HomeMy WebLinkAboutFPA2020-00007 Findings of Fact - FPA Permit / Conditions - 7/7/2020 t
FINDINGS OF FACT
FPA Case#2020-00007
APPLICANT: EE Overton
APPLICATION DATE: July 7, 2020
Mason County has reviewed the above referenced application for Class IV General Forest
Practices and finds it in conformance with all applicable County land use regulations in
effect at the time of application.
FINDINGS
The proposed FPA is compliant with the following conditions:
The proponent has paid the prescribed fees.
The proponent has filed a complete, signed application.
A map has been received that complies with the requirements of 11.05.120:
(1) Harvest boundaries and tree retention areas.
(Il) The approximate location of any structures.
(III) The location of all existing and proposed streets, right-of-ways, easements, skid
roads, haul roads, and landings within the proposal.
(IV) The location of future land development including stormwater management
facilities and vegetation to be retained for site landscaping, open space, wildlife
habitat, screening, and/or buffers.
(V) Site topography at contour intervals of 40 feet.
(VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas
Ordinance.
(VII) Drainage ways and culverts.
(VIII) Site area targeted for further harvest including proposed timing.
(IX) North arrow and scale shall be shown on all site plans. The scale shall be no
smaller than one inch to 200 feet.
That this FPA is in conformance with the following Mason County ordinances:
11.05
That the proposed FPA involves 25. acres.
That the notifications required by 11.05.060 have been made if applicable.
Note: Harvest unit is greater than 500 ft from any State Park.
Mason County Resource Ordinance
t
1
_X_That at the issuance of this permit will not result in a violation of the Mason
County Resource Lands and Critical Areas Ordinance. The site was inspected by
Michael MacSems of the Mason County Planning Department who determined
that any critical area buffer and/or steep slope issues have been resolved.
Geo-Technical Report/Assessment Review
A Geo-Technical_X_ Report_Assessment(check one) was written by The
Riley Group and a submittal checklist was approved as complete by Michael
MacSems of Mason County DCD on 6/17/2020.
Washington State Department of Transportation
X A DOT Access Permit is not required for this proposal.
— — q P p
_A DOT Access Permit is required for this proposal.
Date Approved by DOT:
NOTE:Access is by private roads. WSDOT did not comment during SEPA.
Mason County Road Access Permit
Road Access Permits were issued by Mason County Public Works on
N/A
Shoreline Master Program
That, if applicable, all activity under this application are in conformance with the
Mason County Shoreline Master Program and has a shoreline designation of N/A.
State Environmental Policy Act
This application for FPA# 2020-00007:
_X_Has been reviewed for SEPA compliance under case#: SEP 2020-00025.
_Is SEPA exempt.
DNS
MDNS
Stormwater Management
A Stormwater and Erosion Control plan written to the specifications of the 2012
WSDOE Stormwater Manual Minimum Requirements 1-5 was prepared by
applicant and approved as complete by on
2
i
t
f
Engineered Stormwater plan by Apex Engineering approved by Fred Perryman of
MCPW on 612612020.
Permission from Underlying Property Owners:
Yes
Permit Signed b Operator:
g Y P
Yes
DOR Tag ID#
800-007-011
CONCLUSION
In conclusion,this application for Class IV General Forest Practices is consistent with the
above criteria and that the public uses and Mason County has fulfilled its statutory
obligations.
RECOMMENDATIONS
I,being the Director of the Mason County Community Services,hereby attest to and
certify that appropriate provisions have been made for this Class IV General Forest
Practices Application and hereby recommend approval. In addition to these facts
evidenced by the contents of the file for this Forest Practice Application.
Signed,
[01z 1 Eb
Kel Rowen,Planning Manager Date
A't �'� I()/ I "ice C./
ichael MacSems, FPA Reviewer Date
3