Loading...
HomeMy WebLinkAboutSSP Plan Review for COM2003-00127 - PLN General - 9/2/2003 i MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: September 2°d, 2003 INTER-DEPARTMENTAL COMMUNICATIONS TO: Rick Mraz,DCD -Planner FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. WO#PLG-03 SUBJ: SSP Plan Review NAME: Wolf/Goodell in Belfair COM2003-00127 Rick, The Stormwater Site Plan(SSP)prepared for the proposed commercial development of the Wolf- Goodell property in Belfair,has been received and reviewed by Public Works. The SSP conforms with Department of Ecology minimum stormwater runoff control standards and Mason County discharge rate requirements commonly termed downstream erosion control discharge rates. The second sheet of the SSP plan sheets includes Erosion and Sediment Control notes and construction sequence which should be implemented during the course of the property development. Mason County employs a pre-approved Operation and Maintenance(O&M) Covenant form to satisfy ongoing operation and maintenance of privately owned and operated stormwater control facilities. Attached please find a copy of the form Mason County currently employs. The applicant should be directed to complete, sign,notarize, and record the completed O&M Covenant with the Mason County Auditor's office. This requirement of the stormwater review and approval will be complete when Public Works has received a copy of the recorded covenant. Briefly,the SSP prepared for the Wolf/Goodell commercial property meets minimum stormwater control standards, and approval of the plan is recommended. Public Works should be notified when construction begins so that the E&S features can be inspected, and notified again when the completed stormwater facilities are complete, or near completion, so that they can be inspected and their conformity to the approved plans verified. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Si ely, 2 Al A. Tahja File: H: \WP\Strmwtr\Reviews\Wolf-Goodell.doc (A) Date: ,j ��� Work Order PERMIT#: /2x „oo3 — oo Number. f G Requested by: /24 Z r - Authorized by: , Date: Type QhWork: C� CHAf@E TO: W o J NAME AGENCY/COMPANY U] cn BILLING ADDRESS V C*" z PHONE S b. Irks Person in Charge: o Project Time Line: (from -to dates) P� TO Pro)od Start date: -Z-03 Es&na ed FWsh Date. ApK°0*nate h=s: 2 * ESTIMATED TOTAL$'S: 7� COST ESTIMATE _ (D) P3L4 _ Ernptoyw U9, Boors S1.m31 Frinae% TOTAL$ BAIL TOTAL f's EQUIPMENT USED: MATERIAL USED: "ee4R.t A..i�N'.it YYA.../.•fM..J...r:..A\......:.J...:.4.......w:<:. ..;�..w"� ..�'i.::. (F) Actual Cost $ BARS: PROD#. DATE Employee YtORKED Name ;i Rate Flours Frin�n% TOTAL$ EQUIPMENT USED: IZS.4 SDlt Rate TOTAL S'$ MATERIAL USED: TOTAL ALL (G) BILLED DATE INV I PAID DATE REC.M CKX I