Loading...
HomeMy WebLinkAboutFPA2020-00007 - FPA Permit / Conditions - 11/4/2020 Mason County Planning Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us FPA2020-00007 FOREST PRACTICES PROJECT DESCRIPTION: FOREST PRACTICE APPLICATION ISSUED: 11/04/2020 SITE ADDRESS: 25000 NE STATE ROUTE 3 BELFAIR EXPIRES: 11/04/2022 PARCEL: 123282100000 APPLICANT: OVERTON &ASSOCIATES OWNER: OVERTON &ASSOCIATES PO BOX 1477 PO BOX 1477 TACOMA,WA 98401 TACOMA,WA 98401 1.206.948.0554 FEES: Paid Due Forest Practice Review $300.00 $0.00 Totals : $300.00 $0.00 CONDITIONS " 1. ARCHAEOLOGICAL RESOURCES Archaeological or historical resources, such as ruins, sites, buildings, artifacts, fossils, or other objects of antiquity that may have significance from an historical or scientific standpoint, which may be encountered by the developer/contractor, shall not be further disturbed. If the developer/contractor encounters any such artifacts, he/she shall immediately stop work and notify Mason County and the Washington State Department of Archaeology and Historic Preservation. Failure to do so may result in civil penalties. * 2. STORM WATER& EROSION CONTROL Escape of silty water or mud from this property shall be considered a violation of County and State storm water management regulations and could subject the applicant(s)to civil fines or penalties. This project is represented as meeting the 2012 Dept. Of Ecology Stormwater Manual as well as MCC 14.48. Before permits can be approved, Mason County must approve the submitted plan. * 3. HOURS OF OPERATION Noise associated with this application shall not exceed what is allowed under Mason County Code 9.36. Harvest operations shall start no earlier than 7:00 AM and shall end before 8:00 PM on a daily basis. Printed by:Kati Dooley on:11/04/2020 04:10 PM Page 1 of 2 . Mason County Planning b unity Development ,. 615 W.Alder St.Bldg.8 Shelton,WA 98584 360427-9670 ext 352 www.co.mason.wa.us FOREST PRACTICES FPA2020-00007 ' 4.SLASH ABATMENT This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an extreme fire hazard under RCW 76.04.600 and WAC 332-24-650.An extreme fire hazard Could be created if one or more of the conditions found in WAC 332-24-650 is located within 100 feet of the running surface of a public road;or Is within 500 of an existing structure and/or designated public use area,which Is not owned by the owner of the fire hazard area. The landowner is fully liable in the event of fire,if he or she fails to appropriately abate the hazard,Extreme fire hazards shall be abated by removing the forest debris,or by other means approved by the Washington State Department of Natural Resources(DNR).Assistance with creating an abatement plan can be obtained by oontacting the DNR. ` 5.CRITICAL AREAS SETBACKS Per MCC 8.52,logging and ground disturbing activity shall observe all required critical I area setbacks including a 150'F- Stream setback and the prescribed LSHA setback recommended In the Riley Group's Geotechnical Report#2020-007-1. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein r not.The granting of a permit does not presume to give authority to violate or cancel the provisi n othe It to/I cal law regulating construction or the performance of construction. Issued By: �- Contractor or Authorized Agent: Date: �� 5 6'tintod by:Koti 00048Y 6R:11*4W20 04:10 NA T -ExQ fl / 5 c ` MASON COUNTY COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health 615 W.Alder St.—Bldg.8,Shelton,Wa 98584 FPA 202� Phone:(360)427-9670 ext.352 • Fax:(360)427-7798 FOREST PRACTICES APPLICATION/NOTIFICATION Type IV General This application should be accompanied with an Environmental Checklist (SEPA) as well as an activity map/site plan which addresses items listed below. TYPE OR PRINT IN INK: 1. Landowner Timber Owner and Operator information. Legal Name of LANDOWNER Legal Name of TIMBER OWNER Legal Name of OPERATOR Overton&Associates Overton&Associates t Mailing Address: Mailing Address: Mailing Address: 666""r"���� PO Box 1477 PO Box 1477 trp 150 1t; I K T q City,State,Zip City,State,Zip City, State,Zip Tacoma,WA,98401 Tacoma,WA,98401 �a ggyQ Phone( ) (206)948-0554 Phone( ) (206)948-0554 Phone { Q� Email: David@eeoverton.com Email: David@eeovertoR.com Email: t t 2. Contact person information. Contact Person Phone( ) (2o6)948-o5s4 David Overton Email: David@eeoverlon.com 3. If you are harvesting timber,enter the Forest Tax Reporting Account Number of the Timber Owner: 800-007-011 For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829. 4. Legal description where the forest practices will occur. Parcel Number Sub Division '/.'/. Section Township Ran c E/W 12328-21-00000 NE 1/4 NW 1/4 28 22 01 W 12328-24-00000 SE 114 NW 1/4 28 22 01 W 5. Answer each question as it applies to your proposed forest practice. a. [)No. Yes. Is the activity within an urban growth area? b. [)4 No. [] Yes. Is the activity within a public park? C. [)d No. [] Yes. Is the activity within 500 feet of a public park? Park name: d. [J No. ICJ Yes. Is the activity located on lands platted after January 1, 1960? e. [J No. W Yes. Is the activity within 200 feet of saltwater X lake river/creek/stream X pond wetland seasonal runoff slopes which exceed 15%? x f. What is the expected duration of FPA? 1 year Proposed start date: June 2020 Proposed end date: June 2021 6. Are you cutting or removing timber? []No. Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the activity map. Rev. August 2017 R r Acres Volume to be Steepest Slope in Unit# Harvest Type Yarding Method net Harvested mb Harvest Unit Unft#1 Even-a ed Rubber tired Skidd r 48 867 500% 7. Are you constructing or abandoning roads? [X]No. [] Yes. Complete the table below. Show locations and identify all road activities on the activity map. Total Length Steepest Side Slope Abandonment Date Type of Activi feet % °lyr Road Constriction Does N©t App4- Tenworary Road Construction Road Abandonment Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife (WDFW). If you have questions concerning the HPA,visit the WDFW website at ww« wdfiv.w-a.2ovAhabitat.htm. 8. Are you installing or replacing water-crossings'? V]No. [] Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity snap. Crossing Crossing Dimensions Crossing Crossing Dimensions Identifier Tv width x length) Identifier Type width x length) 9. Mark the following activities that will be done in or over typed water. Activity in or over: Type I Stream Type 11 Stream Type Ill Stream Type IV Stream Type V Stream Removing culverts of bridges N/A Fquipment crossing Ground skidding Suspending cables Cable yarding Falling and bucking aher 10 Is any activity in a wetland or wetland buffer? M No. [ ] Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map. Wetland Wedand Type Activity Type in Activity Type in Total Wetland Total Area Total Area Identifier (1,Il,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres) other 11. Describe how the following are identified on the ground. • Harvest boundaries/unit comers: Pink Flagging • Right-of-way Limits and centerlines for road work,culverts and bridges: NSA • Critical areas and critical area buffer boundaries: Orange Flagging Page 2 of 4 x M 12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American cultural resources? [)No. CK] Yes. 13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance does not ensure compliance with the Endangered Species Act or other federal state or local laws. Signature of LANDOWNER Signature of TIMBER OWNER Signature of OPERATOR (if differen than land wner) (If diffe�tlandoer) � t Print name:Oeumwa*AvAx— Print name: �""+4q"C_ Print name: *5 Date: } 9 Date: Date: Additional information: (Optional) All la►ata s .ri 11 bc aa'a+a exis6---! 7il4m a.c. no c{reftnjs ar weA*-4s Wi rk;n E;S h.narxl- unit- All &�Ktt A-u) &FT,S A (le- G anma4 is*-Aet&A e. +AA 0 e4,.►ly- re 1" ��- In &JMAr S, —141% 00 QA un S4.66- CLAM& 60t 0IGL a I-A6416 {.,Q't. Ale_ Per Mason County Ordinance l 1.05,Section 11.05.120,a site map shall accompany this application which includes the following information. I Harvest boundaries and tree retention areas. II The approximate location of any structures. III The location of all existing and proposed streets,right-of-ways,easements, skid roads, haul roads, and landings within the proposal. IV The location of future land development including stormwater management facilities and vegetation to be retained for site landscaping, open space,wildlife habitat,screening,and/or buffers. V Site topography at contour intervals of 40 feet. VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance. VII Drainage ways and culverts. VHI Site area targeted for further harvest including proposed timing. IX North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet. Staff asks that,at a minimum,the comers of the harvest unit(s)be flagged for clear identification. Page 3 of 4 ti NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion control review. Projects which disturb more than one acre(regardless of total lot size)will require an engineered stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 2012 WSDOE Stormwater Manual. Applicants will be charged for Public Works staff time to review these plans and applications. Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a NPDES (National Pollution Discharge Elimination System)Permit. The threshold for such a permit is equivalent to Mason County's threshold. WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is not a perquisite for FPA approval. It is the responsibility of the applicant to obtain this permit when required. FPA FEE: $300 SEPA FEE: 0-9.99 Acres$730 10 to 20 Acres$880 Over 20 Acres$1,100 EIS(DS)$5,000+90/hr Departmental Review (For Office Use Only) Site visit: Date approved: /20?— Mdson County Community Services Page 4 of 4 WAZ JTl JMg3InJq Kbva TJOT 133M I —� ..v a,awra�n I � an o�i � 7 �rny ou t: r 71 ti 3 LIDVILL I! ,` y, \ i,/ �, "� c.a anm■taraap \ ¢� t ¢ • a � as _ \, W • // a lovbu a � ra �� am w•touwo -_. w .■ sc ... al a ' •$ - - - -- o as Le so v zi w ro �ge ^ •• c rc as d Lacc OR a• Is al �5�'a A I w w ae ,�" w n ■ _ �1 suc at w J � �t ry li OOt�9w1 I t NOLONMVM AIWM NOBVW FLlION WM'163M W BDNVH'HLION W dIFaAM V NO11O36 30 4/l MN 3H1=10 Z/l 3 3FU=10 NOLLHOd V e 31tl�S OlEdVED IMIHX3 DNIUV210 lU-LLLP. 3001EI OICIM-10