HomeMy WebLinkAboutBLD13792 SFR - BLD Permit / Conditions - 4/1/1983 I liarmit No.13792 Type Residence No. Floors I Square Footage 1,642
Owner Werdall, Jeff M-10ne 75-51M_,Pate,�/ /1/R l
Address NE 1� zip -9 8 5 U
Contractor Steve Johnson, Const. __ ne
Address Belfa i r zipPlan Check rove i an or y a pie
Applicant's plot plan approved as to setback requirements, by g.P i 1 and
Legal Description: S 300' of SW 14 of SE 1/4, 1 7-9,1-1
Direction to project site: trom Belfair on Old Belfair Highway.
4/10 mile from 1st brid e on left
ee an Check ipermit ing�_ u r_��
Wood Stove Zeplace Deck Garage 518�zrport
Basement loftn Floor Se�co�Story
Inspections: 71°�'
o
a 4J
II Foundation:
CdiTc—ted FillFireplace footing
Forms i Anchor bolts
Foundation wall & rebar 2/h"3 'Fier spacing
Baseant wall & rebar Vents & crawl space
Retaining wall & rebar Soil-o,xood clearance
III Framing:
Floor Block ng
Ur3ers & posts Bridging
Joist size & grade Sub floor type
Span Grade & Nailing
Walls
material Grade �al� Z�ON
Bracing P , *08� ding
Ceiling height ��� N3{�ng
Roof 141. g.( - -/
7pproved trusses Hurricane Clips
Rafters Rirlings
Cathedral Valley rafters
Beams Sheathing
Span Flashing
Blocking Weather application
Nailing
Fire-stops
Walls Koeilings
Shower walls Unlace ducts
Dropped ceilings Main electrical box
Roof Holes plugged
Firred-gout walls Otbers
Stairs
Riser & Tread Headroom
Width Stair Jacks
Landings Handrails
I
Inspections:
� � v
Fireplace
Construction No. of flues
Flashing For:
Soffits
- ;X�ed Soffit Vents
Closed Ridge Vent
Cathedral
Windows & Doors
Impact protection Header Span
Openings Insulation
Sill Height Caulking
Attic
Ventilation Access
IV Plumbing
dents & Jacks Pipe Rims
Traps throom Facil.
Clean outs g � dicap Facil.
Hot Water Pressure Valv
Mechanical
Fans-Kit en & Bath Cl. Dryer Vent
Furnace & Ducts Stove vent
Insulation
Walls — Floors
Ceiling Exterior Doors
V Interior Cover
Finis Floors Finished Walls , R
Type lype ,C.-c-/,
Nailing
Decks, Balconies & Lofts
Guardrails Structural Sup.
Fire Protection
Doors Bunke Detector
Firewalls & Ceiling Wood Stove
Final & Occupany Approved. Date , By:
REMARKS:
I PEVAMI'f _...wTInN
III
n ATE 8'Y
IV
V
MASON COUNTY
A
Mason County Bldg. III 426 W. Cedar
P.O, Box 186 Shelton, Washington 98584
i i1,A T 1 . fl 1 t%4It's 1 :11 V. Vt m 1 1 t Uit } N`,f'r �. } 11fN`. f r11 i 4.'1 w(►iff
lit I t..111 t N 151"' t ItNif tf,fm 421— 1.16
HE.H 3—f�l68 F'Al•lt_ 1 1 ,' i1. l�1 .S4341V1�IH t'1 rS { I I I V fit f
AIM A111)Rk `�,', HE 16-f- 01,0 Ht I FAIR 11WY HE t FAI k PER
(1I1NI-k .Jf:f l' WE RUAI. 1. :►7h-540H NULL & VOl ' E, EXPIRATION
r(lN 1IIAf I Ifk • OWNER IS COMJRAC 1t1ft �� ,�� BY
I IiAl to a of so sF Is *s112' o1 #63 DATES--
t.1, AS!-) of 141.)111�, A01) fit Ilk H HA I It H �1vp1 111114111111 N( 11111E Rf+t1PI I o 1111011111 lit PAlt ►t HI'ltf
'1 Y I,t: 0 U lJ 7—
Of' '"
f.tlf' . 6k1)111> . H1. 0 _ Hl IrIH 1 _ 43 . i4 f 1 ,PkNi. ':9i.ff l fH f{jl'+i'+ YYMYNYf „ I
ilf'f tit ('tIN rT f 144F'PI All `; . - H P(tf f ttb.ff f I R Y1 14141 belYNYY +
(fVIAIt' I0A0 . . A Wt)()t1`, lfib>I 0 Ipto f ?l .ff PIN f+q/t 9YY4RYN
DWI:-,1. t , IfNI '€S . . . H PAkkINt, I,PAI.I,k' 1 0 INI:N I in Yf P10 Y11M41 ffffeff
:INSPECI' '10N AkE.A : 1 sl4tifil- 1 INI : N 1tifff 1 4,54 1110 A01 1141 �1'•.' 'd ptklAilflN {7Altfl!
1:�.�._ 7�-.-•,�-�.,,��=�� :,T-.ter--•'�.,-�"'",� 1
FItUN ( ..E t, H 1 1'. HA } H HAS I N 0 o-i t fi1'
F?FA W E> Hft H A I H IUN:, . . . N ; `I'y" 14 H" MIMI f,
S tfit, I I . N 01 t. 1411WLkti , . . . . 0 f"IWN 1 00K. H I If 4? !.!, ;r,9 111'
0 f t. WA f U R lit-A F ft H F 131 i N I 001, H 1 11 H 0 I f 1' '
Sifk 111 mt. . H . H f I: 1,1 0 r1l4f WA',111: k`; . H Ft_f14N I l full; N '.H f lit' 49 y I-Aii
tAltf t► _____._.___ .. __..___-- K.1.Tt HtN `, IN1, N tit.-AI NIIMI-' 0
I •1tll ` I Z E x t` I'1. f) R 1)kAIN`.•, . 0 Vt.NI " I'�) II pi', H 1 :'Al' r tifll 1 i:', N 1 1 Nit tH 0
H11 t D'I NG . . 1140 f DR I NV S Nf'3 F(If1N 1 H Vt-H 1 I AN':, H ti(mil', tit 1-11 1) 1 li 0
HW,f ter N 1 0':; t I.AI►NtIRY I rrA Y S H Iliff4; I N1. 1 N 0 1 l`1 AI #..._.
})( f:t Ht i If f '•,HWA`Alt k 0 A 114 IIANII I I N19 UN I f`, f.rfhitgl I Nf. I tI H
NAN' j'l A(;1., Hip I' 6 ARN (1 t ',i II>,A ur —. t04100 ,' tOff . 0 I"t 1 t11 i 1<f i'h I Ic H
it f %d1 ( UR .l Nit I , . 6' 10000 r. 1 W !1 I If k IIN I i 0
MI t; t'IM I I11"; 1tlkf '_ kf (,rI MIIit 1 '. 0
FI ,i{'rl UftiiAfPitnN:a,6N1if11N .
NRn,ff(f tArA1I011:010 BMW N1}t FRON 01FA1R 011140 ttYfN NRINtI,f .4 Nltf+ 11W fill fill
f0h M1411 WOOS kffll A114 ve10 if 110P1 Al r0#%IR6111isN AfITNAAf;IN IN NAI I04111` 11T1 41111111 1$# IIA0. 00 It 1,001,1101111111 fiR 11001 1% W11(NNf@ f(1F A MICA
0t lair 11A7 AI ANY I I N t At1IR It0AI IS f1iN0fMff11 rVI(Ifolt ot, z'01111f0AH"N of 114111 f5 A PRffr,Pf"� t0`:PFr11nN f1}1NIN IHf Iso (IAY 1'1Flop F(04L WpfrfldN Nuyl Af
APPROW11 Nf18Rt 001I01N6 CAP 8f nffuPifA
440kR OR
110 tRNI, rev: f3 311 COMPU I ANCE I (.I A I I A(,1ft- If I:ONO 1 F I ON:, I:, H1.QIJ E'kI i)
- w
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date 7 /- ; c-/ by C Ribbons
date Cq/G- - by C-c J Gas Piping r date b
Foundation Walls Can i� ,,( 6Pro ua date by Set Up
date e- by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date date y
PLUMBING
� by L .� date (o- - Sc by L-� OTHER b
G Attic
date by date by
D.W.V. WALLBOARD NAILING
date &-/(_ - c' by L date !1-- ( (-Z 3-f by
Water Line FINAL INSPECTION
date(�_-�` j� by date by date by
Z ��U GDP i'�U \\ G�'Z c c N ff Z (I
Z II �(p� -�-tPc Fit nc�g G. t ti,L a J OCT" C-:�i
MASON COUNTY
Mason County Bldg. 111 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
'o o I ) I I I it.if IN P
N H t D(43 0 0 6 H *rat
f 0 r' J V i I WkkUA 1.1 Lx
age
i lip its ip tiand i i nq rma s ccl r iop It 1 h.-f/af dolf'. 111-i i oil I i )m I I I
1. I qtj i d5 i n ex.ce,,f; o o t I i t- t I j I j
f 1 it 1,
'I,)A
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas'Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by
date by
WALLBOARD NAILING J I
D.W.V. l-iy- lq
date by date by
Water Line FINAL INSPECTION
date by date by date by
h3 kC I l
Tp� r G, ,,,) r G c GLC '—c
� f(- C O V n r r, it eAC4 � J '
'r G k � CZ 1� ray `
• 0✓l r�t CT r G 2�x v �D C. Cyr t c>r j(f Vl
r
o r
// Ou t t.
�,
r /
l e , e
S r eS � LJ
/ 6✓ 'r
/ Ji►S
i 4e, t u r n e
100 n_ 4'r`, gif,�n d CN-,&(r h,54�� drti
t' f c o r c �� c C
/ r -
3 � t.Yi y�� -} �c' �! r�fr � ram aG ��, <, �?i•.'1 a(o G1 �; ��S �✓
Date Checklist Prepared 3- i -9_
MASON COUNTY BUILDING DEPARTMENT
PLAN REVIEWER AND INSPECTOR CHECKLIST
1991 WSEC AND V&IAQ CODE COMPLIANCE nn d
Permit Number g3- 10(a� Address Nk 16�I Old t d�; r at S . Ft.~ /'/0l�n
Name on Permit s �, ke-sky Contractor/P one # �7S - S3D8
Compliance Method: Prescriptive �_(Option ) ( ) Component ( ) Systems Analysis
Date FOUNDATION
Insp. Rev.
( ) ( ) Slab: R- (Ext.foundation down to frostline/slab bottom;or interior 24"top of slab&horizontal. Radiant under entire.)
( ) ( ) Below grade exterior wall insulation: R-
( ) ( 4 Crawlspace ventilation: IILIQZ - sq.ft.NEW150 sq.ft.floor area-cross vented)
LSD FRAMING
<tandard ( ) Intermediate ( ) Advanced
( ) ( ) Woodstoves and/or fireplaces: (6 sq.inches combustion air supply duct with damper direct to firebox.)
Standard air seal: (Bottom plate/subfloor,rim joist/mudsill,window/door frames,penetrations condition to non-condition.)
Attic ventilation (1 sq.ft.)yA/150 sq.ft.ailing area)
( ) ( ) Spot exhaust fans: W'exhaust-bath/laundry 50 cfm @.23 WG;kitchen 100 cfm®.25 WG. Vented out with dampers.)
( ) ( � Fresh air ventilation: Available to all habitable rooms. Installed and operational. (integrated forced air,windows,wall ports.)
Whole house exhaust fan:84D cfm (Intermittent system manual&auto controls/sone less than or=to 1.5 at.1 WG)
Rlemodel R lh,-odm �
INSULATION
Attic baffles installed to deflect incoming air(Rigid material resistant to wind-driven moisture,extend 12"above loose Fill or 6"
above bait insulation)
Mechanical ventilation ducts R-4(Exhaust in unconditioned space&supply in conditioned space.)
( ) (Wall insulation(above grade) R- (Batts face stapledk__'�)�
( ) ( ) Wall insulation (below grade-intenor) R- (Batts face stapled)
( ) ( Vapor retarders on walls (Faced bait,or 4 mil poly or perm.paint.-circle one)
( ) ( ) Rim joist(Insulated with vapor retarder-rigid foam and caulked or 4 mil poly.)
Vaulted ceiling insulation R-_30 (vapor retarder& 1-air space)
FINAL
( ) ( -I-- r insulation R- ,, (Substantial contact w/surface,supports less than or=to 24"OC,not blocking vents.)
( ) ( Ventilation system is operational (spot,whole house,fresh air to all habitable rooms. If integrated system,certification by installer is
equired.)
( ) ( _r___J1HVAC ducts in unconditioned areas R-8 (Joints sealed;mechanically fastened with a minimum of 3 fasteners.)
( ) ( -��Pipe insulation R-3 (Hot and cold lines in unconditioned areas-service or recirc.see Table 5-12).
( ) C SHW heaters: (NAECA label,separate power or gas shut-off,on R-10 pad if electric in unconditioned or on concrete.)
( ) ( Heating system type: &Iec) Pin f-�� r-.,A.
Radon monitor on site with instructions.No. Supplied by MCBD
( ) ( ) Thermostat: (Heat range 55-75;AC 70.85;both 55-85. Backup heat controls(lockout)prevent simultaneous operation of primary system.)`
( ) ( ) Solid fuel appis.: (Glass/metal ligh(-fitting doors;dir.comb.air source,or 4"dia.dampered,indir.source for existing const.)
( ) (Ground cover: (6 mil black polyethylene or approved equal lapped 12"at joints,extending to foundation wall.)
Penetrations(All exterior wall and ceil)'gg penetrations sealed to drywall-plumbing,exposed beams,will receptacles,fans,recessed lights.)
( ) ( �lCeiling Insulation R-off hnsuulate&weatL/Wrrlp e/-'i baf a to�nt spillover-no cardboard)
( ) ( ) Vapor retarder paint if a vapor retarder was not installed when insulation was installed.
• r �
GLAZING
Plan Reviewer-Fill out this glazing section or attach a window schedule to this checklist. IMpector- Verify window
information during field inspections. Include skylights, glass doors and all other glazing on this form. Use rough opening
area for calculations.
Date
Size Quantity Area Sq.- Ft. U-Value Manufacturer Rev. Ins .
aid
o XD 7,,s c.i4 r r
D
PP
o d SN
D y O I l Zy
M2 FD
D 610 /
Total glazing area:
Total conditioned area:
Percentage glazing: , 17 7 Verified:
DOORS
Plan Reviewer-List opaque doors by type(solid core,insulated,etc.)quantity,U-value,and manufacturer. Impector-
Verify door information during field inspection.
Date
Type/Quantity U-Value Manufacturer Rev. Insp.
3
14
Signature of Building Inspector: Date of Final Inspection:
s
C? 3
/VF_
4
C1.
MASON COUNTY Permit No.BLD _
BUILDING PERMIT APPLICATION
PLEASE PRINT
#1 Owner ff� � tkc—ylv WF—MPLL Phone#
Site Address _ U
City St_ U11A Zip
Directions to Job site OLDl NvJ `f' � Orl\ C� A1P
kJ ti�N KNTL UV-I G QE .1 m 1 EL (-)N LL-FT
Owner Mailing Address
City —St y� Zi
Lien/Title Holder_ �:E \\ l D E SAITJ
Address
City St Zip
#2 Contractor Name C)W LFC-V- Contractor Reg#
Address Expiration date
City St Zip Phone
43 If septic is located qn project site, include records.
Connect to Septic? �/ Public Water Supply Well
(If residential, proof of potable water may be required)
#4 Parcel No. 2 2,i J
Legal Description '�✓ L4 SW S
#5 Building Square Footage: (existing/proposed)
Ist Fl `MO 2nd 3rd Fl / Loft /
Basement Deck / # edrocm #bathrooms NF
Garage - / (Circle: Attached or Detached?)
Other sq f t /
#6 Use of building _ � ` Ivj MCP Describe work W-�\ON VtVUE
#7 Type of Job: New Adder_ Alt Repair Demolition
Woodstove Re-Roof Bulkhead Other
#8 MOBILE HOMED TION
Model Year Model
Length_ Width Serial No.
#Bedrooms #Bathrooms Type of Heat
#9 Any water on or adjacent to property: saltwater lake
river pond wetland seasonal runoff
other CIE L
Show following on the site plan
Lot Dimensions Flood Zones
Existing Structures Fences
Structure Setbacks Driveways
Water Lines Shorelines
Drainage Plan Topography
Septic Systems Wells
Proposed Improvements Easements
Name of Flanking Street Scale:
Name of Fronting Street Date:
--- —1 L
APPLICANT TO DRAW SITE PLAN BELO
T-, ACRES
NEW KM.
4 is
C-Kouvt - WAN
35' AWRY
41
--- -
--------
OLD f3� �1 I.IUI�(
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
V-L97
_'-�1nQ Fixtures each) Fee
No. Toilets Vent Systems X 3 . 00
Bath Basins Vent Fans X 3 . 00
Bath Tubs No. Boilers/Compressors
Showers 0-3 HP 00
Hot Water Htr 3-15 HP 6 . 00
Laundry Washer 15-30 HP 6 . 00
Sinks 30-50 HP 6 . 00
Floor Drains 50 + HP 6 . 00
Laundry Basins No. Air Handling Unit
Dishwasher <= 10000 cfm. 7 . 50
Disposal > 10000 cfm. 7 . 50
Urinals Other
Other Evap Coolers
fS Hoods
Permit Basic Fee 1. 00 Fire Suppression
TOTAL PLUMBING $ Domes . Incin.
Comml . Incin.
Reloc/Repair 6 . 00
Mechanical Fixtures Gas Outlets X 2 . 00
No . Fuel Types Woodstove se arate
Furn < 100K BTU 6 . 00 Other
Furn >a 100K BTU 6 . 00
Furn - Floor 6 . 00 Permit Basic Fee '19,00
Heat Pumps 6 . 00 TOTAL MECHANICAL $ j �
NOTICE: THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK
IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANYTIME AFTER WORK
IS COMMENCED
OWMRS AFFIDAVIT cON PA=Rs AFFIDAVIT
I CERTIFY THAT I AN EXEMPT FROM THE REQUIREMENTS OF THE I CERTIFY THAT I AN A CURRENTLY REGISTERED CONTRACTOR
CONTRACTORS REGISTRATION LAW RCW 18.27 , AND AN AWARE IN THE STATE OF WISHINGTON AND I AM AWARE OF THE
OF THE MASON COUNTY ORDINANCE REQUIREMENTS FOR WHICH ORDINANCE REQUIREMENTS REGULATING THE WORK FOR WHICH
THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE
WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING WITHOUT FIRST OBTAINING APPROVAL FROM THE BUILDING
DEPARTMENT. DEPARTMENT.
X OWNER �" "� X BY
DATE - DATE
Return permit to: Department of General Services
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427 -9670/1-800-562-5628
FOR OFFICIAL USE ONLY: Accepted by:--rk> Date: 2'�
DEPARIWNTAL REVIEW
FOR 0"103 USE ONLY
Approved Cond Hold
Approval
Planning:
Environmental Health:
MT
Building Plan Review:
Occupancy Group:
Fire Marshall:
Other:
FEES
llspecial Conditions: 11 Ilsite Inspection I II
II uao a �I 11 I
II 11 IlBuilding Permit 13 1l
II II U ,1
II 11 11violation Fee I II
II it H it
II 11 Ilviolation Investigation Fee ( 11
II II 11 -I----II
II II II Plan Check I I II
II II I I
II 11 II Plumbing Fee
II 11 I I
II 11 1lMechanical Fee
II II I I
II 11 IlWoodstove Fee 1 11
II II I I
II 11 IlBuilding State Fee I A Il
I I
IlBuilding V*pl t3 d1i: ' ��� II II ''�•' TOTAL 1 q S .
APPLICANT NAME:
BUILDING PERMIT CHECKLIST
1. SITE ADDRESS
If site address is not listed, customer needs to be given
site address form.
DIRECTIONS TO JOB SITE
Needs to be as complete as possible (i. e. major roads, is
house on left or right side of road) Be sure to read for
clarity.
LIEN/TITLE HOLDER
Who holds the mortgage? (Bank or name of private owner
holding contract)
2 . CONTRACTOR REGISTRATION # & EXPIRATION DATE
This information needs to be provided. Building Department
may be able to research expiration information if
customer doesn't know it. We must have a signature in 1 of
the 2 boxes, either the applicant or the contractor.
3 . SEPTIC RECORDS
Septic records should be included or be sure to inform
customer of $25 record research fee for Environmental Health.
If no records are available, make a notation on the form "No
Records" . If septic was just perked, please indicate in upper
left corner. %3 tit UK. �r►��
"N* J4 . PARCEL #
Parcel # must be included or researched through Gateway.
""445. BUILDING SQUARE FOOTAGE
Verify that boxes are filled in. If there's a garage, verify
whether it is attached or detached. Include sq footage
information for mobile homes (you can multiply length X width
to determine number) .
6 . USE OF BUILDING
Is it a residence, garage, greenhouse, etc. . . ?
DESCRIBE WORK
(i.e. mobile home addition, addition to a house, etc. . . )
%%%*1_7 . TYPE OF JOB
Verify boxes are marked.
8 . MOBILE HOME INFORMATION
Verify boxes are marked. If factory order, please put factory
order # in mobile home serial #.
page 2 BUILDING PERMIT CHECKLIST
SHORELINES
If any water is on or adjacent to property within 200 feet,
#9 must be complete. Once permit is entered into Tidemark, it
will be routed to the Planning Department. If property is not
on water, then put "none" or "n/a" .
10.SITE PLAN DRAWING
Must have setbacks from all property lines, easement lines
and structures.
11.TOPOGRAPHY DRAWING
If property is flat write "flat" on the topography section.
If house or structure is near a slope or hill, drawing must
reflect this.
12 .OWNER OR CONTRACTOR AFFIDAVIT
Owner or contractor must sign affadavit statement and date
it.
,"%�13 .ACCEPTED BY
Whoever is accepting permit information must sign your
initials and date form on the bottom of page 3 or use date
stamp and initial on back of permit.
14 .PRINTS
Need two sets of prints unless it is a stock plan. For stock
plans, we only require one copy. " '� AA14 71 09
.WATER ADEQUACY dotty
For new residences and mobiles-. Priv— wells must have well
logs or capacity test and acteritest
11 II
16 .WSEC & V & IAQ CODE '
Energy code app ies to new residences, Jditions to new
residences and a ditions to liv_in -area for mobiles.
Compliance form mu -be complete unless the applicant has a
signed agreement with either PUD (#10 or #3) indicating
participation in the Long Term Good Cents program.
\N417 .PLUMB ING/MECHANICAL
This form must be completed for any structure with plumbing
and mechanical excluding mobiles/modulars.
IM18 .FIRE DISTRICT
Please make sure the fire district is included in the
application information. Refer to map located at counter.
** DO NOT ACCEPT PERMIT APPLICATION WITHOUT PRINTS AND DETAILED
REQUIRED INFORMATION (SETBACKS, ADDRESSES, PARCEL# AND WATER) .
"permitck"
O1/08/93
2 times the tt Top of
egtT of Struc:we =//r
13' Mcx.v Slope Face of
a Footing
Face of roe of _
Not to msed 40'-t-
Structure Slope 3W
�E BUILDING CFFICIAL MAY APPRQv-
TYPICAL STRUCTURAL SETBACK ALTERNATE SETBACKS a CLEp.RgNCES
Scab I" = 20'
SamPie Site Plan
2 41'
I 5 3' 14'
40' 32' 20'
o PROPOSED n ,
RESIDENCE
L
n«a
£DGc OF 9ANK Septic Tang
m 68'
24.40
v
40' O o
to
Min.S'setbarx Weil(see 121
238' I U
TYPICAL SITE PLAN In = 20' _
J. DOE 1406 Malon U. Or.
N
i
II
Ems, ous
• k Werdall makes arrangements or the days construction plans with Olympic College stu-
SCHEDULING THE WORK, Becky
dents Scott Heckly�and Aimee Busch with 1 year-old jesse on her hip. The 7 a.m. meeting is part of the routine Werdall
po to day care, school and work.
� through eve morning before th all rush off y �
I and her four children go th g every g �'
0 L Y M P I C COLLEGE CLASS Z
buildin fior the future
9
j
a
a
Scott Heckly always knew he wanted to phase.All of this must be done within the. the importance of finesse—it's helped me to
build houses.Becky Werdall knew she needed financial framework set by the lender involved slow down and do the job right or be prepared
to do something about her home on the Old with the project. to.do it over."
Belfair Highway. OC also requests that the client make a Busch hopes to be an architect some day
Heckly needed experience;Werdall needed donation to a scholarship fund equal to 10 per- after working in the construction trade for
help.The Olympic College Construction cent of what the commercial labor cost would awhile to practice her newly acquired skills. 3
e been for the project. The scholarship Short has his sights set(In a career in real
Program was able to provide both. hav
Werdall needed help finishing a remodeling money goes to second-year students in the pro- estate management.Already the owner of one
project started in March 1993 to make more gram who maintain a minimum B average. rental property,he hopes to buy,remodel,rent
space for her and her four children. She need- The Werdall project was made possible by or sell a number of homes in Kitsap County
ed exterior siding,sheetrock, countertops,tile, financing from Olympia Savings and Loan in following his June graduation.He is a firm
flooring and more to finish the job,but was Belfair. Cheri Cloud,vice president,says it's believer that to attract quality renters he must
unable to qualify for conventional financing at been exciting for the institution to be involved offer a quality home.
reasonable costs. in a project that has helped Werdall and the With raising five children, owning a small
Then one day this fall she made the call that students as well. business and attending college full time,you
matched her needs with the skills and exper- Werdall's house was actually two structures might think Short's biggest challenge would be
tise of Olympic College students. joined by a long corridor. When OC took over finding some time to sleep.
Grant Newman started the construction pro- the project, a large tarp hung in the hallway "Since I don't have 20 years experience in
gram at OC in 1977 to give his students experi- entrance to conserve heat.Exterior siding, the construction industry,my degree will give
ence with real-life projects. sheetrock, countertops,bathrooms and floor- me the kick start I need to demonstrate my
Newman wanted students to be able to ing were needed to make the addition off the qualifications to future clients,"he said.
learn the nuts and bolts of the trade while he hallway livable. For Werdall,being able to provide a"hands-
offered the guidance to get the job done right. Heckly,Dave Short and Aimee Busch are on"laboratory where the students can gain
Here's how it works: Newman visits the site the three second-year students in charge of the experience is a privilege.The pleasure, she
and assesses its potential for the program. If says, "will come when the job is completed."
he gives it a thumbs up,the students take over. Werdall project.
They must determine what needs to be done Heckly, a recent graduate of North Kitrap She plans to invite the students to an open
et
and then work et a bid that includes a coin- High School,says the most challenging part of house after completion of the project. "I want
the project has been"learning to be diplomatic
plete list and cost analysis of the required them to see my family settled in to our new ;
building materials,site preparation tasks, a with people,like the vendors, client.and other home,to tour what they have done, and to ,
building schedule and deadlines for each class members.Also,I've learned more about experience the satisfaction of a job well done.
Story by Pam Merrill Special to The Sun Photo by Steve Zugschwerdt Sun Staff
r
FOR THE RECORD B2 . OBITUARIES B3 • CODE 911 B3 • LOCAL BUSINESS B4 SECTION B
E OUIND
ST -1- S
A Belfair family that couldiA afford to finish
olution at Olympic College.
remodeling their home found a s
9
{
1
r
- - f
a.
t
i
i
t
R - �