Loading...
HomeMy WebLinkAboutDrainage,Erosion Control Plan - PLN General - 9/18/1992 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton, Washington 98584 INTER-DEPARTMENTAL COMMUNICATIONS DATE September 18, 1992 TO: JASON MANASSEE, Dept. of Community Development FROM: ALAN A. TAHJA, P/W Engr. Support SUBJ: Prince of Peace Catholic Facility Drainage/Erosion Control Plan Jason; Wednesday Sept. 16, 1992 I met with Pat McCullough, the P.E. representing the Prince of Peace Catholic Facility to be built on the Sand Hill Road in Belfair Washington. Mr. McCullough prepared the stormwater-erosion control plan with the assistance of Lenny Kong author of "WATERWORKS", a hydraulic program developed by Engenious Systems of Belview Washington. According to Mr. McCollough's calculations and the WATERWORKS printouts, the facility as proposed will allow stormwater to be discharged in two locations which currently receive the existing stormwater run-offs from the site at 0.40 cfs for a two year 24 hour storm event and 1 .06 cfs for a 100 year 24 hour storm event. Under their proposal water would be discharged at these same locations at 0.19 cfs and 0.37 cfs respectively for the facility with graveled parking areas and at 0.42 cfs and 0.52 cfs respectively for the proposed facility with paved parking areas. I have reviewed the information underlying these calculations and feel they are valid. Upon asking Mr. McCullough what criteria he was designing to he replied he was designing to keep projected outflows at or below predevelopment conditions. Mr. McCullough was not aware of Mason County Ordinance #815 (Mason County's Parking Ordinance) and was not aware of the County's primary aim of retaining stormwater from commercial sites on site as set forth in that ordinance. Even though the design proposed by Mr. McCullough is not up to our ideal standard, I do feel his design represents a sincere and responsible attempt to adapt the proposed facility to the surrounding environment with minimal impact. I recommend accepting Mr. McCullough's design upon submission and acceptance of the details of the outfall control devices. The plans as submitted do not show any Oil/Water separating devices, but I feel that the outflow devices could be constructed to satisfy this requirement. In summary, I would recommend approval of the McCullough design for the Prince Of Peace Catholic Facility upon receipt and acceptance of the outflow structures details with the recommendations that some type of oil/water separator is designed into the facility and I would like to see the lower Orifices designed to restrict the two year st rm outflow to 1/2 (one-half) of the predevelopment outflow. ALAN A. TAHJA Engineering Support cc:MLY,PM