HomeMy WebLinkAboutMIS99-0426 LPG Storage, Fire Review - PAR Letters / Memos - 7/28/1999 t oo2 7u Case � mher. MI$ JUL?, 0 1999 MASON COUNTY PERNFfiFffiSWfi'9%ION CONFERENCE REQUEST FORM The purpose of the pre-submission application is to identify and/or eliminate as many potential problems as possible in order for the project to be processed without delay. Representatives from the Building Department, Fire Marshal's office, Environmental Health, Planning, and Public Works departments may attend the meeting to discuss rules and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction, fire protection and life safety of the proposed project. By providing the most accurate and detailed information on the application and site plan your pre-submission conference will be more informative. Pre-Submission conferences are held every Wednesday and last approximately one hour. To schedule a meeting complete the application on both side and return 7 copies of the site plan to the Mason County Permit Assistance Center, atta. M. MacSems. If you have questions call (360)427-9670 ext. 281. Date: 7/13%99 Site Plan Applicant: Submit 7 copies CENEX HARVEST STATES Mr. Sill Anderson Namc ,include the following Address 15824 66th Ave NW Gig Harbor, WA q83-,c information on siteplans: Daytime telephone (2 5 3)8 51-4 44 i ✓ Property lines,casements,and right- ot=«'ays. Representative ✓ The location of all existing And proposed structures. Include square Name Mr. Fred Eenz P.E. FSB Enterprises, Inc- footage of existing and proposcd Address 942 KW 64th Saattle, WA 98107 buildings. Daytime telephone ( 2 0 6)7 81—21 13 ✓ Setback distance,in fcct,from all property lines and buildings. Pared Number: 12 digits ✓ Existing and proposed road access to 12 3 2 1 _ 10 - G 10 j 0 and from the site. ~ ✓ Parkina sites Description of Project: ✓ Location of on-site sewage tanks and Include square footage of structure,use of buildings i.e. office, warehouse, ete, drainfiel(t,. occupancy classification(L'BC, Table 3-A), and construction type , Provide one set ✓ Location of drinl;iup water supply of of plans, if available. Install 2x30,000 gallon LPG Fuel proposed site and sturounding sites. storage tanks at the hie corner of the existing ✓ Steep bluffs,wedands, strea , and yard adjacent of railroad siding for railcar bodies of"water delivery of fuel . Trucks would off-load from ✓ Location offuc hydrants and emergency vehicle access roads. the storage tanks for local supply and delivery including gradc. of fuel to hones , business, and local government. V Surface and;;turnt'Asterrun-off System would be mounded []Fir- routes. Continued on reverse side 07. 06 99 TUE 13: 40 FAX 3801277799 MASON COUNTY BLD J Z003 Has this project been discussed during a previous Pre-Submission Conference? If yes, please indicate date O- Will the building have employees? If yes, how many? A small job site trailer is ._, proposed for the use of drivers- A single employee may be assigned to site . What is the water availability of the proposed project? If there is an existing well,what is the name of the system? An existing well serves the site and is shown on plans . Name unknown . What is planned fnr an oa-site sewage system? If you are proposing a new on-site system provide detail on the required site plan. A portable toilet will be provided and serviced locall . ADDITIONAL COTS: Fire protection will be provided per uFc Article 82 and Standard 62-1 . The systems will be a mounded installation Yer "spacial prataction" as described in the uniforta Fire Code. APPLICABLE $UILDri G CODES! 1997 Uniform Buildng Code-WAC 51-40 1997 Uniform Mechanical Code-WAC 51-42 1997 Uniform plumbing Code- WAC 51-46/51-47 1994 Non-Resideutial Energy Code/Ventilation and Indoor Air Quality Code Mason County Ordinance Date and Time Conference Schcdulcd, -7 8- ;O U Location: BL O G V I l N. L. OLSON & ASSOCIATES, INC. IL[R44IFK 2453 Bethel Avenue J /� P.O. Box 637 PORT ORCHARD, WASHINGTON 98366 DATE JOB NO. (360) 876-2284 '00 FAX (360) 876-1487 ATTENTIO ,fin {. �,,��/ � U TO /i'/j�G 9}/l � /L�1�/ f/ �rj� E: WE ARE SENDING YOU Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: DvIt—or approval ❑ Approved as submitted ❑ Resubmit copies for approval For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO ;M �/ I.J/��' / / /lam/ /��y SIGNED. I2C \lV/TUA L-: /J[�✓nI M enclosures are not as noted,kindly notify us at once. R MASON COUNTY FIRE MARSHAL Department of Emergency Management Sanderson Industrial Complex W.410 Business Paris Road Shelton,WA 98584 360/427-7535 CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION October 30, 2000 Robert W. Dressel North Mason Fiber Company P.O. Box 275 Belfair, WA 98528 Mr. Dressel: I wanted to confirm our discussion regarding the commercial development of your site on Log Yard Road, in Belfair. I understand the following: 1. The Cenex project will not proceed, but you 'Intend to continue the build out of the fire protection water system. 2. You have offered the site for emergency helicopter landing, in coordination with FD 2, but this will not involve use of the site !or commercial helicopter service. 3. You want to have the flexibility of negotiating with another tenant that may to set up a similar operation as that proposed by Cenex, i.e., a bulk propane distribution facility. You want the assurance that the land use and infrastructure requirements that were relevant to the Cenex project would apply to a new tenant. As we discussed cn the phone, the use o= the sij.a as an emergency helicopter landing site would not drive any specific fire protection requirements other than the Standard Operating Procedures used by local fire districts for helicopter landing zones. The permit that was issued for the Cenex project was issued to Cenex and was specific to the site plan that they submitted. The submittal included tank and piping details that may not be relevant to a new submittal from another company. The permit was not processed beyond being logged onto our permit tracking system. Rather than keeping that permit in the system and changing the name to North Mason Fiber, we will cancel that permit and reissue a new permit specific to a new submittal. E Canceling the Cenex permit will not jeopardize the opportunity for another applicant to present a proposal. Your property is within the Belfair UGA and is designated for a light industry allowed use. Depending on the scope of a future project, we may need to schedule a pre-application meeting. I suggest that you contact me directly if you want to present a new proposal and we can discuss details and process at that time. As I mentioned on the phone, the commercial development of your site is dependent on the availability of fire flow. We will work with you to coordinate the completion of that infrastructure with future development plans. If you have any questions, please contact me. Bes a ards, &A� Dave Salzer Fire Marshal Cc: Allan Borden, Planning Kelly Mayo, Building _ � _ _ � � � � � � 'MA'.A Sl1 IxnPp •pWi:A IIAR i� R APO • x Y �q� - L i •� j - is s r .S t v �ivl•w • ws� ! n TABLE OF CONTENTS SECTION 1 APPLICATION SITE MAP SECTION 2 MANUFACTURER'S DOCUMENTS SECTION 3 ENGINEERS RECOMMENDATIONS Foundation Report 6/20/00 Foundation Report 7/20/00 Drainage Report 12/10/99 SECTION 4 Site Map Site Improvements Plan Water System Improvements(Fire Hydrant Plan) E Cenex Propane Partners March 30,2000 Fa=Marketing & Supply, Inc. 15824 661 Ave NIW Gig.Harbor, WA 98335 Attn,. Bill Dew Bill: There are two options I would like to present to you. The first option is to update the quotation ftom last year, and the second option is the SIdd Style You requested. Option #1 would be for two (normal) 30,000-gallon storage tanks that will set on concrete piers, which can be poured on top of the I V asphalt surface, high capacity transport unloading, bigb capacity bobtail filling, pump, compressor and rail car unloading tower. Option #2 would be for two 30,000-gallon Mounted on skids. One of the skids will have the transport'-anloading,bobtail filliag and a pump mounted on it. The second skid would not have this equipment but would be manifolded logether,ivith the first sIdd. The rail lower and compressor would not be skid mounted. You also asked for budget prices for the installation of both options. Based on this information the pricing is as follows: Option -Equipment for permanent installation S115,074.00 Labor and materials for the installation(no electrical) S 37,811.00 Option#2-Equipment for skid mounted installation S13%074.00 Labor and materials for the installation(no electrical) S 24,653.00 The following items of equipment are included in each of the various equipment options: I. Two previously used 30,000-gallon propane storage tanks delivered to the jobsite. The tanks will be suitable for installation in the State Of Washington.The tanks have been cleaned on the inside., sandblasted and P=' e'painted on the outside. For Option #2, the tanks-AU be permanently attached to steel skids. The "and skid will be painted with white tank- enamel. 66 Y, Two complete sets of high capacity storage tank accessories including relief valves, pressure gauge, 85% maximum filling indicator, magnetron liquid level gauge, storage tank thermometer, hydrostatic relief valves, internal excess flow valves with pneumatic operators and manual globe shut-off valves, For Option # U NTRY. AI all tank fittings will be installed except the liquid level gaugd wili be shipped loose. K. One high capacity trausport unloading riser complete with up-to-date bulkhead to be set it a heavy concrete base, manual shut-off valves, check valve, emergency shut-off valve, breakaway nipples and hose adapters and caps. Liquid lines will be 3" and vapor equalization lines will be 2". The Acme adapters will be 3 1/4" for liquid and 2 1/4" for the vapor. For Option # 2, the t1luSPOrt- unloading bulkhead will be welded to the front of the skid and piped to the tards-, openings. L. One high capacity bobtail filling riser complete with up to date bulkhead to be set in, a heavy concrete base, manual shut-off valves, check valve, emergency Shut-off valves, breakaway nipples and two twelve feet long hoses for connecting to the bobtail. Liquid lines will be 3" and vapor equalization lines will be 2". The ACNV-hose adapters will be 3 1/4" for liquid and 2 1/4" for the vapor. For Option # 2, the bobtail-filling riser AU be welded to the front of the, skid and piped to the pump. M. One complete pump setup for bobtail filling which includes a Corken 3" pump, 10 horsepower explosion proof motor, explosion proof starter with cabinet, explosion proof start/stop switch, manual sbut-off valve, hydrostatic relief valve, prefabricated bypass valuing, pressure gauge, strainer, and sight/back flow indicator. For Option #2, the pump will be mounted on the front portion of the skid and piped to the tank openings and bobtail-filling riser. N. One rail car unloading station complete with rail tower shipped knock-down for field assembly and piping, a new Corken 490-107 compressor with IQ horsepower motor, emergency shut-off -valves with pneumatic operators, globe shut-off valves, break-a-way nipples, sight flow indicator, back check valve, hydrostatic relief valves and three 2" hoses with emergency shut-off valves and adapters for connecting to the rail car valves. Two hoses for liquid and one for vapor equalization. Unit will be shipped prime painted only. For counter balanced areas please.add 9,369.00 0. Freight is included for aU-equipment to the jobsite. P. Sales or Use tax is not included. The following items of field labor and materials are included for each of the installation options: 1. We will do all concrete work for the entire installation. This includes the concrete piers for the storage L-44 foundation for the rail tower, pump, compressor and the, necessary concrete around the risers. The rail tower foundation -will require .T=oval of the blacktop so that it can be adjusted to the rail car height, which we have included. The remainder of the foundations ya be placed directly on top of the asphalt. In the case of Option 02, only the rail tower and compressor foundations will be required. The other equipment is part of the 7 11, 'AV ino VUP177rti Iff it^.1 7 W7 '(17 'In r J. We will furnish all pipes and pipefittiags for the entire finstauation. All screwed fittings are to be extra heavy duty and all threaded pipes will be schedulc 80, We have assumed that the two tanks wM be spaocd 5 feet apart and the rail tower will be not more than 25 fee from the tanks. K. We will pro-,ide all engineering, supervision and labor for the installation. We, would also start-up and adjust the equipment and instruct your personnel in the proper use of such equipment We will require that the fast load of propane be delivered to the tank while our crew is still there. We will check for leaks and proper operation of all the equipment. We have not included any electrical wiring. This must also be complete while our crew is still there, L. We will unload the storage tanks and equipment and set them on the foundations or asphalt slab. M. We have not included fencing. N. We have not included any landscaping or site improvements O. We have included final painting of the tanks, tower and piping. Option 41 ,equipment is prime painted only. option #2 tanks and skid are shipped painted. We would also install decals idmtfying the tacks as propane storage as required by the codes. The pipe xill be identified with decals indicating the type of product and direction of flow. P. We have not included any permits for the iDstallation that may be required Our standard terms are 10 % down payment to reserve the tanks for you with the balance due upon completion of the work. Upon receipt of the down payment we will meet at the site and go over the specifics of the project and fi= up any changes that need to be made. We would anticipate that it would take approximately 60 days to complete the project. Thank you for the opporomity of presenting this proposal. Should you have any questions or would like to place an order,please call me at 1-800-852-8186, ext&465, Sincerely,. Linda Krach Supervisor propane Equipment 30 X 109 TANK INFORMATION: CAPACITY: 30.000 GALLONS 1' CORK PAD NOMINAL DIMENSIONS: A OUTSIDE DIAMETER: 109.347' «4 BARS a 16' HORZ. EF OVERALL LENGTH: 791.37S' #4 BARS a 12' VERT EF 4 BARS a 12' EV SINGLE MAT BASE �2 OR 4 X 4 X 1/4' MESH DESIGN NOTES: 1. THIS DESIGN APPLIES TO PROPANE STORAGE ONLY WITH MAXIMUM FILL PERMITTED BY CODE. o� GRADE 2. THIS DESIGN ASSUMES THAT FOOTINGS ARE PLACED ON UNDISTURBED SOIL OR COMPACTED FILL. MINIMUM SOIL III=III—I' III=III III-II - BEARING STRENGTH REQUIRED IS 3.500 III IIIIIII — — — — _ _ POUNDS PER SQUARE FOOT III=III' III=III III III 3. DEPTH OF FOOTING TO MEET OR EXCEED III III it III LOCAL BUILDING CODE. m 111 III 96• 1 14-•I MATERIAL SPECIFICATIONS: 120• 160 CONCRETEI TO DE ELOPE MINIMUM COMPRESSIVE STM OIVE SEE NOTE #3 1 1 STRENGTH OF 3,500 PSI IN 28 DAYS SECTION A-A A 30.000 GAL. W.C. —'u= ALL DIMENSIONS ON THIS DRAWING ARE MINIMUM AND SUGGESTED -I '�-46 PIER DETAILS ONLY. DUE TO VARING SOIL CONDITIONS ETC., SMALLER FOOTINGS MAY BE POSSIBLE WITH SOIL ANALYSIS. GAS SUPPLY. INC. PIER SPACING ASSUMES NO RESPONSIBILITY FOR SOIL CONDITIONS. DRAWING scAlc rare rrrRoVco�r DR�vN ttr awn IS ISSUED AS A RECOMMENDATION ONLY. DATE, 41111% REVISED GAS SUPPLY. INC. 2236 EDGE►OOD AVE.SD. DRAWING KJKKR MINNEAPOLIS.MINNESOTA 55A21S 30 X 109 2238 Edgewood Avenue So. Phone:612-545-14456 Minneapolis.Minnesota 55426 Fax 61Z545-1228 PROPANE PIPING STANDARD PS-2 (Maximum operating pressure 250 psi - 350 psi) A. Spec for pipe: A-53, A-106 or API 5L grade A or B. B. Specs for welded fittings and flanges: A-105 or A-181 C. Welding procedure Gas Supply, Inc. WPS-10 D. Underground pipe- • Schedule 40 minimum, welded joints • Factory coated • Joints and holidays to be field wrapped • Minimum depth - 36" unless otherwise specified • Pipe to rest on smooth trench bottom • Use 17# magnesium anodes as specified • Use insulated unions or insulated flanges as specified to insulate buried pipe from aboveground piping E. Aboveground pipe - welded • Schedule 40 minimum F. Aboveground - threaded • Schedule 80 minimum G. Threaded fittings Extra heavy black malleable except unions (forged steel 2000# minimum) H. Valves (globe and angle) Rego or equal UL approved for propane - 400 psi I. Hydrostatic relief valves • 400 psi between each pair of block valves on each liquid line Pipe By-Pass Valve Bonnct opcnial to vapor Pipe Equaliziog Line to Vapor Section of Storage Tank or Equaliziat Line. Loading Hose Section of Storage Tank. Equalizint Line must be same size or larger 5 ! Equalizing Hose than By-Pass Valve. \ 9 i I 70 Pipe By-Pass Line 6 — 12 to Storage Tank.--- / TO DELIVERY TRUCK I 5 ti s ti Keep Pump Foundation as close to grade level Connect to Storagc Tank as practical. bottom orcning with free flow type shut-off valve. / 6 7 5 Mount Storage Tank at least 4 feet above pump \ lZ inlcL FITTING ` Unloading Hose NUMBER FITTING DESCRIPTION - _ I. Eccentric Swage Nipple ,, Equalizing Hose when necessary flat Side uP!) 2 Flexible Connector (Hose or FROM TRANSPORT Flexible Type Union 3. CORKEN Flo-Clack Valve or Flow Indicator. Thi: Tvpieal Platt Arrangement will perform the following 4. Stmincr 40 or 30 Mesh Screen) operations S. Shut-off Valve I. Unload Transport into Sronge Tank. Ball or Gate Valve Type) 2- Unload Transport into Delivery Truck. 6. Swage Nipple 3. Load Delivery Truck from Storagc Tank- 7- 1 CORKEN Flo-Click Valvc 4- with addition of Bottic Filling Manifold will fill bottles a. i Pressure Gaugle, 0-400 PSI from Storage Tank. 0-28.1 k cm Ran e 9. ICORKEN B177 Automatic NOTE: This is a generalized balk plant pump installation By-Pass Valve capable of a multitude of load/unload operations. Be sure and 10. Hydrostatic Relief Valvc check all federal, state, local laws and codes to Insure that all II. I SwingCheck Valve piping components are In accordance, 12 + Globc Valve Figure 2. SIZING OF PIPING INLET PIPING UNLOADING HOSE EQUALIZING PUKP MINIMUM EXCESS OLJTLET PIPING LOADING HOTI S£ PIPING BY-PASS MODEL - MUM IDEAL MINT" IDEAL FLOW VALVE RATE MINI" MINI" N' IDEAL VALVE 521 2" 2-1/2° 1-211 2-2" 100 GPM(378.5 lit/min) 2" 1-1/2" IN 1-1/41` 1-1 4" 1021,F1021 3° 4" 2-2" 1.31, 200 GPM(757.0 lit/coin) 2.1/2" 2111/G° 1-1/2° 1.1/21 F1521 41t a 2-21, 1-3" 3S0 GPM 132G.8 lit min 2-1 2° 1 2" 211 211 WARNING Install, use and maintain this equipment according to CORKEN ANSI K61.1 for AnhTdrons Ammonia. Periodic Inspectlon and (nstruetlons and all applicable federal, state, local laws and maintenance is essential- codes, and latest •ersion of NFPA Pamphlet 58 for LP-Gas or 2Q 3' FORGED STEEL HAMMER UNION Z EXCESS FLOW VALVE ®4 CORKEN 3- 1021 PUMP WITH BASE TANK ACCESSORIES W/ VAPOR ELIMINATOR GLOBE VALVE © 10 HP EXPLOSION PROOF MOTOR ^tO5B5�xEF FIXED BEVEL ® 3 FORGED STEEL UNION O REGO 7534G RELIEF VALVE. STACK. RAIN CAP INOTE 11 PRE © REGO A7517AP 3' GLOBE VALVE O REGO 9095RSM72 ROTARY GAUGE IOPTIONAL) PRESSURE RELIEF VALVE ® BLACKMER 2- PUMP BYPASS VALVE O REGO A32828 1 1/4" EXCESS FLOW VALVE IVAPOR) ® REGO 3125L 400 PSI HYDROSTATIC RELIEF O4 2" X 1 1/4' FORGED STEEL BUSHING ANGLE VALVE RELIEF VALVES O REGO A75098P 1 1/4' GLOBE VALVE IVAPORI VAPOR (OPTIONAL) O ©1 1/4' FORGED STEEL UNION ® 7O REGO A3292C 2- EXCESS FLOW VALVE [LIQUID FILL) 16 17 21 19 O8 REGO A7513AP 2' GLOBE VALVE (LIQUID FILL) BS% MAX FILL�� d O ROTARY GAUGE O 2 FORGED STEEL UNION FLOAT GAUGE 15 � :31 �- � REGO A7539V6F 3' EXCESS FLOW VALVE (LIOUIO OUT[ O 10 �-' O O II 3" FLEX-CONNECTION (OPTION SLAB MOUNTED PUMPI il 14 THERMOMETER�� Z ®O O 12 REGO A7517AP 3" GLOBE VALVE ® 12 O TRANSPORT UNLOADING RISER [NIGH CAPACITY[ O 3' FORGED STEEL UNION 3' PUMP SUCTION 13 _ Og _ _ © SEE STANDARD DRAWING SD-203 0 ROCHESTER BIMETAL TANK THERMOMETER MAGNETEL LIQUID LEVEL FLOAT GAUGE 1 1/4' VAPOR EQUALIZATION 16 REGO A2805C COMBINATION GAUGE 85'/. MAX FILL 17 REGO 9488 0-3000 PRESSURE GAUGE I1 3•3 2' TRUCK UNLOAD ® 18 REGO A3282B 1 1/4' EXCESS FLOW VALVE (VAPOR) © _ 19 2- X 1 1/4' FORGED STEEL BUSHING BOBTAIL FILLING RISER[HIGH CAPACITY) ® REGO A7510BP 1 1/4- ANGLE VALVE (VAPOR) 26 SEE STANDARD DRAWING SO-211 �I I I/4" FORGED STEEL PLUG (FUTURE) a REGO A7796 3- SITE FLOW INDICATOR IOPTIONALI t✓ I 1 1/4' VAPOR EQUALIZATION 3' 2" BOBTAIL FILL NOTE: o J 3-RELIEFS REQUIRED FOR 30,000 GALLON TANK i IL 0 O 7 0 0 J J > 30.000 GALLON TANK (FUTURE) PROPANE STORAGE BULK PLANT CENEX - AURBURN. WA. SCALE, NONE APPROVED BY, DRAVN BY,DVD DATE, 4/11/95 1 REVISED GAS SUPPLY, INC. 2238 EDGEVOOD AVE. SO oRnulNc NUMBER MINEAPD-IS.MINWSOTA 55426 CAV 95-2 CENAU82.GCO v MASON COUNTY FIRE DISTRICT #2 P.O. Box 277 • NE 460 Old Belfair Hwy • Belfair,WA 98528 Phone: (360) 275-6711 • Fax: (360) 275-6224 Fire Chief:Michael Greene Administrative Assistant:Nikki Madsen April 12, 2000 Dave Salzer Mason County Fire Marshal P.O. Box 186 Shelton, WA 98584 Dear Dave, This letter is to confirm our discussion about the proposed Fire Protection Water System .North Mason Fiber project. In conferring with the Chief and the Assistant Chief, 'we are in agreement that there needs to be a back-up power source for the fire pump system. Attempting to use a system where the Fire District would utilize a pumper to pressurize the system in the event of a pump failure, would place Fire District equipment and personnel perilously close to the propane storage facility. We believe that a back-up pump or power supply is imperative to our ability deal with an emergency situation at this facility. Thank you for your assistance in this matter. Lt. Carl L. Sande Fire Prevention Officer Commissioners: Bill Hunt * Gene Mc Tee * Jim LeBlanc MASON COUNTY FIRE MARSHAL Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton,Washington 98584 (360) 427-9670 Ext.273 CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION April 3, 2000 TO: Captain Carl Sande FROM: Dave Salzer RE: Fire Protection Water System North Mason Fiber Co. Attached is a civil plan for a proposed fire protection water system for the North Mason Fiber site. This infrastructure proposal is being driven by a proposal we received in July of 1999 from Cenex Harvest States for a LPG bulk distribution facility at this site. FD 2 did a fire safety analysis for this project. A copy is enclosed. Based on the fire safety analysis, a fire protection plan (copy enclosed) was developed for the proposal. The attached civil plan is designed to meet the requirements of the fire protection plan as well as to provide fire protection water for potential future development. I am requesting your input on the water system plan. Be advised that additional hydrants may be required once the actual location of the LPG bulk distribution facility is determined. Additional hydrants may also be required if other development drives that expansion. I would appreciate your comments no later than April 14, if possible. If you have any questions, please contact me. MASON COUNTY FIRE MARSHAL Mason County Bldg.III 426 W. Cedar P.O. Box 186 Shelton,Washington 98584 (360)427-9670 Ext.273 CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION FIRE PROTECTION PLAN CENEX HARVEST STATES LPG BULK DISTRIBUTION FACILITY BELFAIR, WA SCOPE: Installation of two 30,000 LPG storage tanks for bulk distribution. Tanks will be filled by rail car. Trucks will off-load from bulk tanks. Bulk storage tank system would be mounded per UFC 8204.4 and NFPA 58, Section 3-2.4.7. FIRE SAFETY ANALYSIS A detailed Fire Safety Analysis, using the format in the 1992 NFPA Liquefied Petroleum Gases Handbook, has been completed by Mason County FD 2 and is included as a separate attachment. WATER SUPPLY The key element in the Fire Safety Analysis is the availability of a water system capable of providing adequate fire flow. Mason County FD 2 has provided a tactical assessment that results in a water supply capable of supporting a multi-engine operation. Mason County has adopted Appendix III-A of the 1,197 Uniform Fire Code. Section 5.2 of Appendix III-A establishes a minimum fire flow of 1500 gpm, for 2 hours. That value will be applied as the base fire flow required for the proposed LPG storage/transfer facility. vU Fire flow can be accessed from the Belfair Water District, or from an on-site water system designed and installed to the following standards: NFPA 20 Standard for the Installation of Centrifugal Fire Pumps NFPA 22 Standard for Water Tanks for Private Fire Protection, NFPA 24 Standard for the Installation of Private Fire Service Mains and Their Appurtenances Separate plans and permits are required for the water system. ° O } �j �N cr v ton ul �1 w f-- ,n to tA r � J 2 07/27/99 16: 38 FAX MA50N DIST 9 2 lQJut MASON COUNTY FIRE DISTRICT 42 P.O. Box 277 - NE 460 Old Belfair Hwy • Belfair,WA 98528 Phone: (360) 275-6711 Fax: (360) 275-6224 To: Dave Salzer Fire Marshal, Mason County From: Aaron Espy, Assistant Chief, MCFD #2 RE: Proposed P -opane Offloading Site 7/26/99 I have reviewed the Cc aex propane proposal#99-0426. With reference to that document 1 have performed the followir analysis. Introduction: Due to t to proximity of a major thoroughfare, and the likelihood that additional development will take )lace within close proximity of the proposed site, I've concluded that a definite need for fire p otection exists. The project, at its proposed location, does not, in my view, meet the criteria for"I o Fire Protection Needed". (Section A, Pp. 483, Liquified Petroleum Gases Handbook).Ac ditionally,while the tanks will be protected by an ecology block wall and covered with sand, the e is still a concern involving transfer of product at the site, and the potential for leaks and/or fire. Firesafety Analysis 1. Local Conditions of Hazards within the Container Site. The site lies in t lightly developed industrial area.There is minimal residential development in the general proximit,,. The site lies approximately 0.5 miles due west of Highway 3. 2. Exposure to and Frc m Other Properties There is a luml er yard/wood processing operation to the immediate south, and an asphalt manufacturing plant to the north. 3. Available Water Sul ply There is curren :ly no water system to serve this area. The nearest hydrant is approximately 1.5 miles south of this location via Weyerhauser Road and Hwy. 3. In the event of a fire, first alarm fire engines and enders could supply approximately 4000 gallons of water within the first 10 minutes of notification of an alarm. (See#5 below) 4. Probable effectiven( ss of plant fire brigades. (Not applicable) 07/27/99 lti:38 r"Ai MAJur Mimi ff c Luc 5. Response time and )robably effectiveness of fire department The location li :s approximately 2.6 road miles from MCFD#2 headquarters station, and approximately 5-6 mu utes during an emergency response. While first alarm units could theoretically supply 4(00 gallons of water within ten minutes of an alarm, this is an optimistic estimate, and relies up )n a number of factors, including available volunteer manpower. Typical staffing of career pers.-nnel is currently two per shift and, in the absense of volunteer personnel immediately available at the station, would result in only an engine equipped with 500 gallons of water arriving within t ze first ten minutes. Conclusion/Recomm, ndation: Based on the a)ove information,MCFD#2 could be supportive of this project under the following conditions: MCFD#2 fire ;upression units, in the event of a propane leak with fire, would require a water supply sufficien to feed two�monitors delivering 500 gpm each,one for direct fire supression and/or tank cooling, the other for adjacent exposures. This water flow of 1000 gpm would need to be sust,fined for an undetermined amount of time, but in no case less than one hour. F`SB Fnterpr ises Inc rax 2ub—(64—!:)1ur rear i ZZ July 28 , 1999 Mr. Dave Salzer MASON COUNTY FIRE MARSHALL 426 West Cedar St. P.O. Box 186 Shelton, WA 98584 Subject: Cenex Harvest States Belfair Fuel Storage Site Facsimile Transmission: (360) 427-7798 Dear Dave: Thank you for your hospitality and the thorough review by all of the Departments that oversee the permitting of this project. I also appreciate the completion of the Fire Safety analysis for the project. I just wanted to further clarify my understanding of the requirements outlined by the Mason County Fire Marshall in the Fire Safety analysis. The issue of fire protection or special protection is outlined by the Uniform Fire Code. The Code directs us to any one of four different types of fire protection alternatives; mounding of tanks, burial of tanks, a fixed water spray bar system or a water monitor system, as dictated by a competent Fire Safety Analysis. As I understand the requirements outlined by your current Fire Safety analysis, the special protection required for this LPG fuel storage system, shall be a water monitor system with a water supply to "establish a minimum fire flow of 1500 gallons per minute for two (2) hours", The local fire brigade, "MCFD #2 fire suppression unit, ... would require a water supply sufficient to feed two (2) monitors delivering 500 GPM each". The local brigade, MCFD #2 currently has an apparatus with two 500 GPM monitors. The local fire brigade would connect their monitors to our water supply line. The water supply would come from either the Belfair Water District or an "on- site" water storage facility such as a tank, pond, or water well system with the ability to provide 1500 gallons per minute for two (2) hours. Based on this information, we will continue to Investigate the feasibility of the project. Let me know if there is anything further that I need to know or that I can provide to you. Best regards, Fred Benz, P.E cc: Mr.Ed Scheetz, Cenex Harvest States Mr. Bill Anderson, Cenex Harvest States MASON COUNTY FIRE MARSHAL Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton,Washington 98584 (360) 427-9670 Ext.273 CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION July 30, 1999 TO: Fred Benz, P.E. FROM: Dave Salzer RE: Cenex Harvest States Belfair Fuel Storage Site Thank your for your FAX of 7/29/99. 1 wanted to expand on a couple of issues. The foundation of our fire protection analysis is based on Section 903.2, of the 1997 Uniform Fire Code, which states: 903.2 Required Water Supply for Fire Protection. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. When FD 2 did the Fire Safety Analysis, the determination was made that fire flow was necessary for the site and the use of the fire flow to provide heavy stream fire flow via engine-mounted monitors was the method of choice for fire protection for this particular installation. FD 2 estimated a 500 gpm flow per monitor. This value was extrapolated to an assumed flow demand of 1000 gpm. Section 5.2, of Appendix III-A, Table A-III-A-1 sets a minimum fire flow for buildings other than one- and two-family dwellings at 1500 gpm, for 2 hours. Therefore, the requirement for 1500 gpm for 2 hours is based on the minimum fire flow value in the Uniform Fire Code. Section 903.3 of the 1997 Uniform Fire Code states: 903.3 Type of Water Supply. Water supply is allowed to consist of reservoirs, pressure tanks, elevated tanks, water mains or other fixed systems capable of providing the required fire flow. My expectation is that a water system, consisting of adequately sized water mains, properly spaced fire hydrants and a reliable pressure source, would serve the site, and would be able to supply a minimum of 1500 gpm for 2 hours.. That system can be a private system, or can be part of an existing public water system. If I can be of any further assistance, please contact me. P imt-Backaround - %� '_=Fence=-_ O Cenex Harvest States / North Mason Fiber Company 1001000 anuo N.E. 431 Log Yard Road +� r AAA 1001070 001 D70 Q P.O.Box 275 Belfair,WA 98528 i ss 0" LL N 2 X 30,000 GAL LPG STORAGE The property is located to the West of State Route 3 in the Belfair Urban ; SyI I•, TANK SYSTEM 60'� Growth Area. It is approximately 1800 feet to the North of the intersection , of Log Yard Road and State Route 3 in Belfair,Washington. /' 1 -Vicinity Map- GRADED ' i � ` •/' " ADED APpllcant N i i P (NOT PAVED) B U F F E R i Cenex Harvest States Mr.Bill Anderson, Manager fi ' / f ;(r'! ryo i v! 8 d 15824 66th Ave.N.W. I `\ ! it f I o`; :. Gig Harbor,WA 98335 y , y t r� ! } 3. `� 1 r% STANUMID FIRE j I \his c (253)851-4441 �- , f ('1/ /. ` WAWANTAssY Engineer `� irl ( ,,, Q° �Ah of n ZP xUIXENTRY STjNpp j 1 `/ -AWNT FSB Enterprises,Inc. / !! , [� �.h ,i I, i e / L RAILCAR UNLOADING STA Mr.Fred Benz,P.E. 942 NW 64th, it 'yy ;`. r ' r 1 Acres 43560 so ft Slim Seattle,WA 98107 i) �' '� j f i J 155'x 300' (206)781 2113 / t V -- TRUCK ROUTE SITE ENTRY#2�- 1 + i Scale: 1"-100' i / $TANnARn emE / s / WMANT ASSY Agency ( J7 / �Zz7 ccRcct«Wimr>iy� yFi Emergency Shutoff Switch - - \ ./`r P W tar 200' gar ! I Mason County J {r / (3r j ) i &Electric Panel f Department of Community Development + 426 West Cedar St. ) , 1• �' ' i I i I Shelton,WA 98584 ;Qa (360)427-9670 roc i ( _ y I CO ti ! v 0 ProjectSchedule A/C PAVED AREA ) .iN r August-October 2000. —/// I LU " Project Descriptl9nY' �� NORTH MASON FIBER COMPANY i BUFFER Two 30,000 gallon Liquified Petroleum Gas(LPG)tanks will be installed as shown / YARD AREA on this plan. The installation will meet or exceed requirements of NFPA 58 LPG / 1 I rYetibBd Code and UniformFire Code Article 82 and Standard 82-1. General site features, and adequate setbacks from property lines and adjoining buildings will be provided and /' i i llleee I o y are shown. The two tanks are mounted on saddles,and the tanks will be plumbed V ;I and operated per manufacturer's recommendations. r OFFICES + ! SETILiNG EXISTING SHOP POND I ; BUILDING ; + 1 � I -�SFTE EPIT1tY Al 1 war + J 't.'iils!�� .v:L1�S' i B F F E R :;• j i General Notes B'High Cyclone Fence 1 W 'ELECTRICAL 1. The 30.000 gallon containers shall be designed,fabricated,tested&marked in accordance with the GRAVITY OIL WATER FUEL TANK// TRANSFORMER 1 r a applicable regulations of the U.S.Department of Transportation and/or ASME code. The tanks will be SEPARATOR + I U installed above ground on supports(designed by others). � H � EXISTING A/C PAVEMEY.6"r1W) //� U 2. The position 8 marking of the shut oft switch or circuit breaker shall be easily accessible, � �J clearly identified&visible from the point of transfer,in the event of fire,accident,or other emergency. U) 3. The tank,container valves,excess flow valves,back flow check valves,&pressure relief ��-' ;;�i;'i,: %� i ;�i :;;::j;.; ;.;i%;: r y C devices shall be approved by the authority having jurisdiction prior to installation. % �� �Z/1 / z j�, ! i i f�! %/ (f� 4. Unless approved by the authority having jurisdiction,hoses used for dispensing operations i/i f '> ' W C shall not exceed 18 feet in length. n !r ...__—.- __-- __ r>Y'• 'O r 5. Loose or piled combustibles as well as weeds&longd grass shall not be permitted within s? r� M cC dry 9 Pe thin lots f t' tir; m t o the container. ;;�:, 3 -j} `CONK Crib GRAVEL SUBBASE I Q � 6. Posting - `_,� f0 osh of n - o smoking signs r s s as wired b t - he authority having i •: � t a jurisdiction. .. - 9 c _9 9 required Y 4 -- T Y 9 I 000 PSF VE 2 RTtCAI LOAfIING -N.CAPACfrY•: 7. One approved portable dry chemical fire extinguisher with a minimum capacity of 20 lbs. _RalfoRm er,,„` ••• •• •` , !I r ,. O C and a B-C rating shall be installed at"shut-off"switch location. r" AR 'sD�FTK,u) 1 - --------es•AI>aroz-- ---- e - 1^ C U r ••• c0 7 8. Perimeter of LP-Gas storage area to be fenced with 6'high galvanized chain link mesh(16 ga.),with galvanized Sch.40 posts, _ ( Z d O with two gated entries. LL W a 0 9. Installation of tanks,piping,and dispensing station to be installed per 28'g T' UFC Section 82 and UFC Standard 82-1. 10. Installation of Transport Unloading;See Detail SD-203 Note: f } 11. Installation of Bobtail Filling;See Detail SD-211 -LPG Storage Facility with 2-30,000 gal AST capacity i 9"0APFRGx r ' Galvanized Chain Link Fence enclosure 6'high 71- -Two(2)gated entrances 6'high galv. chain link -installation per UFC Section 82, UFC Standard 82-1 I — __ _._ _ _ _ < - �' ;z.. a t_. 4 •" Design, installation and foundation plans for 6 5%10 7/8" LP-G Storage Tanks per Gas Supply, Inc. and/or Manufacturers recommendations, r w m o W W< mm p� O LL U Revision#000 7/12/99