Loading...
HomeMy WebLinkAboutBLD7878 Mobile Home - BLD Permit / Conditions - 11/21/1977 Newkirk, M. W. #7878 11-21-77 N 1/2 W 1/2 W 1/2 NW 1/4 Sw 1/4 21-23-1 1/4 mile east on Newkirk road, south to creek Mobile Home 321 --�Z C�UZD BUILDING PERMIT APPLICATION MASON COUNTY IZZzY P.O. Box 186 Shelton, Washington g884 � �v v DATE ISSUED I%a// 77 PERMIT NO. OWNER NAME r IL ADD SS C &ST E p ZIP PHONE M'W �Ne 12�r� • doX �S �e.� e,�T (�as1h - 5. ' a7S��a�l DIRECTIONS O JOB S T E QY1e- Lk , te'V n,,I2 �'A�-f 6�r. f`IeilJ���r _ C1 LEGAL w� p p n n (❑ SEE ATTACHED SHEET) DESCR. ti � a W �2- 0 � W 1/',- � N W �� O 1— S W' �� O 4' �ec- -)- T-WN 1-3 N RT W CONTRACTOR NAME MAIL ADDRESS CITY&STATE crp 3 3 1 LICENSE NO. PHONE f3 V te�.J o b, e 0130,E a 3 ' 0077 USE OF t0"� BUILDING Class of work: NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: &4 w a d t• �t t oh. 6,d' x a4' YKa bt le �C'Lj e c Valuation of work: $ q p � PLAN CHECK FEE PERMIT FEE o !� SPECIAL CONDITIONS: APPLICATION ACCEPTED BY, PLANS CHECK BY APP ED FOR IS A CE Type of (� 7 Occupancy Division B Const. Group Size of Bldg. No. of Max. (Total) Sq. Ft. Stories Occ. Load CONTRACTOR AFFIDAVIT PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered contractor in RESIDENCE the State of Washington and I am aware of the MOBILE HOME ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. // Firm PUBLIC WORKS By ROAD DEPT. Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. which this permit is issued and that all work done will be injdnformance th reWlth. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER Owner ate �� n WORK IS COMMENCED. PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION K. M.O. CASH