Loading...
HomeMy WebLinkAboutRLC94-1295 - RLC Inspections - 7/1/1994 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE LANDS q4 '0 ANDS AND CRITICAL AREAS CHECKLIST Permit Number 1 O1, RLC# /01WAI 4L Owner Parcel Number— ( L ❑ 1 . Saltwater shoreline or lake 20 acres or larger? Name of Water Body (/lfJ El2. Rivers, streams. or creeks with year round flow? Type of Other Water 3. Rivers, steams or creek with intermittent flow but are withirl a clearly defined channel? ❑ 4. Lakes or ponds less than 20 acres in size? 5. Wetlands: Areas that are inundated or saturated by surface water that under normal circumstances support vegetaluon adapted for life in such conditions; such as marshes, bogs, and swamps. 1 6. Slopes greater than 15% (8.5 degrees)? gn Landslide Hazard Map? &0 "1�0� "kt 6/19tZ % of Slopes ❑ 7. Floodplains? " (� ❑ 8. Seismic Hazard Areas? ❑ 9. Agricultural Open Space Taxation Program? ❑ 10. Open Space Timber Taxation Program, or Designated r st or Classified Forest? ❑ 11 . Site has no Resource Lands or Critic/al Areas. Comments: (�-e 5f `al'` &A,- //-Z� Authorized Signature Date MASON COUNTY DEPARTMENT of GENERAL SERVICES Courthouse Annex I N. Fourth & W. Cedar P.O. Box 186 Shelton, Washington 98584 (206) 427-9670 building environmental health maintenance landfill parks&recreation fair/convention center planning sewer&water CHECKLIST FOR PROPOSED CONSTRUCTION No Yes CC ] Within 200 feet of designated shoreline or wetland [ ] [ ] Proposed construction on/over/in wetland [ ] Proposed construction within floodplain Commercial Development ( Parking Standards , Sign Ordinance , Public Works Review, other applicable agencies ) [ ] Mobile Home and/or R . V . Park f What Type Of Construction Is Being Proposed? [--J C ] Exempt from building permit application C ] C ] Exempt from S.E .P.A. process (WAC 197-11-305, WAC 197-11-800 ) C ] C ] Meet all requirements ( Which section ( s ) of S .M.P. does proposed construction pertain to; C ] C ] Variance or Conditional Use Permit required C ] C ] Exempt from Shoreline Substantial Developmentr (4 Permit process (WAC 173-14-040 ) 1 C 7 [ ] Exempt from Substantial Development but within ^n (A- PrintedArmy Corp. jurisdiction (WAC 173-14-115 r `3/89 DatL6 ni Uals