Loading...
HomeMy WebLinkAboutSurface Mine Reclamation - SEP Letters / Memos - 6/13/1994 ' r • -4 IL_ v WASHINGTON STATE DEPARTMENTOF Natural Resources Comm ER M.BELCHER Commissioner of Public Lands KALEEN COTTINGHAM Supervisor June 13, 1994 . Allen M. Shearer, President Allen Shearer Truckingand Landscape Supply, Inc. P PP Y> P.O. Box 789 Belfair, WA 98528 RE: Surface Mine Reclamation Permit Application Dear Mr. Shearer: I have reviewed the packet of information you provided and am returning it for modification and completion. Specific items which require your attention are the following: * An application fee of $650 is due and owing. Please make your check payable to the Department of Natural Resources. * The lower portion of the County or Municipality Approval for Surface Miring (SM-6) must be completed by Mason County officials. * Standard Reclamation Plan (SM-8A) - Page 1 , Name of Applicant - You indicated just your name, most applicants indicate their business name. Is this an error or is the permit to be in your name? Please clarify. Page 2, HYDROLOGY - Needs to be completed to the best of your knowledge. The present response is not adequate. A suggestion is to contact your neighbors who have wells and determine the depth of water in their wells. Also, a local well drilling firm may have this information. Page 5, EROSION CONTROL - Temporary water-control response of "no" requires an explanation of the design of the storm water runoff retention capacity to meet the 25-year/24-hour peak event. The topography of your site is such that it appears storm water runoff would not leave the site. In effect, the rainfall would percolate into the ground. Since you are not washing your products, there is no need for wash ponds or drainage treatments. This may be proper if this is indeed the situation. Please clarify. Page 6, SLOPE REQUIREMENTS FOR QUARRIES AND . . . MINES - Reclamation blasting was checked "yes. " This was probably done in error. Please clarify. SOUTH PUGET SOUND REGION 1 28329 SE 448 ST 1 PO BOX 68 1 ENUMCLAW, WA 98022-0068 1 FAX:(206)825-1672 1 TEL:(206)825-1637 -: 18 Equal Opportunity/Affirmative Action Employer REcvaeo PAPER Allen M. Shearer Page 2 June 13, 1994 Page 7, BACKFILLING - There appears to be some confusion regarding the term backfilling. In reference to the Surface Mining Act, backfilling is defined as mining to a slope angle steeper than the eventual reclaimed slope and then refilling or backfilling the existing void with material other than what is found at the mine site. This is not to be confused with the mining of an area to the approximate reclaimed slope angle and then grading the slope to the final slopes indicated on the plan. Please clarify. Page 8, FINAL DRAINAGE CONFIGURATION - Reconstructed drainages were addressed previously and the appropriate response should be noted here. Page 8, SITE CLEANUP - Needs to be completed. In your particular situation the appropriate response may be "not applicable, " please clarify. Page 8, REMOVAL OF DEBRIS - Needs a response to address the issue. Page 10, REVEGETATION - Your response was "yes, " which requires an explanation of how the work will be accomplished. There is a response required for the documentation relating to the subsequent use. Page 10, RECOMMENDED PIONEER SPECIES - This portion was left unanswered. I recommend hydromulching the sloped areas upon completion of mining. It is more expensive to apply than hand casting of grass seed, but the seed grows more readily, thereby, reducing erosion and promotes revegetation more rapidly. This in turn allows the Department of Natural Resources (DNR) to terminate a permit and release the required reclamation security sooner, which reduces your overall costs for the long term. Page 12, FINAL RECLAMATION MAP - This is unclear in that there needs to be two cross sections indicating the final slopes. The cross sections should depict the before and after configurations of the site. They should be at 90 degree angles to each other across the long and short axis of the site. Page 12, FINAL CHECK - The signature block portion was left incomplete and needs to be completed. The DNR will approve the information when it is satisfied with the information. Allen M. Shearer Page 3 June 13, 1994 * Environmental Checklist - Page 5, PLANTS - Threatened or endangered plants, the DNR accesses a system which will bring to our attention specific issues which need to be addressed. Page 5, ANIMALS - Threatened or endangered animals, see foregoing. Page 9, HISTORIC - Preservation, see foregoing. As soon as the fees are paid, the completed forms and reclamation plan modified, I will proceed with the application process. A reclamation security is required for all Surface Mine Reclamation Permits. The amount: of the security is based upon the state's estimate of the costs required to reclaim a specific site should the operation default on the reclamation permit. There is no specific minimum, however, rarely have I seen values less than $5,000. I am enclosing a variety of security options for your review and use. Most small operations prefer to use the Saving Account Assignment or the Savings Certificate Assignment. The reason, I suspect, is that they have a hard time securing a bond or the expense of the bond is too high to justify. Your prompt response is appreciated. Thank you for your cooperation. If you have questions, I can be reached through the South Puget Sound Region Office at. (206) 825-1631 . Sincerely, Bonnie B. Bunning Region_ Manager David S. Pierce Surface Mine Field Inspector DSP/bh JUN94.41 Enclosures c: Mike Burns, Mason County Planning Dept. COUNTY OR MUNICIPALITY WASHINGTON STATE DEPARTMENTOF APPROVAL FOR Natural Resources SURFACE MINING (Form SM-6) NAME OF COMPANY OR INDIVIDUAL APPLICANT(S) TOTAL ACREAGE OF PERMIT AREA APPLIED FOR Same as name of reclamation permit holder. (Type or print in ink.) (Include all acreage to be disturbed by mining,setbacks and buffers,and �J C_ associated activities during the life of the mine.) L///e�✓! S_ // Cyr t/ tcf/C , C� acres COUNTY MAILING ADDRESS No attachments will be accepted.Legal description of permit area: 1/4 1/4 Section Township Range .vim a.I '-V Telephone �, Proposed subsequent use of site upon completion^of reclamation Signature of company representative or individual applicant(s) Name and title of company representative (please print) Date signed L � Alle"7 1 c Qlsi'C/ / n� TO BE COMPLETED BY THE APPROPRIATE COUNTY OR MUNICIPALITY. Yes No 1. Is the proposed subsequent use consistent with the local land-use designation? 2. Does the applicant have an appropriate permit to conduct surface mining if required by local regulation? (Please attach a copy of the permit,written order,or ordinance.) COMMENTS When complete,return this form to the appropriate Department of Natural Resources regional office. Name of planning director or administrative official (please print) Address Signature Title (please print) Telephone Date DNR Reclamation Permit No. County or Municipality Approval(SM-6) Revised 9/93 Copy distribution:White.Olympia,Yellow.Region,Pink-Applicant.Goldenrod-County or Municipality WASHINGTON STATE DEPARTMENTOF STANDARD L Natural Resources RECLAMATION PLAN .......................... �� (Form SM-8A) DO I NEED TO FILE A RECLAMATION PLAN? Mines with working faces higher than 30 feet The Surface Mining Act(RCW 78.44), as amended in 1993, and steeper than 45e requires you to file a reclamation plan for: You must file a reclamation plan for mines with Mines more than three acres in size working faces that are both higher than 30 feet and You must file a reclamation plan for mines in which steeper than 1 foot horizontal to 1 foot vertical(45a), three or more acres(including highwalls, pit floors, unless there is a pre-existing natural hazard in the area. stockpiled area!;, side-cast areas, and processing-plant Note: Lands that have already been reclaimed to the standards sites)will be or have been disturbed by mining. given In RCW 78.44 should not be included when calculating the A disturbed area is any place where operations in disturbed-area or face-height thresholds. preparation for or durina surface mining physically This form will help you by providing a checklist of the infor- disrupt, cover, compact, move, or otherwise alter the mation required. Even so, it is not uncommon for applicants characteristics of soil, bedrock, or topography that to have to modify their original plan before it is acceptable to existed prior to such operations. Disturbed areas may the Department. include, but are not limited to: working faces, excavated Note: This form is also available on disk. water bodies, pit floors, processing plant sites, stockpile Note: When signed by the applicant and approved by the Depart- sites, spoil-pile sites, and equipment staging areas. ment of Natural Resources, this document and the associated maps, Disturbed areas do not include mine access roads cross sections,and other attachments will be the approved reclama- unless these roads have characteristics of topography, tion plan for this permit that the permit holder must follow for the mine site. Variation from the approved reclamation Ian may re- f PP P y drainage, slope stability, or ownership that make quire that a new plan be submitted to the Department for approval. reclamation necessary. Please answer all questions legibly in ink and sign. NAME OF APPLICANT/PERMIT HOLDER(S) (Type or print in ink.) NAME OF MINE This will be the name(s)on the permit and performance security. �_ 1 (/Frt S/raur t✓ � crC �n �i�n� tv,'.� �� �" A/lw ^e 0 re Street address and milepost of surface mine MAILING ADDRESS Distance(miles) Direction from Nearest community COUNTY No attachments will be accepted. Legal description of permit area: Telephone 1/4 1/4 Section Township Range � 1G�1 j� ' - 3 ij/�c A-) SURFACE OWNERSHIP Give names and addresses of all individuals with possessory interest in land. (Continue on another sheet if more space is needed.) Ale 11 ,S� �or eY MINING AREA TO BE DISTURBED (Include ail acreage to be disturbed by mining, reclamation setbacks,and associated activities during the life of the mine.) In the following 36 months acres Total during the life of the mine (This should be the same number as on Form SM-2.) acres Standard Reclamation Plan(Form SM-SA) Revised 10193 Reclamation Permit/Application No. I PLANNING FOR RECLAMATION Reclamation of a site must meet or exceed the minimum rec- any segment within two years of abandonment of mining on lamation standards required by the Washington State Surface that segment (except as provided for in a segmental reclama- Mining Act (RCW 78.44). The primary purpose of the Act is tion agreement). to insure that segmental reclamation occurs promptly and A reclamation plan should be simple, practical, and easy properly for all permitted mines. Each requirement of the rec- to implement. It should be flexible, taking into account the lamation law may not fit every mine. The law provides some potential for unanticipated changes in the geology and the latitude for variance. If you have a good reclamation idea or a market that will affect reclamation. The plan should have pro- unique operating problem, see the reclamation officer at your visions for quality reclamation even if mining to depletion Department of Natural Resources Region office. never occurs. Form SM-8A and the required maps and cross sections are WHAT IS A RECLAMATION PLAN? adequate documentation for most mines. In some instances, A reclamation plan can be thought of as both a financial plan- separate reports, such as an expanded checklist, a hydro- ning document and a contract that defines the topography, geologic evaluation, or an environmental impact statement, drainage, and vegetation of the site after reclamation is com- may be necessary. plete. This plan describes the permit holder's strategy to When signed by the applicant/permit holder(s) and land- achieve acceptable reclamation at the lowest possible cost and owner(s) and approved by the Department of Natural Re- establishes an economic limit of production for each site based sources(DNR), this document and the associated maps, cross on the area available for mining and the grade of the deposit. sections, and other attachments will be considered the ap- It also identifies and addresses mitigation of potential environ- proved reclamation plan for this permit, which the permit mental impacts, such as gullying of impermeable clays, for holder must follow for the mine site. Significant variations which the permit holder is liable; establishes a segmental se- from the approved reclamation plan require that a new recla- quence of mining and reclamation that will avoid unnecessary mation plan be submitted for approval. Managers and senior earth moving; and identifies equipment needed. equipment operators must be familiar with the reclamation ob- The plan should provide a schedule for initiating reclama- ligations to which the permit holder has committed. tion as soon as possible on parts of the site where surface mining has been completed. Reclamation activities, to the ex- The checklist below will help you be sure that nothing is tent feasible, should be conducted simultaneously with surface forgotten. Neatness counts! If a plan is not neat and legible mining, and, in any case, reclamation must be completed on and in ink, it will be rejected. CHECKLIST OF MINIMUM RECLAMATION STANDARDS GENERAL INSTRUCTIONS Direction of ground water flow: ? P 2 Please check the appropriate boxes and fill in the blanks below. Is the aquifer perched? ❑ yes ❑ no Where required,please explain in the space provided. If the question does not apply to your mine, please write in "NA"for "not applica- ble"to let us know you have read the question. If additional space is The site will be mined: ❑ wet )Zdry ❑ both needed, write "(Continued)" in the blank and restate the question and continue youranswer on a separate sheet, or write"Seeattached Explain report"in the blank and attach a report.Any unanswered questions may result in this form being returned to you unapproved. MINE TYPE p Type of mine: ❑ pit ❑ quarry Material(s) to be mined: ❑ sand and gravel ❑ rock or stone ❑ clay ❑ metal ❑ limestone ❑ silica ❑ other _T__1 ,'� —(-4 e-,; I Deposit type: ❑ glacial ❑ river flood plain (alluvial) If any of the following conditions apply, a hydrogeologic evalu- ❑ river channel deposits ❑ talus ❑ bedrock t unknown ation that outlines measures to protect against or mitigate ❑ lode ❑ other avulsion, erosion, and damage to fisheries may be necessary. The site is in a: HYDROLOGY ❑ river or stream channel ❑ 100-year flood plain Water table depth is 9i feet below sea level, or ❑ critical aquifer recharge area ❑ sole source aquifer ❑ wellhead protection area ❑ special protection area ❑ the surface, or ❑ other ❑ public water supply watershed Annual fluctuation of water table is from feet ❑ designated aquifer protection area on to feet on Hydrogeologic evaluation is attached ❑ yes ❑ no (date) (date) Standard Reclamation Plan(Form SM•BA),Fans 2 of 12 Reclamation Pe/mit/Aaplication No. Explain: mixed with sterile soils.Topsoil should not be used for screen- ing berms required by county or municipal government be- cause this would preclude its timely use for reclamation. Depth of topsoil is feet. Depth of subsoil is feet. Depth to bedrock is feet. Topsoil will be salvaged where possible? Xyes ❑ no SUBSEQUENT LAND USE If no, explain: Subsequent land use: 0 industrial ❑ agricultural ❑ forestry ❑ residential ❑ wetlands and lakes Subsequent land use is compatible with county Topsoil and overburden will immediately be moved or municipal comprehensive plan? ` yes ❑ no to reclaim adjacent depleted segment? ❑ yes)21�no County or Municipality Approval for If no, ex lain: Z,411 Surface Mining (Form SM-6) is attached? ❑ yes �ifno If any answers are no, explain: Topsoil and overburden storage areas will be beyond the limits of mining but positioned for the shortest possibie downhill transport during reclamation? ❑ yes P(no If no, explain: Note: Approval of the reclamation plan and (or) Form SM•6 does / ` .0• of not vest the subsequent land use. Subsequent use may be changed �(� /�_�7r / L.r %G S; by the permit holder with the written approval of local government up until the time reclamation is complete and the reclamation permit is terminated. Change of subsequent use by the permit holder may require submission of revised Forms SM-6 and SM-8A and a State Before materials are moved, vegetation will be cleared and drainage planned for the storage areas? 'yes ❑ no Environmental Policy Act(SEPA)checklist. If no, explain: SITE PREPARATION Permit and Disturbed Area Boundaries The permit holder should delineate the permit boundaries and maximum extent of disturbance and setbacks with clearly vis ible permanent boundary markers. The permit holder must Storage areas will be stabilized with vegetation if maintain the boundary markers until the termination of the materials will be stored more than one season? 'byes ❑ no reclamation permit. If no, explain: Boundary of the permit area has been marked with permanent boundary markers? JN yes ❑ no Boundaries of areas to be disturbed by mining (permit area minus setbacks)have been marked with permanent boundary markers? t7 yes ❑ no Permanent Setbacks and Screens If no, explain: Permanent setbacks and screens help control erosion, and provide seed sources for reclamation. Screens should consist of native vegetation and(or)topography. Permanent setbacks are not required for pits(unconsolidated deposits)but may still be useful if the mine has close neighbors or adjacent scenic resources, and setbacks may be required by local government. Permanent setback and screen material should not be mined Saving Topsoil and Overburden for Reclamation or used for reclamation.The minimum permanent setback for Prior to any surface mining operation, the permit holder shall quarries (consolidated deposits) permitted after June 30, carefully stockpile all available topsoil and overburden in stable 1993, is 30 feet. storage areas for use in later reclamation or immediately move The permanent setback for this site will them to reclaim adjacent depleted segments. Topsoil needed be feet wide. for reclamation may not be sold or given away or removed or Standard Reclamation Plan(form SM-GA).Page 3 of 12 Reclamation Permit/Apolieation No. Reclamation Setbacks Conservation Setbacks If the cut-and-fill method will be used to restore siopes rather In special cases, setbacks may be necessary to protect unstable than mining to a final slope, a setback from the property slopes, wildlife habitat, or other sensitive areas or to limit tur- boundary or permanent setback (where used) is necessary to bid water discharge from areas that will be disturbed. insure sufficient material for reclamation. The reclamation set- back for pits (unconsolidated deposits) permitted after June Conservation setbacks are necessary for: ❑ unstable slopes 30, 1993, must be at least equal to the maximum anticipated ❑ wildlife habitat ❑ water quality height of the adjacent working face. (A setback equal to the ❑ other working face will provide only enough material for a 2:1 slope. To meet the standards of the law for slopes of between 2:1 Explain: and 3:1, a larger setback is generally required.) Maximum depth of the mine will be feet. The reclamation setback(material that can be used for reclamation) for this site will be 2z feet wide. Conservation setbacks have been marked Reclamation setback has been marked with with permanent boundary markers? ❑ yes Juno permanent boundary markers? �p yes ❑ no SEGMENTAL RECLAMATION If no, explain: The permit holder must reclaim each segment of the mine within two years of completing mining on that segment and (or)in the manner described in this reclamation plan or a sepa- rate segmental reclamation agreement. Segmental reclama- tion helps establish self-sustaining vegetation,especially native This site will not have a reclamation setback pioneer vegetation, and promotes stable slope conditions and because a backfilling plan is attached? ❑ yes no improves the water quality and appearance of the site. This site will not have a reclamation setback for the Permit area has been divided into segments for mining and reclamation purposes? yes ❑ no following reason(s): If no, explain: Each segment is smaller than seven acres, has less than 500 Setbacks to Protect Streams and Flood Plains linear feet of working face, and has characteristics Generally no mine may be located in or near streams or on that make it feasible to treat it as a unit? Y9 yes y❑ no 100-year flood plains unless a Shoreline Permit has been is- Explain: T,(.c S:T; T J sued.Setbacks from streams and flood plains should be at least 200 feet wide. Wider setbacks may be necessary for stream 1 and flood-plain stability and to prevent breaching of the pit at r c,v a later date. A stream setback of at least 200 feet has been marked with A schedule for the sequence of mining and segmental permanent boundary markers? ❑ yes ❑ no reclamation of each segment or a Segmental A setback of at least 200 feet from the 100-year Reclamation Agreement is attached? ❑ yes N no flood plain has been marked with permanent If no, explain: ze), wo K. .-, c boundary markers? ❑ yes ❑ no Explain: A MINING PRACTICES TO FACILITATE RECLAMATION Copy of Shoreline Permit from the Department of Removal of Vegetation Ecology and(or) local government is attached? ❑ yes Ano Vegetation will be removed sequentially from areas Hydraulic project approval from the Department to be mined to prevent unnecessary erosion? yes ❑ no of Fisheries and Wildlife is attached? ❑ yes )A no Standard Reclamation Plan(Form SM•BA).Page 4 of 12 Reclamation Permit/Applioation No. L If no, explain: _ If yes, give details; if no, explain: / J Small trees and other transplantable vegetation will be sal- Revegetation, sheeting, and (or) matting will be vaged for use in revegetating other segments? ❑ yes no used to protect areas susceptible to erosion? 7 yes ❑ no If yes, give details: If yes, give details; if no, explain: Temporary water-control systems used for Wood and other compactible debris should not be buried; it erosion control will: should be recycled, removed, burned, or chipped.If wood and Divert clean water around the pit? T yes ❑ no other compactible debris will be buried, solid-waste disposal Trap sediment-laden runoff before and land-use permits must be obtained. it enters a stream? '$,yes ❑ no Wood and other compactible debris will be: ❑ recycled Result in essentially natural conditions removed ❑ chipped ❑ burned ❑buried of volume, velocity, and turbidity? Ix yes ❑ no ❑ used to synthesize topsoil or mulch Be designed for 25-yr, 24-hr peak event? ❑ yes p no ❑ other_ Be removed or reclaimed? byes ❑no If any answers are no, explain: Solid-waste disposal, burning, and land-use permits art! attached? ❑ yes no Some wood and other debris will be salvaged and used for fish and wildlife habitats? ❑ yes no If yes, give details; if no, explain: Ditches, flumes, and(or) armored channels will be established to prevent erosion of setbacks on neighboring properties? yes ❑ no If yes, give details; if no, explain: LI yi'.Gr1 Erosion Control Erosion control measures are generally necessary during min- Stormwater conveyance ditches and channels will be ing to avoid severe erosion or loss of topsoil. Each site must fined with vegetation or riprap? yes ❑no be evaluated on an individual basis,and multiple techniques to If yes, give details; if no, explain: control erosion may be necessary.The Department of Ecology requires discharge permits for most surface mines.In addition, some mines at higher elevations should plan for the effects of rain-on-snow events on slope stability and erosion. Pit floor will slope at gentle angles toward highwall, sediment retention pond, or proper drainage? yes ❑ no Standard Reclamation Plan(Form SM-SA).Page 5 of 12 Reclamation Perm/Application No. L Natural and other drainage channels will be kept free of Slope Requirements for Pits and-Waste Rock Dumps equipment, wastes, stockpiles, and overburden? For unconsolidated material (such as sand and gravel pits, �7 yes ❑ no waste rock dumps, etc.), final slopes must meet the following If no, explain: requirements: Slopes will vary between 2.0 and 3.0 feet horizontal to 1.0 foot vertical or flatter, except in limited areas where steeper slopes are necessary to create sinuous topography and control drainage? yes ❑ no If no, explain: RECLAMATION TOPOGRAPHY The goal of reclamation is to create stable, usable land. New drainages should be established, and contours should blend For pits, slopes will not exceed 1.5 feet horizontal to smoothly with adjacent offsite topography. To promote slope 1.0 foot vertical except as necessary to blend stability and revegetation, slopes should generally vary be- with adjacent natural slopes? yes ❑ no tween 2.0 and 3.0 feet horizontal to 1.0 foot vertical or flatter. Give details: Slopes steeper than 1.5 feet horizontal to 1.0 foot vertical are r not acceptable for pits except in limited areas to tie in to offsite topography. The reclaimed mine site should appear natural— 7 - that is, scopes should be sinuous and right-angle corners should be eliminated by rounding. Sinuous slopes can be formed either by mining to the prescribed angles, which is generally more cost effective, or by using the cut-and-fill Slope Requirements for Quarries and method. Backfilling is not allowed unless prior approval isob- Hardrock Metal Mines tained from DNR. For consolidated rock, such as basalt, andesite, granite, lime- FINAL SLOPES stone,or quartzite, a vertical highwall face may be acceptable. There is no prescribed angle or height. Slopes will vary in steepness? yes ❑ no If no, explain: �5 f `� — Some slopes will be reclaimed as cliffs? ❑ yes ❑ no If yes, explain by checking the appropriate box below: ❑ Slopes steeper than 1.0 foot horizontal to 1.0 foot vertical are an acceptable subsequent land use as confirmed on Form SM-6. Slopes will have a sinuous appearance in both ❑ Cliffs are indigenous to the immediate area and profile and plan view? byes ❑ no already present a threat to human life. Photo attached to document presence of cliffs. If no, explain: ❑ Geologic or topographic characteristics of the site preclude slopes being reclaimed at a flatter angle and are an acceptable subsequent land use as confirmed on Form SM-6. Explain- Slopes will have no large rectilinear (that is, right angle or straight, planar) areas? yes ❑ no If no, explain: Where reasonable, tracks of the final equipment pass will be preserved and oriented to trap moisture, Selective blasting will be used to remove benches and soil, and seeds and to inhibit erosion? in yes ❑ no walls and to create chutes, buttresses, spurs, scree slopes, If no, explain: and rough cliff faces that appear natural? ❑ yes ❑ no If yes, give details; if no, explain: Standard Reclamation Plan(Form SU-11A).Paoe 6 of 12 Reclamation Permit/Application No. Wildlife habitat will be developed, incorporating Drai.iages will be constructed on each reclaimed segment such measures as: to controi surface water, erosion, and siltation, and to direct clean runoff to a safe outlet? es ❑ no Sinuous and irregular shorelines? El yes ❑ no �'y If yes, give details- if no, explain: Varied water depths? ❑ yes ❑ no � Shallow areas <18 inches deep? ❑ yes ❑ no Islands and peninsulas? ❑ yes ❑ no ��`�t 6y r�n42 ZL Give details: The grade of ditches and channels will be constructed to limit erosion and siltation? ❑ yes ❑ no If yes, give details; if no, explain: Ponds or basins will: Be located in stable areas? ❑ yes ❑ no Have sufficient volume for expected runoff" ❑ yes ❑ no SITE CLEANUP AND Have an emergency overflow spillway? ❑ yes ❑ no PREPARATION FOR REVEGETATION Have protected spillways and outfalls Dealing with Hazardous Materials (for example, rcck armor) to prevent failure and erosion? ❑ yes ❑ no If surface mining will expose hazardous natural materials, such as acid-forming coals and metalliferous rock or soil, the permit If any answers are no, explain: holder must attach a plan to handle such materials. All grad- ing/backfilling to cover the hazardous materials must be made with non-noxious, noncombustible, relatively incompactible solids unless the permit holder provides written approval from all appropriate solid waste regulatory agencies. Other meth- ods may also be acceptable. Proper measures will be taken to prevent seepage from water impoundments that could cause flooding outside the Natural hazardous materials are present permitted area or adversely affect the stability of at the mine site? ❑ yes ❑ no impoundment dams or adjacent slopes? ❑ yes ❑ no The final ground surface drains away from If yes, give details; if no, explain: any hazardous natural materials? ❑ yes ❑ no If yes, give details; if no, explain: Written approval from other agencies with the jurisdiction to regulate impoundment of water is attached? ❑ yes>no Plan for handling hazardous mineral wastes If no, explain: _ indigenous to the site is attached? ❑ yes ❑ no If no, written approval from all appropriate solid waste regulatory agencies is attached? ❑ yes ❑ no Removal of Debris All debris (garbage, "bone piles", treated wood, etc.) Final Drainage Configuration will be removed from the site? ❑ yes ❑ no Reconstructed drainages must be graded and contain enough All temporary sheds, scale houses, and other energy-dissipation devices so that essentially natural condi- structures will be removed from the site? ❑ yes ❑ no lions of water velocity, volume, and turbidity are re-established w If either answer is yes, give details; if no, explain: within six months of reclamation of each mine segment. Drainage will be capable of carrying the peak flow of the 25-year, 24-hour precipitation event? (Data are available at DNR Region offices.)? ❑ yes ❑ no If yes, give details; if no, explain: Standard Reclamation Plan(Form SM-8A),Page 8 of 12 Reclamation PermiVApokalion No. li Reclamation blasting will be used to reduce the entire Mine floor will be gently graded int6 sinuous drainage highwall to a scree or overburden slope less than channels to preclude sheet-wash erosion during 2.0 feet horizontal to 1.0 foot vertical? / yes ❑ no intense precipitation? :.Oyes ❑ no If yes, give details; if no, explain: If yes, give details. if no, explain: J Small portions of benches will be left to provide habitat for raptors and other cliff-dwelling birds? 8-yes ❑ no Backfilling Mine floor will be bulldozed, plowed, ripped, or If backfilling is proposed, it is necessary to give the source of blasted to foster revegetation? ❑ yes P no the backfill material,quantity needed,grading and compaction If yes, give details; if no, explain: scheme, erosion control plan, and immediate vegetation plan. If backfill is to be brought from off site, copies of all permits '" _ from local government will be necessary. r`� : YI{ iyr /, 5 /e} _�e Slopes will require significant backfilling? ❑ yes 12 no � I f 211� DNR-approved backfilling plan and (or) permits are attached? ❑ yes br no LAKES, PONDS,.AND WETLANDS If no backfilling plan attached, explain: If surface mining results in the formation of a swamp, pond, or lake useful for recreation,wildlife habitat,water quality con- trol, or other beneficial wetland purposes, the site must be reclaimed in the following manner: Reclaimed areas below the permanent low water table in soil, sand, gravel, and other unconsolidated material Backfilling will be done with overburden material will have a slope no steeper than 1.5 feet (not topsoil) perched above the mine? ❑ yes L�no horizontal to 1.0 foot vertical? ❑ yes ❑ no If no, what is the source of the material? If yes, give details; if no, explain: r0 s .T-" n1n .T �L �?rt-✓eI iY All grading/backfilling will be done with non-noxious, non- If not already present, soils, silts, and clay-bearing combustible, relatively incompactible solids? ❑ yes ❑ no material will be placed below water level to If yes, give details; if no, explain: enhance revegetation? ❑ yes ❑ no ! _ If yes, give details; if no, explain: V 1,4 V r I 1 Backfilled slopes will be compacted? In yes ❑ no If yes, give details; if no, explain: Some parts of pond and lake banks will be shaped so that a person can escape from the water? ❑ yes ❑ no If yes, give details; if no, explain: MINE FLOORS Rat areas will be formed into rolling mounds? ❑ yes'Wno Armored spillways or other measures to prevent If yes, give details; if no, explain: undesirable overflow or seepage will be ��C L%1 y L=/: ✓ �i ! �' provided to stabilize bodies of water q Z?c and adjacent slopes ❑ yes ❑ no ( �.S� �� /7'f �IGC ���7��F If yes, give details; if no,explain: Standard Reclamation Plan(form S4-11A).Pays 7 of 12 Reclamation PermiuApplieation No. If yes, give details; if no, explain: Western Washington Wet Areas ❑ birdsfoot trefoil ❑ sedges - ❑ cedar ❑ tubers ❑ cottonwood ❑ wetland grasses ❑ creeping red fescue ❑ willow ❑ red alder` Other Test plots will be used to determine optimum � Eastern Washington Dry Areas vegetation plans? ❑ yes 1 no ❑ alder" ❑ juniper The site will not 1:e actively revegetated because: Cl alfalfa* ❑ lodgepole pine ❑ It is a rural,area with a rainfall exceeding 30 inches ❑ black locust* ❑ lupine* annually and erosion will not be a problem ❑ deciduous trees ❑ ponderosa pine (requires approval of DNR Region office). ❑ deep-rooted ground cover ❑ Russian olive' ❑ Demonstration plots and areas will be used ❑ diverse evergreens ❑ shrubs to show that active revegetation is ❑ grasses ❑ cloven not necessary. \��Revegetation is inappropriate for the approved Other ' subsequent use of this surface mine. Explain: Eastern Washington Wet Areas ❑ alder* ❑ serviceberry ❑ cottonwood ❑ tubers ❑ poplar ❑ willow Documentation is attached? ❑ yes ❑ no ❑ sedges RECOMMENDED PIONEER SPECIES Other Segmental reclamation allows plant communities to develop according to ecological succession stages. A combination of Give planting details: natural reseeding and intentional planting is the most effective means of establishing diverse and prosperous pioneer vegeta- tion. Revegetation with grass and legumes should occur during the first appropriate season after slope shaping and replace- ment of topsoil. Establishing widespread healthy vegetation generally takes several seasons. Follow-up evaluations may be necessary to monitor progress and to determine why piants did not thrive. In eastern Washington, continuous ground cover may not be achievable because of arid conditions or sparse topsoil. However, revegetation shall be as continuous as reasonably possible. The sections below give suggestions for species most likely to survive in different types of climate. Check the species that will probably be planted at your mine site. Western Washington Dry Areas ❑ alfalfa' ❑ lupine* ❑ cloven ❑ orchard grass ❑ cereal n!e ❑ perennial rye ❑ colonial bent grass ❑ ponderosa pine ❑ creeping red fescue ❑ red alder* ' indicates nitrogen-fixing species ❑ Douglas fir ❑ shore pine PLANTING TECHNIQUES ❑ ground cover(other) ❑ shrubs Mined sites generally present harsh conditions that hamper Other _ revegetation. Nevertheless, much can be done to increase the chances for successful seeding and planting. Standard Reciama,tion Plan(Form SM-SA).Page 10 of 12 Reelamatron Permit/Application No. SOIL REPLACEMENT Materials, such as till, loess, and(or)shale, are available If available, ap to 3 feet of topsoil and (or) subsoil on site that could be used to supplement topsoil for reclamation? ❑ es ❑ no will be restored? ❑ yes P no y I If no, explain: f no, explain: ny.lf Aw". ! 1 :UZ AST (i./,, l( /IP d A>f S-T2 Topsoil will be restored and seedbeds prepared as Silts from settling ponds or a filter press will be used for reclamation? ❑ yes ❑ no necessary to promote effective revegetation and to stabilize slopes and mine floor? ❑ yes 9no If no, explain: If yes, give details; if no, explain: Settling pond clay slurries will be pumped or Topsoil will be replaced to an approximate depth of hauled to other segments for reclamation? ❑ yes ❑ no �— feet on the pit floor and a depth of If no, explain: feet on slopes. Topsoil will be distributed evenly over the site ❑ yes �no If no, explain: Topsoil will be replaced with equipment that will minimize compaction, or it will be plowed, disked, or ripped following placement? yes ❑ no if no, explain: If topsoil is in short supply, it will be strategically placed in.depressions and low areas in adequate thickness to conserve moisture and promote revegetation? ❑ yes �no If no, explain: Topsoil will be immediately stabilized with grasses and legumes to prevent loss by erosion, slum ping or crusting? �0�yes ❑ no If no, explain: Topsoil will be moved when conditions are not overly wet or dry? *yes ❑ no If no, explain: REVEGETATION The revegetation plan should show how, when, where, and what vegetation will be planted. A thorough and detailed plan Topsoil will be imported? yes ❑ no increases the chances that plants are well established when Explain: reclamation is finished. It is best to do test and demonstration dr plantings early and to monitor the results so that appropriate { changes can be made before mining ceases. The mine site is in: ❑ eastern Washington --%�westem Washington? Synthetic topsoil will be used and(or)made on The mine site is: ❑ wet -6 dry? site to supplement existing topsoil? es I no The average precipitation is � inches/year. If no, explain: 'C 1 Revegetation of a segment will start during the first proper planting season(fall for grasses and legumes, fall or late winter for trees and shrubs)following restoration of slopes? yes ❑ no Standard Reclamation Plan(Form SY-SA).Page 9 of 12 Rectamation PermiVApptication No. ❑ l,.ocations and names of significant buildings, parks, anJ ❑ Locations and names of all lakes, sprngs, and wetlands. other manmade features. ❑ Location and depth of replaced topsoil. ❑ Locations and names of all wells, lakes, springs, and ❑ Permanent drainage and water-control systems(with existing wetlaridsl. expanded view, if needed). ❑ Boundaries of the areas that will be disturbed by mining. ❑ Area to be revegetated and proposed species. RECLAMATION SEQUENCE MAP ❑ Other information pertaining to the permit and required This map shows the details of tt z plan for mining and segmen- by statute. tal reclamation. It should cover the same area as the pre-min- Cross sections ing topographic map and display the following information: ❑ At least two cross sections(generally at right angles) ❑ Permit area plus an appropriate border on all sides. show original and final topography pography and water table. ❑ Boundaries of the areas that will be disturbed by mining. ❑ Locations of all permanent boundary markers. GEOLOGIC MAP2 ❑ Location of proposed access roads to be built When required by the DNR, a detailed description of geologic in conjunction with the surface mining operation setting and the type of deposit to be mined. and whether they will be reclaimed or left as roads. PHOTOS AND OTHER SUPPORTING DATA ❑ Locations and types of setbacks and berms. Aerial and(or)other photographs should be submitted in sup- ❑ Numbered se gments and the direction and sequence of port of the application, when feasible. Additional maps, pho- mining. Avoid mining from the center outward. tos, and detailed reports may be required by DNR. ❑ Topsoil storage areas and sequence of stripping, storing, and repiacernent on mined segments. FINAL CHECK ❑ Overburden storage areas and sequence of stripping, ❑ All documents submitted have the date, the name and storing, and replacement of soil on mined segments. address of the permit holder, and the application number ❑ Waste rock piles and how they will be reclaimed and on every page of the material. stabilized. ❑ The plan contains predominantly relevant information. ❑ Operation plant and processing areas. When signed by the applicant and approved by the Department of ❑ Measures taken to protect adjacent surface resources, Natural Resources, this document and the associated maps, cross sections, and other attachments will be the approved reclamation including prevention of slumping or landslides on plan for this permit that the permit holder must follow.Significant adjacent lands. variations from the approved reclamation plan may require that a new plan be submitted to the Department for approval. ❑ Location and description of the erosion control systems, including drainage facilities and settling ponds. I hereby agree to comply with this plan. Date signed ❑ Other pertinent features. FINAL RECLAMATION MAP (Signature of applicant permit holder) This is a topographic map of the site as it will look after final I hereby verity that I have see n and approve this plan. Date signed reclamation. It must show all applicable data required in the narrative portion of the reclamation plan and details of the mine reclamation. The map should cover the same area as the pre-mining topographic map and should display the following information: ❑ Permit area plus an appropriate border on all sides. (Signatures o/all 1ndlWduals with possessory interest) ❑ Final elevations and contours, adjacent natural ground FOR DEPARTMENTAL USE ONLY: slopes, reclaimed drainage patterns, and other topographic features. Approved by Date approved ❑ Locations and names of all roads, railroads, utility lines, or any other rights of way. Comments by Region ❑ Locations and names of all streams and drainages. ❑ Locations and names of significant buildings, parks, and other structures, facilities, or features. t Existing wetland should be clearly shown on the plans. If wetland questions arise, contact the Department of Ecology(DOE). 2 Information about geology may be available from the Department of Natural Resources,Division of Geology and Earth Resources,P.O.Box 47007, Olympia, WA 98504-7007, (206) 902-1450 or the USGS, (509) 353-2524. Standard Recianution Plan(Form SM•aAi.Faos 12 of 12 Reclamation PernrvApp6cation No. Revegetation at this site will require: MAPS Ripping and tilling? ❑ yes ❑ no Information about your proposed reclamation plan should be Blasting to create permeability? ❑ yes ❑ no provided on several types of maps: (1)a site-access map,(2)a Mulching? ❑ yes ❑ no pre-mining topographic map, (3) a reclamation sequence Irrigation? ❑ yes ❑ no map, and (4) a final reclamation map with at least two inter- secting cross sections. These maps and cross sections should Fertilization? ❑ yes ❑ no be at an appropriate scale to show the desired information. Importation of clay or humus-bearing soils? ❑ yes ❑ no Suggested Map Scales Adding other soil conditioners or Site size Mao scale amendments? ❑ yes ❑ no .--5 acres not less than 1 inch = 50 feet Give details: 5r10 acres not less than 1 inch = 100 feet 10 or more acres not less than 1 inch = 200 feet Other Map Requirements Preferred map size is 11 x 17 inches unless otherwise noted; larger maps are acceptable, but you must be prepared to fur- nish additional copies, if requested. If maps are small, they may be grouped together on a single sheet of paper. Each map must include: ❑ Scale ❑ Bar scale ❑ North arrow Trees and shrubs will be planted in topsoil ❑ Legend with all symbols defined or explained or in subsoil amended with generous ❑ Title block with the following information: amounts of organic matter? ❑ yes ❑ no ❑ Title of map If yes, give details; if no, explain: ❑ Application/permit number ❑ Name and address of applicant/permit holders) ❑ Space for signature ❑ Map/exhibit number O Date map was drawn or revised Mulch will be piled around the base of SITE ACCESS MAP trees and shrubs? ❑ yes ❑ no High-quality stock will be used? ❑ yes ❑ no An 81/t x 11 inch copy of the pertinent section of a road map that clearly shows how to get to the site from the nearest town. Trees and shrubs will be planted while they are dormant? ❑ yes ❑ no PRE-MINING TOPOGRAPHIC MAP' Stock will be properly handled, kept cool and This map is necessary to establish the location and setting of moist, and planted as soon as possible? ❑ yes ❑ no the mine site. It must show: Seeds will be covered with topsoil or mulch ❑ Permit area plus an appropriate border on all sides. no deeper than a half inch? ❑ yes ❑ no ❑ Elevations and contours, natural ground slopes, drainage If any answers are no, explain: patterns, and other topographic features 2. ❑ Boundaries and names of counties and municipalities. ❑ Boundaries of property ownership, including adjacent properties. ❑ Names and addresses of adjacent property owners. ❑ Locations and names of other mines. O Locations and names of all roads, railroads, utility lines, A Reclamation and Seeding Report(Form SM-3)will or any other rights of way. be filed with the Department upon completion of ❑ Locations and names of all streams and natural and revegetation for each segment? ❑ yes ❑ no manmade drainways. If no, explain: 1 For a base map,use U.S.Geological Survey 7.5-minute maps,which are available from sporting goods stores or may be ordered from the U.S. Geological Survey, (509) 353-2524, or DNR Photo and Map Note: The Department of Natural Resources will not release a recta- Sales, P.O. Box 47031, Olympia, WA, 98504-7031, (206) 902- motion permit or performance security until it deems that effective 1234. revegetation has commenced. That is, uegetation has survived 2 Contour 'intervals are deemed adequate if they accurately reflect the through at least one growing season and come up again (usually conditions of the site. Generally, contour intervals should be between about 18 months). 5 and 20 feet. Standard Reclamation Plan(Form SM-BA),Page 11 of 12 Reclamation PermiuAppllcation No. x Department of Natural Resources BRIAN BOYLE OLYMPIA, WASHINGTON Commissioner of Public L y� 1889 �O 98504 JCiN• ONMMML Vr1FL11L71 Purpost• ol'Checklist: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agen- cies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS: Answer the questions briefly, with the most precise information known, or give the best de- scription you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases. you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really (it) not know the answer, or if a question does not apply to your proposal, write "do.not know" or "does not ap- ply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional in- formation reasonably related to determining if there may be significant adverse impact. l :sc of checklist for nonproject proposals: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN AD- PI Il()\, Cuttlplele the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). or nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area," respectively. I Name of proposed project, if applicable: / 19111?ki Name of applicant: f�rrlrt "� Veal er t. Address and phone number of applicant and contact.person: 4. Date checklist prepared: 5. Agency requesting checklist: h. Proposed timing or schedule (including phasing, if applicable): 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal'' II' ycs, explain. ill✓= 8. List any environmental information you know about that has been prepared, or will be prepared, directly rrl:ued to this proposal. __3 (2, ✓ �� 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting. the property covered by your proposal'? If ycs, explain. 14 10. List any government approvals or permits that will.bc .needed for your proposal, if known. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There arc several questions later in this checklist that ask you to describe certain aspects of your prolmsal. You du nut need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific infor- mation on project description.) ,s S . ze 7,�0k .S 7,C.7i( GtJ: !/ /3r .� e v*f S; I e S p1a e Oil iyG/71 GUGy �u cle Lr S2 S 7`r S j 0 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your pro- posed project, including a street address, if anv, and section, township, and range, if known. If a proposal would occur over a range of area. provide the range or boundaries of the site(s). Provide a legal description, site pion. vicinity mar, and topographic map. if reasonably available. While you should submit any plans required by the agency, you arc nut required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. TO BE COMPLETED BY APPLICANT FVAI VA"I111♦ IUR A(�G�i('l I'SI 11\I 1 B. ENVIRONMENTAL ELEMF-KTJ I. Earth a. General description of the site (circle one): Flat rolling, frilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)'? �f TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)'' If you know the classification of agricultural soils, specify them and note any prime farmland. / SQ�� G r.•�t� d. Are there surface indications or history of unstable soils in the immediate vicinity? if so, dcscri be. c. Describe the purpose, type, and approximate quantities of any filling or grading pro- posed. Indicate source of fill. -T ��f-e 1�7a'f' C / L71 / f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? s h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 2. Air a. What types of emissions to the air would result from the proposal (i.e.. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. _ 1l3 1 'Tw Summ er- b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. j 41L-� c. Proposed measures to reduce or control emissions or other impacts to air, if any: /t -8- TO BE COMPLETED BY APPLICANT EVALUATION FOR 3. Water AGENCY USE ONI Y a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year—round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. In- dicate the source of fill material. 14 4) Will the proposal require surface water withdrawals or diversions? Give general de- scription, purpose, and approximate quantities if known. A-1 5) Does the proposal lie within a 100—year floodplain? If so, note location on the site plan. v 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. Ac/ b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. C_ 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals . . .; agricultural; etc.). Describe the general size of the.system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. —4— r(► III; COMPI.1711) BY APPLICANT EVALUATION FOR AGENCY USE ONLY �. Water Runoff (including storm water): I) Describe the source of runoff (including storm water) and method of collection and disposal. if any (include quantities, if known). Where will this water flow? Will this water flow into other waters'? If so, describe. '1 Could waste materials enter ground or surface waters? If so, generally describe. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if anv: _ 4. Plants a. Check or circle types of vegetation found on the site: _ deciduous tree. alder, maple, aspen, other _ evergreen tree: fir, cedar, pine, other _ shrubs grass _ pasture _ crop or grain _ %%-ct soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, celgrass, milfoil, other _ other types of vegetation b. What kind and amount of vegetation will be removed or altered? C. List threatenpe�d or endangered species known to be on or near the site. // d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: �. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: <="l.E , , , .��y e E / X2':-1/ J- mamn)als: deer' bear, elk, beaver, other: Iish: b .sa mo ass. n, trout, herring, shellfish, other: b. List anv threatened or endangered species known to be on or near the site. '6- TO BE COMPLETED BY .APPLICANT l•VAI UA I WN I l►R A(4-NCY t•SU t►VI 1 c. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: 14 �ra;ff 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs'? Describe whether it will be used for heating, manu- facturing, etc. Z/-9 eT, ' L �;r // 7 f 4 / b. Would your project affect the potential use of solar energy by adjacent properties'? If so, generally describe. /110 c. What kinds of energy conservation features are included in the plans of this proposal'? List other proposed measures to reduce or control energy impacts, if any: 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal'? If so. describe. 4AI I) Describe special emergency services that might be required. 14 ?) Proposed measures to reduce or control environmental health hazards, if any:/�/� b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? 'Tr,,;;,f/,' C ¢ C �Lr•/�/14L'j ?) What types and levels of noise would be created by or.associated with the project on a short—term or a long—term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. 10 Ill ( ()MIDI FTH) BY APPLICANT EVALUATION FOR AGENCY USE ONLY ;) Proposed mcasures to reduce or control noise impacts, if any: �. Land and Shoreline Use a. What is the current use of the site and adjacent properties? ,40 r1 -e b. Ilas the site been used for agriculture? If so, describe. c. Describe any structures on the site. d. Will any structures be demolished? If so, what'? C. What is the current zoning classification of the site? I. What is the current comprehensive plan designation of the site'? g. II' applicable. what is the current shoreline master program designation of the site? h. Has any part of the site been classified as an "environmentally sensitive" area? If so, speci l'y. Li i. Approximately how many people would reside or work in the completed project'? r Approximately how many people would the completed project displace'? k. Proposed measures to avoid or reduce displacement impacts, if any: I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: _ _ �� la)Vt Pe"o-f (S "7� TO BE COMPLETED BN APPLICANT 1 \Al UA1'1(►N I()I( 9. Housing a. Approximately how many units would be provided. if any'? Indicate whether high, mid- dle, or low-income housing. b. Approximately how many units, if any, would be eliminated'? Indicate whether high, middle, or low-income housing. 0 c. Proposed measures to reduce or control housing impacts, if any: 10. Aesthetics a. `'What is the tallest height of any proposed structure(s), not including antennas. what is the principal exterior building matcrial(s) proposed'? f b. What views in the immediate vicinity would be altered or obstructed'? c. Proposed measures to reduce or control aesthetic impacts, if any: yu.� r� sC4:Oeiny 11. Light and Glare a. What type of light or glare will the proposal produce'? What time of day would it mainly occur'? _ b. Could light or glare from the finished project be a s:►fcty hazard or interfere with viewO /to c. What existing off-site sources of light or glare may affect your proposal? /CVI* d. Proposed measures to reduce or control light and glare impacts, if any: 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity'? //>> CLi I Sv � ii jfCLLks 4 /Q/� ya r,ie ��': n 5 b. Would the proposed project displace any existing recreational uses'? If so, describe. I II) RI ('(IMPLLI1:1) BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. Proposed measures to reduce or control impacts on recreation, including recreation op- portunities to be provided by the project or applicant, if any: ]3. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preser= vation registers,known to be on or next to the site? If so, generally describe. h Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. c. Proposed measures to reduce or control impacts, if any: 14. 'Transportation :I. Identity public streets and highways serving the site, and describe proposed access to the crosiing, street system. Show on site plans, if any. h. Is site currently served b public transit'?y p If not, what 1s the approximate distance to the nearest transit stop? c. Ilo%% many parking spaces would the completed project have? How many would the project eliminate? d. Will the proposal require any new roads or streets, or improvements to existing roads or streets. not including driveways? If so, generally describe (indicate whether public or private). V e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transporta- tion". If so, generally describe. 1'. llo%% marry vehicular trips per w ?p p day would be generated by the completed. project. If known. indicate when peak volumes would occur. �(< %r�`t� �ua+►��'+�l �� / �11 av TO BE COMPLETED BY APPLICANT I YAI UA1'll)N MIN AGUNCY t'1 - 0%*1 l g. Proposed measures to reduce or control :transportation impacts, if an P P Y lam/ 15. Public Services a. Would the project result in an increased need for public services (for example: fire pro- tection, police protection, health care, schools, other)? If so, generally describe. b. Proposed measures to reduce or control direct impacts on public services, if any. 16. Utilities a. Circ ities currently' available at the site: electr` icity,Jnatural gas, water, refuse scrv- ice to ephone,-sanitary sewer, septic system, other.�, �} b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. (.� /J #3 C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is rel ff on the _ ��:G<<:�its decision. Signature: . ... ...................................... Date Submitted : - ......................................... Approvedby: .... ............................................................ Title: ............ ..... ........ ................................................. Date: ..... . . . ... . . . ........ .............................................. -10- �r SURFACE MINING +� WASHINGTON STATE DEPARTMENTOF RECLAMATION BOND Imo......::: Natural Resources (Form SM-1) Bond No. KNOW ALL MEN BY THESE PRESENTS,That we, as Principal, and a corporation organized and existing under the laws of the State of and authorized to transact business in the State of Washington, as Surety, are held and firmly bound unto the State of Washington, acting through the Department of Natural Resources, in the sum of ($ 1 U.S. DOLLARS, for the payment of which sum, we bind our selves, and each of our legal representatives, executors, administrators, successors,and assigns,jointly and severally, firmly by these presents. WHEREAS,the Principal has received from the Department of Natural Resources,State of Washington,a Reclamation Permit to conduct surface mining on the Premises whose legal description is in a portion of: 1/4 Sec .T N, R (E)(W)(circle one)W.M. 1/4 Sec T N, R (E)(W)(circle one)W.M. 1/4 Sec .T N, R (E)(W)(circle one)W.M. 1/4 Sec .T N, R (E)(W)(circle one)W.M. in County. NOW, THEREFORE, The conditions of this obligation are such that if the Principal, in conducting such surface mining, faithfully performs the requirements of the permit and Chapter 78.44 of the Revised Code of Washington (RCW), relating to mining and the reclamation of surface-mined land,and the Rules adopted thereunder,then this obligation shall be exonerated and discharged and become null and void; otherwise it is to remain in full force and effect. In accordance with RCW 78.44, this bond secures completion of reclamation for the area to be surface mined after the signature date of this bond and any previously disturbed areas on the Premises on which reclamation has not been satisfactorily completed and approved. PROVIDED, However, the Surety shall not be liable under this bond for an amount greater in the aggregate than the sum designated in the first paragraph hereof and any reasonable legal fees that the Department may incur to recover the security.The Surety shall not be liable for surface mining performed on the Premises after a date sixty days after the Surety mails a cancellation notice to the Principal and the Department of Natural Resources, Olympia, Washington. The bond shall remain in full force and effect as respects obligations related to surface mining performed on the Premises before that date unless the Principal files a substitute bond or other performance security approved by the Department of Natural Resources or unless the Department of Natural Resources otherwise releases the Surety in writing. Signed,sealed, and dated this day of Attorney in fact(type name below line) Principal(type name below line) Resident agent(type name below line) Title Agency Mailing address Mailing address Surety Approved as to form: Date Mailing address Assistant Attorney General Name of mine Reclamation Permit No. Surface Mining Reclamation Bond(Form SM-t) Revised 9/93 L 1 `F WASHINGTON STATE DEPARTMENT Of SURFACE MINING Naturtil Resources SAVINGS ACCOUNT ASSIGNMENT (Form SM-4) I. For value received, Assignor,does hereby assign,transfer,and set over to the State of Washington,Department of Natural Resources,hereafter called the State,all rights,title,and Interest in the Assignor's Savings Account No. deposited in the Branch of a financial institution authorized to oo business in the State of Washington, hereafter called the Bank,which Bank is a member of the Federal Deposit insurance Corporation,the Federal Savings and Loan Insurance Corporation,or the National Credit Union Administration,in the amount of dollars 15 II. The Assignor makes this assignment pursuant to Chapter 64,Laws of 1970,1 st Ex.Sess.,and that certain Reclamation Permit No. was issued to on Ill. The State may,at any time after giving written notice to the Assignor,demand payment from the Bank holding the above Savings Account of an amount not to exceed dollars f5 1, IV. Any penalty suffered by the State as a resuh of demanding payment from the Bank shall be assessed against the Assignor. V. The Assignor is not entitled to any earmngs or interest on the cash proceeds after the State has withdrawn such proceeds in the amount as above specified from the herein described Savings Account.Such earnings and interest shall be retained by the State. VI. Tina passbook to the above-mentioned Savings Account shall be held by the Stale during the term of the assignment. VII. The Assignor hereby authorizes and directs the Bank to pay all or any part of the abovedescribed deposit account as instructed by the State until such lime as the Bank shall receive the Release provided for below.The Bank shall not be liable to inquire whether there has been performance by[the)Assignor or notice has been given Assignor or to see to the application of any monies paid on the instruction of the State,and in such matters the Bank may rely upon the instruction of the State executed over the signature of the person,or his dengue ,app-nng under the Acceptance below without need to verify the authority of such parson.Nothing herein ,tall prevent the State from designating a person authorized to act for it In another lawful manner. V01. It is agreed,as between the Bank and the Assignor,that in the event the Bank closes or goes into receivership,any Federal Deposit Insurance Corporation,Federal Savings and Loan Insurance Corporation,or National Credit Union Administration Insurance proceeds paid on,to,or as a result of the Assignor deposits with said Banks,shall first be applied to cover this assignment. IX. Signed and dated at Washington,this day of A,ngnor',aignai Malting address BANK ACCEPTANCE X. The Bank,as witnessed below by the signature of a duly authorized officer hereby recognizes the above assignment of Savings Account No in the amount of$ this day of Authorized tignature MtJing address Six— DEPARTMENT OF NATURAL RESOURCES ACCEPTANCE XI. The State of Washington,Department of Natural Resources,hereby accepts the foregoing assignment of Savings Account No. held by in the amount of$ this day of A.thonzed ngnature Xil. The above assignment of Savings Account No. drawn on Bank in the amount of E Is hereby released.The authorized signature and seal,below,shall witness the termination of the State's interest in this assignment. Authonzed signature XIII. 1, ,Assignor In the above agreement,recognize by my signature below the release of the assignment carried out in Clause IX above. Signed this day of Assignor t signature Reclamation permit N. Swaq,Attouni Aa„onmaM If orm 54a1 Ra.eW V9J •rt.�n, d ?.'r : e;.r;n.walAFisv` .�: Z, !>? j wi:MW'rti,"i'� '! >r• i °�)eayl• :+!> � .a: Mrs 64ia ii— <t":.�.'.•ty. w �'`r ri �' f�c.,,F.s♦� ra `r�W i .,_7'^ "S ' S;" 1- ����' q�a (' ✓!— 4 z7, y ,;' �'^�� A �ess�' s'' ' �,fi J y Nj � 't'n "I't"'es�a,..t DT's ��{f ��y \�Y��,\yz��eJ E L •T +'� ��C.y 1 � � s,! ''A �Y r+ r y�,r�`r Y j '+�F1�'4 p� (.• •S♦ } Y WASHINGTON STATE DEPARTMENTOF SURFACE MINING SAVINGS •Natursl Resources CERTIFICATE ASSIGNMENT (Form SM-5) 1. For value rscetved, Assignor,does hereby assign,transfer,and set over to the State of Washington,Department of Natural Resources,hereafter called the State,all rights,title,and interest in Savings Certificate No. in the amount of dollars 1$ I,payable on or after ,issued by a financial institution authorized to do business in the State of Washington,hereafter called the Bank,which Bank is a member of the Federal Deposit Insurance Corporation,the Federal Savings and Loan Insurance Corporation,or the National Credit Union Administration,and payable to the Assignor herein. II. The Assignor makes this assignment pursuant to Chapter 64,Laws of 1970.1st Ex.Seas.,and that certain Reclamation Permit No. was tssu.d to on Ill. The Assignor may,with the consent of the State,replace or renew a Savings Cerilificate once it has expired or is voided by the Bank. IV. The State may at any time,after giving written notice to the Assignor,surrender the Savings Certificate to the Bank in exchange for money. V. Any penalty suffered by the State as a result of demanding payment from the Bank shall be unused against the Assignor. VI. The Assignor is not entitled to any earnings or interest on the cash proceeds after the State has surrendered the Savings Certificate. Such earnings and interest shell be retained by the State. VII. The Savings Certificate shall be held by the State during the term of this assignment. Vill. The Assignor hereby authorizes and directs the Bank to pay the als—described Savings Certificate or any interest or earnings thereof as instructed by the State until such time m the Bank shall re—we the Release provided for below.The Bank shall not be liable to inquire whether there has been performance by the Assignor or notice has been given the Assignor or to see to the application of any monies paid on the instruction of the State,and in such manes the Bank may rely upon the Instruction of the State executed over the signature of the parson,or his designs,appearing under the Acceptance below without need to verify the authority of such person. Nothing herein shall prevent the State from designating a person authorized to as for it in another lawful manner. IX. It is agreed,as between the Bank and the Assignor,that in the event the bank closes or goes into re,sivenhip,any Federal Deposit Insurance Corporation,Federal Savings and Loan Insurance Corporation,or National Credit Union Administration Insurance proceeds paid on,to.or as a result of the Assignor deposits with mid Banks,shall first be applied to cover this assignment. X. Signed and dated at Washington,this day of Assignor'.ugnmr. Melling address BANK ACCEPTANCE X1. The Bank,as witnessed below by the signature of a duly authorized officer hereby recognize the above assignment of Savings Certificate No. in the amount of$ this day of Authorized sig-1w. Malting address Branch DEPARTMENT OF NATURAL RESOURCES ACCEPTANCE XII. The State of Washington.Department of Natural Resources,hereby accepts the foregoing assignment of Savings Certificate No. hell by in the amount of$ this day of Authorized ugn,lure X111. The above assignment of Savings Certificate No. drawn on in the amount of$ is hereby released.The authorized signature and mal,below,shall witness the termination of the State's interest in this assignment. Aulhorissd ogn.ture XIV. I, Assignor in the above agreement,recognize by my signature below the r.fees.of the assignment as carried out in Clause X above. Signed this day of Assynor's signature Red,mation Permit NoIt Sarnp.Gn.wna A.agnmeM tFerm bMsl RweW enl7 ' .. .. y. .. - .. ,t�.'� �Wit. �'� •7 y'„t � � z1�w i.:f Az'�j���' �. .,...: s .•3 �., K M-. -.� -6 ry '� � �.,� 4. M'^ - �1..�% Y`-C.t?.r. ii �a. ar�i•1 .t•i,...',tl_��i 1. nS,r 1Y -. ��.ice �nr7j�; � ♦ .!"k'rhbi�21}4 Ls�!•s•.'�q=;•..:''..�i,'s%s'"tl�,'�tKArS!+v, sgr. x,rza�x.a,�� s�.�,. p�+�'''.ys}>��'77:t�lvt'�;!wsa:l�3s�,ihti::'�rw+StJ, L