGHT AND TO AVOID CRACKING OF CONCRETE BY THE MOVE. NOTE: AT THIS POINT, STRUCTURE IS STABILIZED AND CAN BE MOVED TO THE NEW PIER LOCATION WHERE REMAINDER OF BASIC RESTORATION WORK WOULD BE PERFORMED AS FOLLOWS: • INSTALL 30# FELT AND FINISHED CONCRETE TOPPING FLOOR SLAB • INSTALL EXTERIOR FURRING/RIGID INSULATION AND CONCRETE SIDING • INSTALL NEW WINDOWS • INSTALL ROOF FURRING/RIGID INSULATION AND NEW CEDAR SHAKE ROOFING • REFURBISH EXTERIOR DOORS AND HARDWARE NOTE: REMAINDER OF BUILDING RESTORATION WOULD NOW BE ALL INTERIOR WORK SUCH AS CONCRETE WAINSCOT PANELS, INTERIOR WALL FINISHES, REBUILDING THE STAIRS AND RAILINGS, ANY INTERIOR WALL AND DOOR MODIFICATIONS OR RESTORATIONS, ELECTRICAL OUTLETS, AND LIGHTING, ELECTRICAL HEAT OR OTHER HEATING SYSTEMS. NO PLUMBING OR WATER TO BE PROVIDED. AN APPROXIMATE TYPICAL CROSS SECTION OF THE BUILDING STRUCTURE FOLLOWS FOR REFERENCE. NEW PIER ESTIMATE ASSUMPTIONS: FOR THE PURPOSE OF THE ESTIMATE, A VERY ROUGH CONCEPTUAL PLAN WAS DEVELOPED FOR DEVELOPING QUANTITIES AND LAYOUT. SEE ATTACHED FOR REFERENCE. • EXISTING BOAT RAMP AND ASSOCIATED STRUCTURES TO BE DEMOLISHED AND REMOVED PRIOR TO OTHER WORK. • GEOTECH AND BEACH TOPO SURVEYS WILL NEED TO BE PERFORMED PRIOR TO ANY PIER DESIGN/ENGINEERING WORK. • ESTIMATE ASSUMES 12" DIA GALVANIZED STEEL PILINGS DRIVEN TO APPROXIMATE 30 FOOT AVERAGE LENGTH WITH REINFORCED CONCRETE PILE CAP BEAMS. • PIER DECK STRUCTURE TO BE GALV STEEL OR TREATED WOOD JOISTS WITH ADA COMPLIANT FRP GRATING FOR DECK SURFACE. • CODE COMPLIANT GALVANIZED PIPE RAILINGS TO BE PROVIDED AT PERIMETER. • SHORE SIDE STRUCTURE TO BE A REINFORCED CONCRETE BULKHEAD/ RETAINING WALL TYPE STRUCTURE SUPPORTING THAT END OF THE BUILDING AND ANCHORING THE PIER/STRUCTURE TO THE SHORE SIDE. • ESTIMATE DOES NOT INCLUDE ANY LIGHTING, SIGNAGE, OR OTHER AMENITIES. NOTE: ESTIMATES DO NOT INCLUDE ANY COSTS / MARK-UP5 FOR PORT OF ALLYN ADMINISTRATIVE COSTS NOR COSTS FOR SHORELINE, ENVIRONMENTAL OR OTHER CONSULTANTS, AND DOESN'T SPECIFICALLY INCLUDE COSTS FOR ANY PERMITS THAT MAY BE REQUIRED. �Niy��yy� �� �Q�.�.��� ��o�� �a� . . _ _ _ __ �, ��!-1�) Zl�'1� �,.i�e�+ab,Q amM�a hr� � �n� .. - - - - �_ _ � I }: ___-_ - � , _.__._.A�� ____._.. - � � � \ _ � �- ���� � i � y • � ' �1 1 �, .� 1 f �'�.�'` �, ,. _,, ffF/? /� �/� 1 ..r'� i hN(y�I�I i�l o -V -2 r�4q rtoiL`slGt��O•,��d`t/A}h1'in`� '71�0? j 4 • 11/20/2018 11:49 AM ROM ESTIMATE WORKSHEET ART ANDERSON ASSOCIATES ESTIMATED BY: AAA PROJECT:Oyster House Pre-Move Stabilize PROJECT&CITY: Port of Allyn-Oyster House Renovation CONTRACT No. DATE: NOVEMBER 2018 PURPOSE IROM Budget Est 1 of 4 EST.VALID TO: N/A ROM use only SHEET 1 OF 1 SCOPE OF WORK: Lift and demo lower walls and all of floor structure. Replace/rebuild with all new treated materials. Brace all stmcture for move and for seismic compliance and cover with weather tight cover. Excludes: no hazmat anticipated or included. Temp utilities provided by Port ITEMS QUANTITY ITEM COST TAX TOTALS DESCRIPTION OF WORK # UNIT UNIT$ SUM TOT $ SUM TOTS $ Mobilization/Demob 1 LS $4 000.00 $4 000.00 $4 000 Attach Lifting beams lifting supports and mack/lift structure 1 LS $8,000.00 $8 000.00 $8 000 Demo beams flooring, lower 4'of walls. Load/haul dispose 300 CF $30.00 $9 000.00 $9 000 Install cripple walls/beams for support of new floor structure 120 LF $15.00 $1 800.00 $1 800 New treated 12"x 12"longitudinal beams/steel channel ties 160 LF $120.00 $19 200.00 $19 200 New transverse treated 4"x 12"flat w/1/2"treated plywd sheati 1030 LF $12.00 $12 360.00 $12 360 Rebuild lower walls with new built up treated sill plates 190 LF $15.00 $2 850.00 $2 850 Lower structure and install hold-downs/anchors to new floor 1 LS $6 000.00 $6 000.00 $6 000 Allow for added interior temporary brace framing for move 1 LS $1 240.00 $1 240.00 $1 240 Remove siding and install 1/2"exter CDX plywd incl inter wall 1500 SF $3.60 $5 400.00 $5 400 Remove roofing and install 1/2"exter CDX plywd+water shield 1450 SF $5.00 $7 250.00 $7 250 Repair and install 3/4"plywd sheathing at upper floor 900 SF $3.00 $2 700.00 $2 700 Install framinci and insul & 1/2"marine gr plywd btwn beams 900 SF $7.00 $6 300.00 $6 1 300 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 DIRECT LABOR/MATERIAL ITEM SUBTOTAL $86,100 GENERAL CONDITIONS ITEMS QUANTITY COST Description of Item # UNIT UNIT$ SUM TOT $ SUM TOTS $ Field Admin/su ervision direct costs 5% $86,100.00 $4,305.00 $4,305 Temporary construction safety protection allow 1°io $861.00 $861 $0.00 $0 WSST 8.8% $7 577 $7 577 $0 $0 SUBTOTAL $0.00 $7,577 $1Z743 CONTRACTOR'S OVERHEAD 12% $11 861 CONTRACTOR'S PROFIT 10% $9 884 BONDS/INSURANCE 3% $2,965 GC SUBTOTAL I I $34,488 BID ADDITIVE ITEMS N/A $0 00 $0.00 $0.00 $0 N/A $0.00 $0.00 $0.00 $0 LABOR& MATERIALS SUBTOTAL 120,588 A/E DESIGN COST/EST CONTINGENCY 15% $18 088 CONSTRUCTION EST CONTINGENCY 10% $12 059 SUBTOTAL $150 735 $0 GRAND TOTAL >> $150,735 ROM Est 1 of 4 PoA Oyster House Stabilize Phase (1) 11/20/2018 11:50 AM ROM ESTIMATE WORKSHEET ART ANDERSON ASSOCIATES ESTIMATED BY: AAA PROJECT:Oyster House Post-Move Restorati PROJECT&CITY: Port of Allyn-Oyster House Renovation CONTRACT No. DATE: NOVEMBER 2018 PURPOSE IROM Budget Est 2 of 4 EST.VALID TO: N/A ROM use only SHEET 1 OF 1 SCOPE OF WORK: Move bIdg to new pier location and anchor to structure,add exterior wall insulation and siding/roofing siding/roofing over insulation, and install new wood windows to match existing. Install roof furring/insulation and new shake roof. ITEMS QUANTITY ITEM COST TAX TOTALS DESCRIPTION OF WORK # UNIT UNIT$ SUM TOT $ SUM TOTS $ Mobilization/Demobililzation of work area equipment 1 LS $5 000.00 $5 000.00 $5 000 Relocate bidg to the new pier location 960 SF $22.50 $21 600.00 $21 600 Add furring and rigid insulation board+tyvek at walls 1150 SF $6.00 $6 900.00 $6 900 Add furrinq and rigid insulation board+asphalt felt at roof 1440 SF $7.50 $10 800.00 $10 800 Install concrete siding panels 1150 SF $8.00 $9,200.00 $9 200 Install cedar shake roofing 1440 SF $5.00 $7 200.00 $7 200 Install wood windows 120 SF $25.00 $3 000.00 $3 000 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 1 $0 DIRECT LABOR/MATERIAL ITEM SUBTOTAL 1 1 $63,700 GENERAL CONDITIONS ITEMS QUANTITY COST Description of Item # UNIT UNIT$ SUM TOT $ SUM TOTS $ Field Admin/su ervision direct costs 5% $63,700.00 $3,185.00 $3,185 Temporary construction safety protection allow 1°io $637.00 $637 $0.00 $0 WSST 8.8% $5 606 $5 606 $0 $0 SUBTOTAL $0,00 $5,606 $9,428 CONTRACTOR'S OVERHEAD 12% $8 775 CONTRACTOR'S PROFIT 10% $7 313 BONDS/INSURANCE 3% $2,194 GC SUBTOTAL $25,516 BID ADDITIVE ITEMS N/A $0.00 S0.00 $0. )0 $0 N/A $0 00 S0 00 $0.00 $0 LABOR& MATERIALS SUBTOTAL 89,216 A/E DESIGN COST/EST CONTINGENCY 15% $13 382 CONSTRUCTION EST CONTINGENCY 10% $8 922 SUBTOTAL $111,520 $0 GRAND TOTAL >> $111,520 ROM Est 2 of 4 PoA Oyster House Renov Phase ' 4 11/20/2018 11:50 AM ROM ESTIMATE WORKSHEET ART ANDERSON ASSOCIATES ESTIMATED BY: AAA PROJECT:Oyster House Post-Move Restorati PROJECT&CITY: Port of Allyn-Oster House Renovation CONTRACT No. DATE: NOVEMBER 2018 PURPOSE IROM Budget Est 3 of 4 EST.VALID TO: N/A ROM use only SHEET 1 OF 1 SCOPE OF WORK: Demo existing boat ramp and construct new 40'x 50'public pier with space for the oyster house. Note: Beach and pier work typically requires longshoreman's insurance affecting labor rates Est doesn't include geotech and beach/in water surveys ITEMS QUANTITY ITEM COST TAX TOTALS DESCRIPTION OF WORK # UNIT UNIT$ SUM TOT $ SUM TOTS $ Mobil ization/Demobi IIlzation of work area equipment 1 LS $5 000.00 $5 000.00 $5 000 Demo conc boat ramp,piers,and shore bulkhead 100 CYD $300.00 $30 000.00 $30 000 Excavate for shore foundation wall 1 LS $1 000.00 $1 000.00 $1 000 Form Reinforce and pour shore side conc footing and wall 25 CYD $480.00 $12 000.00 $12 000 Compact and backfill shore side of foundation wall 1 LS $800.00 $800.00 $800 Drive galvanized steel piles 25 piles 30ft avq len th 750 LF $80.00 $60 000.00 $60 000 Form shoring,form reinf and pour concrete pile cap beams 200 LF $350.00 $70 000.00 $70 000 Pier deck framingat non-o ster house foot rint treated or alv 1200 LF $15.00 $18 000.00 $18 000 FRP Gratin -ADA compliant spacing 1200 SF $16.00 $19 200.00 $19 200 Galy Pipe Railings 42"h w/kick late 140 LF $100.00 $14 000.00 $14 000 $0.00 $0.00 1 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 DIRECT LABOR/MATERIAL ITEM SUBTOTAL $230,000 GENERAL CONDITIONS ITEMS QUANTITY COST Description of Item # UNIT UNIT$ SUM TOT $ SUM TOTS S Field Admin/su ervision direct costs 5% $230,000.00 $11,500.00 $11,500 Temporary construction safety protection allow 10% $2,300.00 S2,300 $0.00 $0 WSST 8.8% $20,240 $20,240 $0 SO SUBTOTAL S0.00 $20,240 $34,040 CONTRACTOR'S OVERHEAD 15% $39 606 CONTRACTOR'S PROFIT 10% $26 404 BONDS/INSURANCE 3% $7 921 GC SUBTOTAL $100,050 BID ADDITIVE ITEMS N/A S0.00 S0.00 50.00 $0 N/A So 00 5o 00 so 00 So LABOR& MATERIALS SUBTOTAL 330,050 A/E DESIGN COST/EST CONTINGENCY 15% S49,508 CONSTRUCTION EST CONTINGENCY 1090 $33 005 SUBTOTAL $412,563 $0 GRAND TOTAL >> $412,563 ROM Est 3 of 4 PoA Pier for Oyster House 11/20/2018 11:51 AM ROM ESTIMATE WORKSHEET ART ANDERSON ASSOCIATES ESTIMATED BY: AAA PROJECT:Oyster House Post-Move Restorati PROJECT&CITY: Port of Allyn-Oyster House Renovation ICONTRACT No. DATE: NOVEMBER 2018 IPURPOSE IROM Budget Est 4 of 4 EST.VALID TO: N/A ROM use only SHEET 1 OF 1 SCOPE OF WORK: Interior renovation ROM bud et estimate Assumes that bldg insulation will be to exterior side of seismic sheathing and not internal at wall studs and disturb historical look Work to be performed by historical team members. ITEMS QUANTITY ITEM COST TAX TOTALS DESCRIPTION OF WORK # UNIT UNIT$ SUM TOT $ SUM TOTS $ Spray Tpray clear sealer/wood stabilizer at exter walls and roof framin 2500 SF $2.00 $5 000.00 $5 000 Finish interior walls allowance 750 SF $6.00 $4 500.00 $4 500 Concrete wainscot at main areas 600 SF $8.00 $4 800.00 $4 800 Rebuild interior stairs/add railing 1 LS $1 850.00 $1,850.00 $1 850 Clear sealer on concrete floors 900 SF $1.50 $1 350.00 $1 350 Electrical panel and interior lighting,wall heaters and outlets 900 SF $15.00 $13 500.00 $13 500 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0 $0.00 $0 $0. $0 00 DIRECT LABOR/MATERIAL ITEM SUBTOTAL $31,000 GENERAL CONDITIONS ITEMS QUANTITY COST Description of Item # UNIT UNIT$ SUM TOT $ SUM TOTS $ Field Admin/su ervision direct costs N/A 0% $31,000.00 $0.00 $0 Temporary construction safety protection allow 1°i° $310.00 $310 $0.00 $0 WSST 8.8% 1 $2 728 $2 728 $0 $0 SUBTOTAL $0.00 $2 728 $3 038' CONTRACTOR'S OVERHEAD N/A 0% $0 CONTRACTOR'S PROFIT N/A 0% $0 BONDS/INSURANCE N/A 0% $0 GC SUBTOTAL $3 038 BID ADDITIVE ITEMS N/A $0.00 1 $0.00 $0.00 1 $0 N/A $0.00 1 $0.00 $0.00 $0 LABOR& MATERIALS SUBTOTAL $34,038 DESIGN EST CONTINGENCY N/A 0°ro 1 L $0 CONSTRUCTION EST CONTINGENCY 10% 1 1 3 404 SUBTOTAL I 1 $37 442 $0 GRAND TOTAL >> 7 $37,442 ROM Est 4 of 4 PoA Oyster House Renov Phase RECEIVED f 1 5 2019 615 W. Alder Street Draft Project Plan Port of Allyn Sargent's Oyster House Museum 1 Draft Project Plan Port of Allyn Sargent's Oyster House Museum January 2019 Overview This Project Plan and Drawings with the prefix of OH and starting at OH-200 (OH- 2XX etc.) are to be used by the Port of Allyn and the North Bay Historical Society for the purposes of planning, budgeting, obtaining quotations and where appropriate renovations and construction. Some drawings will require Washington State Design Authority stamps provided by licensed individuals or organizations. Vision The Sargent's Oyster House is a historical part of the community of Allyn. The North Bay Historical Society has been working with the Port of Allyn for several years to save Sargent's Oyster House, relocate it and turn it into a museum. This is the last oyster processing facility of its type left on Puget Sound and perhaps the entire west coast. Saving this building and creating a museum to showcase a local industry is a way of preserving local history. This building was built in the early 1950's and was used to process and sell oysters. The proposed museum will display early oyster processing techniques and equipment as well as showcase the unique construction by local mid twentieth century craftsmen. Without this museum an era of Allyn's history and of oyster processing in this portion of the Pacific North West will be lost. 2 Draft Current The Sargent's Oyster House has been moved to the Port of Allyn. The project has had several significant milestones completed. These items include but may not be limited to: (FROM NBHS REPORT DATED 5/1/218) • Architectural, historical & feasibility work • Building opened, documentary video by Mark Woytowich • New storage shed completed & artifacts inventoried & removed • Building moved to temporary site • Tarp placed over building to protect from further damage • Asbestos siding/hazardous material removal and disposal • Tyvek on building • Basic stabilization — metal cables, bracing walls, beams replaced • WDFW Permits in hand • Shoreline Permits in hand • Clean up & restoration of windows • Clean up of inside: nails, drywall, etc. (ongoing) • Concrete inside building removed There is also a building permit in hand at the Port of Allyn for Structural Repairs. Funding—TBD. Both the Port of Allyn and the North Bay Historical Society are exploring funding options. THIS PROGRAM IS COMPLETELY FUNDING DEPENDENT Phase responsibilities: See-Proposal Joint effort between the North Bay Historical Society (NBHS) and the Port of Allyn (Port) December 2018. Scope of Program This is a historical renovation and not a standard renovation program. In order to obtain historical registration as much of the original structure material must be left, as built in the early 1950's and the Oyster House must be placed over the water as was its original condition. 3 Draft Schedule • Formal schedule is being developed at this time but there are too many variables for a realistic schedule to be developed. • Target date for completion is Fall of 2020 • Schedule is completely dependent on funding with consideration for working in the marine environment. • Engineering is underway, this will help scheduling • Request for bids for Phase 1 will be let out in January of 2019. Phased Program This program can be broken into nine distinct phases. 1. Structural repair and drying-in. (window openings boarded) 2. Demolition of existing condemned boat ramp. (standalone project) 3. Construction of new pier 4. Move the Oyster House onto the pier and permanently mount the structure to pier 5. Exterior completion of pier 6. Exterior completion of Oyster House 7. Museum Design and planning 8. Interior renovation and Museum completion 9. Landscaping and signage 4 Draft Phase One Part A Project — Structural repair NOTE: Phase one will be broken down into 2 parts, A & B. Part A & B to be quoted January thru February 2019. Due to funding constraints quoted price must be guaranteed thru August 2019. Start date is totally dependent on acquiring adequate funding. Funding is dependent on quotations Part A consists of Notes and items 1 thru 11 of this document NOTES • There is a Mason County Building Permit and Engineering in hand at the Port of Allyn for Part A portion of this phase. • See Site Plan OH-202 for Phase One Part A construction location. • See drawing OH-203 for Phase One Restoration & Stabilization Part A. • Approved Engineering is on file at the Mason County Dept. of Community Development, to support existing Building Permit & OH-203. • Structure is currently secured but is unstable • Electrical power is on site and will be supplied by the Port of Allyn/NBHS. • All construction and demolition debris to be disposed of by contractor. • All staging, jacks etc. to be supplied by contractor 5 Draft ITEMS 1. Lifting building off Steel transport I-Beams using second floor structure and securing in place for demolition and construction of new main beams, decking, sill plates and interior wall spacers is recommended but is not the only way to accomplish this task. See OH-203. • 2 interior wall are load bearing (see OH-203, sheet 2 & sheet 3 and may need to be supported from ground during part of the construction. i. The interior wall separating the Pacific Oyster Processing Room and the Canning/Sales Room (See OH-201) is not only load bearing but carries the heavy bridging structure for the trap door opening (See OH-203 sheet 3). 2. Remove and dispose of all wooden structure from below the sill plates. e.g.: • 12" x12" x 40' main beams (3 remaining) • All temporary cribbing and supporting lumber • 4" x 12" x 12' deck planks • NOTE: CAUTION-When the 4" x 12" decking is removed concrete structure left over from concrete floor demolition will fall if not previously removed. 3. Replace solid 12" x 12" main beams with stacked 4" X 12" X 20" beams - See OH-203, Sheet 3 & sheet 4 • Original construction had 5 ea. 12" x 12" main beams. Renovated structure shall have 4 ea. stacked beams. This approach has been approved by Washington State Historical Architect and is supported by the engineering on file with Mason County Dept. of Community Development. 4. Replace 4" X 12" X 12' deck planks (2 planks side by side) with 3 ea. 4" x 12" x 8' or 4" X 6" X 8' deck planks (3 planks side by side), See OH-203, Sheet 4. S. Add plywood seismic diaphragm sheathing. See OH-203, Sheet 4. 6. Remove ship lap siding as required to inspect and repair exterior wall studs. Save as much ship lap siding as possible for reuse to maintain historic structure. 7. Repair exterior wall studs as required. 8. Replace sill plate as required. (4 walls) 6 Draft 9. Add spacers under interior load bearing walls as required. 101ower building onto new 4 x 12 decking 11.Fasten sills and exterior walls to deck planks and main beams. See OH-203, Sheet 4. 12.Remove jacks and bracing Phase One Part 6 Project — Drying in Additional Building Permit is required at this point and should include roof. Separate roofing contractor permissible Contractor may need to plan for possible pause to wait on Building Permit. This portion should be self-explanatory without drawings. Drawings for Phase One Part B Building Permit will be available by the end of January 2019. 13.Repair/replace ship lap siding as required. 14.Add exterior sheathing as required by local code. See OH-203, sheet 4 for sheathing and insulation reference. • NOTE: Due to the addition of sheathing and ridge insulation spacers will need to be added to door Jambs and window Jambs for correct architectural effect. Wrap structure with Tyvek or equal. 15.Treat all exposed wood framing on first floor, second floor, and truss system and inside roof decking with Borax solution to treat for wood eating organisms. Heat and ventilate as required to ensure complete drying. 16.Treat all exposed wood framing on first floor, second floor, and truss system and inside roof decking with wood hardening solution. Heat and ventilate as required to ensure complete drying. 17.Rebuild/reinforce stair. Draft 18.Strength second floor joists as required. NOTE: First floor ceiling will be completely covered with dry wall hiding any structural repair. • Additional engineering required i. For quotation purposes plan on "sistering" on full 2" X 6" in areas where there are load bearing walls. In the Lobby area and where the office was plan on using 4" X 4" steel angle iron bolted thru the existing or replaced 2" X 6". This area is approximately 8" X 24". See OH-200 & OH-201. 19.Remove fiber board floor that covers second floor planking and dispose of. 20.Repair floor planks as required 21.Install plywood on storage area floor 22.Repair exterior wall as required 23.Repair Attic Truss structure as required ROOF 24.Remove existing roofing material (Shingle, building felt, ect.) 25.Replace rafters as required. 26.Replace shiplap decking as required. • NOTE: Required to see shiplap from inside for historical reference. Shiplap decking is random widths. 27.Install exterior rated plywood sheathing to meet local codes requirements 28.Install water and ice shield covering 29.Add rigid insulation to exterior of roof to allow historical look from inside. 30.lnstall new composite (or metal) roof shingles. Windows/Doors 31.Reframe window openings as required 32.Repair window jambs (head jamb and/or side jambs) as required. Replace sills as required. • NOTE: Each window is a built in place unit and as such any rebuilding of jambs and sills (window openings) must be an EXACT duplicate. All windows swing out and are hinged at top 8 Draft • Windows have been removed and have been reworked and are in storage. Widows are available for fitment but WILL NOT be reinstalled until after structure has been moved on to new pier. 33.Rebuild double door as required at second floor front wall. See OH-200, sheet 2. FRONT ELEVATION (WATER SIDE) 34.Reframe Pacific Oyster Processing Room door. Install temporary plywood door that hinges out. • This door will be removed and discarded after permanent door is installed. 35.Reframe Culling Room door and cover with plywood. • NOTE: All windows and Culling Room door opening to be covered with plywood. Windows and door will be installed after moving onto new pier. 36.Add exterior ridged insulation on all 4 walls • NOTE: Exterior cement siding shingles WILL NOT be installed until after structure has been moved on to new pier. 37.Replace any rotted lumber on the Oyster House not already addressed. This completes the Phase 1 Project. Items 1 thru 36 of this phase and associated drawings will make up bidders packets to be give out to any interested contractors with a Request for Quotation (RFQ). Package will also include information for permanently attaching structure to pier. Phase 2 Project— Demolition of existing condemned boat ramp See Site Plan, OH-202 and Beach Cross Section & Old Boat Ramp At Oyster House Final Location, OH-204. 1. Suggest this be a standalone project. a. Needs to be accomplished with or without placement of the Oyster House on a new pier 9 Draft 2. Planning for equipment and labor has begun 3. Will verify planning in January 2019 4. Permits should be in hand 5. Work window is 15 July thru 15 October. 6. This is anticipated to be no more than a 2 day task a. Possible that much of this can be a donated effort. 7. Must coordinate with Port of Allyn Executive Director to ensure minimal impact to Ports normal summer activities. Bidders package for Phase 2 (if required) will consist of RFQ and Drawings OH-202 & OH-204. \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Phase 3 Project—Construction of new pier 1. GeoTech Report required a. Should be contracted as soon as possible b. Required for final engineering 2. Topographical survey required. map/report 3. Completely contractor driven 4. Time of year driven 5. Concept design complete 6. Requires Licensed Washington State Professional Engineer to approve a. Engineer contracted 7. It is entirely possible that contractor will use their own engineer. a. Design will still be used 8. Impossible to schedule until we have a construction company on contract. 9. Permit for the Pier should be obtained by the contractor that builds the pier. \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Bidders package for Phase 3 will consist of RFQ and Drawings OH-202, OH- 204, OH-205, OH-206 & OH-207 \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ 10 Draft Phase 4 Project— Move Oyster House onto the pier. 1. Port Executive Director has been in contact with firm that moved the Oyster House to its current location. 2. Will send them appropriate drawings along with tentative time frame spring/summer of 2019 for revised quote. \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Bidders package for Phase 4 will consist of RFQ and Drawings OH-202, OH- 204, OH-205, OH-206 & OH-207 \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Phase 5 Project— Exterior completion of Pier Deck 1. Permanently attach structure to pier 2. Installation of walkway/decking and guardrail \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Bidders package for Phase 5 will consist of RFQ and Drawings OH-205 & OH-220 \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Phase 6— exterior completion of Oyster House 1. Installing exterior concrete siding shingles with corner caps 3. Installation of windows 4. Finish paint \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Bidders package for Phase 6 will consist of RFQ and sketch to show shingle installation. \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ i1 Draft Phase 7- Museum design 1. Primary responsibility of North Bay Historical Society a. Need NBHS to ensure historical accuracy of Museum b. Preliminary work begun c. Need to determine how Museum will function and if water will be required i. Probable that water maybe required for fire suppression system (required by code) No Bidders package for Phase 7 required. This is a volunteer effort. All drawings will be available to NBHS at their request. Phase 8— Interior renovation and museum completion 1. Install 30# builders felt on floor and poultry wire 2. Rebuild and replace room divider walls See OH-2XX 3. Replace cast concrete table legs 4. Replace of concrete floor, 2-1/2" to 3" a. Original floor was between 4" and 8" inches thick 5. Replace concrete tables 6. Replace barn type sliding door with standard 8' x 6'- 10" sliding door. Glass is recommended but a solid sliding door is permissible. See drawing OH-210 7. Replace office walls & interior window 8. Rough electrical See OH-208 9. Rough plumbing See OH-218 10. Drywall (drywall/tap & float) first floor 11. Install fire protection system See OH-219 12. Replace concrete wainscoting See OH-2XX 13. Heating & Ventilation See OH-209 12 Draft 14.Rebuild and install trap door on second floor 15. Refurbish and rehang interior doors 16. Rebuild or reinstall built in cabinet in Culling Room 17. Rebuild chute over Pacific Oyster processing table. Include see through panels (glass or Plexiglas) to showcase Trap doors and trolley doors. 18. Finish electrical 19.Finish plumbing 20. Install plumbing fixtures (functional or mock) and complete plumbing as required. 21. Paint. 22. Fabricate Culling Room exterior hand operated crane 23. Install crane on deck outside of Culling Room. \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ No Bidders package for Phase 8 required. This is a volunteer effort. All drawings will be available to NBHS at their request. \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ Phase 9— Landscaping, hardscaping (sidewalks) and signage 1. ADA compliant sidewalks and ramps SHALL be provided. Design TBD 2. Signage TBD. May require Permit. 13