Loading...
HomeMy WebLinkAboutEngineering Grading Sediment Pond - COM Plot / Site Plans - 10/30/1995 T 23 N , R 1 W, W. M . , SECTION 21 - - m Al // �/ J/ 04 0 LLJI / AI& Llj O 3 Ld p�d 0000l> _ o Q � V• / / LO ol IN CL • . �. .� / - CLEARING 3 , / LIM/ TS \ / AI IIR Q C 1 -0 h o o z CONSTRUCT f ELEVA TiOr o S 78- EMBANKMENT m mo LJ zzY �® wiz O O U Q� _ _ ►`? SB I W \ t ELEVA TION / ; DA TUM = SPIKE a 78.t ELEV = 121. 49 Q o a —'- _----- - ^••• - ?1FiTiiYi'1i �w..r�r - �.���� 00 ��4�1��r14P`IiY�Mlrir+ter�.�+t+1�'MiM4W11fli�fl/1��-i�r�.••"1�•r.�i _ wl�>.+r��r�•rrAiAi R_LW �r �� v r Mt�rr�wY1 �� >4i N -- _ --- - — --_ .. _ - -_ -_ — --- -- - -- - - - -- ----- - r - -- - - -- - - -- ------- --- - -- _ _.. -= ----- - — - n 04 IN ell Y — _ —_ / I ---- ----1 R%W v� cc GRAPHIC SCALE °' -Z 00 W EROSION CON TROL LEGEND o ,� �� 2W 00 '°° v_�Q� Z T 23 N, R 1 W, W.M. O '�J d M N N 3'1 op Q CE CONSTRUCTION ENTRANCE - IN FEET \ 1 inch = 100 � o SB SEDIMENT BASINS.- A T PERMANENT DETENTION POND LOCH TIONS r SECTION 3 o o (D-iNLO IMENT POND EMBANKMENT SCALE W w > _ 'ac' GENERAL NO TES: F= Q 46 U) _ �5, 1. ALL COIVSTRUC77ON SHALL BE IN ACCORDANCE WITH THE WASHINGTON STATE DEPA?7MENT E— 0 OF TRANSPORTA77ON 7994 STANDARD SPECIFICAPONS FOR ROAD, BRIDGE, AND MUNICIPAL IF PLOTTED DRAWING SIZE IS NOT m = co/vsTRucnoN (wsDor); AND THESE PLANS 24"x36" DRAWING SCALE WILL BE z o � Z Z 3 2 7HE EROSION CONTROL FEATURES "CONS 7RUCTION ENTRANCE~ & "SEDIMENT POND DIFFERENT THAN THE SCALE SHOWN � 0 1) � SHALL BE INSTALLED AND OPERA TONAL PRIOR TO LAND CLEARING_ Q 00LLJ U U 20' MIN. J. CLEARING SHALL BE CONFINED TO WI THIN THE AREA DESIGNATED, AND SHALL BE rn 29 28 z CLEARL Y MARKED ON THE SITE PRIOR TO CLEARING OPERA 770NS Z r2O 00 < 4" TO 8" QUARRY x 4. THE LOCH TION OF UNDERGROUND U77LI nES SHOWN IS BASED ON ABOVE GROUND Ft_A TURES �'�Alt �� �� c 3� Q F— SPALLS, 12" DEPTH ``' ABOVE GROUND FEATURES FOUND IN 7HE FIELD, THE CONTRACTOR SHALL VERIFY UNDERGROUND �` �,�� 02 v o �pl Y U 77LI TY L OCA 77ONS PRIOR TO COMMENCING WORK. c o � BEL �R DETAIL ° ° A 5, BULK GRADING OF THE St7F SHALL SLOPE EARTHWORK SO THAT DISTURBED AREAS W7L_ <<�� 0t9d19�� � Z CONSTRUCTION ENTRANCE NOT DRAIN OFF—SI TLC ���1 ' ►STEM C E ONAL `SIONAL Drawing No. VICINITY MAP No scALE cluSCALE: 1" = 2000' EXPIRES 07 13 97 EXPIRES 5 23 96 C 1 — 0 T 23 N , R 1 W, W . M . , SECTION 21 - / O u4 04 00 �i / 04 00 \ W o.00 100 3 ? a J W - - // m V / y �• - / n //ove r a POS/TI VE # DESI GNA TES .1 r ' / ✓ �. FILL TO FINISHED GRA DE / ' a •0 3r � \'�7o m J NEGA TI VE # / AREA LOW POINT, s q� DESI GNA TES / EL E2A TION 95.00 \ \ \ \ -\ � � X X X X CU T TO FIN. '�� r -tee Q, s9 (TYPE 21 e ��- / GRADE R.E asQopo / \ \ \ x x x x •\J / 1 j .�J �J J ,c i .._d s � �o :•'', o �'P - x' i % i e �a I • - , a 'o •J m \ / J os • =o Q ''! m o .,c x x x 'ate o X `a• xs :. o s •f \ - \q - . .> 's. -P i '4r \PJ - Y=o • P m J e e . a \ / e 'r o � ,n a '� B o.J ;1p E­8550 f6- SJ \ C xPB �' ?r J s \r \it Xr k xJ xa, XJ i? xrvN :< O Y, J x�s �B J - a / BER O - , � ' ?J � Pi �� ✓ J qJ J \Pi •O - `rJ a /'J J J •i - 'J r ? �' •P3, J -J 'J P✓ � 'B 'B !.TOA1B7.0(JTYPE 2) / Q► X, X i S xD X f X X X X '� 'B 'P � � Qe 'r � � P ? i J e O .D \ \ x x x x \ \ x x x x x x x x x x x x x x x x x x x x x O O ,D J. .? .� •O ',D 'C qr 'J' 'J ` 1 • m i m m O \ \ \ \ \ n x x x� X x x x r. x� x X� x x�. i x �+ s ? O J \O x0 �? .� �' a �y W {J 0 �� PJ \'J 'O '9 ✓ �J B -� ST '-x *'B J POD a -? 'e r 'O ',D -e 'J i v? P-� U B/A ( r W t CR A2 TYPE Z STA4AI CBS TYPE?1 CE 4 83'�E?I � / l. . 7 3 y/per B8. W 2 \ x+ \q i \@ f6E 100. q e, $ 99.601� ~Sr o• ✓ - x Q'-__ 99.40�'p ''i x x x� x x,D % X I _ U 40 -o -� •J �:.o -r •c P,v X�J L O X \• ♦ \ x x \ \ x x x x r, x x x x x x x x H x O x _ 4, ize, �Ja ✓ i �P O 4y 'dr '� RETENTION POND #1 i / o SEE DRA WNG C2-2 ' _ I x -. � X X, II r? I ns J r Y'Q` e c J 'J i•' -i '' 4' i 4 q 4 J J P 'J 'a J 'P 'R ;o4> Qalo '4 o F'o V"J 2 O Q DA TUM = SPIKE TION .?p \ J P➢?OPOS _B J e x� x p .v ELEV 121.49 a J ' D H A J� J Q AND NEW APPROACH PA TANG v' a .SEE DRfI WING\C2-1,,,, ,� :�_ `o \ o ; X�? 0 x Xr )I',. X' x x; lr Xe ,r > -'J 7 'e . -1�J 'O C 8. STYPE 2 T0944(TYPE 2) CB . _ - 1 B9. 5 C,BJ�� /. 94.80 ( E 2� o N R.E 104.ODf' L l.E. 97 ; � O R.E 104.00 RE /gSQpt �✓✓ T o - o x o x�r \�o o �: J o J a J ' ° � = °r e s QJ �a `'c m x l... co - -- - - z ---------- ---- r -- -- -- - �------ -TARN - _ - -.a s 26- 0+1m CO 17, N -- - - STA - --- - -- -- - - - --- -- - - - - - - --- ---- ----- -- to00 ( r:------1— v Q� d \ Q J ------- ---------� U N m C m Q a o o W P uj 0 � GRAPHIC SCALE � � J co � o Z <W 4 w PQQ``�4„r a 0 50 1� 200 goo � N w g EXCA VA TION = 100, 000 cy W, X IN FEET EXCA VA TION = 170, 000 cy i inch = ioo r,� EMBANKMENT = 45, 000 cy �, EMBANKMEN T = 225, 000 cy z m , q m N J 3 C) a_ GENERAL NO TES 1. FOR GENERAL CONSTRUCTION NOTES, ALONG W TH CLEARING AND TEMPORARY >_ RE TEN TION POND SED/MEN TA TION CON TROL & WA TER QUALI TY DESIGN: EROSION / SED/MENTA TION CONTROL NOTES, SEE DRA WING Cl-0 DA TED 06- 13-95. Z Q FUTURE DE VEL OPMEN T STORM DRAINAGE RUN-OFF- 0 � 3 • 0 ONLY FUTURE BUILDING FOUNDA TION AND ROOF DRAINS SHALL BE PIPED DIRECTLY _ RETENTION POND DESIGN /NFORMA TION: o THE RETENTION POND. GRAD/NG NOTES: Q 1. RE TEN TION PONDS #1 IS DESIGNED TO A CCEP T NA TURA L L Y OCCUR/NG UPS TREAM 1. PRO VIDE TEMPORA R Y BERMS A T THE TWO L OCA TIONS SHO WN, TO KEEP RUNOFF W m = STORM RUN—OFF (EASTERLY OF S TA TE HIGH WA Y) WHICH EX/S TED A T THE TIME OF b) PA VEMEN T A REA S A ND 0 THER DRA/NA GE RUN—OFF SHA L L BE D/SCHA RGED TO THE Wl THIN THE PROJEC T A ND PRO TEC T SL OPES A BO VE PONDS 0 m w DESIGN, AND PROJECT DE VEL OPMEN T RUN—OFF ACCORDING TO THE FOL L O WING CRITERIA: STORM SEWER TRUNK LINE AS SHOWN. O C) ADDI TIONAL STORM WA TER TREA TMENT MA Y BE REQUIRED BASED ON THE TYPE STORM PIPING NOTES: 0 �' POND #1 OF DEVELOPMENT 1. STORM PIPING SHALL BE ADS N- 12. Q 32. 41 A CRES PROJEC T IMPER VIOUS A REA A T CUR VE NUMBER = 98 2. CA TCH BA SINS SHAL L BE A S NO TED. Ln 7 0.80 A CRES PROJEC T PER V/OUS A REA A T OUR VE NUMBER = 68 of �► �� F w U'P Z z I:iTIME OF CONCEN TRA TION = 28.00 MINU TES ,� ,` �, ,ti o RE TEN TION POND NOTES: i�bINFIL TRA TION MEDIUM = COARSE SAND & GRAVEL (GP) ��° �i o,Q 1. IF RE TEN T/ON POND INFIL TRA T/ON MA TERIA L S FOUND DURING CONSTRUCTION ARE W o INFIL TRA TION RA TE = 20.00 INCH/HR ,, DIFFERENT FROM THOSE L IS TED IN THE "RE TEN TION POND DESIGN INFORMATION", THE Z z - . �J �� I F P DRAWING WI N ( I T CON TRA C TOR SHA LL CON TA C T THE ENGINEER FOR RE—CA L CUL A TION OF THE POND VOL UMES. 0 w is O 079819 S n LOTTED D G SIZE S NO FUTURE DE VEL OPMEN T WHICH DOES NOT INCREASE RUNOFF ACREAGE, OR DECREASE THE •�, Ll- TIME OF CONCENTRATION FROM THE CRITERIA LISTED ABOVE, DOES NOT REQUIRE 0XAAL SIDNAL 24 x36 , DRAWING SCALE WILL BE Drawing No. RE—CALCULA TION OF THE CAPACITIES OF THE RETENTION POND. DIFFERENT THAN THE SCALE SHOWN "' EXPIRES 07 13 97 EXPIRES 5/23/96 C 2 — 0 T 23 N , R 1 W . W. M . , SECTION 21 STATE HIGHWAY 3 CHANNELIZA TION DESIGN: 0 a = oIt = o X, Q Q r r Q DESIGN & RECORD REFERENCE TA PER RA TE = 55: 1 1D g g SR-3 DECELERA TION TAPER LENGTH = 165' °0 00 TI WA TER CREEK TO UNION RIVER CHANNEL LANE WIDTH = 11. `�' KI.TSAP & MASON COUNTIES CHANNEL WID TH APPLIED TO NB LANE = 0. 0 0 0 SHEET 7 OF 8 CHANNEL WIDTH APPLIED TO SB LANE = 11.5' O� vY (REFERENCE DM FIG. 910-80) Z 67 vph 't 26 vph ROAD WA Y INFORMA TION: _ 164 h .t 4-263 vph 13 vph # •-888 vph SPEED LIMI T = 55 MPH 698 vph--No- SR-3 463 vph-► SR-3 A VERAGE LANE WID TH = 71.50' APPROACH DESIGN: 0 EXISTING NORTHBOUND LANES = 2 TYPE = COMMERCIAL 00 in PREDICTED PEAK HOUR ( PREDICTED PEAK HOUR ( EXISTING SORTHBOUND LANES = 1 VEHICLE = WB-4000 Li / BUILDINGS AND ROADS (REFERENCE DM FIG. 920-20) x a / 1 TO BE DEMOLISHED 3 _ - o W m O v �-- � �n a }: o TRAFFIC DESIGN DA TA o cn a AVERAGE DAILY TRAFFIC (ADT) = 13,426 vpd V m DESIGN HOURLY VOLUME (DHV) = 1,J57 vph 86 O Q TRUCK PERCENTAGE = 6. 77' O Q <: - W DESIGN SPEED = 55 mph + - o ACCESS CONTROL = CLASS 2 CON TROL ED ACCESS FACILITY HIGHWAY CLASS = RURAL PRINCIPAL ARTERIAL ff) o Q n o DESIGN CLASS = P-3 W ; o DESIGN VEHICLE = WB-40 O N � I Q ^ a O / 1, 765 PROPOSED CHA NIVEL IZA T/ON Wl 422' T- J � DENING REMOVE & REPLACE EX. BEAM GUARD RAIL FOR LANE WIDENING 4 0 ABANDON EXISTING ' U APPROACH CONNECTION I / N Q TO STA TE HIGHWAY G-G 00 h + F / EJ-3 o x �6S 1 1+0 h 00 H UJ G� d "" ------ U 150' f RIGHT 7URN LANE a STORAGE LENG rTYP.) o - -- 7 -- -- - U) - -- Cl- Z- _ o - - -1------_ _ - — _ _� _ los L&I -- 4 - — - --- --- -- - - — -� --- --- __ L`--- - -- -- - ---- - --- - ----- - _ ----- -- _ -------- — -- - -- —� - -�— -- ---- — ------ -- -- 1�-- v ----- I 3 m TO BELFAIR, SR-300 _- -- EXISTING EDGE OF I � INTERSECTION = 1 MILE PAVEMENT ----� TO BREMERTON r O =c m m 0 z Ld U Z -y � p Q � G1` Z � Z x Q z Qo �� � ? w QQ �QP ° a_ o 0 0 0 U) zQ < 1 11 ( PP Q Q rn 0 0 o � N c� w v `��Q�<` _� o o O + � � o O On xo G' z Xz o •- W w " MW Wn I LJ O F- � r LL W \ "> � N U Q O v cn o a 1 I C N C\4 00 O N � O .-. N 10 O _+- OD N (�_ N � x V C (p m � C m W � a•V J Z � 00 0) w t1 O � J 0 M fn N Z ' O F-- C� Z Z Q 3 GENERAL NO TES.-. CL 1. FOR PROPOSED GRADING OF PROPER TY NOR THWES T OF S TA TE HIGH WA Y, REFER TO DRAWINGS C2-0 AND C2-2. �j �_ Q Z 2 FOR DRAINAGE DESIGN NORTHWEST OF STA TE HIGHWA Y AND CONNECTIONS Z S TA TE HIGH WA Y CUL VER TS, REFER TO DRA WINGS C2-0 A ND C2-2. Q ® _ tY U 0 ' IF PLOTTED DRAWING SIZE IS NOT . 24»x36", DRAWING SCALE WILL BE DIFFERENT THAN THE SCALE SHOWNe�,� w z o 0 GRAPHIC SCALE `l o 00 0 30 00 120 240 � 019819 � zrs °�ti ►SrE ° L I�NAL `sIONAL Drawing No. - _ 1 inch IN �go � ft. [E�CPIRES 07 13 97 EXPIRES. 5 23 96 C2 - 1 i ` � o I i L RETENTION POND1 N VOL UME SCHEDULE / X O v ELEVA TION SURFACE AREA // Q ... 72.00 17, 777 SF z 74.00 22,005 SF O 76.00 26,607 SF / °N° / rn o ,� w 78.00 31, 793 SF G 80.00 38, 166 SF / �� > x a / / O W m 3 f-- � o a a � m 76 _ o Q ul O o 6 (OD a -p o .> Of RIP-RAP �6, / O j DI TCH / OU TFALL o? Q14 • � O goo m 8 0 0• mm0 Z Z Y O V� 3 W W' _ / / \ 0 0 U / , rn uY M o I o `\I ' o o L � Q / O 00 o co n 0 DITCH CULVERT ` 00 0 o OUTLET TO POND, / I RIP-RAP DITCH V � = a � / R °� W •` J 00 Q N O > Z V) Alf - T -- -- ----- _- ---- - --- - - --- -- _ __- _ - - - .- - - -_- - � Q in Of - -=:-- - _. ---=_---------_----------------- ------=- -- IF PLOTTED DRAWING SIZE I 0 � n — -- - --- — - — U r - - -- - - -- = -� -- 24"06", DRAWING SCALE WILL BE O V) R / W DIFFERENT THAN THE SCALE �--SHOWN 4F W AS��� z w GRAPHIC SCALE , Z W 0 30 0 19 30 60 120 AO �t� I��t O O 019819 IST - \ j4 IN FEET ) NAL Drawing No. 1 inch = 30 f (EXPIRES 07 13. '97-1 EXPIRES 5/23/96 C2 - 2 _ o 0 o t° W u-> t` � N I I w O o O U z RETENTION POND #710 v r� r� O z U Q) O 0 � Q, V) C 0 - - -- �— - --------------- ------ -- -- I __ -- --- ----- - - - ----- ---- O 00 1 -- — 80 70 - — - -- - - r- ----- - - - - -- - - ------ — --- --- --- ------ --- - - --- --- - - - - — - -------- - .- 0o LiDATUM ELEV 0.00 100.00 200.00 300.00 400 00 500 !� DATUM ELEV -- - - - - - - _ _ __ _ —i > 6'0- 00 .00 600.00 80. 00 0.00 100.00 200.00 300.00 400.00 500.00 LJ m 3 GROUP GENERAL GROUP GENERAL (— SECTION A-A SECTION SECTION B-B SECTION V rn O Q 1 a �- J W (E)-GENERAL GRADING B _ GENERAL GRADING m HORZ. SCALE: 1 = 50 HORZ. SCALE: 1 = 50 VERT. SCALE: 1" = 50' VERT. SCALE: 1 " = 50' U 0 0 it tn J � N U � b I I d. v 13 0 -- - --- -- -- -- - ----- - - ---------- - - - -- ---- - - - ---- - - 77 O i - 100 .. 90 ---- - ----- -- ---- -- -- --- - - ---- -- -- — -- -- --- --- —------ —— ------ — —-- - --- - -- - - - - - - --- I DATUM ELEV ------- 1 - --- — — —fi �- , 60, 00 0.00 100.00 200.00 300.00 400.00 500.00 600.00 7G , CiQ "-13-. GROUP GENERAL SECTION C-C SECTION OGENERAL GRADING HORZ. SCALE: 1 - 50 VERT. SCALE: 1 " = 50' 0 25.00' CON TROL ZONE N h � + o p : o 5't 11.50' 11.50' 11.50' Z 51f 5'f 11.50' 11.50' 11.50' 11.50' 11.50' 5't II PAVED CLIMBING PASSING PASSING 7 PA VLU PA VED CLIMBING PASSING CHANNEL Ti,A VEL RIGHT TURNI PA VED >- } SHOULDER LANE LANE LANE SHOULDER SHOULDER LANE LANE LANE LANE LANE SHLDR M 0D o nz W (NB) (NB) (SB) (NB) (NB) (NB) (SB) (SB) 0 3 w 5.75' 5.75' o o 0 of rn O O O pZ j� � OJ p2 p2 � � pJ pJ pZ pZ -200�" L0 �' p O � J � J � � O O � J i o I� /tom 100 ---- -- - - -— - - - - - - - -- - - -- - - - -- - - - - Li REMOVE SHOULDER MA 7FRIAL S o IF NOT EOUI VALENT TO SEC77ON - _ u a F-F, NEW MATERIALS - ExIsnlvc NEW , 0 7" (0.58) CSBC D T'Z, 1 f I o 1 I 5" ( )0.42 ACP — ---- --------- —---- - - -- o 0 0 0 � o 0 0 o No x t0 � � � � � N � '� p TYPICAL CROSS— SECTION , SR- 3 TYPICAL CROSS— SECTION , SR-3 _ STA 380+00 EXISTING _ STA 380+00 PROPOSED � _ _ ^ -v o E HORZ. SCALE: 1 = 10 r HORZ. SCALE: 1 = 10 + - m�- " 0+00 1 00 2+00 3+00 m C I VERT. SCALE: 1 " = 1 ' VERT. SCALE: 1 " = 1 ' '� z o PROFILE W APPROACH ROAD w to HORZ. SCALE: 1 = 50 3.00' 12.00' 12.00' 12.00' VERT. SCALE: 1 " = 10' o PA VED RIGHT TURNI LEFT TURN 7RA VEL SHOULDER LANE LANE LANE - PERMANENT SEEDING (EB) (EB) (WB) (n c=n SEE SEEDING NOTE 5FE-DING NO TE m o z 3 CHANNEL WIDTH + 2.0' VERTICAL ON 5L OPf5 � Z Z Z O_ 18' LZ :zj O i LINE W/ 5EED TYPE PROPORTION5 By WflGHT PERCENT PURITY PERCENT GaflNATION U 6" DEPTH M TOPSOIL. CREEPING RFD FESCUE 40Z 48 90 ?� W >- CPENNLA WNW N _ 3 1 RED TOP 307. 92 80 - - (FE5 TUCA ARUNDINCEA-) — m = BIRD5FOOT TREFOIL 307. 90 80 ' f� Ld CL O TU5 CORNICULA TU5� 6" (0.50) 0 Q CSBC _j V) N APPLY AT THE RATE OF 120 POLNYD5 PER ACRE ^j I`A'X INTO THE ABOVE 5EED M'X THE FOLLOWING= (j 2" (0.17) ACP 100 LB5. PER ACRE 10-20-20 FERTILIZER L, e 0 0 TYPICAL CROSS— SECTION 1000 LB5. PER ACRE WOOD CELLLX05E FIBER MULCH `" 25 LB5_ PfR ACRE 501L 5TABILZER of I�'� ��0 �F WAS �o ZO INTERCEPTOR DITCH �� o,�� ,�, CL—� SCALE: NOT To SCALE TYPICAL CROSS- SECTION, APPROACH Z STA 1 + 25 PROPOSED FDIFFERENT TED DRAWING SIZE IS NOT � 11 O 019819 ' O O- G - _ z HORZ.- SCALE: 1„ 1,0 , DRAWING SCALE WILL BE �� SNAL o A Drawing N0. VERT. SCALE: 1 = 1 THAN THE SCALE SHOWN EXPIRES 07 13 97 EXPIRES 5 23 96 C 2 — 3 m rn