Loading...
HomeMy WebLinkAboutCOM2015-00136 Replace Playground Equipment - COM Permit / Conditions - 9/15/2015 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. III Phone: (360)427-9670, ext. 352 426 W. Cedar Shelton, WA 98584 /R54 COMMERCIAL BUILDING PERMIT COM2015-00136 OWNER: PORT OF ALLYN RECEIVED: 9/15/2015 CONTRACTOR: LICENSE: EXP: ISSUED: 9/15/2015 SITE ADDRESS: 18560 E STATE ROUTE 3 ALLYN EXPIRES: 3/15/2016 PARCEL NUMBER: 122205008001 LEGAL DESCRIPTION: ALLYN BLK: 8 LOTS 1-10; BLK: 9 LOTS 2-10 & BLK:10 LOTS 1-20 &VAC ALLEY&VAC GROSS PROJECT DESCRIPTION: DIRECTIONS TO SITE: Replace playground equiptment General Information Construction&Occupancy Information Type of Use: Playground Equi Insp.Area: No. of Units: Type of Constr.: Type of Work: ACC Fire Dist.: No. of Bathrooms: Occ. Group: Valuation: No. of Stories: Exit Design. Load: Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline& Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp. Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2015-00136 Please refer to the following pages for conditions of this permit. Page 1 of 5 Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee _nA/ 0/1 Fi9ni F 1�7'1 nn S9gnl rnn Building State Fee _nn/ wi Fnni F �a rn S99ni Fnn Building Permit Fee T\ni gnFignlF riai nn g9gnlFnn Total $218.50 CASE NOTES FOR COM2015-00136 CONDITIONS FOR COM2015-00136 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-09 2 The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) Owner/Agent is respo sible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. el X 3) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE r E OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 4) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Build Inspector shall be made prior to requesting additional inspections. X 5) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant wit son County ordinances and building regulations. X 6) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder hamprevented action from being taken. No more than one extension may be granted. X COM2015-00136 Page 2 of 5 7) 1.Fire-retardant-treated wood complying with Section 2303.2. 2. Light-transmitting plastics complying with Section 2606. 3. Foam plastics (including the pipe foam used in soft-contained play equipment structures) having a maximum heat-release rate not greater than 100 kilowatts when tested in accordance with UL 1975 or when tested in accordance with NFPA 289, using the 20 kW ignition source. 4. Aluminum composite material (ACM) meeting the requirements of Class A interior finish in accordance with Chapter 8 when tested as an assembly in the maximum thickness intended for use. 5. Textiles and films complying with the flame propagation performance criteria contained in NFPA 701. 6. Plastic materials used to construct rigid components of soft-contained play equipment structures (such as tubes, windows, panels,junction boxes, pipes, slides and decks) exhibiting a peak rate of heat release not exceeding 400 kW/m2 when tested in accordance with ASTM E 1354 at an incident heat flux of 50 kW/m2 in the horizontal orientation at a thickness of 6 mm. 7. Ball pool balls, used in soft-contained play equipment structures, having a maximum heat-release rate not greater than 100 kilowatts when tested in accordance with UL 1975 or when tested in accordance with NFPA 289, using the 20 kW ignition source. The minimum specimen test size shall be 36 inches by 36 inches (914 mm by 914 mm) by an average of 21 inches (533 mm) deep, and the balls shall be held in a box constructed of galvanized steel poultry netting wire mesh.8. Foam plastics shall be covered by a fabric, coating or film meeting the flame propagation performance criteria of NFPA 701. 9. The floor covering placed under the children's play structure shall exhibit a Class I interior floor finish classification, as described in Section 804, when tested in accordance with NFPA 253. 424.4 Seperation.Children's play structures shall have a horizontal separation from building walls, partitions and from elements of the means of egress of not less than 5 feet(1524 mm). Children's playground structures shall have a horizontal separation from other children's play structures of not less than 20 feet(6090 mm). x /_00`�,_ 8) All equiptment must be installed per Burke Installation Guidelines and Specifications. Detailed prints and instructions are included in the back of the manual, arranged in numberical order by the component number which can be found on the site plan drawing which are the every end of the manual. X 9) A proper safety surface, as recommeded by CPSC Guidelines for Public Playground Equipment and ASTM-F 1487 Standards or CSA/CAN Z614 Standards. X COM2015-00136 Page 3 of 5 OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is ended for a period o 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APP 80 S INVALIDATE THE APPLICATION. 15 oC— Signature Date `i1kJ,ef,/c� OWNE - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) COM2015-00136 Page 4 of 5 Page 1 of 3 Genie McFarland - Fwd: Re: Port of Allyn Permit Application From: Rich Balderston To: McFarland, Genie Date: 8/31/2015 9:58 AM Subject: Fwd: Re: Port of Allyn Permit Application CC: lfc@portofallyn.com Genie, this is for the port of Allyn playground equipment. Can you get back to them if you haven't already. Thanks >>> Lary Coppola <Ifc@portofallyn.com> 8/24/2015 2:51 PM >>> Hey Rich, The cost is $29,259.20. The contractor is Zephyrs - Contractor#ZEPHYI*033C0 The value of the volunteer labor is $1,000. Anything else you need? Call me with a price for the permit and I'll make arrangements for payment. Thanks again for all the help. LFC Lary Coppola • Executive Director The Port of Allyn Ifc@portofallyn.com • www.portofallyn.com (360) 275-2430 — Office - (360) 801-3935 — Wireless P.O. Box 1 • 18560 E. State Highway 3, Allyn, WA 98528 Please Consider Our Environment Before Printing This Email From: Rich Balderston<RBalderston@co.mason.wa.us> Sent:Thursday, August 20, 2015 2:12 PM To: Lary Coppola Subject: Re: Port of Allyn Permit Application I just spoke to someone from L & I, he said he is not aware of any special certification for playground equipment, all that would be required is that a licensed bonded contractor do the project. I don't know the reason for the condition on the older permit that I checked but it doesn't matter. I gave the application to Genie to process, she will need a bid amount for the project, it needs to include labor cost even if some is volunteer labor because labor has value whether it's being paid for or not. Thanks Rich >>> Lary Coppola <Ifc@portofallyn.com> 8/20/2015 1:06 PM >>> file:///C:/Users/Gmm/AppData/Local/Temp/XPgrpwise/55E42543Masonmail 10016D686D... 9/1/2015 Page 1 of 3 Barbara Adkins - Re: Re: Port of Allyn Permit Application From: Lary Coppola<lfc@portofallyn.com> To: Rich Balderston<RBalderston@co.mason.wa.us>, Genie McFarland <Gmm@co.ma... Date: 9/15/2015 11:54 AM Subject: Re: Re: Port of Allyn Permit Application CC: Terri Jefferies <tenij@co.mason.wa.us>, Tim Sheldon <tims@co.mason.wa.u... Rich & Genie, What is the status of this permit? We have sent emails and left messages, yet we haven't heard one word from anyone and we are scheduled to begin construction this weekend. This is a community project, and we have 20+ volunteers scheduled to come and work. It seems to me that this shouldn't have taken anywhere near this long for such a simple permit. It's a piece of playground equipment, not the Empire State Building. I am coming to Shelton today, and would like to pick this permit up today. If it isn't ready, we will move forward with the construction anyway, and let the chips fall where they may. See you this afternoon. LFC Lary Coppola - Executive Director The Port of Allyn Ifc@portofallyn.com - www.portofallyn.com (360) 275-2430 — Office - (360) 801-3935 — Wireless P.O. Box 1 - 18560 E. State Highway 3, Allyn, WA 98528 Please Consider Our Environment Before Printing This Email From: Rich Balderston <RBalderston@co.mason.wa.us> Sent: Monday,August 31, 2015 9:58 AM To: Genie McFarland Cc: Lary Coppola Subject: Fwd: Re: Port of Allyn Permit Application Genie, this is for the port of Allyn playground equipment. Can you get back to them if you haven't already. Thanks >>> Lary Coppola <Ifc@portofallyn.com> 8/24/2015 2:51 PM >>> Hey Rich, The cost is $29,259.20. The contractor is Zephyrs - Contractor#ZEPHYI*033CO Page 2 of 3 The value of the volunteer labor is $1,000. Anything else you need? Call me with a price for the permit and I'll make arrangements for payment. Thanks again for all the help. LFC Lary Coppola • Executive Director The Port of Allyn Ifc@portofallyn.com • www.portofallyn.com (360) 275-2430 — Office • (360) 801-3935 — Wireless P.O. Box 1 • 18560 E. State Highway 3, Allyn, WA 98528 Please Consider Our Environment Before Printing This Email From: Rich Balderston <RBalderston@co.mason.wa.us> Sent:Thursday, August 20, 2015 2:12 PM To: Lary Coppola Subject: Re: Port of Allyn Permit Application I just spoke to someone from L & I, he said he is not aware of any special certification for playground equipment, all that would be required is that a licensed bonded contractor do the project. I don't know the reason for the condition on the older permit that I checked but it doesn't matter. I gave the application to Genie to process, she will need a bid amount for the project, it needs to include labor cost even if some is volunteer labor because labor has value whether it's being paid for or not. Thanks Rich >>> Lary Coppola <Ifc@portofallyn.com> 8/20/2015 1:06 PM >>> Hey Rich, Thanks for the help - it is appreciated p LFC Lary Coppola • Executive Director The Port of Allyn Ifc@portofallyn.com • www.portofallyn.com (360) 275-2430 — Office • (360) 801-3935 — Wireless P.O. Box 1 • 18560 E. State Highway 3, Allyn, WA 98528 Please Consider Our Environment Before Printing This Email From: Rich Balderston<RBalderston@co.mason.wa.us> Sent:Thursday,August 20, 2015 11:11 AM Page 3 of 3 To: Lary Coppola Subject: Re: Port of Allyn Permit Application No, I was hoping you already had a person who was doing the install, the condition I found states a qualified installer but no criteria as to exactly what that means. I will see if I can find anything but I will give the application to Genie to process when she has time and the installer question can be addressed later if that works for you. I've emailed L&I to see if they have any information on the certification. Thanks Rich >>> Lary Coppola <Ifc@portofallyn.com> 8/20/2015 9:59 AM >>> Our maintenance person, who is a licensed carpenter, will be doing a big part of it and overseeing a crew of volunteers. Other than that, I'm not sure where I'd find a "qualified playground equipment installer." Any advice? Lary Coppola • Executive Director The Port of Allyn Ifc@portofallyn.com • www.portofallyn.com (360) 275-2430 — Office • (360) 801-3935 — Wireless P.O. Box 1 • 18560 E. State Highway 3, Allyn, WA 98528 Please Consider Our Environment Before Printing This Email From: Rich Balderston<RBalderston@co.mason.wa.us> Sent:Thursday, August 20, 2015 9:55 AM To: Lary Coppola Subject: Re: Port of Allyn Permit Application I've checked previous permit for playground equipment and it appears we can use the manufacturers installation instructions and would only need engineering if those were not available, the one thing that has been required in the past is that the equipment must be installed by a qualified playground equipment installer, do you know who will be doing the installation? >>> Lary Coppola <Ifc@portofallyn.com> 8/19/2015 3:42 PM >>> Here is the application and drawings for the big toy we are installing at the Port's playground. It replaces a previous one that had deteriorated to the point of no longer being safe. Lary Coppola • Executive Director The Port of Allyn Ifc@portofallyn.com • www.portofallyn.com (360) 275-2430 — Office • (360) 801-3935 — Wireless P.O. Box 1 • 18560 E. State Highway 3, Allyn, WA 98528 Please Consider Our Environment Before Printing This Email . ft" toMASON COUNTY Permit No: DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING•PLANNING.FIREMAR5HAL (360)427-9670 Shelton ext.352 IO — - http:/lwww.co.mason.wa.us/community devl (360)275-4467 Belfair ext.352 UV `u 426 W Cedar Street,Shelton WA 98584 (360)482-5269 Elma ext.352 BUILDING PERMIT APPLICATION PROPERTY OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: Port Of Allyn NAME: MAILING ADDRESS: PO Box 1 MAILING ADDRESS: CITY: Allyn STATE:—WA—ZIP:_98524_ CITY: STATE: ZIP: PHONE:(360)275-2430 CELL:_(360)801-3935_ PHONE: CELL: EMAIL:—Ifc@portofallyn.com EMAIL: L&I REG# ENP. CONTACT : OWNER X CONTRACTOR❑ BELOW❑ NAME: Lary Coppola M AILING ADDRESS:_PO Box 1 CITY: Allyn STATE:_WA ZIP:_98524 PHONE:_(360)275-2430_ CELL:_(360)801-3935_EMAIL:—Ifc@portofallyn.com PARCEL INFORMATION: PARCEL NUMBER(12 DIGIT NUMBER)_ FIRE DISTRICT 5 LEGAL DESCRIPTION(ABBREVIATED):_Sec.20,Township 22N,Range 1 W SITE ADDRESS_18560 E.State Route 3 CITY Allyn DIRECTIONS TO SITE ADDRESS From Shelton tum R on Drum Street,at dock turn L and playground area is in the park. IS PROPERTY WITHIN 200 FT: SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES❑ NO X TYPE OF JOB:NEW X ADDITION ❑ ALTERATION❑ REPAIR❑ OTHER ❑ USE OF STRUCTURE(RESIDENCE,GARAGE ETC.) Play Set IS USE: PRIMARY X SEASONAL❑ NUMBER OF BEDROOMS-0—NUMBER OF BATHROOMS-0—DESCRIBE WORK—Installation of playset SQUARE FOOTAGE: 1 ST FLOOR sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft. DECK sq.ft. COVERED DECK sq.ft.STORAGE sq.ft. OTHER sq.ft. GARAGE sq.ft. ATTACHED❑ DETACHED❑ CARPORT sq.ft. ATTACHED❑ DETACHED❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE FLOOR PLAN REQUIRED MAKE MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner or owner's legal representative.I further declare that I am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project.The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) dg"Py-9�b' 9d.rap Lawrence F.Coppola �f flw0 a1mam-Pwdw�,`U5 X MWMI5.9fl,91S31A6 Tw _August 19,2015 Signature of OWNER Date DEPARTMENTAL REVIEW APPROVE DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL FEE'S TOTAL VALUATION: BUILDING PERMIT FEE FIRE ACCESS AND GRADE PLAN REVIEW GEO-TECH REVIEW PLUMBING&BASE FEE STORMWATER REVIEW MECHANICAL&BASE FEE TOTAL FEES WOOD/GAS/PELLET STOVE VIOLATION INVESTIGATION FEE PLANNING REVIEW FEE VIOLATION FEE