Loading...
HomeMy WebLinkAboutDRV2020-00006 FPA2417400 Forestry Waiver - FPA Permit / Conditions - 6/15/2020 R FINDING OF FACT WAIVER OF FOREST MORATORIUM # DRV 2020-00006 APPLICANT: Matthew Van Dijk APPLICATION DATE: 6/15/20 Mason County has reviewed the above referenced application for a 2-acre waiver of the six-year moratorium resulting from a permitted Class II forest practice activity (2417400) and finds it in conformance with all applicable County land use regulations in effect at the time of application. FINDINGS The proposed waiver of six-year moratorium is compliant with the following conditions: The applicant has paid the prescribed fees. The applicant has filed a complete application. This six-year moratorium waiver is in conformance with the following Mason County ordinances: Forest Practice Moratorium Ordinance 11.04 1. The development area is no larger than two (2)acres in size. See attached site map. 2. The harvest and reforestation of the property shall be completed as specified in the approved forest practices application/notice. Jason Sharp on 71612020 3. There shall be no damage to a critical area or its associated vegetation area nor to the shoreline area(if any)or any damage to those areas is repairable with restoration. No damage has occurred. 4. The proposed development is consistent with the Mason County Comprehensive Plan and Development Regulations. 1 The proposed development is limited to residential use per the criteria of the waiver process. The location is zoned RR-5 which is consistent with residential development. 5. If necessary, mitigation shall be required for impacts to critical areas, stormwater, and shorelines. Other mitigation may be required to prevent adverse environmental impacts, pursuant to Mason County Ordinance #55-97, the Environmental Policy Ordinance. No mitigation required. Title 15 Mason Development Code This application for a waiver from the six-year moratorium has been processed as a Type II permit with appropriate notices. Comprehensive Plan and Development Regulations The activity proposed for the site affected by this waiver from a six-year moratorium is compatible with the Mason County Comprehensive Plan and Development Regulations. The site is zoned Rural Residential 10. Shoreline Master Program This property does not contain land that falls within the jurisdiction of the Mason County Shoreline Master Program. Designation: N/A . Any activity in those portions of this site shall be consistent with the requirements of the Shoreline Master Program. Mason County Critical Areas Ordinance Site contains or is within 300 feet of minimal slopes. A geotechnical report or geological assessment was written for the site by and the checklist approved as complete by county staff. N/A Stormwater and Erosion Control An engineered stormwater and erosion control plan(by )was reviewed by Fred Perryman in Mason County Public Works. The plan was approved with conditions on Note:Applicant submitted Minimum Requirements 1-5 and a corresponding site plan. 2 State Environmental Policy Act This application for waiver from the six-year moratorium#DRV 2020-00006 has been reviewed for SEPA compliance under case# SEP 2020-00029, and a determination of non-significance has been made. CONCLUSIONS In conclusion,this application for a waiver from the six-year moratorium associated with FPA 2417400 is consistent with the above criteria. The following types of permits may be issued prior to 10/17/20 under this waiver. 1. Building permits for a single-family residence and/or for a residential outbuilding. 2. Single-family on-site septic permit. 3. Road access permit. 4. Earth modification permits. 5. Shoreline Master Program approvals. 6. Well and potable water permits. 7. Other approvals necessary to the development of a single-family residence and outbuildings. Any permit issued under this waiver shall be conditioned, as necessary,to limit the approval to only that development consistent with the intent of section 11.04.340 of the Mason County Forest Practice Ordinance # 11.04. RECOMMENDATIONS I,being a duly appointed designee of the Mason County Community Services Department,hereby attest to and certify that appropriate provisions have been made for this six-year moratorium waiver and hereby recommend approval. Kell owen, Planning Manager Date Michael MacSems, Forest Practices Reviewer Date 3 ' RECEIVED -DV.✓2o2O - 6mocp JUN 12 2020 5EE SEP2020-06029 f - _ �6 W AlCM65ONECOUNTY DEPARTMENT OF COMMUNITY SERVICES Mason County Bldg.8,615 W.Alder Street,Shelton,98584 (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 www.eo.mason.wa.us FOREST MORATORIUM WAIVER/RELEASE APPLICATION - ---Ttus application-fsio-beusedto waiver a portion of a parcetfor developmettt-pormitsar to reuse-the-ent r�tra rom---- the six year moratorium for development permits.This process was created under the guidance of RCW 76.09.060.This application needs to be filled out completely,so that we have all the information to process this in an expedient manner. Which are you requesting from the Moratorium? d Waiver ❑Release Applicants Name: lVQ t w Vz,10 i k Operator's Name: SQr V t— f Applicant's Address: 3Gl 4 X%ncutfdit�I)r" Operator's Address: j`�,0 �jn�t 1.19 9461' �1(� i Applicant's E-mail:�d�1'Y1__�` 1.1 YYIf ,L-C,6ry1 Applicant's Phone number:'31 A-801 - -4- 1 ox )�8--I Effected Parcel Number: %(� .�� �f'C p 1 a Parcel size(in acres): 5� D.�l> rsta'e5 Identify what type of timber was removed,ie:Douglas Fir,Western Red Cedar,Alder,Maple,etc: Was the timber harvest done under an approved forest practice application: MYes ❑No Was there an enforcement action taken by the Department of Natural Resources(DNR): )U No Firest Practice Application Number: „c )7 q00 Forest Practice Application date of approval:IO$/,t Ol y What is your intention to do with the effected parcel: re-5:ki,hi.l I t Have you attached a site plan to show the area of the requested waiver or release: Rj Yes ❑No Are there any critical areas on your site?ie:wetlands,streams,creeks,steep slopes,etc.: Yes No If yes,identify the type of critical area(s): Please list conditions of approvals by DNR for your forest practice application: Were any of the buffer areas effected by the timber harvest?: ❑Yes [Q No Identify if you harvested any timber in the critical areas on your site: ❑Yes Q No Did you replant per DNR standards: (l Yes ❑No ! Application Signature 1) I certify that I am the forest land owner,as that tern is defined in RCW 76.09.020 and WAC 222-16-010,and that I am familiar with the requirements of the Forest Practices Act, RCW 76.09 and the forest practice rules,WAC Title 222.1 am specifically familiar with RCW 76.09.460(c)and its effects. 2) I certify and declare under penalty of perjury under the laws of the state of Washington that the foregoing �is fide and c6rrecL Signed this "1 day of 1-IL,20 ZJ at (Month) 51vf—F+AIE- W Y-\ (City) (State) (Si ature) STATE OF WASHINGTON } I,the undersigned Notary Public, in and for the juris- `n :SS V`COUNTY OF , Ql_-Sn _) diction aforesaid,do hereby certify that RU DFH -r�� V� 1 V— �� S SEAL: = G _y9�ON o1ARy %moo z Amy i Z i 'Oue- =k = whose nam is(a�signed to the Declaration of LP 29 Parcel Combination,appeared before me and OF \N \N A, personally acknowledged the same. GIVEN under my hand and seal this day of 20, Qo�(J+n s?\ si S e*v 61 - o D - APPROVED DATE Director of Community Services a � Publication Cost Agreement Publication cost is the responsibility of the applicant. Final permit processing will not occur until advertising fees have been paid to the newspaper by the applicant. The -------- _..__ Shelton=Mason-Counbi-Joumal-wiU bill the appHcant-duectly- - ----_ -- I /WE understand that I/WE must sign and date the attached acknowledgment indicating and that I /WE understand that is MY/OUR responsibility. i/WE must submit the signed page as part of application in order for it to be considered as complete. LD- DATE lM*fR" S, VA-ed OWNER APPLICANT 1 l � ti 1 � V 1 -� &L- Mathew and Krista Van Dijk 100 NE Ridgetop Ct, Belfair WA Parcel# 12319-42-50070 Requirement #1 — Stormwater site plan 1: Construction road location noted on plan. Built using a 2"-4" crushed rock base topped with 1 1/a" minus crushed rock. 2: Minimum 40' buffer to be maintained consisting of natural vegetation and trees to be un disturbed. Per wetland study, there were no sensitive areas noted. 3: Natural vegetative buffer will be utilized for sediment control. 4: Non-applicable. No soils onsite the need stabilization, not enough slope 5: Natural drainage features and constructed features as noted on site plan. Narrative 1: 100 NE Ridgetop Ct. Belfair WA. Parcel #12319-42-50070 No permit numbers yet. 2: 5.05 acres. 1.28 acres will be cleared. 3/4 of an acre to be utilized for shop construction, the remaining to be allowed to grow naturally. 3: Construction access/driveway is approximately 210' long by 16'wide built out of crushed rock of varying sizes. 4: Soil types- 21-30" of sandy loam topping hard pan. Topography is mostly flat with slight slopes of less than 5%. There appears to be a natural drainage path, but no water has been observed entering or leaving the property. 5: Anticipated start date would be end of July or early August 2020 and last 2 months. 6: Clearing method was tracked excavator, use afterwards is residential. Requirement #2 Element 1 Property corners have been surveyed and are marked in pink or pink/green survey tape. Trees that are currently standing will remain so, as no further clearing is required. In most areas the cleared areas is in excess of 100' from property boundaries._Wetland study concluded no sensitive areas recognized on property. Element 2 Access road/driveway is already constructed using clean crushed rock building materials. Driveway roughly 210 feet in length by 16 feet wide. Element 3 Not applicable due to slight slope of property and large vegetative buffer situated along downslope side of property. Element 4 No soils to be removed. Element 5 There will not be any cut and fill areas on the site. Stockpiles may be covered in plastic to avoid erosion. There are no storm drain inlets,waterways or drainage channels on property. Element 6 Not Applicable Element 7 12" culvert installed as noted on plan. There is a low spot on the property that could have potential for water. Water has not been visible yet, culvert placed as a precautionary measure. Element 8 Not applicable. There will be no site runoff into channels, streams or other natural drainage point. There are no steep slopes or erosive soils onsite. Element 9 There is no known pollutants, but good housekeeping and preventative measures will be taken. Element 10 Not Applicable Element 11 Not applicable per element 3-8 Element 12 Design was created to fit existing topography and natural shape of the property. Erosion control will be emphasized,all sediment will remain onsite. Requirement #3 Not applicable per Requirement#2. See Element#9 of the SWPPP Requirement #4 There has been no visible water run off or standing water. Wetland reconnaissance was performed by The Wetland Corps on 6/13/2020. Report turned in to Mason County. No wetlands, sensitive areas or setbacks/buffers noted in the report. Requirement #5 All stormwater run off will be managed onsite to prevent floodinganderosion through dispersion and infiltration into natural vegetation. vt. 4 e ( ' E t lOno?, ti. 1 "]t`1 11 vqk17 -�l�l v t } 1 1 FPA Storm water management plan Mathew and Krista Van Dijk Property address: 100 NE Ridgetop Ct, Belfair,WA Parcel number: 12319-42-50070 1: Proposal is to clear less than 2 acres of the 5.05 acre parcel under a granted waiver envelope for this site. Soils on this site consist of roughly 26" of sandy loam, glacial till underneath. Site is mostly flat with slopes of less than 5%. Plans have been submitted to build a 2944 square foot detached shop, with a future single family residence to be built. Project will hopefully start in July. 2: Construction access site is located towards the NE corner of the property. Driveway is roughly 16' wide and extends into the property roughly 210 feet. Driveway was constructed using 2" and 4" quarry spalls. Quarry spalls were topped with 1 1/a" minus crushed rock and rolled and compacted. The driveway crosses through a natural drainage path. At the lowest point of the drainage, a 12" culvert was placed to allow potential surface water runoff. Driveway was built using clean materials as to not allow track out onto paves surfaces. 3: A site plan showing clearing limits, site egress, natural drainages and site slope is included with this plan. A biological wetlands reconnaissance was conducted for this site. No sensitive areas were found on the site and no buffers were recorded. 4: The natural shape of this property is mostly flat with a slight slope to the west. Natural slope of this property is less than 3% in most areas with the greatest slope less than 5%. Due to the flat nature of this property, no soil or slope stabilization measures are needed. 5: Run off from the site will be minimal due to the natural topography of the site. BMP's will not be used as runoff will flow minimally into the large vegetative buffers around the perimeter of the property. FPA Storm water management plan Mathew and Krista Van Dijk Property address: 100 NE Ridgetop Ct, Belfair,WA Parcel number: 12319-42-50070 1: Proposal is to clear less than 2 acres of the 5.05 acre parcel under a granted waiver envelope for this site. Soils on this site consist of roughly 26" of sandy loam, glacial till underneath. Site is mostly flat with slopes of less than 5%. Plans have been submitted to build a 2944 square foot detached shop, with a future single family residence to be built. Project will hopefully start in July. 2: Construction access site is located towards the NE corner of the property. Driveway is roughly 16' wide and extends into the property roughly 210 feet. Driveway was constructed using 2" and 4" quarry spalls. Quarry spalls were topped with 11/4" minus crushed rock and rolled and compacted. The driveway crosses through a natural drainage path. At the lowest point of the drainage, a 12" culvert was placed to allow potential surface water runoff. Driveway was built using clean materials as to not allow track out onto paves surfaces. 3: A site plan showing clearing limits, site egress, natural drainages and site slope is included with this plan. A biological wetlands reconnaissance was conducted for this site. No sensitive areas were found on the site and no buffers were recorded. 4: The natural shape of this property is mostly flat with a slight slope to the west. Natural slope of this property is less than 3% in most areas with the greatest slope less than 5%. Due to the flat nature of this property, no soil or slope stabilization measures are needed. 5: Run off from the site will be minimal due to the natural topography of the site. BMP's will not be used as runoff will flow minimally into the large vegetative buffers around the perimeter of the property. 60oct ` Zed` _ eA. i It \ y =`J N sz- oz Tia3S SIC/o [IDA QQ YO e } kp y� €