Loading...
HomeMy WebLinkAboutStormwater Site Plan for COM2002-00072 - COM Engineering / Geo-Tech Reports - 9/12/2002 MASON COUNTY PUBLIC WORKS DIRECTORICOUNTY ROAD ENGINEER ShehoR Washington 98584 DATE: Sept. 12'', 2002 INTER-DEPARTMENTAL COMMUNICATIONS TO: Allan Borden, DCD - Planner FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. SUBJ: Stormwater Site Plan Review NAME: Lee Allyn Hotel in Allyn COM2002-00072 Allan, Public Works has received and reviewed the Stormwater Site Plan(SSP) prepared by Mr. James Bottom, P.E., for the proposed Lee Allyn Hotel/retail land use in Allyn. The SSP conforms to Ecology and Mason County requirements and standards. The SSP contains a Temporary Erosion and Sediment Control Plan which should be followed during development of the site. The County's Stormwater Management Ordinance includes a requirement that privately owned and maintained stormwater control facilities be covered with an Operation and Maintenance Covenant which insures the continuing function and maintenance of stormwater control features. Enclosed please find a copy of the covenant form Public Works employs to meet this requirement. The applicant should complete the form, sign and notarize the form, record the completed covenant with the County's Auditor's office, and deliver a copy of the recorded covenant for monitoring and administration. The applicant is responsible to ensure that no mud or silt is tracked onto the State Highway, and that the State may need to be contacted (Larry Anderson(360) 3 5 7-2 7 0 9) if an access to the property does not already exist. Please direct the applicant to notify Public Works when the stormwater control features have been completed so that they may inspected and checked for conformance to the accepted plan. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel other issues need further attention. Sic ely, l l � Al A. Tahja File: H:\WP\STRMWTR\REVIEWS\Lee Allyn Hotel.doc EXHIBIT E