Loading...
HomeMy WebLinkAboutSEP2017-00049 - SEP Determinations - 9/22/2017 MASON COUNTY Department of Community}�drvices Planning Divisior� 615 W Alder St, Shelton, WA 98584 otoM (360)427-9670 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2017-00049 Description of Proposal: This SEPA is associated with a Class IV General FPA which will cover about half of a 30 acre parcel. The parcel includes an F-stream and associated wetland, but the harvest will be setback 150' at it closest, but mostly 400' or more. The site contains steep slopes, up to 44% per a geological assessment by Envirotech Engineering. The owners are not interested in developing the parcel, but are planning to sell it after the harvest. The harvest should result in less than one acre of ground disturbance. Proponent: CADY TREE FARM Site Address (If Assigned): NE STATE ROUTE 3 BELFAIR Directions to Site: FOLLOW STATE ROUTE 3 TO BELFAIR, LOCATION IS BEHIND THE RITE-AID IN BELFAIR Parcel Number: 123294100180 Legal Description: TR 18 OF NE SE Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Michael MacSems at ext. ext 571 or mms@co.mason.wa.us with any questions. This DNS is issued under WAC 197-11-350. The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Community Services Department, 615 W Alder St, Shelton WA 98584 by 10/6/2017. Appeal of this determination must be filed within a 14-day peri o owing this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date SEP2017-00049 Page 1 of 3 MASON COUNTY Department of Community Services Planning Division 615 W Alder St, Shelton, WA 98584 (360)427-9670 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2017-00049 CONDITIONS OF THIS DETERMINATION 1) ARCHAEOLOGICAL RESOURCES Archaeological or historical resources, such as ruins, sites, buildings, artifacts, fossils, or other objects of antiquity that may have significance from an historical or scientific standpoint, which may be encountered by the developer/contractor, shall not be further disturbed. If the developer/contractor encounters any such artifacts, he/she shall immediately stop work and notify Mason County and the Washington State Department of Archaeology and Historic Preservation. Failure to do so may result in civil penalties. 2) HOURS OF OPERATION Noise associated with this application shall not exceed what is allowed under Mason County Code 9.36. Harvest operations shall start no earlier than 7:00 AM and shall end before 8:00 PM on a daily basis. 3) GEO-TECHNICAL A geological assessment has been prepared by Envirotech Engineering and the submittal checklist has been reviewed and found complete by Michael MacSems of Mason County Community Services Department. The applicant shall follow the recommendations of the sections 4.4 and 5.0 of the revised assessment. It is understood that this assessment was written only to address logging. Future development of this site shall require another geo-review. 4) FISH & WILDLIFE HABITAT BUFFERS This site is subject to multiple fish and wildlife and wetland buffers. Buffers are as follows: F-Stream: 150 ft with additional 15 ft building setback Ns-Stream: 75 ft with additional 15 ft building setback Wetland: 200 ft with an additional 15 ft building setback The proposal exceeds the required buffers (at most locations) by 100' or more. The unit corners have been flagged. No activity is to occur within that buffer except as allowed under section 17.01.110.17 of the Mason County Critical Areas Ordinance. SEP2017-00049 Page 2 of 3 MASON COUNTY Department of Community Services Planning Division 615 W Alder St, Shelton, WA 98584 to (360)427-9670 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2017-00049 5) STORM WATER & EROSION CONTROL Escape of silty water or mud from this property shall be considered a violation of County and State storm water management regulations, and could subject the applicant(s) to civil fines or penalties. This project is represented as disturbing less than one-acre of ground and creating less than 5,000 sq ft of new impervious surfaces. The contractor shall comply with the 2005 WSDOE Stormwater Manual compliant 12-point best management practices narrative written by Don Cady for this project. 6) SLASH ABATEMENT This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an extreme fire hazard under RCW 76.04.600 and WAC 332-24-650. An extreme fire hazard could be created if one or more of the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road; or is within 500 of an existing structure and/or designated public use area, which is not owned by the owner of the fire hazard area. The land owner is fully liable in the event of fire, if he or she fails to appropriately abate the hazard. Extreme fire hazards shall be abated by removing the forest debris, or by other means approved by the Washington State Department of Natural Resources (DNR). SEP2017-00049 Page 3 of 3 e.p Za 1-7 ^ 000 L4 9 FPA Zo 17. 0000 (o MASON COUNTY DCD SEPA ENVIRONMENTAL CHECKLIST FOR THE CADY TREE FARM LLC PROPERTY TREE HARVESTING IN BELFAIR, WA. RECEIVED A. background AUG 0 7 2017 1. Name of proposed project, if applicable: CADY TREE FARM LLC TREE HAR sit. Ater Street 2. Name of applicant: Don Cady 3. Address and phone number of applicant and contact person: Applicant and Contact Person: Don Cady - PO Box 2022, Belfair, WA 98528. Phone 360-275- 6379. Email donaldcadyC�wavecable.com 4. Date checklist prepared: July 31, 2017 5. Agency requesting checklist: Mason County DCD 6. Proposed timing or schedule (including phasing, if applicable): The timber harvest will occur during the fall of 2017. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. The Wetland Corps prepared a Wetland Delineation and Stream Type Report dated January 2106. This report was used to flag and survey the wetland stream boundaries by ESA Inc. and West Sound Engineering. Envirotech Engineering of Belfair prepared a Geological Assessment for Tree Harvesting. Both-reports have been included in electronic fomtet with-this-SEPA document. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. None. 10. List any government approvals or permits that will be needed for your proposal, if known. None SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 1 of 14 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. Description of the Project: This project includes harvesting the trees on the Cady Tree Farms LLC property in Belfair, WA. See Exhibit A and B Below: hc'yver - s►�� SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 2 of 14 - opi' c Rc LIXL co 1 1 Me AM Ir �� � � •f' 4��,,�I�iuws� s o -� AA i la@ ACRES 70 lt'o V aEVBOP WWH - RIo zanwo ,' IMACRER I 3 m ZDA&W -- J#le - - - PRO67TYBOUNDARY ——— cAorrw..rrnusrw�a�+r acA,e r•too EXHIBIT A: THE CADY TREE FARM LLC PROPERTY WITH WETLAND BUFFERS Page 3 of 14 8EPA Envlronnwntal cheddW(WAC 197-11-960) May 2014 �, � ... u.--.s - �✓' . .. sue°� � _ r 3 y 1 + x.` � '�..qt ,ti t tt \• •" "► '. .t.r l#ems„ r . • ► Jo 14, .A 1 _ r� .,st 1• .• ,„,;F ti r f'. J •t -//'�.�_ �}+ ..d. r �` Sys '•�+� _ ,p• � try . ��}+�:'''' oco, 40 !: if ,p 1 volo ! e'.ffl ',*/ Y (. >, a f is F-;Zi?'4r'�1 t .i- x ,- � ,ice¢! .f,•- � r C S I ^* w - CADY FAMILY TRUST PROPERTY SCALE: V 000' EXHIBIT B: CADY TREE FARM PROPERTY WITH IMAGE SEPA Environm•ntiW c' A rwt(WAC 197-11-W May 2014 Page 4 of 14 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. If See Exhibit A and B for the location of the property. See Exhibit C below for the 5' contour interval topography of the property. The geological report recommends not harvesting on slopes over 40%, leaving the stumps on the steeper slopes, and a 10 foot buffer below 40% slopes. With these restrictions in place it is expected that between 21 to 23 acres of the site located outside the wetland and stream buffer areas will be harvested. Parcels No. 12329-41-00180 and 12329-44-00000 SE '/4 and NE '/4 of Section 29 TWN 23N, R1 W WM Latitude 47 degrees 27 minutes North, Longitude 122 degrees 50 minutes west. V Geo c,ssessrA"�-- ll`eVXx 6 C: IcUV IOSS MS CA (+4 6 Y)cp , �► �\',,�, }ham \0cvuLSJ- LA14; cC cec�V Aci 2CJ �c re 5 SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 5 of 14 040 00 op 01 Iopo OMWSPACE l � �f 7 25( All .44 gnu r- ' 44, 'J j f v CADYFA1LY IWAI P1 OFEWY am 1%,"v EXHIBIT C: SITE TOPOGRAPHY SEPA Environmental checklist(WAC 197-11-960) May 2014 Pape 6 d 14 B. ENVIRONMENTAL ELEMENTS hel� 1. Earth a. General description of the site lil hel�:;r_ (circle one): Flat, rolling, hilly, steep slopes, mountainous,other: See Exhibit C for the site topography. b. What is the steepest slope on the site (approximate percent slope)? There are slopes up to 40% on the site at various locations on the site. Ge e) c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. See the accompanying Report entitled Geological Assessment for Tree Harvesting (GATH)for soils information and the potential landslide dangers. The GATH Report identifies specific area where tree harvesting should not occur. The site is not located in a high landslide hazard area. V�,sha�n-� it I V,,hCNA /�Uc , I AII%Av, 4-1 J�C,� d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. Seethe accompanying GATH Report. e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. Only minimal grading will occur on the site.The existing logging roads will cleared and refurbished to accommodate logging equipment. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. No clearing will occur on the site other than the harvesting of the trees.Wetland areas and streams— including buffers—will be avoided. Erosion will not occur on the site during the logging operations. The logging roads will be replanted with grass seed after use. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? None h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: BMP's will be implemented per the Washington State Department of Ecology's Storm Water Management Manual for Wester Washington (latest edition)to control erosion. Existing logging roads will be used for access to the site. The logging access roads will be revegetated with trees and grass. SEPA Environmental checklist(WAC 197-11-9ti0) May 2014 Page 7 of 14 2. Air a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. None b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No. c. Proposed measures to reduce or control emissions or other impacts to air, if any: None 3. Water a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. See Exhibits A and B and the accompanying Wetland Delineation and Stream Type Report prepared by the WETLAND CORPS. No tree harvesting will occur in the wetland and stream buffers that are mapped in Exhibits A and B.The buffers have been staked in the field. 2)Will the project require any work over, in, or adjacent to (within 200 feet)the described waters? If yes, please describe and attach available plans. No 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None 4)Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known_ No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground Water. 1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well_ Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. No. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 8 of 14 c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. None 2) Could waste materials enter ground or surface waters? If so, generally describe. No 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: Replant the logging roads with grass after logging has been completed. 4. Plants a. Check the types of vegetation found on the redevelopment site: X deciduous tree: alder, maple, aspen, other X evergreen tree: fir, cedar, pine, other X shrubs X grass _pasture crop or grain Orchards, vineyards or other permanent crops. wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other X other types of vegetation. Blackberry vines b. What kind and amount of vegetation will be removed or altered? The large trees will be ' harvested on slopes less than 40 percent slope. Ces s P mul 4 S 96 -- - - --- r�• QjRo b. List threatened and endangered species known to be on or near the site. The site is above the summer chum range in Mindy Creek. Steelhead salmon are not currently present at the site but could be when the stream is restored. There are no bull trout in Mindy Creek. The Marbled Murrelet may forage in the area but none have been observed at the proposed forest harvesting arae. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None e. List all noxious weeds and invasive species known to be on or near the site. Blackberries and Scotch Broom. 5. Animals SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 9 of 14 I a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: birds: hawk, heron, eagle, songbirds, other: mammals: deer, gear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other b. List any threatened and endangered species known to be on or near the site. None - Not in the area in which they are going to harvest trees. c. Is the site part of a migration route? If so, explain. No d_ Proposed measures to preserve or enhance wildlife, if any: None e. List any invasive animal species known to be on or near the site. None 6. Energy and natural resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. None 1) Describe any known or possible contamination at the site from present or past uses. None 2) Describe existing hazardous chemicals/conditions that might affect project development and design_ This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. None. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. None 4) Describe special emergency services that might be required. The normal emergency services required for high density residential. NA 5) Proposed measures to reduce or control environmental health hazards, if any: None. SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 10 of 14 b. Noise 1)What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Logging Equipment 2)What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. None. 3) Proposed measures to reduce or control noise impacts, if any: None 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. As a tree farm. c. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? No. d. Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: No. c. Describe any structures on the site. None d. Will any structures be demolished? If so, what? No e. What is the current zoning classification of the site? See Exhibit A. R 3 1 V f. What is the current comprehensive plan designation of the site? See Exhibit A a I t-c►,r u A g. If applicable, what is the current shoreline master program designation of the site? See IVY A Exhibit A. h. Has any part of the site been classified as a critical area by the city or county? Yes, The wetlands and the wetland buffer areas that have been delineated in Exhibit A- i. Approximately how many people would reside or work in the completed project? None j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any; None L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: None SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 11 of 14 m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: None. Natural reproduction will occur. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. NA b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. NA c. Proposed measures to reduce or control housing impacts, if any: NA 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? NA b. What views in the immediate vicinity would be altered or obstructed? NA c. Proposed measures to reduce or control aesthetic impacts, if any: None 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, K any: None 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? Theler Wetlands is within %mile of the property. b. Would the proposed project displace any existing recreational uses? if so, describe. No. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None 13. Historic and cultural preservation I a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specically describe. No SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 12 of 14 b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries.Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. None. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data,etc. l None. k"V 'i Z I )?)I D � d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. None. t 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. NA b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? NA c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? NA d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). NA e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. NA f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates? NA g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No h. Proposed measures to reduce or control transportation impacts, if any: None 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. Fire Protection: NA SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 13 of 14 16. Utilities a. Circle utilities currently available at the site: NA b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. NA C. Signature WELD The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relyin them to make i s decision. Signature: (�Alz , Name of sign O Position and Agency/Organization Date Submitted: 0-l- v SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 14 of 14 SSTCADY PRO TY R Y CAD'y P O RTY BD NDA t l r�� x, �� 40 AA 01 •L ` ► Z ,. ♦ ,'t/� \\V �, yr aC , L i W N _ 1 AVMNVItI 81/ -i7TF!Q7(7 h � , ''� �p�' t A+�J tNf�Ut�t C)NINOZ MV 123294190102 1232941 081 123294100080 123294190240 123283290070 r 123294290001 123294290001 123294190110 123294100090 123294290002 123294190111 123294100091 123294190230 123294100170 123294200160 123294100121 123294100000 123294106120A 123294100160 123283290080 123294200191 �. 941001501M. y►4 ° 123294200220 L 123290060010 123294100180 123294160140 _r ' "low w v � 123294100130 NE BELFAIR ST " ,$��.'"4or 11� , 123283290020 123294300040 w 123294400010 s � 123294300010 123294300270 123294300020 123294300220 123294300210 123294300230 123294300200 123294300000 123294300190 123294300090 123294400000 123283360000 7 1 3294 90170 123294300180 1 123294390173 123294390175 ''� 123294390160 l23294390290 123325000001 i 123320060010 123325290020 Q� 123325200008 123328888888 123325090040 Q� _ + 123325200006 123325200007 123325400005 123325400003 123331000010 123325200029 123325400001 123325200005 123325300005 123325200004 123325200009 123325000012 123325300003 123325200100 123325300002 123325200003 123325200010 123325000011 123325200002 123325200011 123331060000 Department of Archaeology and Historic Preservation 1232942 00180 123290060010 12 32 94100130 123294100180 12328329008 123294300081 / 123294300050123294300040 123294400010 123298888888I1) 3294_ 30003 O� 123294300082 123294300010 232943010270 123294300060 - /--A.,123294300020123294300220 123294300080 / � 1 123294300210 12329430A230 12 300200 1232943000911 123294300000 123294300190 12329430009r T� �RC311N 12328336000r L=L/2 2`-� 12329440000012329430009 123294390170123294300180 123294300160123294300100 1232943CA1110 123294390173 123294300120 123294390175 123294300140 123294390160123294390290 123294390270,23294390280 123294300150 - 123328888888 l 1 1-23325000004 123325000001 T �123�32520029 3320060010223325290020 a3R01W 123325200008 1233250 00003 123320060000 a 33 123325090040 123325200007 I September 8, 2017 r �} I -p6 /SE 0� - �+5 1:4,425 C��.l 0 0.0375 0.075 0.15 mf Determined Eligible 7 Parcels F �, I ,T, 1. ,T! 0` Determined Not Eligible Township Range & Sections 0.05 0.1 0.2 km Sources: Esn, HERE, DeLorme, Intermap, ncrement P Corp, GEBCO, USGS,FAO,NPS,NRCAN,GeoBase,IGN.Kadaster NL,Ordnance Survey, No Determination �� County aM1. 1 Cav4� ► 1 - �6 / s P 1 - 4� Lc,vNcA m-S s,-�� • f 4 ` r i1 .wed' � ,✓'tV!. y�.'.' `3 '��. r :...a ,� �• y •r6w.� ♦ i�: ,;. t S kk",in, lae-�c r +, � ..li•'s.� •Ale' +�". �'A as- .41C,.. 5• .w..�. ' '4 )• �� � I� �A ,i:"' n .:,tee-s±t. � �i1.i,-. t���� �,t,iy�.,F � . 9' t y . i I MASON COUNTY DCD SEPA Contact List Sent SEPA i to (check all that apply)on /Z Z t 7 Skokomish Tribal Nation,Nat.Res.Dept. WA Department of Ecology ATTN: Randy Lumper Environmental Review Section N 541 Tribal Center Rd.,Skokomish Nation,98584 PO BOX 47703,Olympia,98504-7703 riumper@skokomish.org separegister@ecy.wa.gov Skokomish Tribal Historic Preservation Officer WA Department of Commerce ATTN: Kris Miller reviewteam@commerce.wa.gov 80 N Tribal Center Rd,Skokomish Nation,98584 shlanay1 @skokomish.org U.S.Army Corps of Engineers SEPA Reviewer-Jason Sweeney Quinault Indian Nation PO Box C-3755, Seattle,98124 ATTN: Mark Mobbs Jason.t.sweeney@usace.army.mil PO Box 189,Tahola,98587 mmobbs@quinault.org EdWA Dept.of Fish and Wildlife SEPAdesk@dfw.wa.gov Squaxin Tribal Nation,Natural Res.Dept. 2952 SE Old Olympic HWY,Shelton 98584 WA Dept.of Fish and Wildlife jdickison@squaxin.us ATTN: Joshua Benton(360)602-0364 emarbet@squaxin.us (Habitat Biologist-Hood Canal Watershed) szaniewski@squaxin.us 450 Port Orchard Blvd, Suite 290 sneil@squaxin.us Port Orchard,WA 98366 Joshua.Benton@dfw.wa.gov The Confederated Tribe of the Chehalis ATTN:SEPA Reviewer-Glen Connelly 420 Howanut Rd.,Oakville,98568 WA Dept.of Fish and Wildlife gconneliy@chehalistribe.org ATTN: Margie Bigelow (Habitat Biologist-S Puget Sound Watershed) WA DNR,South Puget Sound Region 2391 W Deegan Rd.,Shelton,98574 950 Farman Avenue N, Enumclaw,98022-9282 margaret.bigelow@dfw.wa.gov southpuget.region@dnr.wa.gov WA Dept.of Transportation WA DNR,Aquatic Resources ATTN: Dale Severson PO BOX 47027,Olympia,98504-7027 P.O. Box 47440, Olympia 98504-7440 and@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov WA DNR,SEPA Center City of Shelton ATTN: External Coordinator ATTN:Jason Dose PO BOX 47015,Olympia,98504-7015 525 West Cota St.,Shelton 98584 sepacenter@dnr.wa.gov jasond@ci.shelton.wa.us Olympic Region Clean Air Agency Port of Shelton ATTN: Lauren Whybrew ATTN: Brandon Palmer 2940-B Limited Ln.NW,Olympia.98502 21 West Sanderson Way, Shelton 98584 lauren.whybrew@orcaa.org randonP@portofshelton.com Mason County Transit Office of Archaeology&Historic Preservation ATTN: Mike Oliver ATTN: Lance Wollwage PO Box 1880,Shelton,98584 P.O. Box 48343,Olympia,98504-8343 moliver@masontransit.org Lance.Wollwage@dahp.wa.gov Mason County PUD#1 El Tacoma Public Utilities-Real Property Services ATTN:Steve Taylor ATTN: Dave Letterman N 21971 Hwy 101,Shelton,98584 3628 S 35th St, Tacoma, 98409-3192 ntaylor@mason-pud1.org dletterm@cityoftacoma.org Mason Cty P.W.ATTN: Mason Cty E.H.ATTN: Other: School District: Mason Cty Bldg ATTN: Agent: MC DCD last updated on 01/04/2017 Applicant: