MASON ENVIRONMENTAL PERMIT
May 04, 2011
M.J. SCOTT ENTERPRISES
PO BOX 1238
BELFAIR WA 98528
Parcel No.: 123213300020
Issued: 5/4/2011
Case No.: MEP2011-00015
Project Description:
MEP buffer enhancement submitted with new residence.
The following critical areas are present on this property:
Long-Term Commercial Forest FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
XX Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance
(Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with
any other federal, state, or local statutes, ordinances, or regulations applicable to this project.
This permit may be rescinded if the permitee fails to complete the project as proposed or fails
to comply with the standards of this ordinance.
�, 'S14 i
Authorized Local Government Official Date
r
Mason Environmental Permit
5/4/2011 Case No.: MEP2011-00015
Conditions:
1.) Approved per dimensions and setbacks on site plan submitted by The Wetland Corps
(March 2011). X
2.) Temporary erosion control measures must be implemented to prevent water quality
degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained
until upland vegetation has become established. X
3.) All construction and demolition debris must be removed from the site after project
completion. Proper disposal of construction debris must be on land in such a manner that
debris cannot enter or cause water quality degradation of State waters.
X
4.) The applicant acknowledges that the project will be completed as proposed, so that the
project will be consistent with all applicable standards of the Mason County Resource
Ordinance.
5.) As noted in the Habitat Management Plan prepared by The Wetland Corps (Mar. 2011)..
To address the impact of vegetation clearing, the placement of the new residence and
septic system, and new plantings in the wetland buffer:
A)The buffer restoration area should be planted with native plant species to occupy a total
enhancement area of 45 feet wide and 40 feet deep (1,800 sq. ft.) in the wetland buffer.
B) Plantings in accordance with the plant list stated in the restoration plan:
1) Trees and shrubs planted 5 feet on center planted in associated clusters in buffer
enhancement area; 18 trees and 54 shrubs are to be planted.
2) Each tree planted in the wetland area shall be flagged to aid in monitoring the
restoration effort.
C) Site preparation by non-native berry and roots removal and recontouring that is done in
dry weather; and silt fencing or straw/jute matting erosion control installed following site
preparation and prior to replanting.
D) Equipment checked for leaks and careful control and storage of fuels, lubricants, and
other substances.
5/4/2011 Page 2 of 2 MEP2011-00015
MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use:
❑ CONDITIONAL USE($1520) MEP
HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Resource Ordinance(Chapter 17.01 MCC)
ENVIRONMENTAL PERMIT APPLICATION
The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is
under the authority of Chapters 36.32,36.70A,39.34,58.17,76.09,84.33,84.34 and 90.58 RCW.
PLEASE PRINT
1.PROPERTY O . R
Name: M C..0-# (' >
L. r 1 S�-
Mailing Address: �Q x I 's 8 f ^ �
Work Phone: 3' _ S�C'I� Email Address:
Home/Cell Phone: , ' J Fax#:
If an agent is acting for the property owner during the permitprocess,complete#2.
2.AUTHORIZED AGENT
Name:
Mailing Address: Q x JZSLI
Work Phone: 1b O - 40 a o -O 's Email Address:
Home/Cell Phone: 7� G r Fax#
3.PROJECT SITE 1t+
Site Address: L-I l '/ N r—
Parcel#: Legal Description:
ia�al -� o� � g f7d's SW
Directions to Site:
Attach a site plan showing the following. Lot Dimensions,Flood nes,Existing Structu Fences,
Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed
Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram.
4. State which section requires permit:
❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090
❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100
❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102
❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Fish&Wildlife Habitat Conservation Areas,Chapter
❑ In-Holding Lands,Chapter 17.01.062 17.01.110
M Wetlands,Chapter 17.01.070
5. Identify current use of the property with existing improvements:
� 7
-ev-L oza.K '-, ", �' J ,
6. Identify and describe the proposed project,including the type of materials to be used,construction methods,
principle dimensions,and other pertinent information(attach additional sheets,if needed):
7. Describe why the action requiring this permit cannot be avoided.
��]` l t
ic�U4 r h 1 ��CG �
, trA Ct wick l5 nc �.CC')6r'1 i'C CA i .`�� \
8. Will there be an alteration of a wetland add/or wetland vegetation area(circle one)? Yes, No
9. Identify any surface water on or adjacent to property (circle one):
Saltwater Lake ' Stream ) Pond ? Wetland Drainage Ditch
10. Identify existing septic/sewer connection(circle one): If septic is located on project site,include records.
Connected to Septic Connected to Community Septic
11. Identify existing water sup ircle one): Public Water Supply Well
I I.-Type of Job(circle one):
New ) Add Alteration Repair) Demolition Other:
C-X �'N� 1, 1�11 4 ',A/
Print Name Signatu ' Date
,
" " This site map was created by TWC by
Viola Creek coordinating measurements and information
Type F Stream from several sources, including the Mason
�l�>'ne Np Stream _
100' buffer+ 15' / 1 buffer+ 15' County Assessor Aerial Photo 200S and
building 7 setba / 1 buil ing Setback GoogleEarth aerial images and measurements.
1 All locations are approximate.
Wetland B 1
Category I Wetlan 1 _ —
200' buffer+ 15' _ _►- ' ' .1 0 200'
building setbac
uffer
Type F Stream
150' buffer+ 1�' nhan ement Zone �
(18 0)sq. ft.)
building setbackrdposed Drainfield
(300 sq ft)
PropoA SFR(30' t 50')
Wetland A A ` 71
Category I Wetland
i 250' buffer+ 15'
building setback
i
Wetland C
Category I Wetland East McKnight'
200' buffer+ 15' Road /
building setback N
i ui� r� 1
Yistin* aragQ
FIGURE 2. SITE MAP
Project Name: Parcel 123213300020 WBMP
Location: Belfair,WA
^�-� E IY L 1 Syr Project: TWC11-W25
1 r-�^T -L_- i N D CORPS Client: M.J. Scott Enterprises
H
Date: 3/11
THE WETLAND CORPS
Wetland Delineation • Habitat Management Plans • Riparian Restoration • Mitigation • Biological Evaluation
PARCEL 123213300020 WETLAND BUFFER MITIGATION PLAN
410 NE McKnight Road
Belfair,Washington
PAJ (232-1( � --> CIO 7-0
Mason County
Prepared for:
M.J. Scott Enterprises
c/o Judy Scott
Prepared by:
Lee Boad and Heather Lane
March, 2011
_ THE WETLAND CORPS
Wetland Delineation • Habitat Management Plans • Riparian Restoration • Mitigation • Biological Evaluation
PARCEL 123213300020 WETLAND BUFFER MITIGATION PLAN
TABLE OF CONTENTS
PROJECTDESCRIPTION........................................................................................I
PROPERTYDESCRIPTION.....................................................................................I
APPLICABLESETBACKS.......................................................................................2
ANALYSISOF EFFECTS..........................................................................................2
MITIGATION MEASURES ......................................................................................4
MONITORING............................................................................................................7
SUMMARY..................................................................................................................8
REFERENCES.............................................................................................................9
Figures
Figure 1. Site Vicinity Map
Figure 2. Site Map
Figure 3. National Wetland Inventory Map
Figure 4. Mason County Soil Survey Map
Figure 5. DNR Water Resource Map
THE WETLAND CORPS '
Wetland Delineation • Habitat Management Plans • Riparian Restoration • Mitigation • Biological Evaluation
March, 2011 Project#TWCI I W25
Page 1 of 8
PARCEL 12321-33-00020 WETLAND BUFFER MITIGATION PLAN
410 NE McKnight Road
Belfair,Washington
PROJECT DESCRIPTION
The details of a Wetland Buffer Mitigation Plan for the above referenced property (Parcel
Number 12321-33-00020) are discussed in full in this report. The site is found in the SE '/4
of Section 21, Township 23 North, Range 01 West WM (Figure 1. Vicinity Map).
The purpose of this Wetland Buffer Mitigation Plan (WBMP) is to address potential impacts
resulting from the proposed installation of a replacement septic system and construction of a
replacement Single Family Residence (SFR) to be located within the buffer of a Category I
Wetland. The wetland meets criteria for a Category I Wetland with high habitat function,
and therefore requires a buffer of 250 feet with an additional 15-foot building setback in
Mason County. The wetland is identified in the wetland report titled, "McKnight Farm
Wetland Delineation Report".
The intent of this proposal is to re-establish the 2-bedroom home site on the property while
preserving both natural and agricultural features of the land. The proposed building
footprint location is mostly within the footprint of a recently demolished 3 bedroom house,
slightly rotated to increase distance from the wetland. The proposed septic system will be
limited to a 300 square foot area and not encroach any nearer to the wetland than the house.
The SFR will be located approximately 110 feet from the wetland at the nearest point, while
the septic will also be located 110 feet from the wetland at the nearest point. The proposed
SFR will occupy an area of approximately 1,500 square feet within the wetland buffer, and
the proposed septic will occupy an area of approximately 300 square feet within the wetland
buffer.
The objectives of this WBMP are as follows:
■ To evaluate the potential adverse effects to critical area functions as well as fish and
wildlife habitat resulting from the re-establishment of the SFR and septic within the
wetland buffer.
■ To identify possible mitigation measures that could be implemented to offset the
adverse effects resulting from the re-establishment of the SFR and septic within the
wetland buffer.
PO Box 2854, Belfair, WA 98528 cell:360-620-0618, Office: 370-372-2421 e-mail: wetlandcorps@hotmail.com
Parcel 123213300020 Wetland Buffer Mitigation Plan
TWC No.l 1 W25
March,2011
Page No.2
PROPERTY DESCRIPTION
The property is accessed from NE McKnight Road off of Belfair Valley Road. The eastern
portion of the property has been logged within the last 10-years, while the western portion
contains mature forested components with interspersed pastureland. The ownership includes a
series of farm buildings as well as an existing SFR. The adjacent property to the west
contains a diverse forested wetland complex with an open water component in the central and
southeastern portion of the ownership. The property slopes up to the east, with flat buildable
portions along the western side.
! r
TV
is
tr
Project Area
t
R1,
IJ
WAI
N
Photo 1. Subject Property
Two fishbearing streams drain southerly into the wetland, entering from the northwest and
southwest sides.
PO Box 2854, Belfair, WA 98528 cell:360-620-0618, Office: 370-372-2421 e-mail: wetlandcorps@hotmail.com
Parcel 123213300020 Wetland Buffer Mitigation Plan
TWC No.l 1 W25
March,2011
Page No.3
The property is surrounded primarily by residential parcels and large undeveloped parcels of
varying size and shape.
APPLICABLE SETBACKS
The project site is within the jurisdiction of Mason County. Ordinance 17.01.070 identifies
Wetland Areas adopted by Mason County.
The applicable setback for this project is as follows:
Habitat Type Buffer Building Setback from Buffer
Category I Wetland 250' 15'
ANALYSIS OF EFFECTS
The project lies within the regulated buffer of a Category I Wetland. Project scale in the
protected area is as follows:
Development Type Habitat Type Project scale
Septic Drain field Category I Wetland buffer 300 sq. ft.
SFR Category I Wetland buffer 1500 sq. ft.
Vegetation Disturbance
The proposed septic will be located in a portion of the ownership that has been maintained as
lawn area. The proposed SFR will be situated mostly over an area occupied by a remnant
building pad that historically contained a residence (see photos below). Therefore, no native
vegetation removal is necessary for proposed septic. With recommended planting of native
vegetation described below, the project will result in an overall net benefit of native
vegetation abundance and diversity within the parcel.
PO Box 2854, Belfair, WA 98528 cell:360-620-0618, Office: 370-372-2421 e-mail: wetlandcorps@hotmail.com
Parcel 123213300020 Wetland Buffer Mitigation Plan
TWC No.11 W25
March,2011
Page No.4
{ r �
,�#•'6�,j.�.�,",`�.a�'�."�+,! '� r..a�°pa :.r f ''f.'' .c�°`.� , '�da.+, r'�.a'S,J -r
Photo 2 Project Area
Designated Critical Habitat for Salmonids
Designated Critical Habitat for Salmonids is not within the vicinity of the project area.
Therefore, none of the proposed actions are likely to destroy or adversely modify designated
critical habitat. Actions described in this plan are not expected to jeopardize the continued
existence of any listed species.
Noise Pollution
A slight increase in noise from construction activities is likely to occur during daylight
construction hours. No nesting sites are located within the radii of concern that would be
impacted by noise associated with the establishment of the SFR or septic.
Temporary Increase in Sediment and Turbidity During Construction
The proposed work has the potential to temporarily increase turbidity and suspended
sediment within the project area. Best Management Practices have been recommended to
minimize the adverse effects to sediment supply and turbidity during project
implementation.
Light and Glare
The proposed project may result in an increase in light and glare commonly associated with
residential construction and land use. The vegetative buffer to be enhanced between the
proposed project area and the wetland is expected to shield the majority of the wetland and
buffer from increased light and glare. No impacts to the use of the site by wildlife species
are likely to result from light and glare associated with this project.
PO Box 2854, Belfair, WA 98528 cell:360-620-0618, Office: 370-372-2421 e-mail: wetlandcorps@hotmail.com
Parcel 123213300020 Wetland Buffer Mitigation Plan
TWC No.l 1 W25
March,2011
Page No.5
MITIGATION MEASURES
Avoidance
The proposed building site has been located to avoid the need for native vegetation removal
and significant earthmoving. Due to the natural topography of the site, positioning the
building further from the wetland would require a substantial amount of hillside excavation
and removal of native vegetation from within the 250-foot buffer. The project, as proposed,
requires no native vegetation removal and minimal earthmoving.
Minimization Mitigation
The proposed project minimizes impacts to the wetland buffer by limiting the building
footprint of the SFR to 1500 square feet. In addition, the project entails utilizing the area
already impacted by a previous building, displacing minimal native vegetation. The septic is
located 110 feet from the wetland at the nearest point, and the proposed SFR will be located
90 feet from the wetland at the nearest point.
Enhancement Recommendations
To compensate for the proposed project being located within the wetland buffer, mitigation is
proposed in the form of invasive species removal and native vegetation restoration within the
wetland buffer. Chapter 17.01.070, Section (F) of the Mason County Resource Ordinance
requires that mitigation for buffer impacts be on a minimum 1:1 ratio. Therefore a total
buffer enhancement area of 1,800 square feet will be removed of invasive species and
planted with native trees and shrubs. The area is located between the proposed project site
and the wetland boundary. The portion of the property chosen for planting is currently
dominated by a dense thicket of Himalayan blackberry and lawn grass.
Prior to installation of native plants, the Himalayan blackberry will be uprooted and disposed
of off site. This can be done either by hand or using a rubber tracked excavator. Best
Management Practices are outlined below to be followed during this work.
The following plant species are recommended for installation within the buffer enhancement
area. The species have been chosen based on their versatility, tolerance to on-site conditions,
and tolerance to shady conditions. Other native plants may be used upon review by either
county staff or a qualified wetland specialist. The use of potted plants as opposed to bare
root seedlings is preferable due to the increased survival rate.
Trees
Western red cedar(Thuja plicata)- 2 gallon
Western hemlock(Pseudotsuga heterophylla)
Shrubs
Oregon grape (Mahonia nervosa)- 1 gallon
Salal (Gaultheria shallon)— 1 gallon
Evergreen huckleberry (Vaccinium ovatum)—gallon
Sword fern(Polystichum munitum)
Salmonberry(Rubus discolor)
PO Box 2854, Belfair, WA 98528 cell:360-620-0618, Office: 370-372-2421 e-mail: wetiandcorps@hotmail.com
Mitigation Plan
Parcel 123213300020 Wetland Buffer Miti g
TWC No.l 1 W25
March,2011
Page No.6
It is recommended that plantings be installed within the identified zone to achieve a density
of five feet on center. A minimum of two tree and four shrub species from the above list are
recommended. This density will provide a moderately dense, structurally diverse plant
community within the Enhancement Zone. To fulfill the above mentioned planting density
recommendation, the Enhancement Zone will be planted with a total of 18 trees and 54
shrubs. Any volunteer vegetative species may be counted toward target densities.
Typically, planting should occur during winter dormancy. The optimum time for planting is
during February and March, however, the need to complete the project in a timely manner
may call for planting to occur outside optimum time periods. All installed vegetation shall be
marked with colored flagging to facilitate monitoring inspections. The monitoring program
is outlined to insure project effectiveness.
I it1 �
A1A1A1AA ,� r
�•,
Photo 3. Buffer Enhancement Zone. Himalayan blackberry removal in progress.
Best Management Practices
Recommended Best Management Practices for this project are as follows:
• Perform excavation and site preparation work during dry weather.
• Install silt fencing between the work area and the wetland to prevent erosion and
siltation of waters (See diagram below).
• Minimize amount of erodible soils at any given time to the maximum extent feasible.
• Check all equipment daily for leaks. Refueling and lubrication of equipment should
occur off site. Do not store any fuel, lubricants, chemicals, or hazardous substances
outside overnight within the project area.
PO Box 2854, Belfair, WA 98528 cell:360-620-0618, Office: 370-372-2421 e-mail: wetlandcorps@hotmail.com
Parcel 123213300020 Wetland Buffer Mitigation Plan
TWC No.I 1 W25
March,2011
Page No.7
• Do not apply any chemicals when there is a possibility of rain.
• Comply with all permits and requirements of governing authority.
HIGH
CONSTRUCTION
STEEL POST FENCE
row
R r-
10 FT w,x SPACM WITH
WWE SUPPORT FF
s FT N spy wmaur
,»WE SUPPORT FENOE
FILTER FABRIC
PONDING HT.
FILTER Fpg{�C
ATTACpH�SpE�CgU�RELY
Mn
POST /TO
Tow.
-RUNOFF
T
12'WN.
4-a6 CONPMPAr
M.fED MC
BAKFlIl
Silt Fence Diagram
Silt fence Installation
The presence of exposed soil associated with site preparation work poses a risk of erosion and
siltation to the wetland during storm events. It is recommended that silt fencing be installed
between the work areas and the wetland to avoid siltation. The silt fence should be inspected
and repaired if necessary after each storm event. Sediment should be removed from the fence
and deposited to an area that will not contribute to regulated waters. The fence can be
removed once the project is complete and soil has stabilized.
MONITORING
Monitoring of the site will begin the first fall following native species plantings and
maintained on a seasonal basis. The information gathered will provide the following: 1)
condition of reintroduced plant species; 2) the use of the site by wildlife species; 3) any
disturbance caused by the development and its effect on the protected zone and associated
aquatic habitat; 4) any occurrence of exotic species within the Enhancement Zone; 5) any
corrective measures that may be deemed necessary to provide desired conditions. This
monitoring will be in effect for the duration of five years. The information gathered will be
provided in an annual report and submitted to the Director of Mason County Department of
Community Development.
PO Box 2854. Belfair, WA 98528 cell:360-620-0618. Office: 370-372-2421 e-mail: wetlandcorps@hotmail.com
Parcel 123213300020 Wetland Buffer Mitigation Plan
TWC No.l 1 W25
March,2011
Page No.8
SUMMARY
This report addresses the re-establishment of a single family residence and on-site septic
system to collectively occupy an area of 1,800 square feet within the regulated buffer of a
Category I Wetland. The intent of this proposal is to protect both the natural and
agricultural features of the property by condensing the project site to the area previously
utilized for residential use. The SFR is proposed 90 feet from the wetland within an area
occupied by a building pad of a previous house. The septic is proposed 110 feet from the
wetland, and is proposed in a portion of the ownership maintained as lawn. Best
Management Practices are recommended to insure no negative impacts to the wetland.
Mitigation recommendations include native vegetation enhancement of 1,800 square feet of
the wetland buffer that is currently dominated by invasive plant species (see Figure 2. Site
Map). No impacts to water quality or aquatic habitat are predicted.
Mitigation Measures, and Best Management Practices, have been identified to avoid,
minimize, and mitigate for impacts associated with the proposed project.
We trust this information is sufficient for your needs at this time. Thank you for choosing
The Wetland Corps as your wetland consultant. If you have any questions feel free to call.
Respectfully submitted,
Lee Boad
Senior Ecologist
MeLane14�
Staff Wetland&Natural Resource Specialist
PO Box 2854, Belfair, WA 98528 cell:360-620-0618. Office: 370-372-2421 e-mail: wetlandcorps@hotmail.com
REFERENCES
Cowardin, L.M., V. Carter, F.C. Golet and E.T. LaRoe, 1979. Classification of
Wetlands and Deepwater Habitats of the United States. U.S. Fish and
Wildlife Service document FWS/OBS-79/31. 84 pp. Washington, D.C.
Hitchcock, L.C. and A. Cronquist, 1973. Flora of the Pacific Northwest.
University of Washington Press.. 730 pp.
Hruby, T., 2004. Washington State Wetland Rating System for Western Washington—Revised.
Washington State Department of Ecology Publication#04-06-025.
Munsell Soil Color Charts, 1998. GretagMacbeth. New Windsor,New York.
Pojar, J. and A. MacKinnon, 1994. Plants of the Pacific Northwest Coast. Lone
PinePublishing. 528 pp. Vancouver, British Columbia.
Speare-Cooke, S., 1997. A Field Guide to the Common Wetland Plants of
Western Washington and Northwestern Oregon. Seattle Audubon Society.
417 pp.
US Department of Agriculture, Soil Conservation Service. Soil Survey of Mason
County Area, Washington. September, 1951.
US Fish and Wildlife Service. National Wetlands Inventory. 1978.
Washington State Department of Ecology, 1997. Washington State Wetland
Identification and Delineation Manual. Ecology Publication#96-94,
various pagination. Olympia, Washington.
Washington State Department of Ecology, 1993. Washington State Wetlands
Rating System, Western Washington Second Edition. 61 pp.Ecology
Publication#93-74. Olympia, Washington.
Washington State Department of Ecology, 1999. Methods for Assessing
Wetland Functions for Reverine and Depressional Wetlands in the
Lowlands of Western Washington. Ecology Publication#99-115. Olympia,
Washington.
United States Fish and Wildlife Service, 1993.National List of Plant Species that
Occur in Wetlands Region 9—Northwest. Resource Management Group
PO Box 2854, Belfair, WA 98528 cell:360-620-0618, Office: 370-372-2421 e-mail: wetlandcorps@hotmail.com
a AM
CU Q.
m
i
i
Site Location
40'6' - Belfa r
r-
-
1 mi
1 km +��� @2009 Google-Map data 02009—ale Atlas-s erms of U�_
FIGURE 1 VICINITY MAP
Project Name: Parcel 123213300020 WBMP
Location: Belfair,WA
Project: TWC11-W25
Client: M.J. Scott Enterprises
THE WETLAND CORPS Date: 3111
"Viola Creek" This site map was created by TWC by
Tyne Nn Stream Tyne F Stream coordinating measurements and information
from several sources, including the Mason
100" buffer+ 15' / I " buffer+ 15" County Assessor Aerial Photo 2005 and
building setba- / 1 buil ling setback GoogleEarth aerial images and measurements.
1 All locations are approximate
1
Wetland B t 1 1
Category I Wetlan
200' buffer+ 15' L .I 0 200'
building setbac
t
,
Tyne IFStream 0 A el-i utter
�
nhan ement Zone t
150' buffer+ 15" 18 0)sq. ft.) t
building setback Prdposed Drainfield
04—�t (300 sa ft)
t
1':ur�l 1 I.,nni�uii Proposeb SFR(30' x 50')
Wetland A t
Category I Wetland t
t
250' buffer+ 15' t
building setback t
t
Wetland C.
Category I Wetland East McKnight]
200' buffer+ 15' Road /
building setback N
zistinI-I uarauQ
FIGURE 2. SITE MAP
Project Name: Parcel 123213300020 WBMP
Location: Belfair,WA
-�-�7 Project: TWC11-W25
1 E ��r ETL-'4.N D CORPS Client: M.J. Scott Enterprises
M
Date: 3/11
"Viola Creek" r This site map was created by TWC by
T ' e Stream T Type F Stream 4w coordinating measurements and information
_ _ from several sources, including the Mason
$, tier+ 1 , , , I buffer+ 15' i. , CountyAssessor Aerial Photo 2005 and
gip, y s.;
1 n ' Rtback Goo eEarth aerial images and measurements.
Id g setba J t I g g
# 1 I e All locations are approximate.
� � — —� ti t 01 m 200
IR
Jr
s ai SOL
t r
�++ Buffer Enhancement_ + +�
ype F Stream �. Zone(1.800 sq ft) t
yt 150" buffer+ 1
building setback , ; , �" S-A- •- 4
-
ft
or
•R311 �• R
Jj
s Wetland �.
i
. ding, setbiwic tor
Wetland C ` ' ► ,�. ,� ,
Category I Wetland Fast -igtii�' :� - � -,J
'700' buffer+ 15' r a r
Te
NIE-M
C K-W
FIGURE 2. SITE MAP
Project Name: Parcel 123213300020 WBMP
Location: Belfair,WA
Project: TWC11-W25
THE W ETL_'IL N D CORPS Client: M.J. Scott Enterprises
Date: 3111
PSSC .,
PER�IG
Map Legend N
CONLIS eider.
CONLIS states soon Approximate
Lower 48 wetland Polygons P L?4-T Site location
t•.lumme and Marine Oeepwater -
kaluanne and Marine Welland
Freshwater Emergent Welland
Freshwater Forest*WShruu Wetland ..i
Freshwater Pond �2>} 1
Lake
Other
Rlverine
BetFjir
WON
It f•° r' a
PUBP
algJtsl assc`
hetFlir
P�sF' pUBF?x.
103
I,PF}OL
Figure adapted from NWI Figure 3 National Wetland Inventory Map
Mapper website Section 21 Township 23 North Range 1 West
FIGURE 3. NWI MAP
Project Name: Parcel 123213300020 WBMP
Location: Belfair,WA
Project: TWC11-W25
Client: M.J. Scott Enterprises
Date: 3111
THE WETLAND CORPS Note: Three wetlands mapped in project vicinity.
t � i
N '`,, - Approximate
1 «�'
Site Location
�y s
a11►�� s •„ � i � Yr
f
f
i
Onsite Soil Conditions based on Mason County Soil Survey
Subject Site Soils:
Indianola loamy sand,5 to 15 percent slopes(lb): In the Indianola series are excessively drained, droughty. brown soils of
the uplands. They have developed on hummocky and rolling ridges from glacial drift that consisted of loose,porous sand. The
sand came mainly from acid igneous rocks.The annual rainfall ranges from 50 to 70 inches,and the native vegetation is mainly
Douglas-fir. Indianola loamy sand,5 to 15 percent slopes(lb).-This is the dominant soil of the Indianola series.
Everett gravelly sandy loam,5 to 15 percent slopes(Eh)The Everett series consists of somewhat excessively drained,pale-
brown gravelly soils. They occur as inextensive gravel ridges on the glacial moraines or,more commonly,as fairly continuous
outwash channels between ridges of Alderwood soils. They have developed upon assorted glacial till and outwash material.
The rainfall is 45 to 60 inches a year.The vegetation is mainly drought-resistant madrone,manzanita,and kinnikinnick.Everett
soils are droughty because the loose gravel and sandy subsoil and substratum offer little resistance to downward movement of
water. Saxon silt loam, 5 to 15 percent slopes(Sa).-The Saxon series consists of friable, well-drained, brown, silty soils on
the uplands. They have developed from Vashon glacial lake sediment similar to that of the Kitsap soils. Surface drainage is
well developed, internal drainage is medium, and the moisture-holding capacity is good.The rainfall is 45 to 60 inches a year.
The vegetation is a dense forest of fir, cedar, and alder, with a dense undercover of salal, vine maple,bracken fern, and sword
fern. Saxon soils differ from the Kitsap soils in having browner surface soil and less dense subsoil,and in containing shot.
This soil occurs on rolling or gently rolling benches near Belfair.
Mukilteo peat, 0 to 2 percent slopes (Mg).-The Mukilteo series consists of peat that is mainly partly decomposed sedges,
spirea, twigs, and roots. Peat bogs usually are densely covered by spirea and are generally free of trees and other shrubs.
Intermixed with the spirea are various sedges that form a good part, of the peat material. Occasionally, Mukilteo peat has a
cover of deciduous trees, brush, and shrubs in place of the spirea. Mukilteo peat is widespread throughout the county, and it
comprises the largest part of the upland bogs. This peat is very poorly drained and often ponded many months of the year.
Artificial drainage can be used to remove excess moisture. Mukilteo peat is more acid and less fertile than McMurray peat.
The surface layer consists of leaves,twigs,and small roots 1 to 2 inches thick.
FIGURE 4 SOIL SURVEY
Project Name: Parcel 123213300020
WBMP
Location: Belfair,WA
Project: TWC11-W25
THE W ETL___*tL N D CORPS Client: M.J. Scott Enterprises
Date: 3111
Note: Hydric soils present in project
vicinity.
S vwk
4SX. N N
I � U
LI
F— '
1
Approximate 170 646 1 8648 yF $74'
41�- Site location + +
SOILS
Hydric Soils
SIRE WS Hig bil-Unstable TRANSPORTA.-HON
Stream Water Type 1-5(Ea:,side; 3iHigh Un:ctb:e S y Erodible ,O 9 Paved Road
ghh
Stream Type Urkuonm(Bast:ide,, Erodible Unpaved Road
� � No Data or Gravel Pirs �Road(Suiface UnLionu)
Stream Water Type :-5(Wes:side;
Abandoned RoadStream Tyre Unknoum(West side)
�•�
Otpliati<ecl Road
.' Trail
FIGURE 5 DNR STREAM MAP
Project Name: Parcel 123213300020 WBMP
Location: Belfair,WA
Project: TWC11-W25
—Irinr` Client: M.J. Scott Enterprises
THE Vti'ETL-'-N D CORPS Date: 3/11
Note: