Loading...
HomeMy WebLinkAboutCOM2015-00080 Cell Tower Alteration - COM Permit / Conditions - 8/16/2018 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT one: 36 )L-11 IV 427- ,,,,0, e ion oopH Phone: (360)427-9670, ext. 352 '= Mason County 615 W Alder St Shelton, WA 98584 ISM • COMMERCIAL BUILDING PERMIT COM2015-00080 OWNER: VERIZON WIRELESS RECEIVED: 5/12/2015 CONTRACTOR: LICENSE: EXP: ISSUED: 1/19/2017 SITEADDRESS: 24765 NE STATE ROUTE 3 BELFAIR EXPIRES: 7/19/2017 PARCEL NUMBER: 123282190030 LEGAL DESCRIPTION: TR 3 OF NE NW* LOT: C OF SP#745 PROJECT DESCRIPTION: DIRECTIONS TO SITE: CELL TOWER ALTERATION: REPLACE 6 ANTENNAS, ADD 6 WA ST RT 3 N (22 MILES FROM SHELTON) TO BELFAIR, SITE ON LEFT REMOTE RADIO HEADS AND 2 SURGE PROTECTORS JUST BELOW THE EXISTING ANTENNAARRAY, REMOVE 8 COAXIAL CABLES, ADD 2 HYBRID CABLES. General Information Construction &Occupancy Information Type of Use: COMMERCIAL Insp. Area: No. of Units: Type of Constr.: Type of Work: ALT Fire Dist.: 2 No. of Bathrooms: Occ. Group: Valuation: $ 15,000.00 No. of Stories: Exit Design. Load: Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp. Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2015-00080 Please refer to the following pages for conditions of this permit. Page 1 of 6 � r Plumbing Fixtures Mechanical Fixtures FEES Type qty Type (sty, 'type By data Amount Receipt t Plan heck Fee .tRN .+S/17PJnis .tiwA 1i C77niw ' P ann ng Revieov Fee .1RN 911917ni R tiln nn R?7ntann Totes $493,31 t CASE NOTES FOR COM2015-00080 ; CONDITIONS FOR COM2015-00080 1) Appr pe dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure, X 2) The shall be in full compliance with the Mason County Cell Tower Ordinance 95-98 (Revised by Ord. No. 53-04). X The design of the equipment buildings and related structures shall,to the extent possible, use js, colors, textures, screening and landscaping that will blend the tower facilities to the natural setting and built environment.X 3) All construction and demolition debris must be removed from the shore area after project c p etlon. Proper disp of oonstruotion debris must be on land in such a manner that debris cannot enter or cause water quality degradation of,Rate waters. X 4) Temporary erosion control measures must be implemented to prevent wafer quality degrad tion of adjacent watery or prgperties, Silt fencing, straw, or surface matting must be installed and maintained until upland vegetation has beco a established. X f .. � I i I 4 COM2015-00080 Page 2 of 6 y 5) The following special conditions should be made a part of the building}permit: . i 1. Electrical Permit Required. The electrical system shall be installed under a separate electrical permit issued by the Washington State D rtme Labor& Industries(L&1). Electrical"final"inspections must be approved by L&I prior to requesting a building final. X i 2. Special Inspection: IBC Chapter 17, Section 1704. In addition to the iinspections required�y IBC Section 109, the owner or the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors &ho shall provide inspections during construction on the types of work listed under iBC Section 1705. The special Inspectors'duties &responsibi ities shall be as specified in 1704. All special inspection reports shall be provided to the Mason County Building Department in accordance with IBC 1704.2.4. Prior to final inspection, the special inspection agency shall also provide a final, signed report to the building department stating that all Items requiring special inspection and testing were fulfiAe and reported,corrections of any discrepancies has been completed,and,to th best of their knowledge, are in conformance with the appro desi rawings,specifications, and applicable provisions of the code. X 3. Speci Inspection Contractor Responsibilities.Third-Party Special Inspection is required n accordance with IBC Sections 1704& 1705 for the items identified in the Statement of Special Inspections(as required by'1IBC Section 1704,3) In accordance with IBC Section 17 04.4, each contractor responsible for the construction of the work listed in the stat#-meat of special Inspections shall submit a written statement of responsibility to the building official and the owner prior to the commencement of work on the system or component. The contractor's statement of responsibility sha ntain nowledgment of awareness of the special requirements contained in the st tement of special inspections. X 4.All Construction:Ali construction shall meet or exceed all local ordinances and the requir ments of the 2012' International Codes as adapted by Mason County and Washington State, Occupancy is limited to the approved and permitted lassification.Any non-approved change of use or occ cpuId result in permit revocation and/or Code Enforcement action. 5. Field Correct: The construction of the permitted project is subject to inspections by Mason County Building Department.All construction must be in conformance with the 2012 International Codes as adopted by Mason County and Washington State.Any corrections, changes or alterations requir a lriuilding or fire Inspector shall be made prior to requesting additional inspectio s. X 6, Final Inspection Required:All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Mason County as being non-compliant with the city's ordinances and building regulations and may be referred to the City AjGarrr6 tax action, 7, Permit Validity: IBC 105.4/IRC R105.4:The issuance or granting of as permit shall not be nstrued to be a permit for, or an approval of, any violation of any of the provisions of the building code, or any other code or ordinance of Mas n County. Permits presuming to give authority to violate or cancel the provisions of the building code or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring correction of errors in the construction documents and other data.The building official is also authorized to prevent occupancy or use of a structureiwhere in violation of this code or of any other ordin s o ' urisdiction. i X 8. Pemmi xplration: All permits expire 180 days after permit issuance,',or 180 days after thellast inspection activity is performed. The Building Official may extend the time for action for a period riot exceeding 180 days, upon the receiptjof a written extension request indicating that f � COM2015-00080 i J Page 3 of 6 r I A s circ cee beyond the control of the permit holder have prevented action from being to n. X �, - _ 9. Engineering or Architecture:Any changes in proposed construction 61hali be reviewed byte engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/c r architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed,or changes are n iade without approval from the architect or engineer and the Building Official, approval will not be granted,and a re-inspection fee may be charged by Mason County prior to any further Inspections be' "Re d or approvals granted.e . i '- -- 10,Sales Taxes: This work is being done In Mason County.All sales tax for materials deliverd to, or work performed in Mason County shalt be sourced to Mason County. Prior to final approval, a completed supplierisub-contractor list m y be requested by Mason County to identify suppliers that d ed materials to the project site, and sub-contractors who pejformed work on the site, X '''— i 6) All of er necessary permits from Mason County,Washington State and/or Federal Agencies that are feaulr for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X 7) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State ept Labor and Industries, Contractor Compliance Division, There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0. 2,Ihe person signing this condition is either the homeowner, age nt for the owner or a registered contractor according to WA state law. X 8) All approved plans ' equired to be on-site for inspection purposes. If inspection is called for and plans are not on site,Approval WILL NOT be granted_ In addition,a reinspection fee, based on the current fee schedule, minimum one-h Dur will br+charged and collected by the Mason County . Building Department prior to any further inspections being performed or approvals granted. 9) Owner!Agent is responsible to post the assigned address and/or pur6hase and post private road signs in accordance with Mason County Title 14.28 X 1(3) The a roved site plan is required to be on-site for inspection purpose . If inspection is callod for and the site plan is not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current ee schedule, minimum one-hour will be charged and collected by the Mason XCounty,.B�riDepartment prior to any further inspections being performed or approvals g-anted. i 11) Provisions or surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, ether private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an.existing utility and drainage easement dedicated for that specific purpose. For further Information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Pubic Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way,it is suggested to contact that office to review future planned k pvtch may affect your project. 12) Changes to approve/d(bbu-ilding plans that affect compliance to the current Washington State,E'nergy Code(WSEC), ventilationrequirements), Buildin 4u ;tiagtMechanical Codes and/or Mason County Regulatiorij shall be approved t rior to construction. X 19) All property lines shall be clearly identified at the time of foundation inspection.X � }i COM2015-00080 Page 4 of 6 14) ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITE ANP SHALL NOT ADVERSLY AFFECT ANY ADJACENT PROPERTIES NOR INCREASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ATY STATE OR COUNTY CULVERTING/DITCHING YS�ROAD WAY. OWNER/BUILDER,acknowledges submission of inaccurate Information may result in a stop work rder or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further d aclare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, idcluding any easeme t holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and Inspection. This permitlapplication becomes nu�l& void if work or auihorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days, PROOF OF CONTINOATION OF WORK IS BY MEANS OF INSPECTION.INACTIVITY OF THIS PERMIT A"-L4C4TION OF ISO DAYS WILL INVALIDATE THE APPLICATION. Signatur Date OWNER EPIFt'ESENT�ATIV CONTRACTOR Print Nairie (circle one o1ridicate) COM2015-00080 Page 5 of 6 n CONCRETE MECHANICAL MANUFACTURED HOME M o _ n Date By Footings I Setbacks Ribbons N Gas Piping Q o Interior Date By Interior-Date By Date By CZ 00 ----- G % Exterw Date By Exterior-Date By Setup Point Load I Isolated Footings: INSULATION Date By m BG/SLAB INSULATION .—_,.....,.....-,...--„,• ... . 1 r- Dsrte By Data ay FIRE DEPARTMENT m Foundation Walls Floors Date By Date By Data By DECKS FRAMING Wails Date By Date By Data By PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Type: Bate By Date I3y Date fay D.w.v DRYWALL Type- n Date B Int Brace Walt Date B y 0 y Dale t3y N FINAL INSPECTION Water tine Fire Seperation Date By Date By Date "k-16-es- By J72_ 0 Pass or Request Inspect. CD pe of insp. Fail Date Date Done By Comments c J-7Z vvc-fv✓Al o S.crv.A4ev,j ✓�' Y L e1a-,91 aH I i tv 0 0 Krazan & A S S O CI A T E S I INC . GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRliCTION TESTING & INSPEC.TION August 15,2018 KA Project Number: 10618172 Mason County Building Permit No.:COM2015-00080 Seth Ewing MASTEC NETWORK SOLUTIONS E-Mail: seth.ewing@mastec.com 210 Interstate N.Parkway, Suite 300 Atlanta, GA 30339 RE: Structural Observation Letter WA4 Belfair 24765 NE SR3 Belfair,WA 98528 Dear Mr.Ewing, Per your request, we have prepared this structural observation letter for new tower attachments at the above mentioned project. We performed a site visit on August 13, 2018 to visually observe the six (6) new Verizon Wireless antennas and the six (6) new Verizon Wireless RRUS+A2. For our use in preparing this letter, we were provided with the approved construction drawings prepared by Camp+ Associates,dated May 24,2017. Based on our site visit, it is our opinion that the six (6) new Verizon Wireless antennas and the six (6) new Verizon Wireless RRUS+A2 were installed per the approved plans. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN& ASSOCIATES,INC. P� CHAU� of W E' C137'EK� �✓ Vijay Chaudhary,P.E. Project Engineer Attachments: Site photographs,daily field report and approved construction drawing 1230 Finn Hill Rd.NW Suite A•Poulsbo,WA 98370•(360)598-2126•FAX(360)598-2127 With Offices Serving the Western United States KA Project No. 10618172 August 15,2018 Page No.2 Site Photo ra hs 9[p �4 �1 1� r. Krazan&Associates,Inc. Offices Serving fbe Western United States i KA Project No. 10618172 August 15,2018 Page No.3 F f . 4 e x*ti Krazan&Associates,Inc. Offices Serving The Western United States KA Project No. 10618172 August 15,2018 Page No.4 s, , Krazan&Associates,Inc. Offices Serving The Western United States KA Project No. 10618172 August 15,2018 Page No. 5 Krazan&Associates,Inc. Offices Serving The Western United States KA Project No. 10618172 August 15,2018 Page No. 6 H. MANAGED ny iC� TC4 VPor IL aaae t.■►, i- esca�r;; �ti.i e',.s. ,� .•,ark o. Ili a e.... s� Krazan&Associates,Inc. Offices Serving The Western United States KA Project No. 10618172 August 15,2018 Page No.7 i TwYy �Pik YA 4. YM .+ N6 f w- a �y{ 4� ros Krazan&Associates,Inc. Offices Serving The Western United States . . KA Project No. 10618172 August !%2018 Page No a . .�14, �\\� . Krszaa&Associates,Inc. Offices Serving TheWestern United States KA Project No. 10618172 August 15,2018 Page No.9 y; Krazan&Associates,Inc. Offices Serving The Western United States - FIELD ZIUM �L QZan&A s s o c i a t e s, I n c. REPORT NO.: 18172DFRO81318-AC Geotechnical Engineering.Environmental Engineering Construction Testing and Inspection DATE: 8/13/2018 CONTRACTOR: American Tower PROJECT#: 10618172 PERMIT#: COM 2015-00080 PROJECT: WA4 Belfair 4x4 INSPECTOR:Aaron Clyde LOCATION: HWY 3 Belfair JURISDICTION: Mason County KA P.M.: WM WEATHER: Hazey TEMP: 82° I am on site at 24765 NE State Route 3 Belfair WA. as dispatched for new antenna installation inspection. I reviewed he on site and approved plans by C Camp+dated 5/24/17. I walked the site for visual observations and noted the new VZW antennas are in place two per sector,and two new US+A2 are in place. The Antenna's and RRU units are attached to the new mounting brackets with new hardware. I btained pictures of the new antennas and RRU units. The antennas and RRU units appear to be installed in accordance with the on site and approved plans. See the attached pictures. Photo I Photo 2 Photo 3 Photo 4 ux x u Photo 5 Photo 6 Photo 7 Photo 8 a. 3�, 3' Reviewed By: ASTM Test#: Equipment/Asset Number(s): To the best of my knowledge,the above WAS performed in accordance with the approved plans,specifications and regulatory requirements. Superintendent/Representative: Technician: Z",�, — Blank Sgrdure-SgRusl Offices Serving the Western United States Lynnwood(425)485-5519•Poulsbo(360)598-2126•Puyallup(253)939-2500 Daily Field Repon Revision 8 Effective 02/132013 The mtawnan pmvWetl m tlds report is prepercd for @e eul°s x of the cant.This report m of be repaducad in anv f xiNout the ssntue pmnissiw ofMe client W%reran&Acs°cutes.This report irsdica mspecwrs Msm wd sesnng results basal on site caodiooru and canvactar acbnoes.ibis mfamutian is wbjW w review MM to dais report our mpena dots nrn accept respmsNhm far W idin'ofrewlte.The sane infamanm has bew provi b�Mors on sire.