HomeMy WebLinkAboutMIS95-0602 Final Retaining Wall Repair - MIS Permit / Conditions - 11/25/1996 MASON COUNTY
Mason County Bldg, III 426 W, Cedar
RO. Box 186 Shelton, Washington 98584
M 1,S C: F" t_. l._A N t--,- 01 lJ 11-3 p E F1 M 1 ..T 1-'OR 1 NSPFCT I ONS CAL..L. 42 7- 9670
MI S95-0602 PARCEL. ;32.2245000081 PLAT :CAPt.0 D 1 V : BLK : LOT -
JOB ADDRESS : NF 11301 NORTH SHORE RD RULFAIR
APPL. I CAN 1 : BONN I F PR I TCHARD 876--3206
OWNF R x BONN I f- PR 1 TCHARD 876- 3206
LEGAL - CAD1'S SUIRISF 11FACH 11. 7t SF 4F 10 1 1.1 .
PROJECT USCR I PT I ON :
REPAIR OF RETAINING WALL (TWO 13--FOOT SECTIONS)
PROJECT IOCATION :
1 1 M 1 L F:S FROM BUL.f A 1 R ON NORTH SHORE RD, WATERSIDE , FENCE AND DECK NE: 11301 NORTH SHORE AD ON
LIGHT POLE .
PROJECT NOTES :
TYPF AMOUNT BY DATE RFcr i PT
PLCK $ 8 ,50 CPH 08/28/95 0000
PIiMT $ 23 .00 CPH 08/2€3/95 0000
STFI• $ 4 .50 CPH 08/28/95 0000
TOTAL- 36 .00 OWNER OR AGENT / bATF_
MIS_F111, rev, 0061192 COMPLIANCE'. TO ATTACHED CONDITIONS IS �
REQUIRED
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by
PLUMBING date by OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION 'C C,
date by day' l��G7�/ date by
MASON COUNTY
Mason County Bldg, III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
P FEE f'2M I J- 0t?N0 1 7 1 ON :
Case No . : MIS95-0602
For : BONNIE PRITCHARD
Page : 1
1 ) The proposed project must be consistent with all applicable policies and other
provisions of the Shoreline Management Art , Its rules , and the Mason County Shoreline
Master Program .
x
2 ) Temporary erosion control measures must be implemented to prevent water quality
degradation of adjacent waters or wetlands . X
3 ► Approved per site-plan . X_ __,
4 ) Perforated drain lines Installed behind the toe of each proposed wall shall be routed by
tightiine to a location behind the existing bulkhead wall where existing bulkhead weep
holes can drain .
X
5)• All approved plans are required to be on-site for inspection purposes . If inspection Is
railed for and plans are not on site, Approval WILL NOT be granted . In addition, a
Re- Inspection fee In the amount of $30 .00 per hour (minimum 1 hour ) will be charged and
must be collected by this department prior to any further Inspections being performed or
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
approval granted .
X e _�
6 ) 11011SUAN1 'TO 1991 UNIFORM BUILDING CODE , SECTION 305(C ) AND SECTION h13 , ALL SITFIS MUST
HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE
AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING
DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A
RE1NSPFCTION FEE , BASED ON RATES IN TABLE 3A OF THE 1991 UNIFORM BUILDING CODE Wilt EjE
ASSFSSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECTIONS,
X
7) ALL CONSTRUCTION MUST MEET OR EXCEED ALL. LOCAL CODES AND (16C
REQUIREMENTS
8 ) Changes to approved building plans that effect compliance to the 1991 Washington State
Energy Code, 1991 Ventilation and Indoor Air duality
Code, the Uniform Building Code and/or Mason County Rpqulations must
be approved by Mason County prior to construct i onX _. `-�_�
9) AL._I. CONSTRUCTION MUST MEE:D OR EXCEED LOCAL CODES . IF ANY QUESTIONS, PLEASE
CALL THIS OFFICE BEFORE CONSTRUCTION .
X
r 10) CONSTRUCTION PROCESS TO BE FIELD CORRECTED A REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE .x
i
II `. .
Page No. 1 CASE HISTORY FOR CASE NO.: MIS95-0914
PRINCE OF PEACE CATHOLIC
NE1171 SAND HILL RD BELFAIR
12/09/97
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MISA010 Application received / / / / 11/21/95 11/21/95 KW
MISA050 Approved For Issuance / / / / 12/18/95 DONE KS 12/18/95 KS
MISA500 (F) Issue permit / / / / 12/18/95 DONE KS 12/18/95 KS
MISA900 Telephone call / / / / 07/19/96 recived call from prince of peace of DONE SKM 07/19/96 SKM
church asking about the requirment of
the floor sink and the grease trap why,
where, and how come and I advised them
to get a code book and see what the book
requires .
MISB009 Fire Marshal Review 12/15/95 / / 12/18/95 see conditions. DONE DLS 12/18/95 DLS
MISB110 Structural Plan Review 11/21/95 / / / / need more information PEND DH 12/15/95 DWH
MISB110 Structural Plan Review 12/15/95 / / 12/15/95 not approved for LPG. Electric only. DONE DH 12/15/95 DWH
MISB128 Addressing / / / / 11/21/95 DONE GMM 11/21/95 GMM
MISB130 Planning Review 11/21/95 / / 11/21/95 DONE AHB 11/21/95 AHB
MISB131 Environmental Health Review 12/18/95 / / 12/18/95 They need to become a certified kitchen DONE PSD 07/19/96 SKM
priot to serving food to the public.psd
MISB135 RLC Checklist Review / / / / 11/21/95 N/A AHB 11/21/95 AHB
MISC050 Pre-site Inspection 06/26/96 06/27/96 06/27/96 see h:\wp\pop file for report. DONE SKM 07/19/96 SKM
copy has been given to Mike Byrne and
Dave Salzer.
MISC050 Pre-site Inspection 07/05/96 / / / / SENT REPORT TO APPLICANT SENT SKM 07/05/96 SKM
JOESEPH TESTIE / CO PRINCE OF PEACE
CHURCH
1171 SAND HILL RD
BELFAIR, WA.
MISC130 Plumbing inspection 07/10/96 07/11/96 11/25/96 1. ON THE 3 COMPARTMENT FOOD PREP SINK DONE MJB 12/02/96 MJB
THE DRAIN OFF THE BOTTOM NEEDS TO BE TO
AN INDIRECT WASTE.
2. THERE NEEDS TO BE A GREASE TRAP TANK
INTERCEPTOR, I SPOKE WITH JOE TESTO HE
STATES THERE IS ONE INSTALLED ON THE
EXTERIOR OF THE BUILDING AND IT WAS
INSPECTED BY THE HEALTH DEPT.
3. ON THE HAND WASH SINK A STANDARD P
TRAP FITTING NEEDS TO BE USED.
4. ON THE 2 DISH WASHER DRAINS CENTER
THE PIPES OVER THE INDIRECT WAST FLOOR
SINK AND LEVEL A 1 INCH GAP BETWEEN THE
TERMINATION ON THE PIPE AND THE TOP OF
THE FLOOR SINK.
Completed..Site inspection..11-25-96 mjb
Page No. 2 CASE HISTORY FOR CASE NO.: MIS95-0914
PRINCE OF PEACE CATHOLIC
NE1171 SAND HILL RD BELFAIR
12/09/97
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MISC135 Mechanical inspection 07/17/96 07/19/96 11/25/96 1. Mechanical portion of kitchen is as DONE MJB 11/25/96 MJB
per code.EXCEPT FOR THE EXHAUST OF THE
KITCHEN FAN , WHICH WILL NEED TO BE
APPROVED BY THE BUILDING OFFICAL.
2. Fan specs show that the fan cfm is
above 1500cfm and less than 2500cfm
which is acceptable. 3. Will still need
specs on the liquid tight sealer that is
used on the hood to duct connection
instead of the welded joint that the UMC
calls for at this conection point.
----------------------------------------
----------------- THEY HAVE SUBMITTED A
SET OF PLANS TO SHOW WHAT IS ACTUALY IN
PLACE IN THE KITCHEN, and they are being
sent to the file, and attached to the
hard card.
FINALED PER SITE INSPECTION 11-12-96.
ANY REMODELING OF KITCHEN WILL REQUIRE
DUCT WORK TO MEET MECHANICAL CODE. MJB
11-25-96
MISC155 Final inspection 11/22/96 11/25/96 11/25/96 DONE MJB 12/02/96 MJB