Loading...
HomeMy WebLinkAboutFIR2010-00036 Final Fire Supression System Suite A - FIR Permit / Conditions - 3/17/2011 IIAASON COUNTY DEPT. OF COMMUNITY DEVELOMENT Irspec6on Line(350)427-7282 r {� N Masan Couritr Bldg. 342E W. CsdarP.O. Box 186 Phone (3E0)427s367Q ext 352 ., Shelton, WA 98584 N N o r p FIRE PROTECTION PERMT FIFR20 1 0-00036 0 a - A"' JCANT: BOBALOOS BAR 8 GRI:.L CONTRACTOR: NORTHWEST FIRE Br MECHANCAL INC 1.350.M.1794 LICENSE:NWFIF RECEIVED 11�9/2010 SITE ADDRESS: 2409{3 NE STATE ROUTE 3 BELFAlR 1SSWY 12121f2010 pEXFIRES: 6QIM11 PARCEL NUMBER: 123283290030 LEGAL DESCRIP K)N: LOT: B OF SP*178 PTN TR 3 OF NW SW _ m PROJECT OESCRPTION: INSTALL NEW FIRE SUPPRESSION SYSTEM N EXISTING HOOD GENERAL WORMATION System Information i Type of Use: COMM Sprinkler"eads A.udbie SwAches: PLO Stations: z Fire District 2 thexr�i Flow Switches_ Visual Devices: DoorReieases: 0 Hood a Duct? Y Pressure Sw%ches:. smolke Detect .00rs: Duct Detectors: Dry Ccaf'} N Zones: Heat Deus: Wei Chemical?: Y Sperkte0- Sundppe? SDUARE FOOTAGE FEES IAorkoringCorapanr First ow: Type Amount Due Amount Paid llor4odrh0 Phone No.4- Second Hoar Hood& Dud Petm+t Fee $141.00 $14 t.00 Auto fie Alarrn� Third Floor: Hood and Duct Plan $73.00 $73.00 TGUL, $214,00 $214.00 a N O O O r N H N U FIR2010-00036 P*me refer to the fcibw n8 pages tar condibans of!firs permit. 1 of 4 �J A " CASE MOTES r N N F I R2010-00036 N r N O O r w CONDMONS FOR FIR2010.000M a a Y 1.) The hood and dud system is subject to inspections and corrections as deemed necessary by the Mason Canty Inspector to insure the minirmrn fire and life safety requirements are met as adopted by Mason County. o X > N The fire suppression system is required to be a lit 300 approved system. X n Z) peg section 901.2.1 bVttfie 2M5 fFtft-Twboh6i Fie code,Statement of Compliance. Before requesting final approval of the instalation, the instating coctractcr shad furnish a uxitten statement to the fire code official that the subject fire protection system has been instalted in accordance with the approved pLarrs and has been tested in accordance With flee manufactures specfications and the appropriate installation standard. Any devraborts frorn the design standards shall be rimed and copies of the approvals for such deviations shall be attached to ow written stalernent X o Thspermit bewmes null and void 0 work or conamiciorr a,ihohmd is no aommenoed wit,n 180 days,or If constructon a work is suspended for a period of 180 days all arty kneafter work a z corrnrenoed. Evh n ofcontnt>"onof work is a progress inspection%itn the 190 day period. Final inspecion must be approved beforebuildrg canbe oea kxi Prod ofconknuatlon of work is o by means of a prN seas`ape down The%vne r or the agaat on the owners be half,rr:prge nts tint fn a in lorma4on provided is am rale and gran is ern pioyees of Mason C o my amens to the above .o dw-nbed property and structure for review and ins pedlar. OMEA OR AGENT: DATE: 1 2- Z l- B X 553 NORI IWES P.O.3C s N rn 0 P 0 O N 0 N 0 F1R2010-00036 Pawn'turtothfdty+ringpQgmkrconditior. ddispe• 9t m 2 at t v A T W CONCRETE MECHANICAL MANUFACTURED HOME O Date By Footings 1 Setbacks Gas Piping Ribbons r OIntenor Date By Interior-Date By Date By O 00 Exterior Date By Exterior-Date By Set-up Point Load I isolated Footings INSULATION Dam t3y ca BG I SLAB INSULATION Date By Data By FIRE DEPARTMENT M Foundation Walls Floors Date By 90 Date By Data By DECKS X FRAMING walls Date By r Date By Data By PROPANE TANKS PLUMBING vault gate By Date _ BY OTHER Groundwork Attic Date By Type. Date B y Date By o.w.� DRYWALL Type- Date By DateBrace Wall By paw By X FINAL INSPECTION c Water Line Fire Seperation _& Date By Date By Date By O O CD o Pass or Request Inspect 0 Type of Insp. Fail Date Date Done By i Comments W M 1 n 0 R ai to 0 .r z N 3 w 0 h A L Get more power with less pressure!Mi-T-M's cold water,high volume wash is the perfect STATIONARY ELECTRIC - BELT DRIVE answer for applications that require cleaning • of heavy solids, especially from large industrial equipment.Ideal for wash bay set-ups. , Belt drive diaphragm j pump with pulsation dampener �" • • Pressure regulator with manual dump lever and gauge CHV-0525-OME3shown with remote slant control box op6bn(CX-0075) Pump:Aluminum manifold Motor.Totally enclosed fan-cooled electric motor with therm&overload protection Makeup water shut-off 10-foot,8/3 power cord on single-phase-1 0-foot,10/4 power cord on three-phase solenoid and flow Frame:Powder coated steel base plate-Four(4)rubber isolators • switch on outlet for Components:Time delay shutdown-Heavy-duty dual cogged belt drive system time delay shutdown and cast-iron pulleys Unit Includes:Stainless-steel Ion nozzle-50-foot x%-inch non-marking 9 range 9 9 hose with quick connects-High volume gun with adjustable pattern from straight stream to cone mist Typical Water Treatment Installation v.. Lk PB CHV 0505-OME3 connected to optional 300-gallon tank(CX-0072)which is connected to optional sump pump CLEANER SALES 1NCR and in-ground fiberglass pit (206) 622-4262 (800) 446-8778 from our water treatment line. www.BensCleaner.com ITE■ ITRI ITRR PARTS 6 LABOR ELECTRIC MOTOR POMP W.RR.MTY WARRANTY WARRANTY e Model No. PSI GPM HP/Motor Plug Type Dimensions(LxWxH) Ship Wt. Net WL • CHV-0525-OME1 500 25.0 10.0/230V,10,41.5A NEMA 6-50P 38in.x23.5in.x24in. 432 lbs. 372 lbs. CHV 0525-OME3 500 25.0 10.0/230V.30,25.6A NEMA 115-30P 38ir.x23 5in x24in. 407lbs. 347 lbs. .. Dptions moult price list or www.mi",cwn for more information on option descnot ons and qualifying models) NEMA L 15-30P, NEMA 6-50P, 16-0440 Replacement gun 30-amp plug 50-amp plug 50-0185 Accessory hose reel CX-0072 300-gallon tank "` NEW L 16-20P, CX-0073 460V.3-phase models(NEMALI6-20P) 20-amp plug CX-0074 18-inch stand CX-0075 Remote start control box i WC'P Series These wash-water recycle systems combine enhanced design with state-of-the-art technology to offer: Cone-shaped tank for easy handling of accumulated solids. J Quality recycled wash water without common odor problems. f Jle' Easy operation&maintenance. 4 �'h \ d 0 Heavy duty,corrosive-resistant base,for years of maintenance-free operation. d�'blCa o NF.MA-4 rated corrosion- ' proof control panel for safe and reliable operation. Hose connectors are designed for easy accessibility and quick installation;the connections are clearly t marked. y �ill i Filter pumps are easily accessible. WCP 20 0M10 Model# Flow Clarifier Media Cartridge Carbon Ozone Power Air RateTank Filter Filter Filter Generator Requirements Required Lx W x Hns Weight Shipping WCP-10-0M10 0-10 GPM 300 gal. 285 lbs. 120 sq.ft. 200 lbs. 6 grams/day 120V, 10,24 amps - 5'x 8'x 9' 2.100 lbs. WCP-20-OM10 0-20 GPM 600 gal. 350 lbs. 450 sq.ft. 300 lbs. 12 grams/day 230V, 10,26 amps - 6'x 8'x 9' 2,670 lbs. WCP-30-OM10 0-30 GPM 600 gal. 900 lbs. 450 sq.ft. 450 lbs. 12 grams/day 230V, 10,34 amps - 6'x 9'x 9'WCP-30AB-OM1 2,700 lbs. 0' 0-30 GPM 600 gal. 900 lbs. - 450 lbs. 12 grams/day 230V, 10 34 amps 60-100 PSI 6'x 9'x 9' 2,700 lbs. *Includes auto backwash Recommended Mi-T-MAir Compressor ACl-HE02-05M1 for use with the auto backwash. Consult your Mi-T-M Option: Authorized Dealer for specifications. Part# Description V1/X-0014 2'Automated Dump Valve CLEANER SALES INC. (206)On-4M (OW)4e""S i at 1.Surface-Mount Sump pump:Untreated wash-water is Introduced into the system vla a yi HP surface-mount sump pump. 3 2.ClarlfierOfl/Water/Solids Separator.-As the water flows through the cone-shaped oiVwater/solids separator,it changes directions countless times as the water is directed and redirected through cone baffles,and hundreds offj square feet of oleophilic(oil attracting)coalescing media. Mechanically emulsified oil particles are attracted from the water to the oleophilic media,and float to the surface. Once on the surface,the oil is skimmed off into an oil decanter for easy disposal.Pine silt and particulates are dropped to the bottom (� 9 of the cone for easy flushing and disposal of the accumulated solids. 3.Corona Discharge Ozone Infection: , Water in the cone tank is injected with a high concentration of ozone via a corona discharge ozone injector system,tiny h' bubbles saturate the water in the cone tank,killing live bacteria Instantly on contact. 4.oil Decanter.Oil skimmed from the surface of the clarifier tank Is captured in a conveniently located oil decanter.Oil can be removed easily for appropriate disposal. S.Solids Separator Chamber:Solids from the wastewater stream settle at the base of the clarifier tank.With the opening of a single valve,solids are easily dropped into a bag filter for effective capture and easy disposal.The bag filter is suspended on a de-watering tray with drainage returning to the in-ground pits. %.Customized Muld-Media filter(located at the back of the skid):Once♦fie water has been treated for oil and solids removal,it is then pushed through a customized multi-media filter which contains a special media blend to filter out particulates larger than 25 microns. 7.Reusable polyesterfflter.•Once the larger particulates are removed,the water is then filtered through hundreds of square feet of reusable polyester 20 micron filters.(Not used on auto backwash models) B.Activated Carbon filter:The final treatment stage of the system occurs as the water Is filtered through activated carbon which adsorbs hydrocarbons,herbicides,pesticides,some metals,and dozens of other carbon-based constituents.Activated carbon also works as a polisher for treated water to remove chlorides. g.O►tp/pNController.Por longer-term control of bacteria,the ORP injection system automatically measures and injects a germicide to control odor by killing odor-causing bacteria.The automated pH control system keeps the water at an appropriate pH level so the germicide Is effective at killing bacteria and controlling odor. 10.ltieated WaterHoldtng Tank:Treated water is delivered for reuse at 30 PSI to 50 PSI via a pressurized water storage tank 11.Electrical Control panel:NEMA-4 reated corrosion-proof control panel for safe and reliable operation. the importance of a properpitSystem(not shown in picture):Once equipment is washed,the untreated wash-water flows into your pit system(see page 24).A proper pit system for your application Is the first step in proper wash-water treatment,and is a critical element in any wash-water recycle system.Consult Mt-T-M Corporation or your local distributor to determine the pit system that will work with your application. 22 MASON COUNTY FI"{E MARSHAL �g Mason County Bldg.111 426 W Cedar St PO BOX 186 Shelton,WA 98584 (360)427-9670 Ext.273 Permit 9 go/O -0003(�;, Mason County Fire Protection System Permit Application Incomplete application will not be accepted i 36o-46 -"7actI Owner: l�u l' ��1--L- Phone#: 3LQ-27S- d 4 Z ) p 5,�'a R 3 - S . �4 Mailing Address: oC l — City: State:�Zip: 85 2 8 Site Address: &L cl City: State: Zip: �N 3 Parcel #: �� a8' ' �D Legal Description:( r ryv/ Lien/Title Holder: Address: r City: State: Zip: 4 Contractor: F-�Q q- Phone#: a 10 35►�fiti 1 1 " Address: c7, E 5 3 City: J m 4!'�G.State: bA, Zip: q eDS Contractor Registration#: �1 LJ 1 tl 271 K K Expiration Date: {C-t 6 3 � Building Square Footage(existing & proposed): 1" / 2nd / 3rd / Building Use: Occupancy Classification: Construction Type: Type of System: Type of Work: Sprinkler: Wet Dry New System: X 3 0 0 Standpipe: Wet Dry Modification: >z- j ti ig R AFA: Hood & Duct: �t� �ress;p�-1 5y5f2r� j t-2 Dry Chem: stirs hcx�ca' . Wet Chem: _ l /ye K/!rrl k• P,E,,,�S 3 b D-Be6 - 7R Fire Pump: c4V at6- t /�-7q 7 UL certified Monitoring company: F19� 3bO-996--91-2.3 Phone #: Contractors Bid Price: $ 1 3 5 D \\CLUSTERI_HOME_SERVER\HOME\COMMON\Community Development\BLIILDING\Fire Protection System Permit Application.doc Plan Submittal Requirements Your plan submittal shall include the following: • Plans shall be on standard 24" x 36"paper, drawn to scale with dimensions and north arrow. • Site and Floor plan with cross sectional and exterior elevations. • Location of occupancy and/or area separation walls, partitions, stairway enclosures, concealed spaces, etc. • Cut sheets and/or references for all new devices. • Location/description of all new and existing devices. • Battery calculations. • Wiring diagrams per floor or zone overlaid on an accurate floor plan. • Electrical riser diagram showing all zones, circuits, devices, and end —of— line resistors. • Hydraulic calculations. • Copy of Contractors bid. Fees The permit fee will be assessed based on the submitted contractor bid for the project or a minimum of$168.50. A plan review fee will be calculated at 65%of the permit fee(minimum$109.50)and is due upon submittal of permit application. Contractor's Affidavit I certify that I am a currently registered contractor in the State of Washington. I am aware of the ordinance requirements regulating the work for which the permit is issued and certify that all work will be in compliance with this ordinance. No changes will be made without first obtaining approval from the Mason County Fire Marshal. By: Date: \\CLUSTERI_HOME_SERVER\HOME\COMMON\Community Development\BUILDING\Fire Protection System Permit Application.doc