Loading...
HomeMy WebLinkAboutBLD2024-00454 SFR - BLD Inspections - 8/28/2024 615 W.Alder St.Bldg 8,SHELTON,WA 98584 MASON COUNTY SHELTON:360-427-9670,EXT 352 /1 COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 Building,Plammg,Envitonmental Health Community H"Ith ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php Permit Number BLD2024-00454 Date Issued 05/09/2024 Issued By Project NEW SFR-STOCK PLAN 2018-0044,1217 A GR / 1 Site Address 261 NE OLYMPIC RIDGE Applicant LENNAR NORTHWEST INC Contractor LENNAR NORTHWEST INC Contractor Phone 1.253.350.6264 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW SINGLE FAMILY RESIDENCE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. "THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.- PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls _ — Other Rough-In Groundwork Plumbing Framing t Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing7. �( Underfloor - (-TI DIED Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls .-( ,94, tC Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other Mason County 1 Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov FR 4-00454 NEW SINGLE FAMILY RESIDENCE ESCRIPTION: NEW SFR-STOCK PLAN 2018-0044, 1217 A ISSUED: 05/09/2024 ESS: 261 NE OLYMPIC RIDGE BELFAIR EXPIRES: 11/05/2024 PARCEL: 123285100076 APPLICANT: LENNAR NORTHWEST INC OWNER: LENNAR NORTHWEST INC 33455 6TH AVE S, UNIT B1 33455 6TH AVE S, UNIT 131 FEDERAL WAY,WA 98003 FEDERAL WAY,WA 98003 1.253.350.6264 GENERAL CONTRACTOR'S LICENSE: LENNAR NORTHWEST INC License: LENNANL783JO 33455 6TH AVE SOUTH UNIT 1-13 Expires: 08/18/2026 11807 NE 99TH ST,SUTIE 1170,VANCOUVER WA 98682 FEDERAL WAY,WA 98003 1.253.350.6264 VALUATIONS: FEES: Paid Due U VB Utility, miscellaneous 400.00 $26,592.00 Mechanical Fees $153.00 $0.00 R-3 VB Residential, one- 1185.00 $196,804.80 Technology Surcharge $51.03 $0.00 and two-family Plan Check Fee $371.39 $0.00 Covered Deck/Carport 60.00 $1,320.00 Building Permit Fee $1,856.96 $0.00 Building Plan Review/Change of $135.00 $0.00 Use-Onsite Sewage Planning Review Fee $240.00 $0.00 Plumbing Fees $115.00 $0.00 State Fee-Residential $6.50 $0.00 Plumbing Base Fee $25.00 $0.00 Mechanical Base Fee $30.00 $0.00 Total: $224,716.80 Totals : $2,983.88 $0.00 FIXTURES Qty Mechanical Fixtures (3ty Plumbing Fixtures 1.0000 Dryer Vent(s) 1.0000 Number of Hose Bibs Printed by:Annie Wilson on:05/09/2024 08:56 AM Page 1 of 7 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2024-00454 (Qty Mechanical Fixtures Oty Plumbing Fixtures 1.0000 Kitchen Exhaust Hood(s) 1.0000 Number of Clothes Washers 1.0000 Ductless Heat Pump 1.0000 Number of Dishwashers 1.0000 Wood/Gas/Pellet Stove(s) 1.0000 Number of Kitchen Sinks 3.0000 Spot Vent Fan(s) 1.0000 Number of Water Heaters and or Vent 2.0000 Number of Bath Tubs 2.0000 Bathroom Sink 2.0000 Number of Showers 2.0000 Number of Toilets REQUIRED INSPECTIONS Setback Inspection Rough- Plumbing Inspection Footing Inspection Mechanical Inspection Foundation Wall-Pre-Pour Inspection Insulation Inspection Underfloor Inspection Exterior Wall Insulation Inspection Shearwall Inspection Connection is to be verified by Health or Utilities Framing Inspection BLD-Final Inspection CONDITIONS * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. * The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth, minimum 12 inches, shall be observed below grade in undisturbed soils. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. Printed by:Annie Wilson on:05/09/2024 08:56 AM Page 2 of 7 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2024-00454 Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * All property lines shall be clearly identified at the time of foundation inspection. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. * Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. * Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer specifications and in accordance with IRC Section R315. Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level of the dwelling. EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or created. * Concrete used for basement walls,foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * The use, handling and storage of hazardous materials or flammable and combustible liquids is not allowed without the approval of the Mason County Fire Marshal. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries(L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. Printed by:Annie Wilson on:05/09/2024 08:56 AM Page 3 of 7 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2024-00454 " By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 mph with 110 mph gust factor. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * Installation of heating equipment in a single-family residence shall meet the requirements of the current WSEC R403, applicable sections of the IRC, and IMC. Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.7. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be available for inspection during inspection. Referencing IRC M1601.4, all ducts, air handlers, filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure- sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches(38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be insulated to R-8 DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit documenting test results in accordance to IECC/WSEC Section R403.3.3 shall be provided to the Mason County Building Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website titles, "Duct Leakage Affidavit"or"Duct Leakage Testing Results (Existing Construction)." Duct tightness testing is not required if the air handler and all ducts are located within the heated space. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Annie Wilson on:05/09/2024 08:56 AM Page 4 of 7 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2O24-00454 * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverti ng/d itch i ng system or road way. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. * A minimum of 90 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance with IECC/WSEC Section R404.1. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. * A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space where the furnace is located, a utility room, or an approved location inside the building.When located on the elctrical panel, the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab, basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the solar heat gain coefficient(SHGC)of fenestration. Where there is more than one value for each component, the certificate shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service water heating equipment, duct leakage rates including test conditions as specified in WSEC Chapter 4, and air leakage results if a blower door test was conducted. Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air changes per hour when tested with a blower door in accordanve with WSEC Section R402.4.1.2. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 500 square feet. Reference WSEC R402.4.1.2. Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2015 Certificate"and are available in %or'/2 sheets. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. Printed by:Annie Wilson on:05/09/2024 08:56 AM Page 5 of 7 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2024-00454 Adopted Washington State Energy Code Compliance has been approved as follows: Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C, Window(Max U- Factor):0.30, Skylight(Max U-Factor):0.50, Doors(Type/Max U-Factor):0.30 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation min. R-49, Vault Insulation R-38, and Slab Insulation R-10. Table 406.3—Energy Credits (Single Family) 1.2 Prescriptive compliance is based on Table R402.1.1 with the following modifications: Vertical fenestration U =0.20 2.1 Compliance based on R402.4.1.2: Reduce the tested air leakage to 3.0 air changes per hour. maximum at 50 Pascals or For R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested air leakage to 0.3 cfm/sf maximum at 50 Pascals and All whole house ventilation requirements as determined by Section M1507.3 of the International Residential Code or Section 403.8 of the International Mechanical Code shall be met with a high efficiency fan(s)(maximum 0.35 watts/cfm), not interlocked with the furnace fan (if present). Ventilation systems using a furnace including an ECM motor are allowed if they are controlled to operate at low speed in ventilation only mode. 3.4 Ductless mini-split heat pump system, zonal control: In homes where the primary space heating system is zonal electric heating, a ductless mini-split heat pump system with a minimum HSPF of 10.0 shall be installed and provide heating to the largest zone of the housing unit. 5.5 Water heating system shall include one of the following: Electric heat pump water heater meeting the standards for Tier III of NEEA's advanced water heating specification or For R-2 Occupancy, electric heat pump water heater(s), meeting the standards for Tier III of NEEA's advanced water heating specification, shall supply domestic hot water to all units. If one water heater is serving more than one dwelling unit, all hot water supply and recirculation piping shall be insulated with R-8 minimum pipe insulation. 5 7.1 All of the following appliances shall be new and installed in the dwelling unit and shall meet the following standards: Dishwasher—Energy Star rated Refrigerator(if provided)—Energy Star rated washing machine—Energy Star rated Dryer—Energy Star rated, ventless dryer with minimum CEF rating of 5.2, all appliances shall be installed and connected to utilities. Dryer ducts and exterior dryer vent caps are not permitted to be installed in the dwelling unit. From Richard Dickinson, Deputy Director of Utilities and Waste: Must meet all Mason County design and construction standards, must pay all fees including: connection fee with permit and inspection fee, and Latecombers charge (TBD). Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * Stock Plan Identification number: 2018-0044 This project is approved subject to the provisions identified the Mason County Stock Plan Policy. The site plan approved by the Planning Department, red stamped approved building plans, and all attachments approved by the Mason County Building Department shall be available for the Mason County Building Inspector at each required inspection. Printed by:Annie Wilson on:05/09/2024 08:56 AM Page 6 of 7 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncoun"a.gov NEW SINGLE FAMILY RESIDENCE BLD2024-00454 A separate inspection in addition to the inspections required in the IBC, Section 110 shall be required in accordance with the 2018 IBC, Section 1705.12.2 and Section 1707.1. The additional inspection is required when shear wall fastener spacing is required to be 4 inches or less. The shear wall schedule shown on sheet S3.01 designate TYPE 4, 6, AND MUD SILL @ ALL WALLS TYPES with fastener spacing 4 inches or less. The required inspection may be performed by the Mason County Building Department, a WABO certified inspector, certified to inspect lateral connections, the Engineer of record (EOR), or an authorized representative of the (EOR). The special inspectors duties and responsibilities shall be as specified in Chapter 17. When a third party inspector is used to perform the inspection, special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton, WA 98584 and also available on site for review by the Building Official. Inspection reports shall be completed and submitted to the Mason County Building Department in a timely manner and shall be submitted prior to the framing inspection of said project. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: �� 'f V1 �,VI/��/�1 ` Date: Printed by:Annie Wilson on:05/09/2024 08:56 AM Page 7 of 7