HomeMy WebLinkAboutMeeting Notes-Design Development Code Review - PLN General - 7/7/1992 The
BJSS GROUP
JUL 17 �^
ARCHITECTS & PLANNERS, AIA
MEETING NOTES - DESIGN DEVELOPMENT CODE REVIEW
PRINCE OF PEACE CATHOLIC CHURCH
Belfair, Washington
July 7, 1992, at 9:00 AM - REVISED
Attendees: Dana Herron, Mason County Building Department
Tony Hannan, Prince of Peace Catholic Church
Todd Tovani, BJSS
Dwayne Harkness, BJSS
DISCUSSION
A. Site:
Dwayne reviewed the Schematic Site Plan with Dana Herron. Dwayne indicated
that it is the design intent, as shown, to provide the exterior concrete on grade
ramp as the means of handicap access from the Main to the Lower Floor. The
Lower Floor will also be accessible by the handicapped from the Lower level
parking area. Dana stated that the exterior ramp, as indicated, is an acceptable
means of handicap access to the Lower Floor, in lieu of an elevator, wheelchair
lift, or internal ramp. Dana noted that a meeting with the Fire Marshall will be
needed to review Fire Department requirements for site access, water provisions,
etc. Dwayne replied that the Owner and their civil engineer had already met with
the Fire Marshall and reviewed his requirements.
B. Drawing Review:
The separate bids for the project were reviewed including Base Bid and the three
Alternate Bids. It was noted that in Base Bid the Lower Floor level would be an
unfinished and unoccupied space. A furnace unit would be installed at the Lower
Floor for heating purposes. Alternate Bid #A-1 is to finish out the Main floor level
converting the unfinished portions of this level into office spaces. Alternate Bid
#A-2 was reviewed. This hirl iS to innli de finishing out of the Lower Ficor space
with the exception of the future kitchen area which was noted to remain
unfinished provided only with mechanical rough-ins, gypsum wallboard fire taped,
and vapor barrier over capillary break without any slab.
C. Occupancies:
Dwayne presented the following occupancy classifications per BJSS' Code
interpretation:
Main Floor
Main Worship space A2.1
Office/Support spaces B2
Lower Floor
Dining/Conference space A3
Support spaces B2
A DIVISION OF THE BJSS GROUP INC.
320 WEST BAY DRIVE SUITE 212 OLYMPIA WA 98502 (206)943-4650 FAX (206) 357-9022
Prince of Peace Catholic Church Meeting Page 2
Dana agreed to the above classifications. Dwayne indicated that the Lower Floor
Dining/Conference space may be used for small group conferences and
instruction. Moveable-type acoustical partitions would likely be used to divide the
space up. Dana requested a layout of these partitions be provided to Mason
County Building Department for review. Dwayne responded BJSS would provide
partitioning plans.
D. Construction Type:
Dwayne noted that based on the occupancy classification of the Main Worship
space the Type of Construction is planned to be Type V, one hour. Dana stated
he will review the project to see if Type V non-rated is a possible option for the
Type of Construction based on classification of Main Worship occupancy as A3.
Under Base Bid, at the unfinished Lower Floor, Dana noted that flame resistant
foil faced insulation ould b acceptable in lieu of gypsum wallboard at the walls
j and the underside o main to at the Lower Floor.
MA V $E m8m,'s SP o
E. Energy: '+* 'Z pox four cvn5h1Y-�i-r-
Dwayne commented that the Owner desires to incorporate the "Energy Smart
Design" program per local PUD energy conservation credits. He noted that the
design can meet most of the prescriptive criteria including insulation value
minimums. However, as designed, window/door area exceeds the prescriptive
criteria. The Owner is currently deciding direction on this matter. Dana stated that
Dan Fitchet of Mason County will be reviewing the project for compliance with the
Washington State Energy Code and that that Code will be the criteria for permit
approval. Dwayne indicated that, as planned, insulation values are as follows:
Perimeter/Foundation R-8
Below grade wall R-10.8
Exterior walls R-19
Roof/Ceiling R-30
Dwayne noted that exterior windows are planned as residential aluminum, non-
thermal-break insulating glass at smaller openings, and non-thermal-break
aluminum storefront with insulating glass at larger windows.
F. Exiting:
Exit location and exit width were reviewed. Specific items discussed included the
side exits from the Main Floor Worship space. On the southwest side of this
space the exits open directly to a landing and stair which conducts occupants out
of the building and down to grade at the Lower level. It was noted that the
construction of this would be treated wood. Dana stated this would be an
acceptable construction type and location for the exterior stairway and landing.
Dwayne noted that the main exit from this Worship space is required to equal the
total aisle width. This width needs to be maintained to the exterior of the building
and the drawings will be revised to show this. Future expansion of the project and
its impacts on exiting were briefly discussed and it was noted that additional
exiting will be required as the Worship space expands. The Lower Floor, as it is
unoccupied and unused, Dana stated, would not be an issue regarding exiting in
the Base Bid. The single exit door shown is satisfactory.
Prince of Peace Catholic Church Meeting Page 3
G. Fixtures:
Dwayne stated the fixture count was established by the programmed occupant
load for the area which was established as 250 occupants for each floor. Dwayne
noted that this was in conflict with the 1991 Uniform Plumbing Code which stated
the fixture count would be based on the number of occupants as established by
exiting requirements in the Uniform Building Code. Dana stated that Mason
County has not yet adopted the 1991 Uniform Plumbing Code and that the fixture
count will be based upon the 88 Uniform Plumbing Code. It was agreed that as
shown at this time the fixture count meets the requirements of the 1988 Uniform
Plumbing Code and that the program for 250 occupants is a satisfactory load
criteria.
H. Dwayne indicated that BJSS would provide a set of the preliminary progress
drawings to Dana for his use and files, as requested.
TRT:edv
cc: All Attendees
Frank Smith, BJSS
I
PRINCE OF PEACE BUILDING COMMITTEE MEETING WITH MASON COUNTY OFFICIALS,
JUNE 19, 1992
PRESENT: Caroline Jensen, Health Department;Mike Byrne, Building Department;
Jason Manassee, Planning Department; Dave Salzar, Mason County Fire Marshal;
Mark Tompkins, Environmental Health; Pat McCullough, Tony Hannan, Joe Testu,
Michael Baker, Ann Baker.
Pat Mc Cullough opened the meeting with a prayer.
Joe Testu gave a short background history of Prince of Peace Catholic Mission.
He stated that presently the congregation meets in the Belfair Community
Baptist Church. He also told the committee that at one time we had proposed
building a catholic facility on Highway 3, but abandoned the site because it
wasn't a large enough piece of property for expansion. He stated the Bldg.
Committee came to that conclusion after the site was examined by both a
retired contractor and the contractor's son who is presently a builder.
Joe told the Mason County officials that Dwayne Harkness, BJSS Group is our
architect who will present the plans for the facility to contractors for bidding
purposes this fall. Joe further stated we need the cooperation of Mason County
officials and other agencies regarding permits, etc.
Pat McCullough explained the location of the proposed catholic facility on Sand
Hill Road in Belfair. He exhibited a contour map and the proposed revision of
Scheme C plans for the facility.
McCullough stated an access study of the property had been accomplished and had
been examined by Mason County Public Works Department. Pat told those attending
the meeting that the proposed structure is a 2-level building comprising
10,000 square feet; there are future plans also to expand the facility to include
an educational facility. He explained that presently the building budget does
not include such an educational facility.
Pat stated the soil on the site is loamy sand to wash sand and there will be no
problem of storm grater disposal. He further stated there will be 125 parking
spaces on the property when the first increment of construction takes place.
Pat said a more detailed survey of the location of the facility is in the offing.
The question of handicap access was brought up by Caroline Jensen. Ann Baker
explained that access would be via paved paths at the front of the facility and
there will be a handicap access to the lower level off the drive that circles
the perimeter of the building.
Joe Testu stated there will be two services each weekend when the facility
is built; one on Saturday and one on Sunday morning.
Tony Hannan stated there was a seating capacity of 216 in the worship area of
the facility.
Mike Byrne said parking spaces relate to the seating area, e.g. , one parking
stall for each 4 seats or one parking space for each 50 square feet of the
building.
Pat explained the proposed fire protection plans, saying that formerly the
building committee had considered obtaining water from Sand Hill Elementary
School, but after further consideration that idea was abandoned. He stated
Page 2 - Prince of Peace Meeting with Mason County Officials, June 19,1992
Prince of Peace will have its own well with a 60,000 gallon capacity underground
concrete storage tank. For fire flow, with the use of pumps, there will be an
ability to produce 1750 gallons of water per minute. The facility will have a
deep well supply of water and will use a pump system to keep the storage tank
filled.
Caroline Jensen told the committee the necessary amount of water depends on
the anticipated use, seating, kitchen usage and drains of the building. She
stated she would personally inspect test holes to determine the suitability
of the soil for the septic system. Caroline suggested we might use a pump
to move disposed water to a drain box and then use a gravity feed to the
drain field. She also stated water adequacy is based on the amount of water
that can be pulled out of the well.
Pat asked Caroline to give hir4 the list of requirements for a drain field.
She stated she would do so.
Joe Testu questioned if the drain field is related to the number of occupants
using the building. Caroline stated she would furnish the information by
giving Pat McCullough all the requirements for the drain field.
Mike Byrne said churches today are used for many purposes, i.e. , community
services, educational classes and community groups. Pat said the usage of
water in the proposed facility will be less than 5000 gallons per day. He
expanded on his statement by saying there would be a 20 gallon per minute pump
to keep the storage tank of 60,000 gallons capacity full.
Caroline stated the following studies must be completed before a building
permit can be issued: energy study, inspection of the well, water adequacy
for potable water and disposal water. She said the water system has to be
approved and enumerated some of the requirements for the well, e.g. the
well has to be 100 feet away from any surface water, detention ponds and
drain fields. It has to be at least 10 feet from the building's foundation
and 5 feet away from any easement or property lines. She will inspect the
site for drain fields, well, etc.
Mark Tompkins, Mason County Environmental Health Department, was asked to
join the group to render some information. Mark stated Prince of Peace may
be able to obtain a building permit on a variance when the well is drilled.
Dave Salzar, Fire Marshal told the committee for fire flow purposes the
water system must have a capability of producing 1750 gallons of water per
minute for a period of 30 minutes. Mike Byrne concurred.
Dave said any building area over 15,000 square feet requires a sprinkler
system. He added if we intend to expand the facility in the future we
should keep this requirement in mind.
Ann stated, since we do intend to expand, it is her opinion that we should have
the sprinkler system 'roughly piped in' during the initial construction phase.
Pat McCullough said the sprinkler system would be a costly item in construction.
1
Page 3 - Prince of Peace Meeting with Mason County Officials, June 19, 1992
Ann agreed with Pat, however, she said it would be far more costly to put in
a sprinkler system once construction was completed.
Pat will discuss with the architect the feasibility of including a sprinkler
system in the initial construction.
Dave Salzar told the committee that a water supply is required before any
combustible construction begins. He also said the fire hydrants must be located
no farther from the building than 150 feet because that is the length of a fire
hose.
Dave will test the fire flow by physically attaching a meter to the fire
hydrants. McCullough told Dave he had planned to use a 10 inch pipe from
the water tank to the front of the building and a connecting pipe of 8 inches
to the rear of the building.
Dave stated it is prudent to have good fire protection for all of the property.
Michael Baker asked if the sprinkler system would lower the cost of insurance.
No one seemed to have substantial knowledge of this and McCullough said he
would contact the Archdiocese of Seattle regarding insurance premiums if we do
or do not have a sprinkler system. Ann stated the insurance on the facility
will be carried through the Archdiocese.
Dave said we must create a zone between the surrounding area and the structure
itself. He stated a 20 foot wide access around the building is required for
fire trucks and equipment to maneuver. Dave said he would contact Fire
District No. 2 to determine their requirements for fighting fires. He also
said fire lanes have to be designated and kept open, i.e. we will need
No Parking signs designating the fire lanes.
Tony Hannan said he will take the site plan drawings to Fire District No. 2
for their examination and evaluation.
Ann asked if we will have to have a fire alarm system. Dave will look into the
matter and will also contact BJSS, the architectural group.
Submitted by Ann Baker, Secty.
Prince of Peace Bldg. Committee
Note: John Flynn, Engineering Department of the Mason County Road Department
Brad Banner, Director of Health Services