HomeMy WebLinkAboutCOM2017-00051 Radio Tower - COM Permit / Conditions - 5/12/2017 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: Line (96004ext7262 Mason County 615 W Alder St Shelton, WA 98584 1R54 COMMERCIAL BUILDING PERMIT COM2017-00051 OWNER: WA DEPT OF CORRECTIONS RECEIVED: 5/12/2017 CONTRACTOR: LICENSE: EXP: ISSUED: SITE ADDRESS: 3420 NE SAND HILL RD BELFAIR EXPIRES: PARCEL NUMBER: 123180060000 LEGAL DESCRIPTION: ENTIRE SECTION PROJECT DESCRIPTION: DIRECTIONS TO SITE: RADIO COMMUNICATIONS TOWER HWY 3 TO BELFAIR, CONT ON NE NORTH SHORE RD, R ON NE SANDHILL RD, FOLLOW TILL SITE. General Information Construction&Occupancy Information Type of Use: COMM TOWER Insp.Area: No. of Units: Type of Constr.: I I No. of Bathrooms: Occ. Group: U Type of Work: NEW Fire Dist.: 2 No. of Stories: Exit Design. Load: Valuation: $ 60,000.00 Building Height: 80 Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp. Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2017-00051 Please refer to the following pages for conditions of this permit. Page 1 of 5 Plumbing Fixtures Mechanical Fixtures FEES Type - Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee AMP r,/1R/9017 4aR4 Qa S47n17nn Planning Review Fee AMP 511Rl9n97 ,tisn nn Si9n17nn Building Permit Fee AMP 5/1r,/9n17 0 71'1 75 C'l9nl7nn Building State Fee AMP r,i1ai9n17 ad rn A39n17nn Total $1,512.19 CASE NOTES FOR COM2017-00051 CONDITIONS FOR COM2017-00051 1) A Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450. The building permit will not be"finaled" until the permit holder can show proof that the access permit from Public orl has been "finaled"and approved. X 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 3) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X 4) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. 5) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, FIRM-NATIVE SOIL. X 6) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason County Buildin Department prior to any further inspections being performed or approvals granted. X COM2017-00051 Page 2 of 5 7) In addition to the inspections required in IBC, Section 109, the owner, the engineer or architect of record acting as the owner's agent shall employ 6ne•or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by the design professional. The special inspectors duties & responsibilities shall be as specified in Chapter 17. Special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton WA 98584 and available for inspection. Inspection reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and final occu a cy inspections. X 8) Any changes in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are removed, approval will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and X collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. v 9) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x ^ 10) Changes to approved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilationrequirements), Buildin /Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 11) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason ou ty Building Inspector shall be made prior to requesting additional inspections. X 12) All property lines shall be clearly identified at the time of foundation inspection. 13) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-com pliant with Mason County ordinances and building regulations. 14) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit older have prevented action from being taken. No more than one extension may be granted. 15) The approval of this project is subject to the recommendations and specifications outlined in the attached geotechnical report or assessment. Structures and/or land modifications (grading, cuts, fills, etc.) required in the geotechnical report/assessment, may require a seperate permit. The geotechincal report/assessment shall remain attached to the approved building plans. X COM2017-00051 Page 3 of 5 OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.'I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. SignaC tu Date ,, l OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) COM2017-00051 Page 4 of 5