Loading...
HomeMy WebLinkAboutGeological Assessment for FPA2017-00006 - FPA Reports - 9/20/2017 (6%12/2008) Michael MacSems -Geological Assessment Review Checklist 6-08.doc Page 1 Mason County Review Checklist For a Geological Assessment Instructions: This checklist is intended to assist Staff in the review of a Geological Assessment. The Assessment is reviewed for completeness with respect to the Resource Ordinance. If an item is found to be not applicable,the report should explain the basis for the conclusion.The Assessment is also reviewed for clarity and consistency. If the drawings,discussion,or recommendations are not understandable,they should be clarified. If they do not appear internally consistent or consistent with the application or observations on site,this needs to be corrected or explained. If resolution is not achieved with the author,staff should refer the case to the Planning Manager or Director. Applicant's Name: !; Permit# I`J* 2c,I — UC Parcel# ) Z?� Z cl — Y T UUC"'v Date(s)of the Document(s)reviewed: (1) A discussion of geologic conditions in the general vicinity of the proposed development,with geologic unit designation based on referenced maps. OK?_--/- Comment: 3- Z (2) (a)A discussion of the ground water conditions at the site, OK? ! Comment: �. 3 . i (b) A discussion of the estimated depth to water OK? "' Comment: Z, 'a. j (c) A discussion of the quantity of surf seepage A OK?_ L_Comment: _a 13 . 1 (d) A discussion of the upslope geomorphology OK?�L Comment: 7 _ Z. 1 (e) A discussion of location of upland waterbodies and wetlands. OK? ✓ Comment: Z_ 3 1 (3) The approximate depth to hard or dense competent soil,e.g.glacial till or outwash sand. OK? y Comment: 3, 3 (4) A discussion of any geomorphic expression of past slope instability(presence of hummocky ground or ground cracks,terraced topography indicative of landslide block movement,bowed or arched trees indjcating downslope movement,etc.). OK? / Comment: s 0 (5) A discussion of the history of landslide activity in the vicinity,as available in the referenced maps and records. OK? V Comment: . (6) An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development. OK? I/ Comment: (7) A recommendation by the preparer whether a Geotechnical Report should be required to further ev luate site conditions and the proposed development of the subject property. OK? Comment: 5_ 0 (8) If the presence of a hazard is determined within 300 feet of the proposed development, then the following are delineated on a geologic map/site map: (a) the area of the proposed development, OK? ✓ Comment: 4, i, 1 (b) the boundaries of the landslide hazard area (top, both sides, and toe), Page 1 of 2 Form Effective June 2008 (6/12/2008) Michael MacSems-Geological Assessment Review Checklist 6-08.doc Page 2 OK? Comment: i / (c) the associated buffers(top, both side ,and toe) OK? ✓ Comment: N / (d) building or other setbacks(top, both sides,and toe). OK. 7 Comment: Al 2�. (9) A site map drawn to scale showing property boundaries, scale, north arrow, and the location aid nature of existing aAd proposed development on the site. OK? f Comment: tp/)c--.od1i x Are the Document(s)signed and stamped? \/ . Type and#of License:_i� y-0V t\A ��o. tF 30 S If not approved,what is the next action/recommendation for further action? Reviewed by V V`'VV S ,onGt� Time spent in review: SECOND REVIEW/UPDATE: Reviewed by on Time spent in second review: THIRD REVIEW/UPDATE: Reviewed by on Time spent in third review: Disclaimer: Mason County does not certify the quality of the work done in this Geological Assessment Page 2 of 2 Form Effective June 2008 r-- Geological Assessment (Revised) Tree Harvesting Cady Tree Farm, LLC XXX NE State Route 3 Parcel No's 12329-41-00180, 12329-44-00000 Mason County, Washington September 20, 2017 Project#1756 Prepared For: Alan Cady Cady Tree Farm, LLC CLYp PO BOX 2022 'ASy ST9T Belfair, Washington 98528 Prepared By: ' 9/1 17 Envirotech Engineering �o k`Q ST ti� �� PO Box 984 SlONAIJr Belfair, Washington 98528 Phone: 360-275-9374 Mason County Department of Community Development Submittal Checklist For a Geological Assessment Instructions: This checklist must be submitted with a Geological Assessment and completed, signed, and stamped by the licensed professional(s)who prepared the Geological Assessment for review by Mason County pursuant to the Mason County Resource Ordinance. If an item found to be not applicable, the report should explain the basis for the conclusion. Applicant/Owner Alan Cady Parcel# 12329-41-00180, 12329-41-00000 Site Address XXX NE State Route 3, Belfair (1) A discussion of geologic conditions in the general vicinity of the proposed development, with geologic unit designation based on referenced maps. Located on page(s) 5 (2) (a)A discussion of the ground water conditions at the site, Located on page(s) 7 (b) A discussion of the estimated depth to water Located on page(s) 7 (c) A discussion of the quantity of surface seepage Located on page(s) 7 (d) A discussion of the upslope geomorphology Located on page(s) 3 (e) A discussion of location of upland waterbodies and wetlands. Located on page(s) 3 (3) The approximate depth to hard or dense competent soil, e.g. glacial till or outwash sand. Located on page(s) 5 (4) A discussion of any geomorphic expression of past slope instability (presence of hummocky ground or ground cracks, terraced topography indicative of landslide block movement, bowed or arched trees indicating downslope movement, etc.). Located on page(s) 4 (5) A discussion of the history of landslide activity in the vicinity, as available in the referenced maps and records. Located on page(s) 8 (6) An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development. Located on page(s) 8 (7) A recommendation by the preparer whether a Geotechnical Report should be required to further evaluate site conditions and the proposed development of the subject property. Page 1 of 2 Form Effective June 2008 Located on page(s) 11 (8) If the presence of a hazard is determined within 300 feet of the proposed development, then the following are delineated on a geologic map/site map: (a) the area of the proposed development, Located on Map(s) N/A (b) the boundaries of the landslide hazard area (top, both sides, and toe), Located on Map(s) NIA (c) the associated buffers (top, both sides, and toe) Located on Map(S) N/A (d) building or other setbacks (top, both sides, and toe). Located on Map(s) N/A (9) A site map drawn to scale showing the property boundaries, scale, north arrow, and the location and nature of existing and proposed development on the site. Located on Map(s) Site Plan(app.A) 1, Michael C. Staten hereby certify under penalty of perjury that I am a civil engineer licensed in the State of Washington with specialized knowledge of geotechnical/geological engineering or a geologist or engineering geologist licensed in the State of Washington with special knowledge of the local conditions. I also certify that the Geological Assessment, dated Sep. 20, 2017 , and entitled Tree Harvesting Cady Tree Farm, LLC (Revised) meets all the requirements of the Mason County Resource Ordinance, Landslide Hazard Section, is complete and true, that the assessment demonstrates conclusively that the risks posed by the landslide hazard can be mitigated through the included geotechnical design recommendations, and that all hazards are mitigated in such a manner as to prevent harm to property and public health and safety. (Signature and Stamp) C L1!\ S_ ,{ 4304 s j 9/20/17 Disclaimer: Mason County does not certify the quality of the work done in this Geological Assessment. Page 2 of 2 Form Effective June 2008 Table of Contents 1.0 INTRODUCTION.................................................................................................................................I 1.1 PROJECT INFORMATION.....................................................................................................................1 1.2 PURPOSE OF INVESTIGATION AND SCOPE OF WORK.........................................................................1 2.0 SURFACE CONDITIONS....................................................................................................................3 2.1 GENERAL OBSERVATIONS..................................................................................................................3 2.2 TOPOGRAPHY......................................................................................................................................3 2.2.1 Upslope Geomorphology............................................................................................................3 2.3 SURFACE DRAINAGE...........................................................................................................................3 2.3.1 Upland Water Bodies..................................................................................................................3 2.4 SLOPE AND EROSION OBSERVATIONS................................................................................................4 3.0 SUBSURFACE INVESTIGATION.....................................................................................................5 3.1 FIELD METHODS,SAMPLING AND FIELD TESTING...........................................................................5 3.2 GEOLOGIC CONDITIONS.....................................................................................................................5 3.3 SPECIFIC SUBSURFACE CONDITIONS.................................................................................................7 3.3.1 Groundwater............................................................................................................................... 7 4.0 ENGINEERING CONCLUSIONS......................................................................................................8 4.1 LANDSLIDE HAZARDS.........................................................................................................................8 4.1.1 Landslides and Slope Stability Analysis.....................................................................................9 4.1.2 Surface and Subsurface Drainage.............................................................................................9 4.2 EROSION HAZARDS.............................................................................................................................9 4.3 SEISMIC HAZARDS............................................................................................................................ 10 4.4 TIMBER HARVESTING RECOMMENDATIONS...................................................................................10 5.0 CLOSURE............................................................................................................................................11 Appendix A-Site Plan Appendix B-Soil Information 1.0 INTRODUCTION Envirotech Engineering (Envirotech) has completed this geological assessment for a property located at XXX NE State Route 3, identified as parcel numbers 1232941-00180 & 12329-44- 00000 in Mason County, Washington (Project). As presented herein, this assessment includes information pertaining to the Project in this Introduction Section;observations of the property and surrounding terrain in the Surface Conditions Section; field methods and soils descriptions in the Subsurface Investigation Section; and, assessments for landslides, erosion, seismic hazards, and other considerations in the Conclusions Section. A geological assessment was prepared for this project in lieu of a geotechnical report. Per 17.01.100.E.2 of the Mason County Resource Ordinance (MCRO), the Director may waive the requirement for the Geotechnical Report if there is adequate geological information available on the area proposed for development to determine the impacts of the proposed development and appropriate mitigating measures. This assessment covers land modification, and not future development. During the evaluation and site visit by Envirotech, surface and subsurface conditions were assessed in order to determine if further geotechnical studies are required.After completion of the field work and applicable Project research,Envirotech prepared this geological assessment. 1.1 Project Information Information pertaining to the Project was provided by the property owner's representative, and observations from a field visit by Envirotech. The property is currently vacant with an un- improved access road. The proposed site alterations are expected to consist of tree harvesting, which has been conducted in the past on the property. Tree harvesting will be primarily confined to the south and southeast portions of the property. Significant land disturbing such as stump removal will be less than 1 acre, and significant earth movement (over 250 cy) is not expected. Approximate site features are illustrated in the Site Map in Appendix A. 1.2 Purpose of Investigation and Scope of Work The purpose of this geological assessment was to evaluate the Project in order to confirm that the proposed development is outside of any landslide hazard area and its associated buffers and setbacks as determined in the MCRO. The investigation included characterizing the general Project surface and subsurface conditions,and evaluating the suitability of the soils to support the planned site development. In order to fulfill the purpose of investigation, the geological/ geotechnical program completed for the proposed improvements of the Project include: • Review project information provided by the Project owner's representative; • Conduct a site visit to document the site conditions that may influence the land modification; • Define general subsurface conditions of the site by observing soils within test pit excavations, review well logs from existing wells near the Project, and evaluate geological maps depicting the site geology for the vicinity of the Project; • Perform soils testing,such as visual classifications,to determine selected index properties of the soils; • Complete an engineering assessment supported by planned site alterations and the surface Envirotech Engineering Geological Assessment Ph. 360-275-9374 page I Parcels 12329-41-00180, 1232944-00000 Mason County,Washington September 20,2017 and subsurface conditions that were identified by the field investigation, soil testing, and applicable Project research;and, • Establish engineering conclusions based on findings and anticipated Project. F i l d Project ge+Q i c 7 da � t p MAW XcyM1w�F 'c'!�ccw,cW Vicinity Map from Mason County Website Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 2 Parcels 12329-41-00180, 12329-44-00000 Mason County,Washington September 20,2017 2.0 SURFACE CONDITIONS Information pertaining to the existing surface conditions for the Project was gathered on April 17, 2017,and September 15, 2017 by Robert McNearny and Michael Staten with Envirotech.During the site visit, site features were documented that may influence site alterations or reveal potential geological hazards. This Surface Conditions Section provides information on general observations, vegetation, topography, drainage and slope/ erosion conditions for the Project and surrounding areas. 2.1 General Observations The Project is currently vacant land with few improvements as previously mentioned, and surrounded by mixed development. State route 3 extends to the west of the project.Vegetation on and near the property consists primarily of 2"d growth firs, alders, cedars, and other trees and shrubbery common to this area of the Pacific Northwest. An aerial photo of the Project and immediate vicinity is provided on the following page. 2.2 Topography The topographic information provided in this section was extrapolated from a public lidar source, and incorporated observations and field measurements. Where necessary, slope verification included measuring slope lengths and inclinations with a cloth tape and inclinometer. See the Site Map in Appendix A for an illustration of the general slope indicators with respect to the planned development. Average slope grades are approximately 26%with a total vertical relief spanning both parcels of approximately 260 feet. Although field measurements were less, public lidar indicates isolated areas of sloping grades of up to 50%with vertical reliefs of less than 40 feet. 2.2.1 Upslope Geomorphology The upland area of the property is situated on hillsides and crests. Landforms are primarily of glacial origin with centuries of weathering overburden. Additional geomorphology that is pertinent to both upslope and downslope areas are provided in the Subsurface Investigation Section of this report. 2.3 Surface Drainage Sheet flow on much of the properties is apparent, and directed to multiple un-named streams crossing both parcels. Significant scour, erosion and sediment transport was confined to the stream convergences only. 2.3.1 Upland Water Bodies Except for the above mentioned streams, there are no large water bodies or wetlands located upslope from the planned development that would significantly influence the Project. Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 3 Parcels 12329-41-00180, 12329-44-00000 Mason County,Washington September 20,2017 2.4 Slope and Erosion Obser vations rvations The existing moderate slopes near the Project signal a potential landslide or erosion hazard area. Some indicators that may suggest past slope movements include: • Outwash of sediments near the bottom of the slope, • Fissures, tension cracks or naturally stepped land masses on the face or top of the slope, and parallel to the slope, • Fine, saturated subsurface soils, • Old landslide debris, • Significant bowing or leaning trees,or, • Slope sloughing or calving. The above mentioned indicators, or other signs of significant mass wasting on the property or within the general vicinity of the Project were not observed or discovered during research. Indications of past landslides, current unstable slopes, deep-seated slope problems, or surficial slope failures were not observed during the site visit. 10 ,r �e t Aerial Photo from Google Website Envirotech Engineering Geological Assessment Ph. 360-275-9374 page 4 Parcels 12329-41-00180, 12329-44-00000 Mason County,Washington September 20,2017 3.0 SUBSURFACE INVESTIGATION Information on subsurface conditions pertaining to the Project was gathered during research and a site reconnaissance. The site visit was accomplished on April 17, 2017 by Robert McNearny, staff engineer with Envirotech. Specific information on field methods, sampling, field testing, subsurface conditions, and results from soil testing are presented in this section of the report. Appendix B has pertinent information on subsurface conditions for the Project, including test pit log(s) representative of the site soils, and water well report(s) originating from the subject property and/or nearby properties. 3.1 Field Methods,Sampling and Field Testing Information on subsurface conditions for the Project was accomplished by probing anticipated foundation areas with hand tools, and observing soils within test pit excavations and/ or earth cuts. Information on subsurface conditions also included reviewing geological maps within the Project vicinity, and water well reports originating from nearby properties. No soil samples were collected for this Project.Envirotech measured the relative density of the in-situ soils by gauging the resistance of hand tools. 3.2 Geologic Conditions In general, soils at the project are composed of materials from glacial advances. The geologic conditions as presented in the "Geologic Map of Washington," compiled by J. Eric Schuster, 2002 indicates Quaternary sediments, Qg. Quaternary sediments are generally unconsolidated deposits,and dominantly deposited from glacial drift, including alluvium deposits. This project is located within the Puget Lowland. Typically, "lower tertiary sedimentary rocks unconformably overlie the Crescent Formation."as revealed in the Geologic Map. Initial sedimentary rocks were formed from shales, sandstones and coal deposits from rivers. During the Quaternary period,the Puget Lowland was covered by numerous ice sheets,with the most recent being the Fraser glacier with a peak of approximately 14,000 years ago. Upon the glacial retreat, the landscape was formed by glacial erosion glacial drift deposits. The "Geologic Map of the Belfair 7.5-minute Quadrangle, Mason, Kitsap and Pierce Counties, Washington" by Michael Polenz, Katelin Alldritt, Nicholas J. Hehemann, Isablle Y. Sarikhan, and Robert L.Logan,July 2009,provides the following caption(s)for the project area: Envirotech Engineering Geological Assessment Ph.360-275-9374 page 5 Parcels 12329-41-00180, 12329-44-00000 Mason County,Washington September 20,2017 Qqt Vashon till—Unsorted,unstratified(but locally banded)mix of clay. silt. sand. and gravel: typically supported by a sandy matrix.mostly gray but locally ranging to tan. light brown.or orange: typically unweathered: lodgment till compact.With Well-developed facies resembling concrete. but near the surface cormmonly hackly and(or) looser and covered by 1 to 6 ft of loose ablation till: deposited directly by glacial ice and commonly includes casts or clumps plucked from underlying units. Clasts are commonly striated and faceted.with angular or rounded edges. Boulders are generally sparse Within the till but large(erratic)boulders of plutonic or metamorphic rock are connnron on till surfaces. Some exposures include interbands and lenses of sand and gravel.locally with shears and joints. Till forms a locally patchy and seemingly randomly distributed cover up to a several tens of feet thick. With a thickness of 5 to 20 ft most common. It typically dominates. but is also locally discontinuous on. fluted surfaces. with individual druurrinrs measuring 0.1 to 0.3 mi wide by 0.8 to 1.3 nu long and the long axis aligned With the direction of ice flow. Till typically is in sharp.unconforimable contact Aitll underlying units.most commonly advance outWash(unit Qaa and subunit). Unit Qgt lies stratigraphically below unit Qgo. It may include unrecognized exposures of older till.A map boundary mismatch between unit Qgt on this map and unit Qgos on the Vaughn quadrangle to the south (Logan and Walsh. 2047)may have resulted from a map-production error in the northwest corner of the Vaughn map(Josh Logan.Wash. Divn. of Geology and Earth Resources. oral connnn.. 2009). Vashon advance outuash—Pebble to cobble gravel. sand. and layers and Qga lenses of silt and clay: gray to tau: typically stratified.Well rounded. Well sorted. and clean(<50,'o silt or clay in matrix).except in less-sorted and more angular ice-proximal deposits:compact(Fig. 4)and resistant to erosion. except where Well sorted and well rounded.very thinly to very thickly bedded: contains planar and graded beds. cut-arid-fill structures. trough and ripple cross-beds. and foresets: thickness not Well constrained by this mapping but ranges from a few feet to more than(?) 100 ft: deposited as proglacial fluvial and deltaic sediment during Vaslron glacial advance and typically overlain by uuiit Qgt along a sharp.unconformabhe contact. Locally divided unto: aaf Alluivial fan—Silt. sand. gravel. and boulders: typically poorly sorted and stratified:forms concentric lobes where streams emerge from confuting F-------1 valleys and reduced gradients cause sediment load to be deposited. Envirotech Engineering Geological Assessment Ph.360-275-9374 page 6 Parcels 12329-41-00180, 12329-44-00000 Mason County,Washington September 20,2017 3.3 Specific Subsurface Conditions The following subsurface conditions are estimated descriptions of the Project subgrade utilizing information from the depth of penetration at all testing, sampling, observed and investigated locations. Soils for this project were described utilizing the Unified Soil Classification System (USCS). Using the USCS in conjunction with estimated relative densities and other anticipated engineering properties of the soil, susceptibility for potential landslides, erosion and seismic hazards may be assessed. The Project is primarily composed of undisturbed, native soils, without indications of substantial fill. Competent bearing soils were encountered at 12 inches below the existing native ground surface in locations where the ground was probed. For engineering purposes, these native soils consist of distinguishable layers,as presented below. Soils within the upper 6 feet of natural ground were observed to be primarily moist, brown silty sand with gravel (SM). Soils below the upper SM layer are expected to be an SM hardpan. The hardpan is believed to extend to depths of at least 50 feet. This is based on nearby well reports, site geology, and/ or knowledge of the general area. Expanded and specific subsurface descriptions, other than what is provided in this section, are provided in the soil logs located in Appendix B of this report. According to the "Soil Survey of Mason County," by the United States Department of Agriculture, Natural Resource Conservation Service (NRCS), the site soils are described as Everett Very Gravelly Sandy Loam, Eh, 8% to 15% slopes,and Everett Very Gravelly Sandy Loam, Ek, 15% to 30% slopes. See the soil map below and the applicable SCS soil profile in Appendix B of this report. Ow �a g , s F` `t y Soil Survey From USDA Natural Resources Conservation Service 3.3.1 Groundwater From the water well report(s)and knowledge of the general area, permanent groundwater is at least 50 feet directly below the property. Surface seepage or perched groundwater at shallow depths was not observed on-site,nor indicated on the well reports. Envirotech Engineering g Geological Assessment Ph.360-275-9374 page 7 Parcels 12329-41-00180, 12329-44-00000 Mason County,Washington September 20,2017 4.0 ENGINEERING CONCLUSIONS The following sections present engineering assessments and conclusions concerning the Project. These conclusions have been made available based on the planned project activities as outlined in the Introduction Section of this report; general observations of drainage and topography as summarized in the Surface Conditions Section; and, soil conditions that were identified by the field investigation and soils testing as outlined in the Subsurface Investigation Section. Conclusions for the Project that is provided herein, includes pertinent information for landslide, erosion and seismic hazards. 4.1 Landslide Hazards For the planned site alterations, as provided in the Introduction Section of this report, it is Envirotech's opinion that these site alterations is not subjected to or cause adverse impacts to a landslide hazard area or its associated buffer or setback as defined in the MCRO. This conclusion is based on the contents provided in this report. However, future building development on the property should be required to be evaluated by a geotechnical engineer. According to the Washington Interactive Geologic Map, Division of Geology and Earth Resources-Washington's Geologic Survey, previous landslide activity recorded on and near the property is a deep seated, dormant landslide. Per the Resource Map from DNR,the Project is not within terrain labeled `highly unstable' or `highly erodible' relating to soils. DNR labeled portions of this project as medium to high slope instability with relation to slopes. This delineation is primarily dependent upon slopes and convergence. Secondly, lithology and precipitation are modeled within this delineation. In summary, this designation is based on mapping without field observations or knowledge of the specific site geology or soils. A resource map from DNR is provided below: Isis AF ri Project '•" ti ■ � 1 . is all.1 ■fir b ~ '+ « ■sya is - • ■ Map from Washington State Department of Natural Resources Website Envirotech Engineering Geological Assessment Ph.360-275-9374 page 8 Parcels 1232941-00180, 12329-44-00000 Mason County,Washington September 20,2017 4.1.1 Landslides and Slope Stability Analysis Past landslide activity near the planned site alterations was revealed during the Project research. This landslide is over 1500 feet to the east of the edge of property. The landslide appears to be ancient,and is due to a combination of over-steepened terrain and glacial retreat,and not similar to the existing and proposed conditions of this project site. Detrimental landslide activity or potential high landslide indicators were not observed during the site visit as outlined in the Surface and Subsurface Conditions Sections of this report. Considering the planned site alterations as summarized in the Introduction Section of this report; the aforementioned surface and subsurface conditions for the Project; the slope stability assessment provided herein; and the Engineering Conclusions provided later in this report, it is our opinion that the Project is not within a landslide hazard area, and that the proposed site alterations will not encourage a landslide hazard. 4.1.2 Surface and Subsurface Drainage It is our opinion that standard and ordinary stream setbacks from the network of un- named steams on both properties are sufficient for this project with relation to geotechnical and geological hazards. Due to the acreage of timber to be removed, we recommend that applicable re-planting per County/State permitting is sufficient for this project. If more than an acre of stumps are removed or future residential development is planned, an engineered drainage and erosion control plan should be prepared for this project. 4.2 Erosion Hazards Based on the USCS description of the Project soils, the surface soils are considered moderately erodible. According to the Resource Map from the Washington State DNR, as provided above, the Project is not within terrain labeled `highly erodible.' This Project is not within an erosion hazard area as defined by the MCRO. Erosion hazard areas are those with USDA SCS designations of River Wash (Ra), Coastal Beaches (Cg), Alderwood Gravelly Sandy Loam on slopes 15% or greater (Ac and Ad), Cloquallum Silt Loam on slopes 15% or greater (Cd), Harstine Gravelly Sandy Loam on slopes 15% or greater (Hb), and Kitsap Silt Loam on slopes 15%or greater(Kc). Temporary and/ or permanent erosion control measures may be required for any site when land disturbance is involved. An erosion control plan is needed for this project if required by code or sediments are observed to leave the site during timber harvesting. We also recommend an erosion control plan if residential development is planned in the future. Erosion control information and specifications may be found in the applicable "Stormwater Management Manual for Western Washington,"prepared by the Washington State Department of Ecology Water Quality Program. Envirotech Engineering Geological Assessment Ph.360-275-9374 page 9 Parcels 12329-41-00180. 12329-44-00000 Mason County,Washington September 20,2017 L 4.3 Seismic Hazards There are no known faults beneath this Project. The nearest Class `A' or'B' fault to this property is the Sunset Beach Scarp, Tacoma Fault Zone. This fault is a Class `A,` and is located approximately 1 mile to the south of the Project. This information is supported by the USGS Quaternary Fault and Fold Database for the United States. The potential for liquefaction and other earthquake induced hazards are believed to be very low to low for this Project. This is based on subsurface conditions such as soil characteristics and the lack of a permanent and substantial shallow water table. Subgrade characteristics that particularly contribute to problems caused by seismic events include submerged and confined, poorly-graded granular soils. Although gravel- and silt-sized soil particles could be problematic, fine and medium grained sands are typically subjected to these types of seismic hazards. 4.4 Timber Harvesting Recommendations The selective harvesting areas encompass the approximate area as shown in Appendix A of this report. Although not a geotechnical constraint, the selective harvesting is expected to include partial cutting by leaving all trees with a breast height diameter of less than 4 inches in place and undisturbed.All trees left in place, and underbrush shall be minimally disturbed. Due to the small and isolated areas where slopes exceed 40%, we do not recommend buffers or setbacks with relation to slopes. Conventional equipment such as skidders and crawlers may be used for this Project.Logs shall be elevated on one end when dragging across the Project, although dragging should be minimized as much as possible for this site. Timber harvesting causes a disturbance of a complex interaction between water, soil and vegetation. Recommendations in this report are provided as a cost efficient way to alleviate problems that may arise from this disturbance. Young trees should be monitored and protected from competing vegetation. Permanent erosion control, drainage facilities and slopes shall be immediately maintained as necessary. Some conditions that may need immediate attention includes excessive erosion, scour, sloughing, significant changes to drainage patterns, new springs, new seepages or isolated areas of ground saturation. Maintenance may include curtain drains, swales, other drainage facilities, or slope remediation such as reinforcement,retaining structures or surface protection. Conclusions in this report are based on the type and location of the anticipated site alterations and existing surface and subsurface conditions. Site work that significantly deviates from the anticipated improvements presented in this report may require geotechnical design recommendations. Envirotech Engineering Geological Assessment Ph.360-275-9374 page 10 Parcels 1232941-00180, 12329-44-00000 Mason County,Washington September 20,2017 5.0 CLOSURE Based on the project information and site conditions as presented in this report, it is Envirotech's opinion that additional geotechnical studies are not required to further evaluate this Project. However,future developments should require additional geotechnical studies. Due to the inherent natural variations of the soil stratification and the nature of the geotechnical subsurface exploration, there is always a possibility that soil conditions encountered during site modifications are different than those described in this report. Therefore, it is recommended that Envirotech is promptly notified if project and subsurface conditions found on-site are not as presented in this report so that we can re-evaluate our recommendations. This report presents a geological/geotechnical assessment, and is intended only for the owner, or owners' representative. Furthermore, this report is only valid for the project information and location described herein. The services described in this report were prepared under the responsible charge of Michael Staten, a professional engineer with Envirotech. Michael Staten has appropriate education and experience in the field of geotechnical engineering in order to assess landslide hazards, earthquake hazards,and general soil mechanics. Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or require additional information. Sincerely, Envirotech Engineering Robert McNearny,E.I.T. Michael Staten,P.E. Staff Engineer Geotechnical Engineer Envirotech Engineering Geological Assessment Ph.360-275-9374 page t 1 Parcels t2329-41-00180, 12329-44-00000 Mason County,Washington September 20,2017 APPENDIX A SITE PLAN APPROXIMATE SILT FENCE LOGGING LIMITS SCALE, 1'=300' i121± 0 75150 300 600 60' VEGETATED 1 BUFFER (ASSUME FROM STREAM +i / x I60' VEGETATED BUFFER FROM 01 TOE OF SLOPE STREAM EXCEEDING 40% UNNAMED` STREAM o v v s EXISTING TOP OF SLOPE EXISTING GRAVEL � BRIDGE EXCEEDING 40% _ / DRIVEWAY., OVER STREAM EXISTING CLEARED- TOE OF SLOPE AREA FOR LANDING i EDING 40; TF]P ❑F`SL❑PE EXCEEDINC\40% NOTE! BUILDING SETBACKS NOT 1326*TOP OF SLOPE — 610- + APPLICABLE FOR THIS PROJECT. EXCEEDING 40% TOE OF ❑PE ZERO VEGETATION BUFFERS '� RECOMMENDED � EXCEEDING 407 PROJECT/ OWNER/ LOCATIEft LOGGING NOTES- GEOTECHNICAL REPORT 1. CONTOURS WERE NOT PREPARED BY A LICENSED LAND SURVEYOR. CONTOURS WERE EXTRAPOLATED FROM A PUBLIC LIDAR SOURCE, AND _ CADY TREE FARM,INCORPORATED FIELD MEASUREMENTS AS EXPLAINED IN THE GEOTECHNICAL XXX NE STATE ROUTTEE 3 REPORT. LEGEND PARCELS 12329-41-00180, 12329-44-00000 2. BOUNDARIES WERE NOT PREPARED BY A LICENSED SURVEYOR. LOCATIONS MASON COUNTY, WASHINGTON OF SITE FEATURES THAT ARE SHOWN HERE, SUCH AS TOP OF SLOPES, TOE ENGINEER, 13F SLOPES, WATER FEATURES, ETC., WITH RELATION TO THE PROPERTY SLOPE INDICATOR ENVIROTECH ENGINEERING LINES MUST BE VERIFIED BY THE OWNER, RECOMMENDATIONS IN THE PO BOX 984 GEOTECHNICAL REPORT PROVIDE SETBACKS, BUFFERS, DEPTHS, ETC. WITH EXISTING CONTOUR BELFAIR, WASHINGTON 98528 RELATION TO GEOLOGIC FEATURES, NOT PROPERTY LINES. THESE GEOLOGIC TP TEST PIT 360-275-9374 FEATURES MAY BE LOCATED ON THE SUBJECT PROPERTY OR NEIGHBORING PROPERTIES SITE PLAN APPENDIX B SOIL INFORMATION I TEST PIT LOG TEST PIT NUMBER TP-1 PROJECT: Cady Geotechnical Report DATE OF LOG: 4/17/2017 PROJECT NO: 1756 LOGGED BY: RJM CLIENT: Alan Cady EXCAVATOR: N/A LOCATION: Parcel 12329-41-00180, 12329-44-00000 DRILL RIG: None Mason County, Washington ELEVATION: N/A INITIAL DEPTH OF WATER: N/A FINAL DEPTH OF WATER: N/A STANDARD PENETRATION TEST SOIL STRATA, DEPTH SAMPLERS USCS DESCRIPTION ILL PI CURVE AND TEST DATA DEPTH N 10 30 50 0 SM Brown, moist, loose to medium dense SILTY SAND with GRAVEL. Gravel is primarily well-graded and subangular. 1 Sand is mostly medium. Low plasticity. r, 2 i • i 3 I .I 4 s :� t 5 6 Excavation terminated at approximately 6.0 feet 7 8 9 10 No Groundwater Encountered ENVIROTECH ENGINEERING This information pertains only to this boring and should not be Geotechnical Engineering interpreted as being indicitive of the entire site. Map Unit Description:Everett very gravelly sandy loam. 15 to 30 percent slopes—Mason County,Washington Mason County, Washington Ek—Everett very gravelly sandy loam, 15 to 30 percent slopes Map Unit Setting National map unit symbol: 2t62c Elevation: 30 to 900 feet Mean annual precipitation: 35 to 91 inches Mean annual air temperature: 48 to 52 degrees F Frost-free period. 180 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Everett and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Everett Setting Landform: Karnes, eskers, moraines Landform position(two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Convex Across-slope shape: Convex Parent material: Sandy and gravelly glacial outwash Typical profile Oi-0 to 1 inches: slightly decomposed plant material A - 1 to 3 inches: very gravelly sandy loam Bw-3 to 24 inches: very gravelly sandy loam C1 -24 to 35 inches: very gravelly loamy sand C2-35 to 60 inches: extremely cobbly coarse sand Properties and qualities Slope: 15 to 30 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat excessively drained Capacity of the most limiting layer to transmit water(Ksat): High (1.98 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low(about 3.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated). 4e Hydrologic Soil Group: A t !;, Natural Resources Web Soil Survey 511 512 0 1 7 Conservation Service National Cooperative Soil Survey Page 1 of 2 Map Unit Description:Everett very gravelly sandy loam, 15 to 30 percent slopes--Mason County,Washington Other vegetative classification: Droughty Soils (G002XN402WA), Droughty Soils (G002XS401 WA) Hydric soil rating. No Minor Components Aiderwood Percent of map unit: 10 percent Landform: Ridges, hills Landform position(two-dimensional): Backslope Landform position (three-dimensional): Side slope, nose slope, talf Down-slope shape: Linear, convex Across-slope shape: Convex Hydric soil rating: No Indianola Percent of map unit: 10 percent Landform: Eskers, kames, terraces Landform position(two-dimensional): Backslope Landform position(three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No Data Source Information Soil Survey Area: Mason County, Washington Survey Area Data: Version 12, Sep 9, 2016 Natural Resources Web Soil Survey 511 512 0 1 7 Conservation Service National Cooperative Soil Survey Page 2 of 2 �.i L - G lQ RESOURCE PROTECTION/GEOTECH SOIL BORING WELL REPORT N Washington State Department of Ecology O Original and t"copy—Ecology,2"'Copy—owner,3r°copy-driller r PROPOSED USE: / l.0Consa•ucuun Current Notice of Intent No. L IJ DecommissJon ORIGINAL J?VST-jL1_4710N1Votict a of Well J02ri)'/ntr.rn.Vu,aber Type �I2tsouraPrutct:tion C ❑Geotech Soil Boring Consulting L'irm_fhp-w�-'( Unique Ecology Well ID Tag No. SaU 7 DRILLING METHOD WELL LOCATION L I lollow 11cm Auge, U Air Rotary Project Name IZEI rc..a-1 C2 �Nlud Ro"Iry Cl Dual Rotary Owner t4}e_r�— 17 Col', / ❑Other Well Add 1l�L C Borehok:Diameter_ . City County_< Y1 Location /4 1/4 Sec aeTwn S R E o W M. j ENT Tax Parcel No. to have Ground Risei 6"s 3' 0 8"x 5' Suck up height ft Corutruction/Decotnmission Start Date AV A*bw. 0 12" ❑Other Construction/Decommission Completed Date Q aJ Arnotalt used Static Level CASING INSTALLED CONSTRUCTION OR DECOMMISSION PROCEDURE 0 PVC XSch 40 CI Sch 80 fl inclinometer ❑Other Material or Formation From To LI 7•hrcuded "Diameter from ft to ft I 11L.. Citucd ---�>Di ureter from Ll Welded _"Diameter from ti to $ �... SCREEN W Q 01PVC /._R Sch 40 rJ Sch go 0 Other Z Diaultcter--I—Slot Size from _. to ft 11 Pre Puck Type 0 PVC ❑Sch 40 ❑'Sch 80 D Other _ Dtuuteter of inner screen "x Diameter of outer screen C Slot Size _ Installed from ft to ft fi stainless Steel "Diameter from ft to ft pl 11 Uttter Diameter from ft to ft _ G SEAL ---- V Type or ntuterial toed )eBemouite Chips Amount W y,. '�t382ntonite Grout Amoun[r7,,�_ O 0 Portland Cement Amount - C ❑Otther Amount. Plu.ed frun,^�_ft t ft SANDIGRAVEL PACK Typr of nluterial usett*?'d Silica Sand Size ❑Pea Gravel Q U Other Placed tram k-&fl to M5511 — CO 0 Amount oftnaterial used pop WELL CONSTRUCTION CERTIFICATION: I constructed and/or accept responsibility for construction of this well,and its compliance with all Washinsnon well construction standards. Materials used and f. the information reported above are true to my best knowledge and belie f Driller Q Trainee N.urte(print) \vG Drilling Company Gregory Drilling,Inc. _ Driller:Trailtee Signature � IfTrautee,licensed driller's Driller or Trainee License No._ 74y�_ Signature and License No. _ __ Mason County Department of Community Develoament Submittal Checklist For a Geolonical Assessment Instructions: This checklist must be submitted with a Geological Assessment and completed, signed, and stamped by the licensed professional(s)who prepared the Geological Assessment for review by Mason County pursuant to the Mason County Resource Ordinance. If an item found to be not applicable, the report should explain the basis for the conclusion. Applicant/Owner Alan Cady parcel# 12329-41-00180, 1232941-00000 Site Address XXX NE State Route 3, Belfair (1) A discussion of geologic conditions In the general vicinity of the proposed development,with geologic unit designation based on referenced maps. Located on page(s) 5 (2) (a)A discussion of the ground water conditions at the site, Located on page(s) 8 (b) A discussion of the estimated depth to water Located on page(s) 8 c) A discussion of the quantity of surface seepage ( q ty Located on page(s) 8 (d) A discussion of the upslope geomorphology Located on page(s) 3 (e) A discussion of location of upland waterbodies and wetlands. Located on page(s) 3 (3) The approximate depth to hard or dense competent soil, e.g. glacial till or outwash sand. Located on page(s) 5 (4) A discussion of any geomorphic expression of past slope instability(presence of hummocky ground or ground cracks, terraced topography indicative of landslide block movement, bowed or arched trees indicating downslope movement,etc.). Located on page(S) 3 (5) A discussion of the history of landslide activity in the vicinity, as available in the referenced maps and records. Located on page(s) 9 (6) An opinion on whether the proposed development is within the landslide hazard area or its associated buffer or setback and the potential for landslide activity at the site in light of the proposed development Located on page(s) 10 (7) A recommendation by the preparer whether a Geotechnical Report should be required to further evaluate site conditions and the proposed development of the subject property, Page 1 of 2 Form Effective June 2008 Located on page(s) 1 (8) If the presence of a hazard is determined within 300 feet of the proposed development, then the following are delineated on a geologic map/site map: (a) the area of the proposed development, Located on Map(s) Site Plan (b) the boundaries of the landslide hazard area(top, both sides, and toe), Located on Map(s) Site Plan (c) the associated buffers(top, both sides, and toe) Located on Map(s) site Plan (d) building or other setbacks(top, both sides,and toe). Located on Map(s) Site Plan (9) A site map drawn to scale showing the property boundaries, scale, north arrow, and the location and nature of existing and proposed development on the site. Located on Map(s) Site Plan(app.A) I, Michael C. Staten hereby certify under penalty of perjury that I am a civil engineer licensed in the State of Washington with specialized knowledge of geotechnical/geological engineering or a geologist or engineering geologist licensed in the State of Washington with special knowledge of the local conditions. I also certify that the Geological Assessment, dated May 15, 2017 , and entitled Tree Harvesting Cady Tree Farm, LLC meets all the requirements of the Mason County Resource Ordinance, Landslide Hazard Section, is complete and true,that the assessment demonstrates conclusively that the risks posed by the landslide hazard can be mitigated through the included geotechnical design recommendations, and that all hazards are mitigated in such a manner as to prevent harm to property and public health and safety. (Signature and Stamp) CLI 4304� 5/18/17 Disclaimer. Mason County does not certify the quality of the work done in this Geological Assessment. Page 2 of 2 Form Effective June 2008