HomeMy WebLinkAboutPAR2014-00017 - PAR Letters / Memos - 4/23/2014 e:
PAR ZJ)+,f`QQ)_)
DATE
PRE APPLICATION CONFERENCE REQUEST FORM
The purpose of the pre-submission conference is to identify and/or eliminate as many potential problems as
possible in order for the project to be processed without delay. Representatives for the Fire Marshal's Office, Building
Department, Environmental Health, Planning, and Public Works Departments M attend the meeting to discuss rules
and regulations applicable to the proposed project. Topics covered during the meeting will include the comprehensive
plan, shoreline program, zoning, availability of sewer and potable water, development concepts, building construction,
fire protection and life safety concerns of the proposed project. The pre-submission conference will be most informative
when you provide accurate and detailed information on the Pre-Application Conference Application Form and the site
plan.Applications will be accepted when all information is received and deemed complete.
Pre-Application Conferences are held every Wednesday and last up to one hour. To schedule a meeting
complete the applications and return with 10 copies of the detailed site plan,by 3:00 PM on the Wednesday two weeks
prior to the proposed meetinE.
1.Pre-Application/Dept.of Community Dev. 2.Environmental Health
426 W Cedar Street/PO Box 279 415 N 5u' /PO Box 1666
Shelton,WA 98584 Shelton,WA 98584
360.427.9670 ext.352 360.427.9670 ext.400
Check amount: $255.00 Check amount: $150.00
BOTH CHECKS MADE PAYABLE:MASON COUNTY TREASURER
Applicant: Site Plan
Name: Submit 6 copies
Mailing Address: 15� .� Include the following information
Daytime Telephone j Z7 'r7Q7,29 Fax 360-2, =l���S-� Zr Indicate Scale and North Arrow
Email address: . ,,d' Property line dimensions,easements,
and right-of--ways.
Representative:
Name: / ,� l �`The location of all existing and
proposed structures.Include square
Mailing Address: �. �$", { # footage of existing and proposed
Daytime Telephone-!!?-_ S D structures.
MT7
S ack distance,in feet from all
Email address: c �/ lines and structures.
Parcel Number: (12 di )� - 1- 0 - R' Existing and proposed road access to
and from the site.
Description of Project:
Include: 1)S e footage of structure,2)Use of building and orns(i.e., Parking sites
office,warehouse,re nt,.sLcar 9ccu an assification r Location of on-site sew a tanks and
drainfields. /UL`7�T�
IBC, Section 302.1,and construction type.4)Provide two sets of plans,if /
Id' Location of drinking water supply.
available.Use separate sheet if necessary Include location on the proposed site
and surrounding parcels.
A""Steep bluffs,wetlands,streams,and
bodies of water 57o em tcwe e-
Location of fire hydrants and
emergency vehicle access roads,
6 �,6-31 ?j/-�' �.ol
including grade.
Surface and stone water run-off routes.
Has the project been discussed during a previous Pre-Application Conference: If yes,please indicate date.
Will the building have employees? If yes,how many?
What is the water availability of the proposed project?If there is an existing well, what is the name of the
system?
What is planned for the on-site sewage system? If you are proposing a new on-site system provide detail on the
required site plan. 406! e �1�T,f, j / �'y 7 J 4 5,1
ADDITIONAL INFORMATION:
APPLICABLE BUILDING CODES
2012 International Building Code/2009 International Residential Code
2012 International Fire Code-ANSI Al 17
2012 International Mechanical Code—WAC 51-42
2012 Uniform Plumbing Code—WAC 51-56/51-47
2012 International Energy Cons.Code/Washington State Energy Code—WAC 51-11C&51-11R
Mason County Ordinance Title 14
Code changes are on a 3 year cycle;effective in July of that p rtic larrye r.
Date of Conference: 1 _� , ' Time of Conferen : I v 3,0
P J
Location of Conference: 426 west Cedar Street,Shelton Planner: ext. �-�, �--
i
PAR2014-00017
APPLICANT: NORTH MASON FIBER/ ROB DRESSEL
MEETING DATE/TIME: WEDNESDAY, APR. 23, 2014, 1:30 p.m.
PARCEL NUMBER: 12321-10-01070
SITE ADDRESS: 431 NE LOGYARD ROAD, BELFAIR
PROJECT DESCRIPTION: RAIL LOADING OF MSW SOLID WASTE; BUILDING AND
TIPPING FLOOR FOR LOADING ON RAILCARS.
PLANNER: ALLAN BORDEN ext. 365 (from Belfair 360.275-4467)
Property is zoned Belfair Urban Growth Area Business / Industrial. This zone provides for
the location and grouping of industrial enterprises and activities involving manufacturing,
assembly, fabrication, processing, bulk handling and storage, research facilities,
warehousing and heavy trucking.
17.24.220 Allowed uses: Uses allowed in the BI District shall be as follows:
Automobile, appliance, and equipment repair services
Dry cleaning plants
Veterinary clinics Professional office uses
Vocational schools Institutional uses
Business service uses Fuel depot
Truck dealers Auto parts yards
Manufacturing uses Resource land uses
Impound yard Towing services
Height limit of 35 feet; setback from road or property lines is 15 feet to structure
projections. Maximum building heights in the district are three stories. Typically
substantial landscaping buffers are required for those properties adjacent to SR-3.
Business-Industrial properties are exempted from most other site planning and building
design guidelines to maximize flexibility for the uses.
Owner/ applicant seeks to construct a pole building on a property with an existing
industrial business use to load municipal solid waste in closed containers that are loaded
on rail flat cars. Building is proposed in the area of hot load along the west side of the
property. A site plan with defined parking for employees and business vehicles and the
building / storage use areas should be included with the permit reviews.
An existing stormwater facilities is shown on submitted sketch. Addition or modification
of the stormwater features on the property shall include the new roof areas of the
building shall meet the Dept. of Ecology 2005 Stormwater Manual standards (site in the
Belfair UGA). This may be as simple as A) preparing a stormwater site plan with the
needed changes for stormwater treatment in the existing or expanded stomwater pond,
submitting the site plan with the building permit; or B) when additional areas are
disturbed as well, an engineered erosion & sediment control plan with submittal
checklist at the time of building permit application.
Page 1 of 1
Allan Borden - North Mason Fiber Company MSW Rail-Load Proposal
From: Mark Goodin <mark.goodin@orcaa.org>
To: "AHB@co.mason.wa.us" <AHB@co.mason.wa.us>, "fredp@co.mason.wa.us"
<fredp...
Date: 4/23/2014 4:39 PM
Subject: North Mason Fiber Company MSW Rail-Load Proposal
CC: Fran McNair <fran.mcnair@orcaa.org>, Robert Moody
<robert.moody@orcaa.or...
Thanks for the invite to the meeting today regarding North Mason Fiber's proposal to establish a MSW Rail-Load
operation at their facility near Belfair. Here is a summary of air permit approval process:
• Approval of a Notice of Construction (NOC) application is required since the proposal involves
establishing a new stationary source of air emissions.
• A 30-day public notice and comment period is triggered by the NOC.
• A public hearing will likely be required.
• The air permit (NOC)triggers the need for an Environmental Checklist and SEPA threshold
determination by the lead agency. ORCAA would prefer Mason County act as the lead agency for SEPA.
• The NOC application must provide details on:
o The nature of the MSW in terms of age and whether or not it has been pre-processed
o The rate of MSW proposed to be processed in terms of tons per day and year.
o The schedule for transferring the MSW once a load is received
o How leachate will be handled
o How dust will be controlled
o How odors will be controlled
• Best Available Control Technology(BACT)for odors and dust will be required. ORCAA expects North
Mason Fiber's proposal for BACT to be consistent with established BMPs and controls at other transfer
stations of similar size.
Please give me a call if you have any follow-up questions regarding air requirements for this project.
Thanks
Mark V. Goodin
ORCAA Senior Engineer
(360) 539-7610
mark.goodin@orcaa.org
file:///C:/Users/ahb/AppData/Local/Temp/XPgrpwise/5 3 5 7ECB 8Masonmai... 4/24/2014
t 123163460300 I 123164060000 123,164460000 123164060000
� a
SIP
w
'
s
' ' N�12 217500090
� 123217500080
123212100000 123211001000 o � 123217500070 , ,
rz.
2ET 50 —0f,'
1
123212100010 z 123217500050 ;
`" 2 217500040? 123211400010
1 a
123212490050 123212490060 1 3211300010 �
123211300000
NE GARRICK LN
123212400020— 4
123217500030
123212490070 123212490080 / � �y123211400020
1 123211300060 123211400000
I NR f 3
Kitsap
1
123212490020 � w��k�17�, ��'� '* '� �: 123211400040 •� .-
123212400000
12 211 005
123212400010 W, 123217500010-
123219999999 � 123211400030
123211390052
123212490030 � : ����� \
123211400041 e
123219999999 E KATCHE�P ,
123211400001,
123213190011
I123213190010 �
123213101000:123214200070 123214200060
f - a 123214290082
.123213190051 / / <_
/123213190070
123213101020 123214290083 / a
i / / �h y ]
% 123213190040 `
f 123214290081 123219999999 1
123213100031 123214290084 " 123214100000 1
123214200090
123213102000 Q-
5
123213400030 ��� 123214300130
f 123213400010 a
123214400000 a
123214300000
/123214300010\/
f 123213400030 123214360100
N
1 inch = 500 feet
W E
1 inch = 0 miles
S
Bob Dressel/NORTH MASON FIBER Description of Project:
PO BOX 275
Belfair, WA 98528
PRE-APPLICATION CONFERENCE REQUEST
Description of Project: Rail Loading of MSW
North Mason Fiber proposes two different processes for handling municipal solid waste
(MSW) and Construction/Demolition (CDL) debris that would reduce the environmental
footprint of waste hauling, improve economic conditions and employment opportunities
in Mason County.
First, North Mason Fiber plans to allow closed containers to be brought on site, off-
loaded from their truck bases,and loaded un-opened onto rail flat cars. No MSW will be
exposed or accessed at any time during the process.
This process would be accomplished in full compliance of the regulations including
WAC 173-350-300 — On-site storage, collection and transportation standards and, the
applicable sections of WAC 173-350-310 Intermediate Solid Waste Handling Facilities.
It is not clear that this activity would require additional solid waste handling permitting.
Secondly, North Mason Fiber would like to expand its current `Hot Load' capability to
include similar trans-loading of commercial MSW and/ or CDL from trucks to gondola-
style rail cars. --)O.'o tc_r kct (46,
Given the nature of MSW, North Mason Fiber would install a Cover-All type structure
approximately 100'x60' or large enough to house the in-coming trucks,tipping floor, and
loading equipment such that leachate generation would be minimized or eliminated and
stormwater would be excluded from the tipping floor.
The trucks would be scheduled and coordinated with rail car dispensing so that the rail
cars would arrive first, the trucks would arrive and tip into the structure, NMF's loading
equipment would then scoop and place the MSW into the gondola style rail cars on its
rail spur. To maximize rail car loads and reduce air impacts, a biofilter layer of ground
wood material (either CDL or hogged fuel) would be layered over and around the MSW
in each rail car prior to placement of a structural or spray cover material to ensure the
integrity of the material during transport.
At the end of the day,no un-loaded MSW would remain on-site.
North Mason Fiber plans this service for just one commercial client which would enable
clear communications and easier scheduling. Absolutely, no individual MSW deliveries
would be accepted.
Our reading of the solid waste handling regulations lead us to believe WAC 173-350-310
Intermediate Solid Waste Handling Facilities are the relevant rules. We plan to prepare
plans and specifications as well as a plan of operation and closure plan meeting the
requirements of this regulation.
1
Bob Dressel/NORTH MASON FIBER Description of Project:
PO BOX 275
Belfair, WA 98528
This proposal provides numerous benefits to Mason County and surrounding areas:
0 Augmented odor mitigation during transport will be provided by NMF-generated
biofilter material placed over each MSW load under membrane cover;
0 Efficient load / unload capabilities at North Mason Fiber's Strategic South Sound
Belfair location would reduce truck miles and environmental impacts such as diesel
fuel usage and traffic;
0 NMF's central location would reduce the number of jurisdictional boundaries crossed
by waste generated in Mason County on its way to regional landfill improving
efficiency and saving revenues for the County;
0 Increases economic conditions in Mason County by maintaining viability of an
important industrial facility;
0 Increases employment opportunities in Mason County;
0 North Mason Fiber's 28-inch thick concrete pavement allows heavy container
moving, stacking and storage in a safe and efficient manner.
Thank you for your consideration. We welcome your thoughts and comments as we
work to develop the most efficient,mutually beneficial and sensitive approach possible.
Representatives:
Robb Dressel Tamara Thomas, P.E.
North Mason Fiber Terre-Source LLC
P.O. Box 275 720 S. Main Street, suite 207
Belfair, WA 98528 Mount Vernon, WA 98273
253-225-1673 360-336-3536
rob_,olyfish.com tnthomas(&terre-source.com
2
W alwu/MIN j..T •�
BU,�g 03f,w.y
gq�.�Fd /'' r. vn •i,l ol.w+, a wnw Lft frr well„x,/ •
ecr•v y ie lx'ON a01' " raalaer Ll�wnryr �.�Iv •1e10a
SCE6b Fs.IM'.OwINI ei9 a .s�°vK..rirn jo
602�B'OA Ls7007a 3N1 lr llr dwa.07 N L7Nk1t 341
•y •t' aq SIOA 1M1103b 3N1 wlr,37rTFYDINOO O• • - .+O0M11t3n03e 3N1
'>Ic sl{L3wang WWI Mkomml �. 14100 u73.q +w e30Ftl YO L8 30.11 /,. dr dL — i1�TG`a�3TTli a.. l.villrlS tl s1f3c3MlM3y 11173ttl0'7 M.IY 9.a1 w` t•,`
\:. '\� Aq�. 01g37tl tlCl 03bJ
31r71M11.•J Q
tO oo�Tcc
.o i \�� o.� fa. Cy.L•ep. •Laewra
• •� . •r ],a.'en� OaerMr»M l.�anos waves v
�4� o� ,� aaaa�.aarrs oa\v �11m 97a•uMVMe
clwi•ir.s»•scut a+hvwivLhaw
ftsl if•► LNr.ve�vo' Lee.eop
tide v.e rrer '1Mi w.o..a eL
/y{ C7\iN\M h'{fe•.N ewr.w•aye G\wa
sce(+oi',..•wu oo-c. Z"IS �Q�� •310N
usacsr+•u�a.on.00
oez
1M
..........� .. .....y�,.«.r..eU „�/die
v atr0 'a KN; 7 -S ,A
i t e /
•O jM
a
r�
//a�G)dr a71Y•F �r•e
�II ern NL11M /�
•Ir..ewlFWle•i._.IDO MO{Vw N� •lVnaf. qO
'e•IOre1M nifN.feN we.9w•IrIM 1.fwln LVI.�. II �•' • , C�
LM.IY a..b.Wf NIY n0 LN'{aN.a eN1L.ONY 1.e{efN!1NI1
MweeN.Nr.1wOlV e.fnWfrr 'NY Yes W.M laalNl 1 f9N.r 11•M Oe m �lalehl••eM.•IS hel.V ft A f{11MVne .{VfwL.ew {NL
10 rIVM wLfew eM.w0 Lfl.OOLI ..{r fNL A we1Lr0. LVN. �I •�
MIL•alrf0 1V1.'a (• �/ • •ry
h
{aA•�{LIYI•» _ M� �� N
e1Yr11f I �'�
tri7d{t.•Li
N i M
uo e:,r 1 I � , ,•a'
T2 r:� f :o•.Yro+ee.
�` � 7M 1'e•'w G{Y � �r a
• 1 ..T i3OY rG�S .A{ �w p.ee
._...__._.__.—_
r
w
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■ -rr-SEES■
■■■S■■■nENS■■eSENS■■■N■■S■■■NM■■■■■■■■■■■NNE■■Si■NSS■■ES■■ �� i■e■eii■iie11■■r■■i■SEES
■e SEm■sine■S■■■m■M■uS■o■■■■i■■NN■■S■■■■SENSE■■■■■m■■■■■■■■ ►rWr. "=EE ■■■■■■■ SEES■■■"■Ss■■
■■■■■■■N■■■N7=7=nnWM N■■■ES■■■0SME■■iS■■EMEMM■■■S■■■Il T■7T1T1% ,f%S■ !,• . n 1 ■ ..ltrrZVEN■SEES
or■■S■■■■N■EE■NE■■■L ■■■■■■■■■■MEN o■■■■i■■■E■■■ ■■■■L•�7'■■JLIi11 I - NI■1,�I�[■1r■■■i
■■e■■■■EEEEem ■■■E■■■N■■e■■■■■N■Ce■NES■\■■E■n■ ■\■■Mnrm■
NN■SOMME■EnN■ ■■mom■■Mien■■■■Nu■■■N■■EE■■mom iME■■■■r EMS■
ESN■ESN■■S■■S■S■ ME ME ■■■■■■■eEN■■■■■■■■i
NO■■NMN■■■■■Een■ \■■■■O■■■E■■■MM■■■■■■Ni■■■■S■■■■■■S '• • _• • ' • noun■nsMe■■srEMo■
o NN■■ES■no■E■■■■■O ■N■■MNE■■m■■■■■N■■■■■eN O■NE■■N■OO■O■r■■■E
■�■N■■NNEN■nE■■e■m son■MESON■■■En■M■■E ■■■M■E■■EE■■■r■■■n
p�■E■q■nmO■o■n .- ,`7E■■n■■■■mom■■Mom■■EE■■M■■■n■■ nm■■■■ONM■oN■■■E■■See
ME®NONE■n■■En■■■E■ 1 ..,:.�•�■O■n■EN■■ES■■■■e■■■■■■■M■M■■■ ■N■■■■■E■o■E■■■nNe■■■■■■■NE■■Er M■OO
onOO MEMO ONOO■E■MN■■■ .•Nn■■On■■■m■■■■■i■■■■■N■O■■■Em■■■■■■En■■■■■■niNN■E■■■■000Er■■E■
•.NON■E■■■EE■■E■■■■E,,!!�■�■n. McO■M:•th,14Mi■■MS■m■■O■■■NS■■■■■■■■MN■ m ■■■NO■■■■■O1�wI■Nu11■r NONE
r
NO OEM n■■■m■N 1:�--_��0. ■■►e■rI.lqk. R■EM■m■■■EE■■E■■■■■■E■E■■ ■ ■■n■■■■■E\riiy■iiZ\.1■■OMEN
N■n■■m■■ON■ MMmM■N■OM■M■■■■■lmMM■
N■■O■EN■Oem■Nml� ■ ■N■■ri, ■r ■■O►rn■■Ni���,-■NE■ ■■■■O■ONE■■■■i■■ ;. . ��.W r J■■■�e�► =To■■s■n SEES
NN■O■■mSSeN■■ ■C■■nM� mom e\■NM■kuEMN■■■C C■n■■■S■N■■■MMME ■■MOO■■r•� -_='_■1oo■E
N EO■O■■■m■Em ■■N■N■NbgRoo■.■wN11■\.gq■s■�;w�•N■O■■■E■■NNN■■■N ■E■O■u■■■■\a■iEiEE■ ■
■�NOn■■N■■■m i� ■■nsi■■■�,�■■��■o■■■M.RE■■■r,
mNSNN■■■■■ ■■■■i�O■M 1� �:.�.. \�■■■■■■■■■N■rM ■EnO■Ni■E■ESs■M■■■Ens O■Om■■■■om9SOM� ■
\NN■■■■ S■■■■ \■\\�■■■S►\ ■■■■O■O■■S■■nNO■SN ■som■■■■■■ % ■SCl�iJ ! �■■■o■■■EN■ ■ ■E►■O■■■■■■p ■■■m ■MOESMMEMMM ■■■ens■■Er2■■: ■■ B N■oe■■■■ ■■
■■■ ■
M■m■■N■N ■■EN►`N Comp Fad M■■iN ■■:$ ��C�\\■■■!►�■r'���4■■\■Cl�����■■■■nn ,• _. . >,r�1 ■
No ■O■N■■S■■■ So MENSM%■\n■iEY■■EC��N■■\rl►�t""Tl ■■■■C1�c:�lN■■■■o ■ ■
B ■■nouns■■■■ O■■■S■■■■■EIS■lr1■ 17l\sir�N■i:�� �� �.�■N■■�i■:�,�\�\■■ .:•.. • •: , : :� . . S
■Mmo■■■so = ■oN■■■■O■■r.E■efolES■■Yicl ?h#M`:�■\��s�'I■1■ ■E\C�!`���`�q . • ,•• • • .. i.• •it _.• ■
s■NNMEm ■■SE■■ENSL.■n■N■11►_iN0�nMI ZwifiLn\!1!� SEE■rfE■i■■!ate ,
■ENNEN ■■O■■■ yo■OFAMrr:�N�N■Nnli■■■■\��.�■CO■■■a■ON■■EirrM�� . ,. • . C
■n■E■o■■ 1S■S■oS■■�iMe■■■.'cE \�.��■■■i■■■ESN■Ml�iSNr1■1 i .• _ ,. . ;, •. . 1
Mr ■■■■■■■See■ ■p-N■n■M■■■e"■SNEC■■i.�ANE■iiniN7!*��aJNdn ■■�i O , • .• . .. ,:,, ■
SO m■■O■■■■■■■■■ aoil v■r.■■■OAeelreil��*OEnOI� a■Ein■■■.I��aMi:� �_....�ii �■■■ ■
■�Eu■■E■■■enS■■O i■e►�e■m=Amllu■■rrzSff 04 M■■.2--emaaaq ■► i w ��wO■ N■ ■
ME
ME m■■■■■NONO■ .. ■I■OEn ■■. ■� i.a0 Mr,1Z*�w' �1■►J..■E7\:�■■`w + � „`N■■■ �'� �■■■■■■■EOEiiOO■ ■
r■EN■iin■■■i .E►\ll M■ry�i�M>in■HPINI W ■■GS■■r/ENNirin t�,�'� � �.A■ lii �;:1ie� �•M■■N■■nO■■■■
■1 N■■■■■■■■■N ■.■■�7AI ■■i■Nf E■N■■■►_Te■911N■■�I■■■Ee1i\:�IH, �, <<! -�'"%�`�.,�■■■■■N
■1 SS■gSS■■■ ■ �':•: ■�■L.y■■■■■■ID!aIA■■I,s■■'�■R/'II■l �_ w�f�.r� ia�' ��■�■e■
■IiiCi■S■■�Sl�■■■H■■■11■ L■Ry /■I■ rya �EE111i1■lll� ,q■
e .= i •
■o EN■■■En■ � SEES O�e■■IsIN■Oevw■t�■tv■�'i�leEO `:r■irNli��rin� _:�
■E■N■■■■■N■■ �_00SMv_EN■■EriNi ■►/M, ■■N. ►.■i r �a■i■ri E�■..
■.■..■■■■■■■ � ■■1121MR►.a■■.N..■m0-�ii■03■EO/�■■.. _ _..�r►uuE■■rirr��lru ���
sr N■■N■■■NE ,� IN■■1).■%IARC•+��\1►L/i■■n�M1i�`7■i/,I■\'■■N►I■■■\`Ir!■■■!�I spi �I Il!■�li%%I■ �!� ■
■i■■m■o■■m■m■■ ism s■e\\■1FIr t�I•iflil■■n'17= ii ont`\Si!!S■\`■■o■s �, (I1'' III■IIYI��� /���■�SEES
■�■N■■■■oi■■■SN■oo I - `'Belli■■/IO■►`MXMMffW/ ■■NV,&LG■I AMMONSs\S■ ��" � (I!i�l►9i�r_.Ei��■■�SEES
■1 oM■■■M■MN■■N■ ■ •;' 2 i■SLEi■maNnsmam��1�NiMW■'�■\\Et■■\so ��l11•� aaan�3i�11 ■■■■�■oS■
■o■EMN■■■■■SEmE / ■ ti'�■■mmmug/■■o►�\C��■�.�IN■■i■i\■i\ �.,�� '\:�1• �i■■E■■SEES
or o■no■mo■■■■N I t q■r`_N N��■! ■9%■■1•i►`!-'_%IA \■■E■■M\■■ivB!;- r���' SEEN■■■■NNS
er■■ONO■■■■■■■■■O i saw z!i■s�n■■ilr:•.q\■■■�1�■■M�1�■■ON��=ra( �►�__� ■■■SEES NOON
■r■■■■O■e■■O■■ms .�-- .O■149ii--- �■iir�i■■0:...N■ sii�n3 _ ..� SEES■■■■ OM
mom O■■■■m■■em■■ES I u n�►� lsmalm nM■rAI■■■■Ey�IriC■I���■ES■■■■►Ei■Oir��-�'�!��� E■■■■■■■NNE■■■■■SEES
is■NO■■■mOMn■■N■■w,II 1■I� .'"" IlfiElnAl!�41■►uN■■■■� on awmaaNeNNN►N■NiOMMii�.ia..,.:�`" iii■■■■N■■■Nm■■no=
No■EM■■■m■■O■■■■nNI�.I�Jii rim OK +�� �1■om■■■1�■mO■■■►�O��N■■■a■►�r�i►.�Nr9 Mw.�:i N■■■■ENn■NS■M■■son
or■i■o■■■e■OE■ON■■e■r�� l .Oc, fll■ .mzz.Bm■nnE►11■■EEgl OM,1►l■/JO■■■■aX9en• UiIJ■NaS��r ■Om■■■■■■■■N■MM■
mom■MM■■■■M■■■■■■■e■ :N "/► �i M\s■11S■E■��■■■■m■■■■■�■�I■\'■nE■NS�.r/1��s�wS■No1■■.1;1115■s■■■SS■■m■■sons■�■
mom EO■E■■N■■■■■SE■■■C�%i�'in ■■Oelf:i■\\11■■\\NM\1�!"".T�" �f:�:a�ICJCIG.9t. !�Cll7C=l:i'71o■■■■■■■■S■■■■■N■■ ■
sr■MN■■m■■■■mE■■■■1ni1I MIA/ / WHO-411I ■
Nr■■m■■m■■■■m■ 04M■E■E■■II■■■01■■N ZMA111111■■■■M■/.%Mo ■■■■■■I�i.E■■■■SSS■■onii■S■S ■
■r■i■EN■N■■■ENE■N■■ ELICiS lrM�i11■■Ilo■■■ts■■ HN■■■1`I■r�■`iIIIDI■■■EII/gC�\►: e= ■■■'\■IiL�!�iS■■S■■■■■■S■S■N■S��■
H■EEniM■■■ESES■■■/II■0/. Lid G:'�iE.■\nr.!�Ifatl■■E�i�� Cw��!i�i024 TOM III IE!!----L�•----ram ---mom�,•N■NENNNNE■■ENNiiNNE■r E
O■E■■■■■O■■■■nON■O\e_:� �,:0■■i\■■iN■■ESN■■i■■■■i■■■■■■SNP'•r,�•_W�/I\1i■■■N■■■N■■■o■o■►� --
■N■■■■■n■■ON■■■ar.� ENor.YO■O■■■■■■O■■■■■N■O■NN■r n■i
�`" ' arla�■e■E■O■i■■OE■■■■■■■■n■Er SEES
■■■Nii■E■e■■S■■■■■Iwo Mr44,__ ■•■!�ll�■_■!�e■'S■Er■■�■�■■�r�w■■_ .■■ Sc:r-saa-:aac�s�::�■■■■■■N■■■■■N■■■■'■■■■■■■r NONE
■■■■■■■■■■■■■■■■■■�W��a■■■n�■■■■■�■■■■WW■WW■aiiiiiiiiii■■■i■se■■■■i■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■ ■■■■■■■�■■E■
Eslu Sill Acuss
- / - I ^�- Esisl I nE
-+ I L I Ho
• - — - I Edps EsatACP .,'_ J ,.... •:, ._
__ rl I; ���I �• -� - -
�� r
sOUTHEas
HEAS atecKdI0nA �� �. T
STORM WlATER ✓ Mai nmp0gyLH, S¢rv¢e
NT NDS \
PARCEl1 nHydrant -
1 ax"! [Exist'
Project consists of construction of EA
--100'x 60'Fabric Tipping Building[both ends open
to ensure stomrwater I leachate separation
Operations established to move MSW to loag rail cars on spur \ja T -
Solid Waste Handling permit revision as needed TIPPIN .. I
No changes will be made to park ng `l ua
- Existing Structures:Office-3,500 sf footprint. { Ms 'Ha W i
Bagging Shed-1350sf -- -- .
Scale House-580 sf I —
NklliPump House-75 sf
Z Proposed Tipping Building:-6,000st
Edr Df M laOY
Y
UT ST
North I Mason _. AERATED �.
STORM WATER
-'- TREATMENT PONDS' --
so Fiber Company
Lot 12321-10-01070
PROPOSED Solid Waste Trans-Load Facility Layout Plan
_ RevseC March 101M
3-14-14 DRAFT proposal ff
---- 1
Base map by N L asen 2c00 - •-- — - —--
r
Location of _ {
Project
#. rpyw,�t W °'
rrr - .._� g +`r ► °°! ' M
rrrrr
Z
North Mason Fiber Trans-Load
Facility Proposal
Vicinity Map w/ Property Ownerships
3-14-14
• � r
Lle
1 , yr
r
O�
North Mason Fiber Company MSW Rail-Load Proposal
GOAL: Expand current "Hot Load" permit and site layout to facilitate:
-Municipal solid waste trans-loaded into rail cars;
•C&D waste trans-loaded into gondola rail cars;
-Container storage/Rail loading (without unloading containers);
-Exempt status remediation soils (as currently permitted).
REGIONAL ADVANTAGES:
-Efficient load/unload capabilities at North Mason Fiber's central South Sound Belfair
location;
-Bring jobs, people to Belfair/Mason County;
-Create hub for flow of materials (reduced environmental impacts of transport);
SITE ADVANTAGES:
-Easy access from Hwy 3;
-On-site rail spur;
•28-inch thick concrete pavement allows heavy container moving, stacking, storage;
-Fully controlled storm water facility;
-Fully covered operation (expandable 70' x 100' structure);
OPERATIONAL ADVANTAGES:
-Experience handling putrescent materials with minimal off-site impacts;
-Augmented odor mitigation during transport provided by NMF-generated biofilter layer over
each MSW load under membrane/solid cover;
-"Hot Load" approach - no MSW storage;
Existingt� ,� z
HOT LOAD AREA ='
P
Exist RAIL SPUR :;y
FUTURE SW
TIPPING BUILDINGop
1 Y
Existinr SCALES
COVERED RAIL SPUR
-Expandable -70'x100' fabric building;
-Fully enclosable;
•Openable end doors;
INTERMEDIATE SOLID WASTE HANDLING PERMIT APPROACH:
WAC 173-350-310
Application Contents
-Engineering reports/plans and specifications (Building)
*Plan of Operation
-Closure Plan
Design Criteria
-Site allows for controlled access
-Pavement is sturdy, easy to clean
•Effective control of rodents,etc.
•Effective control of litter
-Protects tipping floor from wind, rain, etc.
-Protects surface & groundwater- leachate control berms, cover minimizes leachate
-Pollution control measure-building, biofilter if needed
-All weather surface throughout site
PRE-SUBMISSION MEETING
FOR WEDNESDAY,APRIL 23rd 2014
PAR2014-00021
APPLICANT: PAINTED STUMP, LLC
MEETING DATE & TIME: WEDS,APR 23rd, 2014 9:15/9:30 - 10:30 am
PARCEL NUMBER: 32123-11-50020
SITE ADDRESS: EAST MASON LAKE DRIVE
PROJECT DESCRIPTION: CLEAR 400 x 150 SQ FT AREA, BUILD 8 FT
FENCE CANNABIS PRODUCTION.
LOCATION: BLDG III, 426 W CEDAR STREET, SHELTON WA 98584
PLANNER: GRACE MILLER, ext 360
ENVIRONMENTAL HEALTH: CINDY WAITE, ext.353
/PAR2014-00019
1/ APPLICANT: GRAPEVIEW SCHOOL DISTRICT
MEETING DATE & TIME: WED,APR 23rd, 2014 10:45/11:00 am - 12:00 pm
PARCEL NUMBER: 22110-40-60010 and 22110-31-60010
SITE ADDRESS: 822 E MASON BENSON ROAD
PROJECT DESCRIPTION: ADDITION/REMODEL TO K-8 SCHOOL
LOCATION: BLDG III, 426 W CEDAR STREET, SHELTON WA 98584
PLANNER: ALLAN BORDEN, ext 365
ENVIRONMENTAL HEALTH: CINDY WAITE, ext 353
PAR2014-00017
APPLICANT: BOB DRESSEL/NORTH MASON FIBER
MEETING DATE & TIME: WED,APR 23rd, 2014 1:15/1:30 - 2:30 pm
PARCEL NUMBER: 12321-10-01070
SITE ADDRESS: 431 NE LOG YARD ROAD, BELFAIR WA 98528
PROJECT DESCRIPTION: 6,000 SF FABRIC STRUCTURE, TIPPING
BUILDING, GROUP S-2/S31 TYPE 2-B (SEE ATTACHED)
LOCATION: BLDG III, 426 W CEDAR STREET, SHELTON WA 98584
PLANNER: ALLAN BORDEN, ext 365
ENVIRONMENTAL HEALTH: CINDY WAITE, ext 353
PAR2014-00020
APPLICANT: RONALD "PETER" KAAS
MEETING DATE & TIME: WED,APR 23rd,2014 2:45/3:00 - 4:00 pm
PARCEL NUMBER: 42123-75-00040
SITE ADDRESS: 1851 E EAGLE POINT DRIVE, SHELTON WA 98584
PROJECT DESCRIPTION: GOAT FARMING-3 SMALL STRUCTURES
LOCATION: BLDG III, 426 W CEDAR STREET, SHELTON WA 98584
PLANNER: GRACE MILLER, ext 360
ENVIRONMENTAL HEALTH: CINDY WAITE, ext 353
7icv� Fv l�r�o'�
�iL� IuN1 /�oc.L SGarlea( 2�U 3 �ij-e�/3
V
Page 1 of 2
Allan Borden - RE: North Mason Fiber Company MSW Rail-Load Proposal
From: "Tamara Thomas" <tnthomas@terre-source.com>
To: "'Mark Goodin"' <mark.goodin@orcaa.org>, <AHB@co.mason.wa.us>,
<fredp@co...
Date: 4/24/2014 1:19 PM
Subject: RE: North Mason Fiber Company MSW Rail-Load Proposal
CC: "'Fran McNair"' <fran.mcnair@orcaa.org>, "'Robert Moody"'
<robert.moody@...
Thank Mark, and all, for your time and assistance with this endeavor. We'll be in touch
with more information and response as we move ahead towards application submittals.
Please feel free to contact Bob or myself with any questions or thoughts.
Best wishes,
Tamara
Tamara Thomas, P.E.
Terre-SourceLLC
Helping Compost Happen!
360-336-3536 Office
360-336-3530 FAX
425-844-6068 Field
From: Mark Goodin [mailto:mark.goodin@orcaa.org]
Sent: Wednesday, April 23, 2014 4:32 PM
To: AHB@co.mason.wa.us; fredp@co.mason.wa.us; Mosleyj@co.mason.wa.us;
LAW@co.mason.wa.us; tnthomas@terre-source.com
Cc: Fran McNair; Robert Moody; Matthews, Chuck (ECY)
Subject: North Mason Fiber Company MSW Rail-Load Proposal
Thanks for the invite to the meeting today regarding North Mason Fiber's proposal to establish a MSW Rail-Load
operation at their facility near Belfair. Here is a summary of air permit approval process:
• Approval of a Notice of Construction (NOC) application is required since the proposal involves
establishing a new stationary source of air emissions.
• A 30-day public notice and comment period is triggered by the NOC.
• A public hearing will likely be required.
• The air permit(NOC)triggers the need for an Environmental Checklist and SEPA threshold
determination by the lead agency.ORCAA would prefer Mason County act as the lead agency for SEPA.
• The NOC application must provide details on:
o The nature of the MSW in terms of age and whether or not it has been pre-processed
file:///C:/Users/ahb/AppData/Local/Temp/XPgrpwise/53 590F73Masonmail... 4/24/2014
Page 2 of 2
o The rate of MSW proposed to be processed in terms of tons per day and year.
o The schedule for transferring the MSW once a load is received
o How leachate will be handled
o How dust will be controlled
o How odors will be controlled
• Best Available Control Technology(BACT)for odors and dust will be required. ORCAA expects North
Mason Fiber's proposal for BACT to be consistent with established BMPs and controls at other transfer
stations of similar size.
Please give me a call if you have any follow-up questions regarding air requirements for this project.
Thanks
Mark V. Goodin
ORCAA Senior Engineer
(360) 539-7610
mark.goodin@orcaa.org
file:///C:/Users/ahb/AppData/Local/Temp/XPgrpwise/53 590F73 Masonmail... 4/24/2014
��
� f
--, _
ffr ffff
• %'' - ..
,, ffff ff.
.. f
.�f� %, 'ffff ffff
,�%�� fffff
�ifff
.' ':�' fff
.��''�� fff f fff.
�r ..Jff rf ffr f
"'�,'�I fff if ff .f
„", ,',,'`rfdf�ff fff if ff fff fff ./ffff
/fff Jffffffff fffffff fffff
.i'��..',:�f:f'� JfJ fff fl fff
.�•'�,•%�jjfff ffffrf fffffff fffff
r•'fffJff ffr fJ ffff fffr
.',% ;�� ffff (fffff /ffff JJ
/f ffff fffff
,,ff if��' .fffff fff ,�','
��', �'iSff ffJ' ff If fffr
':fff ffff fff ffff
'�:lf. ffff /fff off
' � f fff fffffff/ fff
,.:'".'.✓ff .Iff fff
,�.flf�ffff' rr fff ff ffJrfrJJ
f J
�,iffff' .ffff.' ffJ/f fffffff
•���/ ':�'�jf f ffff' (fffr( yff.
':'��''�iffff / /f fffff Jfff
�'ff J ff fff fff
�'rrj��l fffffff ffff
''� fffffff ffJ fffffff
' •�•ff,• f /• ffff
.��••'.',%'•ffff /f Jff
fff f' fJ f fff fffr /(Jfff fff
,�ji riff(( /ff/ fJffJ ff//ffr ffff
., f ffff fff JfJ
.i�r �'i✓f' ')fff fff fl/f 1f .
�•',."ffff •/ ffff /f fff
''.fff JJ fJ ,ffJ
,i� ffyl f'
.iijf ffff fff fl
.',,,' fffff rffJJr ff,ffJ
,''�;'.'`rrlfl / /f fffffs ffff ff
'!f. f f! ff!
.�•f f Jff Jfff
�f•ff fffff rf�f
r,ffff f ffff ffff
ffJ' JJ
fff ffff
r ffff
fJffJ ffff
.ffJ fJffJ
fff
fJ fff
ff
ffff
.fff
ff
rf'
4 '
O 01"W
200'-0' OUT-TO-OUT Of STEEL
2 3 4 S 8 7 8 8 1
-0" 20'-V 2W4r 201-1" 20'-0" 20'-V 2V-Cr 201-V 20'-0" 20'4r
Y 1lT-0' 19'-9'
A �B �C b �c� eC �c �Ce eC eC eC eC e8 A
B oA Ao B
C oalA Ar C
O B C C
FIeH
8 19W
0'-0" t 20'4r 0 t 20"0" t 20'-0" 20'41" 21W 20'-O' 20'-V
7 2 3 4 5 8 7 0 9 1D 1
ANCHOR BOLT PLAN
NOTE:All Baee Plates @ 100'-0")U.N.)
PROJECT 70 x 200 ANCHOR BOLT PLAN
ID MBD DESIGN: DRAFT: CHECK:
PROJECT DATE: 4/8114 ISHEET OF
ADDRESS Belfair,WA 98528
c
SPLICE BOLT TABLE MEMBER TABLE
aY Mark Web/EDepth Web late O x Th Flange Inside Flange
Mark Top Bot Int Type Dim Length Start/End d Tr.. 2'
W x Thk x Len W x 511 x Len
uth
RF1-1 B.OI27.0 0. 8 x 114"x 190.1 8 x 5/18"x 172.8
SPA 4 2 2 A325 0.750 2.50 B x 1/4"x 18.0
SP-2 2 2 2 A325 0.625 2.00 RF1-2 27.0111.0 0. 8 x 1/4'x 190.8 B z 5/18"x 79.1
11.0/18.0 0. 6x5/16"x220.0 8x1/4"x 118.4
_ 8 x 5/16"x 24.0 8 x 1/4"x 232.5
OFLANGE BRACES:Both Sides(U.N.)
FBxxA(1):)x-length(In)
A-L2x2x1/8
off
rye
CA
II ,a
Al a-
,z
12
II ii b
II II
II II if a
b � . I I I n
II II b _II
II II
u u
J&1tC 65'-4 15116" 2A 9/16"
CLEAR•%
1-0 I _ 70--W OUT-T.UT OF STEEL - 1
RIGID FRAME ELEVATION:FRAME LINE 1 2 3 4 5 6 7 8 9 10 11 °
PROJECT 70 x 200 RIGID FRAME ELEVATION
ID MBD DESIGN: DRAFT: CHECK:
PROJECT DATE: 4/8/14 SHEET OF
ADDRESS BeBair.WA 98528
a
i�/�'' %sifff �lfllfffrfllrllr
%� "�/ �,. ,Illy' Ifff,f'
%M� Ilj Illfl
:;tllf Iflfr
' rlf Ifflr
:�' ' If Ilf ,
�' '•'iff .Ifr
•'i :,,':�,;:j::f' Ill' .r
Ill
'--•�/'''''%fssf'slfl Ill ffl
'��;"�.f'lf III f Ifl}frl Ifff dff
.��•'�i'�•fffff'Iffflll Ift ff III Illll
.',ff II If
.•,ffjff yff Illf Iffllfr rfff
�.. Iflflr IIIl1fl flf,
,.'•',,'.sfilff� I r Ilfl Iifrfr I I
�• ::yjlf" II` Iffl II/ .illf
'iilff Ifrrlf Iff Ilff/ Iff'
`SII, Irf rff II II
•J,, �'f:ff' Ifff Ifff f
' �'iiSf'r Ill I .ff
J� Sif' I ffff Ifrffflrl
•J�if'Irfffs Ifflll Iffrf III
�'�����fiflf� •r rr Sr lift ifff Iflllffr
.,�If r`f If' Ifs
;�fff Ilil ffrifr Ill.
.�� rlli Jflr
.�' ,.. �,.',:''�fsjTf•I I` .fff•If .rf`r
��If f Illlif Illfrffl Ifrfff s
_:� �">�
.!!.i�r��+ `rill.ff ll! .ifflrl f' II
���I II rlr Ilrf
i�I II Ilflffs
Illrfll rffJffrrr Irl
�.'.:'tiff•` s rr Ilflr .ill,
�. ..`fff ff IIIII Irll;r
���1<I Il rffflll Ill Ifflf
ill
.ffl
Illl III..
Ili lil
ffl Illr f
.ff ,fl
.flf /ni.:'i
II Ifl I, T}i,
Illf
.ifll
iflrr
O Die= 314"
1 1
200'4" OUT-TO-OUT OF STEEL
10
20.-1 20'-0^ 0'4" 0'-0" 2-0" 20'-0" 20'-P 2W4r 20'4' 20'4"
�C eC aC eC X, eC Ce eC eC
4
B ujA A oa B
J
4 eelA "°
>'
D g O c c C, c c c c c B D
Field
18 8"
20'4' 201-V 20'-P 20'-0^ 20'-0" 20'-0" -0' 20'40'
1 2 3 4 5 e 7 e 9 10 1
ANCHOR BOLT PLAN
NOTE;All Base Plates®100'-0"(U.N.(
PROJECT 70 x 200 ANCHOR BOLT PLAN
ID MBD DESIGN: I DRAFT: CHECK:
PROJECT DATE: 4/8/14 ISHEET OF
ADDRESS Belfair,WA 98528
• r
MEMBER TABLE
SPLICE BOLT TABLE Web De th Web Plate Outside sops Inside F sops
t]N Mark SIarUEA Thick Len h W x Thk x Len W x Thk x Lenolh
M
arkTo Bat Int Type Dia Lenptll RF1-1 5.0127.0 0.188 197.0 6 x 1/4"x 190.1 8 x 5118"x 8.0 172.8
4 2 2 A325 0.750 2.50 6 x 114"x 190.
2 2 2 A325 0.625 2.00 RFt-2 27.0/11.0 0.188 194.8 6 x 1/4"x 220. 6 x 5/16"x 16.1
11.0/18.0 0.188 240.0 B x 5l18"x 220.0 B x t/4"x 118.4
6 x 5/16"x 24.0 B x 1/4"x 232.5
'7FLANGE BRACES:Both Sides(U.N.)
FBxxA(1):xx-lenpth(in)
A-L2x2x1/8
7.g
49 Is-
CA
Fg *� '
,r12
�
12
I I II
b II b ! b
b � I I I I lii
II II
I I
U
2'J 9/18" 65'-4 15116" 7-3 9/1e"
CLEAR+l-
70'-0"OUT-TO-OUT OF STEEL
D
A RIGID FRAME ELEVATION:FRAME LINE 1 2 3 4 5 6 7 8 9 10 11
PROJECT 70 x 2OO RIGID FRAME ELEVATION
ID MBD DESIGN: I DRAFT: CHECK:
PROJECT DATE: 4/8/14 ISHEET OF
ADDRESS Belfair,WA 98528