BLD95-0764 PARCEL : 12329439O173 PLAT : DIV : BLK : LOT :
JOB ADDRESS : NE 23554 STATE ROUTE 3 BELFAIR
OWNER : EARL LINCOLN 275-6061
CONTRACTOR : EARL LINCOLN CONSTRUCTION
LEGAL : TR 17-B OF S1 SE TR 3 OF SP #1852
CLASS OF WORK :NEW BEDR : 0 .BATH : 0 TYPE AMOUNT BY DATE RECEIPT TYPE AMOUNT BY GATE RECEIPT;
TYPE OF USE . . . . :COM STORIES . . . . . . . :O
OCCUP . GROUP . . . :? BLDG . HE I GHT . . : O .Oft ADDR $ 5.00 KS 05/03196 0000 S T F E $ 4.50 KS 05103/96 0000
TYPE OF CONST . . :? FIREPLACES . . . . : 0 PRMT $ 508.00 KS 05103/96 0000 I
OCCUP . LOAD . . . . : 0 WOODSTOVES . . . . : 0 PLCC $ 330.20 KS 05103196 0000
DWELL .UNITS . . . . : 0 PARKING SPACES : 0 P L M $ 33.00 KS 05103/96 0000
INSPECTION AREA : 1 SHORELINE? . . . . :N MCH $ 48.00 KS 05103/96 0000 !TOTAL C 928.70 V ULATION: 0
SETBACKS--------------- TOILETS . . . . . . . . . . : 0 FUEL TYPES---------- BOILERS/COMP---- MOBILE HOME--
FRONT . . . O .Oft BATH BASINS . . . . . . : 0 0-3 HP . : 0
REAR . . . . O .Oft BATH TUBS . . . . . . . . : 0 3-15 HP . : 0 MODEL :
SIDE ( 1 ) . O .Oft SHOWERS . . . . . . . . . . : 0 FURN < 1O0K BTU : 0 15-30 HP . : 0 -MAKE------
SIDE (2 ) . O .Oft WATER HEATERS . . . . : 0 FURN >=1O0K BTU : 0 30-50 HP . : 0
SHRLINE . O .Oft CLOTHES WASHERS . . : 0 FURN - FLOOR . . . : 0 50+ HP . : 0 -YEAR------
AREA ---------------- KITCHEN SINKS . . . . : 0 HEAT PUMP . . . . . . : 0
LOT SIZE . . : FLOOR DRAINS . . . . . : 0 VENT SYSTEMS . . . : 0 EVAP COOLERS : 0 LENGTH : 0
BUILDING . . . : 253Osf DRINKING FOUNT . . . : 0 VENT FANS . . . . . . : 0 HOODS . . . . . . . : 0 WIDTH . : 0
BASEMENT . . . : Osf LAUNDRY TRAYS . . . . : 0 DOMES . INCIN :O -SERIAL#----
DECKS . . . . . . : Osf DISHWASHERS . . . . . . : 0 AIR HANDLING UNITS-- COMML . INCIN :O
GAR/CARP :? Osf GARB DISPOSALS . . . : 0 <= 10000 cfm . : 0 RELOC/ REPAIR : 0
AT/ DT . :? URINALS . . . . . . . . . . : 0 > 10000 cf►n . : 0 OTHER UNITS . : 0
MISC PLM FIXTURES : 0 GAS OUTLETS . : 0
PROJECT DESCRIPTION:OFFICE BUILDING
PROJECT LOCATION:BELFAIR BETWEEN NEW CREDIT UNION AND TRUCK SHOP ACROSS STREET FROM BELFAIR CAFE.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR WORK IS SUSPENDED FOR A PERIOD
OF 180 DAYS AT ANY TIME AFTER WORK IS COMV,k,. FV' °!rl: ^r CONTINUATION OF WORK IS A PROGRESS INSPE6TION WITHIN THE 180 DAY PERIOD, FINAL INSPECTION MUST 0
APPROVED BEFORE BUILDING CAN BE OCCUPIED.
OWNER OR AGENT: DATE: l� 111,91�-__..._._______
BLO-rAMT, rev: 03/31191 COMPLIANCE TO ATTACHED COND I 1 1 ON 1 5 REi,U I RED
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
PERM I T C O N E) I T I O N
Case No . : BLD95-0764
For : EARL LINCOLN
Page : 1
1 ) Temporary erosion control measures must be implemented to prevent water quality
deg— a¢a#rj on of adjacent waters or wetlands .
2 ) Approved per site-plan . X
3 ) Parking should be sufficient for 22 normal parking stalls ( 9 feet by 20 feet ) and 1
handicap parking stalls ( 12 .5 feet by 20 feet ) with sufficient maneuvering aisles ; 23
spaces are to be provided - 17 for business users and 6 for employees . Handicap stalls
should be of a smooth , flat surface and should be signed with the International Symbol
of P&Es
4 ) 1 . LOCATE A 5# 2A 10BC RATED FIRE EXTINGUISHER ADJACENT TO EACH EXIT DOOR .
2 . FIRE LANES TO 6E MARKED AS INDICATED ON PLANS . FIRE LANE STANDARDS ARE INCLUDED FOR
APPLICANT .
3 . PROVIDE A LEGIBLE ADDRESS AT ACCESS POINT OFF OF HWY 3 .
5 ) All approved plans are required to be on-site for inspection purposes . If inspection
is called for and plans are not on site , Approval WILL NOT be granted . In addition , a
Re- Inspection fee in the amount of $30 .00 per hour (minimum 1 hour ) will be charged and
must be collected by this department prior to any further inspections being performed or
approval granted .
X ---
6 ) PURSUANT TO 1991 UNIFORM BUILDING CODE , SECTION 305 (C ) AND SECTION 513 , ALL SITES MUST
HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE
AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING
DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A
REINSPECTION FEE , BASED ON RATES IN TABLE 3A OF THE 1991 UNIFORM BUILDING CODE WILL BE
ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPFrTIONS .
Xe'_<:2z_ -
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
7 ) XL�TRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS .
8 ) Changes to approved building plans that effect compliance to the 1991 Washington State
Energy Code , 1991 Ventilation and Indoor Air Qualityy
Code , the Uniform Building Code and/ or Mason County^Re�u J,.� , - ns must
be approved by Mason County prior to constructionX ��__G��1
9 ) ALL CONSTRUCTION MUST MEET OR EXCEED LOCAL CODES . IF ANY QUESTIONS, PLEASE
CAL HI OFFICE BEFORE CONSTRUCTION .
X
10 ) CONSTRUCTION PROCESS TO BE FIELD CORRECTE,[j �4S�REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND UNIFORM BUILDING CODE .x
. _ MASON COUNTY
-�� Mason County Bldg. III 426 W Cedar
RO. Box 186 Shelton, Washington 98584
B t.J I L... D 1 f'J Ca P f' R M 1 T FOf4 1 NSPFCT I ONS CALL 427•-96701
BETWEEN 5pm .AND 84im 427-7262
BLD955-0764 PARCEL t 123294390173 PLAT" t f►1 V z BLIC = t LOT
JOB ADDRESS : NE 2 ROgTF 3BEL.rA 1 R •
OWNER t EAR2.75-6061
CONTRACTOR t E:AR M*NCONSTRUCT I ON
LEGAL t TR 11-0 OF SN SE TN 3 Of SP b1452
CLASS OF WORK . , :NEW BEDR : 0 BATH t 0 111PE ANOVII 5Y DATE 4CEIPT TYPE 1 t10901 OY DATE RECEIPT
TYPE OF USE . . . . tCOM STORIES . . . . . . . t(?I m%=m 0•
OCCUP . GROUP - 0 BL.DG . HE: I GHT . . t 0 0'ft ADaR 1 8.lb KS #5103196 bbbb STFE ! r 4.50 KS 05103196 !!bb
TYPE OF CONST . . 0 FIREPLACES . . . . ; 0 PROT t 608.08 is b510306 #000
OCCUP . LOAD . . . . t 0 WOODSTOVES . . . . t 0 PICC $ 33N.20 KS 05103196
DWELL .UN t TS . . . . t 0 PARKING SPACE St t 0 P1N t 33.01 KS 65163146 00#0 ...,� ;r
INSPECTION AR A t 1 SHORELINE:? . . . . tN NCR t 46.b! KS 0543196 !b!b 101At.t� 920.Tb V40I.ATIONt b
TOILETS , . . . . . . . . . t 0 FUEL 1YPEg___.___ __. . BOILERS/CfT1 --- MOBILE OMF _
FRONT . . . 0 .0f`t BA'rH BASINS . . . . . . : 0 t t 0-3 HI' . z 0 4
PEAR—, O .Oft BATH TUBS . . . . . . . . : 0 3-16 HF . : 01 MODE+ E
S 1 DE ( 1 ) . O .Oft SHOWERS . . . . . . . . . . : 0 F'URN < 100K. BTU : 0 15--30 HP . t N --MA'";•'�-- --
S I DE(2) . 0 .Of t WATER HEATERS . . . . s 0 FURN >-=100K. BTUs 0 30-50 HP . t 0 ,,
SHRL I NE . 0 .0f t CLOTHES WASHERS , , : 0f=URN - FLOOR . —t 0 L,01 f HP t 0 . y;
.. ..._
AREA ------------- --- KITCHEN SINKS . . . . t 0 HEAT PUMP . . . . . . : 0 � 4
LOT SIZE . , t FLOOR DRAINS . . , . . t 0VENT SYSTEMS . . . . 0 FVAP COOL- f S t. NGTH : 0
BUILDING . . . t 21530sf DRINKING FOUNT . . . t 0 VENT FANS - - . : 0! HOOD/.• . . . . . I DTH . : 0
BASEMENT . . . : 0sf LAUNDRY TRAYS . - t 0 DOMES; I NG 14 _SFR I AL
DECKS ,: . . . . . : Osf DISHWASHERS . . . . . . t 0AIR HANDLING UNITS--- COMMV .• I NC I
GAR/CARP :? 0st GARB DISPOSAI �. . . . t 0! c�< �;r11f200 Ofm . t 0 AE:L0C/RFPA�: 0
AT/DT. t? URINALS . . . . . . . . . . t 0 a 10000 ofm . t 0 OTHER UNtTS,, 6
M I SC PLM F I XT )RES t 0 GAS OUTt I,:T` 0
.rlYrasttxwlBxTSws'asm:*.:rARR:o�r1�6'.af�iu4'rmq�lsee xK.i^. r:.TJ¢a.as'Re�SR''Yr.G4a:.��sdlaa`.an�6ce!s.:ffAt:ifUm0.1Y� etS ..:�rsi.aW.
PPOJECT OESCRfIilov;OFFICE 801tOIN3 {
PROJECT 1.00TIOI1t8EIFAIR BETWEEN Oil CREDIT UNION AND TRUCY SHOP ACROSS STREET IRON 811FAIR CAFE.
'1316 PERMIT 1SfCONES NUIt All V14 IF 1011 011 CONSTRUCTION APTN011fZEb 'S NOT CONNENCFQ NITRIN bib DAYS AR IF CONSTRICTION OR WORK IS SUSPENOEO fOR A P[RIOD
Of Iib DAYS AT ANY TINE AFTER 1019 IS CONNENCED. EVIDENCE OF 017INUA11011 OF 1914 6 A PR06RESS IIFSPE61I00 WITHIN THE ti! DAY ►F.110/, FINAI INSPECTION MAST 8
APPROVED 8Ef01E KUItOING CAN 8E JCCIPIFI.
9 qI�E 1 ()A A 6 E M T t_._.._.._.,....._.��� . :� \ C".��,G-:�. .,._..... - - - �w D A T E
st'lill, revs C313f1!I COMPLIANGE TA ATT4c,,*D CONDITIONS' IS REQ
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation l C 5 Floors Final
date 7-36>-S6 b
FRAMING 4 er �� y�✓ s-/0-9 date by date by
Walls 02`- c..j 3�10-9 FIRE DEPT.
date by date r- y
~ �� b 7:?. date by
PLUMBING OTHER
Groundwork Attic
date - b L� date by
WALLBOARD NAILING( U I e,J t e"n
D.W.V. date by f J 3-/
date 3-/O- f'7 by
Water Line FINAL INSPECTION �Jf- W70-q_113
date by date b date by
G I 42/1 TZr
l pp s, { fik C- '11z"-, 4,�- C� /7 i/l�� �,�1 rt— 7 cam_
�l G lr,.t�►r� � c1 Sr. d'1n 1-1rUr'� Gd �c. r�.-� Vwi`c.� C
7—/ 7 �
pro L -�00 4 e— P u LJ
��`/�i,��/�✓G f��i fiy!/�✓� Z�C/ t
LOel�i� T 3-1�
cc
1VbC3AYV\
( � -
c_11 cm c 3e, ?x7�38 �orts� �-e�-►�,r, VAN
ZD
MASON COUNTY
Mason County Bldg. 111 426 W, Cedar
P.O. Box 186 Shelton, Washington 98584
Case No . BUD95-0764
Fort EARL I.- INCOI,N
Page # i
1 > Temporary er-osion oorktrol measures roust be Implemented to prevent water qua ! Ity
derma a jon of adjacent waters or wet l ands .
X
23 Approved per site-plan . X
3 ) Parl: lnil should be <jutflcicent for 22 normal parking stalls (9 tept by 20 feet ) and 'I
hotrod icap parking stalls ( 12 .5 feet by 20 feet ) with' flufflolent maneuvering .aisles ; 23
%�acea are toherrovided - 17 for business risers and 6 for empldyees . Handioap stallf3
would be of a amo oth, flat surface and should be 919rood with the troternational Symbol
of *Aec'". s
X
1 . LOCATE A 5# 2A 10RC RATED FIRF EXTINGUISHER ADJACIFINIT TO EACH EXIT DOOR .
:? . FIRE LANES TO AE MARKED AS INDICAIED ON- PLANS . FIRE LANE STANDARDS ARE INCLUDED FOR
APPLICANT .
3 . PROVIDE A LEGIBLE AODRESS AT ACCESS POINT OFF OF HWY 3 .
Al ! approved plans are required to be on-site for Ins eotion purposes . It inspection
lIS cal led fa,' and Mans are not on it Approval WIrL NOT be ranted . In addpitlon , a
Re-- Inspection too p s e in the amotint of *30 .Ob per hour (miniatum I gour) will be charged and
moist be oolleoted by this dopartment prior to any further Inspectlons heing performed or,
appr-oval granted .
X
6) PURSUANT TO 1991 UNIFORM Evil ILDING CODE , SECTION 305(C) AND SECTION 513, ALL SITES MUST
HAVE APPROVED NUMBFRS OR ADDRESSES PROVIDED IN SUGH A POSITION AS TO BE PLAINLY VISIBLE
AND LFG!BLE FROM THE STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING
DEPARTMENT REnUiRES THAT THIS BE` COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTION$ . A
RE124SPE"'OTION FEE . BASED ON RATES IN TABLE 3A OF THE 1991 UNIFORM BUILDING CODE WILL BE
ASSESSED IF OWNFR/CONTRACTOR r-AILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING
INSPECT I ON
X
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date+ by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors, Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
Building Permit # /�CO`�°�S'�o�CVIASON COUNTY
BUILDING 111 426 W. CEDAR
SHELTON, WASHINGTON 98584
(360) 427-9670
CORRECTION NOTICE
Job Location S, "2
This structure has been inspected by Mason County Building Department
and the following VIOLATION of County Laws and Ordinances has been
found: Items Listed below must be corrected to gain code compliance
/3`/,D/�//� /z-;$pit '9%/G•v ��/ G��/G T �l/s% Lr o� �j- OC�G��
You are hereby notified that the above corrections shall be made
BEFORE PROCEEDING WITH ANY FURTHER WORK
❑ Call for re-inspection when corrections are made before continuing
,Make corrections, items will be checked on next inspection
❑ OK to
❑ This is not a complete inspection Department 13C 0
Date L' o� Inspectorn-
■ *u No *T ', ' Mo *V ' TH1Q& T ' ,* W
ermit No. �JtJ
MASON COUNTY
BUILDING PERMIT APPLICATION 4/1A
426 W. Cedar/P.O. Box 186, Shelton, WA 98584 427-9670/1-800-562-5628
PLEASE PRINT `V
#1 Ear,/ �. /%'I L`D�G� Phone#i"ner
Address►JE L 1 ,�Qb-f Fire District#
Cy /4,i^ St Gfi/1. Zip
Directions to Job Site �,�fo�� —6cT c ,,ee1, 1Ve co, ea✓;r 1.4 oh
Owner Mailing Address�D •• X ` �
City St
Lien/Title Holder Zi
Address 2 3
Clty St b �r�t Zip
#2 Contractor Name Contractor Reg
Address d . l3o X 3 Expiration Date/
City ffe St 1-4l06 Zip Phone #
#3 If septic is located on project site, include records.Connect to Septic? Public Water Supply l / Well
Connect to Sewer System? Name of System
(If residential, proof of potable water is required)
#4 r e No.1,23X -_ - 0 3
Legal Description Z o 7- 3 0re
#5 Building Square Footage: exjsting/proposed)/�, �
1st FI / , 2nd FI / 3rd FI / Loft /
Basement / Deck / # bedrooms / # bathrooms /
n� Garage / Carport / (Circle: Attached or Detached?)
V Other sq. ft. /
#6 Use of building ce Describe work
L'D/rsTf`�*CT „� .s'%6`'v G�'�i'�{ f.�4i�o�•`/�.
#7 Type of Job: New Add Alt Repair Other
#8 MOBILE/MANUFACTURED HOME INFORMATION
Model Year Make Model
Length Width Serial No.
# Bedrooms # Bathrooms Type of Heat
Purchase Price $
#9 Indicate by circling the applicable source if any water is on or adjacent to subject property:
River Pond Creek Stream Wetland Lake Marsh Saltwater Seasonal Runoff Other �,/��
Show following on the site plan
Lot Dimensions Flood Zones
Existing Structures Fences
Structure Setbacks Driveways
Water Lines Shorelines
Drainage Plan Topography
Septic Systems Wells
Proposed Improvements Easements
Name of Flanking Street Indicate Directional by (N, S, E, W)
Name of Fronting Street in relation to plot plan
APPLICANT TO DRAW SITE PLAN BELOW
APPLICANT TO DRAW TOPOGRAPHY PROFILE BELOW
• Plumbing Fixtures ($3 each) Fee Mechanical Fixtures ($6 each)
No. 2-Toilets CIRCL EL TYPE: Ga Electric,
Bath Basins Heatpump Other
�✓Bath Tubs No Units Fees
T
G Showers 7i Furn BTU )�
yHot Water Htr Heatpumps
Laundry Washer Vent Systems
Sinks _ Spot Vent Fans
Floor Drains No. Boilers/Compressors
Laundry Basins HP
Dishwasher No. Air Handling Units
-1
C� Disposal _ cfm#
rl Urinals No. Fire Protection Systems
Other Auto. Fire Alarm Sys 50.00
Fixed Fire Supp. Sys 50.00
Permit Basic Fee 15.00 _ Auto Fire Sprink Sys 25.00
TOTAL PLUMBING $ No. Other
Gas Outlets
Wood, Gas, Pellet Stove
NOTICE: THIS PERMIT BECOMES NULL AND VOID IF
WORK OR CONSTRUCTION AUTHORIZED IS NOT COM-
MENCED WITHIN 180 DAYS OR IF CONSTRUCTION OR Permit Basic Fee 15.00
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD
OF 180 DAYS AT ANY TIME AFTER WORK IS COM- TOTAL MECHANICAL $
MENCED. PROOF OF CONTINUATION OF WORK IS BY lk`�
MEANS OF A PROGRESS INSPECTION.
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIRE- I CERTIFY THAT I AM A CURRENTLY REGISTERED
MENTS OF THE CONTRACTORS REGISTRATION LAW CONTRACTOR IN THE STATE OF WASHINGTON AND I
RCW 18.27, AND AM AWARE OF THE MASON COUNTY AM AWARE OF THE ORDINANCE REQUIREMENTS REGU-
ORDINANCE REQUIREMENTS FOR WHICH THIS PER- LATING THE WORK FOR WHICH THE PERMIT IS ISSUED
MIT IS ISSUED AND THAT ALL WORK DONE WILL BE IN AND ALL WORK DONE WILL BE IN CONFORMANCE
CONFORMANCE THEREWITH. NO CHANGES SHALL BE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT
MADE WITHOUT FIRST OBTAINING APPROVAL FROM FIRST OBTAINING APPROVAL FROM THE BUILDING
THE BUILDING DEPARTMENT. DEPARTMENT.
X OWNER D X BY
DATE : DATE
FOR OFFICIAL USE ONLY: Accepted by: Date:
DEPARTMENTAL REVIEW
FOR OFFICE USE ONLY
Approved Cond. Hold
Approval
Planning:
Environmental Health:
Building Plan Review ICzSIy�
Occupancy Group-t -2— Type of Const:
Fire Marshal:
Other:
Special Conditions: FEES
Building Permit �$
Plan Check
Plumbing Fee
Mechanical Fee CA R
Wood/Gas/Pellet Stove
Radon Monitor
Violation Fee
Site Inspection
Building State Fee
Other R&I reds
Other
Building Valuation: L� TOTAL FEE
Page No. 1 CASE HISTORY FOR CASE NO.: BLD95-0764
EARL LINCOLN
NE23554�STATE ROUTE 3 BELFAIR
03/04/97
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
------- ------------------------------ -------- -------- -------- --------------------------------------- ---- --- -------- ---
BLDA010 Application received / / / / 06/08/95 06/08/95 KW
BLDA100 Approved For Issuance / / / / 05/03/96 DONE CPH 05/03/96 CPH
BLDA500 (F) Issue building permit / / / / 05/03/96 DONE CPH 05/03/96 CPH
BLDA950 List of Conditions / / / / 05/03/96 Printed per Earl Lincolns request, I DONE CPH 05/03/96 CPH
then faxed to 275-6740, cph
BLDB009 Fire Marshal Review 09/27/95 / / 10/03/95 give back to Dana for review. DONE DLS 10/03/95 DLS
BLDB110 Structural Plan Review 09/01/95 / / 01/25/96 need more information, sent letter on DONE DH O1/25/96 DWH
09/07/95.
O1/25/96. DONE. SENT BACK TO ENERGY
BLDB120 WSEC Compliance Review 09/07/95 / / / / send back to structural. HOLD DC 11/13/95 DLC
11/13 MAILED LETTER REQUESTING ADDT'L
INFO. MECHANICAL
(CAPACITY,EFFICIENCY,MECHANICAL INFO,
CONTROLS, ZONE, DUCT LAY-OUT)
BLDB120 WSEC Compliance Review 01/25/96 / / 02/27/96 SENT TO ENERGY. DONE TDH 02/28/96 TDH
BLDB130 Planning Review 06/13/95 / / 09/08/95 this is first of two buildings to be DONE AHB 09/11/95 AHB
built on this parcel; as proposed a 2590
sq. ft. area of bldg. and professional
or business use merits these parking
requirements: 17 spaces (a space per 150
sq. ft. area) and a minimum of 6 spaces
for employees. ahb
BLDB134 RLC Checklist Review / / / / 09/08/95 N/A AHB 09/11/95 AHB
BLDB135 Addressing / / / / 06/16/95 DONE GMM 06/16/95 GMM
BLDB200 Environmental Health Review 06/08/95 / / 06/13/95 need approved design. psd HOLD PSD 06/13/95 PSD
BLDB200 Environmental Health Review 11/13/95 / / 11/14/95 still need approved design HOLD CAJ 11/14/95 CAJ
BLDB200 Environmental Health Review 02/27/96 / / 02/29/96 Need approved design. I called the HOLD PSD 02/29/96 PSD
applicant and he informed me that the
design was submitted with the building
permit. I looked in the file and there
was three copies of the design. I gave
the design to Trish to imput and file
the file in EH hold bin.psd
BLDB200 Environmental Health Review 05/03/96 / / 05/03/96 The design was reviewed by John and DONE PSD 05/03/96 PSD
given to Befair. I did not review the
plot plans. psd
BLDB210 Water Adequacy 06/08/95 / / 06/13/95 Need water adequacy application. psd HOLD PSD 06/13/95 PSD
BLDB210 Water Adequacy 11/14/95 / / 11/14/95 still need water adequacy application HOLD CAJ 11/14/95 CAJ
BLDB210 Water Adequacy 02/29/96 / / 02/29/96 Belfair water system is ok.psd DONE PSD 02/29/96 PSD
BLDC100 Inspection 01/30/97 01/31/97 01/31/97 THE CONTRACTOR HAD SOME QUESTIONS. DONE LW O1/31/97 LAW
BLDC110 Footing inspection 06/24/96 06/25/96 06/25/96 PART APPROVAL: PART LW 06/26/96 LAW
THE FOOTING IS BEING POURED IN SECTIONS,
THIS INSPECTION WAS ON THE REAR AND SIDE
FOOTINGS ONLY.
Page No. 2 CASE HISTORY FOR CASE NO. : BLD95-0764
EARL LINCOLN
NE23554 STATE ROUTE 3 BELFAIR
03/04/97
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
------- ------------------------------ -------- -------- -------- --------------------------------------- ---- --- -------- ---
BLDC110 Footing inspection 07/29/96 07/30/96 07/30/96 FOOTING IN FRONT OF THE BUILDING IS PART PART LW 07/30/96 LAW
COMPLETED,FOOTING BEING POURED IN
SECTIONS. FINISH FOOTING DEPTH NEEDS TO
BE 18 INCHES OVER, DIG DOWN IS LOW
SPOTS.
BLDC115 Foundation wall inspection 07/16/96 / / 07/17/96 WALL, 10 FT. THE BAR WAS NOT LOCATED FAIL LW 07/18/96 CMS
WITH IN THE WALL AS PER ENGINEERING, BAR
CENTERED INSTEAD OF OFF TO ONE SIDE THE
CONTRACTOR NEEDED TO CHECK WITH ENGINEER
ON TH CHANGE ALSO ON FORM COLUMN CHANGE.
BLDC116 Below Grade Insulation 07/29/96 07/30/96 07/30/96 SLAB INSULATION WAS IN ALONG THE SIDES, PART LW 07/30/96 LAW
THE INSULATION IN THE FRONT WILL BE
INSTALL ON THE EXTERIOR AT A LATER DATE.
BLDC120 Underground plumbing insp. 07/29/96 07/30/96 07/30/96 DONE LW 07/30/96 LAW
BLDC140 Fr/Pl/Mc/Pen Ins ection 03/03/97 /0IONS: FAIL LW 03/04/97 LAW
G,!„_�0344
A POSITIVE CONNECTION BETWEEN
ND BEAM.
ALL EXTERIOR PENTRATIONS, ON/ EVEL ONLY LOWER AREA ISHED AT THIS TIME.
G 7 OALL DUCT JOISTS AND SCREW ALL
IONS, WHEN DONE INSULATE TO R-4
S s IN UN-HEATED LOWER AREA.
NLY 1 HOLD DOWN STRAP WAS USED IN
frlpl';C�TllLOWER LRP'S, OK TO ADD AN HD2 TO A
FULL HIEGHT DOUBLE STUD. THERE ALSO IS A
BRAKE IN THE SHEETING THAT IS
UN-BLOCKED. THIS CAN NOT BE NAILED FROM
THE OUT SIDE, OK TO SHEET THE INTERIOR
INSTEAD.
5. PROVIDE A DOUBLE STUD UNDER THE ENDS
OF THE GIRDER TRUSSES. �✓
6. INSTALL FAN IN THE LUNCH ROOM NEXT TO
THE SINK AS PER PLANS AND VENT TO THE
EXTERIOR, ON THE FAN IN THE BATHROOM THE ��k
DUCT CAN BE BUTTED TO THE SOFFIT VENT
VENT OUT ITS OWN PORT AND MAINTAIN 3 FT.
BETWEEN THE OPENINGS INTO THE BUILDING
AND THE VENT TERMINATION.
7. STRAP THE DOUBLE TOP PLATE TO THE
GIRDER TRUSS IN THE FRONT OF THE `U
BUILDING, THE TOP PLATE DOES NOT RUN
CONTINOUS IN THIS AREA.
r
MASON COUNTY BUILDING DEPARTMENT
PLAN REVIEWER AND INSPECTOR CHECKLIST
1994 NON-RESIDENTIAL ENERGY AND 1991 V&IAQ COMPLIANCE
Permit Number •5-6 (Q Address NG a355-4 S,-A-re 12T-,3
Name on Permit LIAICO&Al) CO-t-1 Space heat type ea7 U�`—
BUILDING ENVELOPE /a�8
Insp. /, Z/s-
Slab insulation R- « (sec. 1311.5) a53CP
( ) Below grade exterior wall insulation R-
( ) Under slab duct insulation R-3 . 3 (table 14-5)
FRAMING INSPECTION
Standard air seal (sec. 1314 .1)
Horizontal and overhead glazing (see glazing schedule attached)
Max. U-value C/() vertical, max. U-value Move overhead.
( � ) Attic ventilatiati n ((1 s ft. net free area per 150 sq. ft ceiling area)
��Q --�•`�LL Y. N Fly
MECHANICAL SIMPLE SYSTEM
Equipment type and capacity ffE�i PUr»r� �7 ) 1 i-m 7bi 11--loi it 's4ic�
'(� ) Efficiency:EER SEER IPLV HSPF L.,I C P
( ) Outside air intake, exhaust outlets and relief outlets equipped
with automatic dampers. (sec. 1412.4.1)
( ) Economizer, provide 1000 of the design supply air as outside air.
{ LYMechanical ventilation Ijr' CFM (V&IAQ, table 3-4)�zr
Z7VY-Duct sealing (sec 1414.1)
( ) Separate air distribution systems (sec 1424)
INSULATION
(V ) Wall insulation (above grade) R- /njBatts face stapled (table 13-1)
Vapor retarders on walls
( ) Vaulted ceiling insulation R-
Batts face stapled, vapor retarder & 1" airspace.
(v ) Supply and return Air duct insulation: R- (table 14-5)
(Vapor retarder required on all mechanically cooled ducts.)
{ } Pipe insulation: R- (table 14-6)
FINAL
Floor insulation R- / 6 mir black polyethylene (table 13-1)
�1 ) Ceiling insulation R _ (table 13-1)
� ) Penetrations (sec. 1314)
(�) All supply outlet or other terminal device tested and balanced,
Documentation supplied to Mason County Building Inspector-
Ventilation supply ducts tested to meet V&IAQ requirments.
-44 ) Service water heater placed on R-10 pad in unconditioned space or on
concrete floor.
Service water pipe insulation 1'r closed cell insulation (table 14-6)
Deadband control capable of 5 degree minimum. (sec- 1412.2)
Clock setback, capable of seven different day types per week.
`(v ) Microprocessor heat pump control (sec 1412.5)
LIGHTING
Lighting compliance method
Prescriptive'--- Lighting Power Allowanc" System Analysis
) Lighting controls in all areas separated by ceiling height wall.
) Single switch not to exceed 80t of 20 ampere circuit. (16 AMPS)
Individual daylight zone controls for overhead and vertical glazing Ot
24 hour exterior lighting on timed switch, photocell or comb.
( ) Lightina schedule-
Maximum Allowed Lighting Wattage (Interior)
Allowed
Location
(floor/room no.) Occupancy Description Watts per ft2" Area in ft2 Allowed x Area
CO6-:7 it? �_ .I '�
From Table 15-1(over)-document all exceptions taken from footnotes Total Allowed Watts
Proposed Li htin Wattage (Interior) (may not exceed ToW Avowed Watts for Interior)
Number of Watts/ Watts
Location
(fkartroom no.) Fixture Description Fixtures Fixture Proposed
souk - T - rude
4-
-�s
Total Proposed Watts may rat exceed Total Allowed Watts for Irrterior Total Proposed W
Maximum Allowed Lighting Wattage (Exterior)
Allowed Watts Area in itz Aiknved Watts
Location Description per fti or per If (or tf for perimeter) x fe(or x If)
Covered Parking 0-2 W/ft2
Open Parking 0.2 W/ft2
Outdoor Areas .2 W5 W 0 1f
7
Bldg.(by facade) .5 WM
11f
`
Bldg.(by perim) Total ANowed Watts
Note:for building exterior,choose either the facade area or the perimeter metfad,but not both)
Pro osedLi 51htinWattage (Exterior) (may not exceed Total Allowed Watts for Exterior)
Number of Watts/ Watts X
Fixture
Location Description Fixtures Fixture Prof°
1
--- Total Proposed Walls may not 1 otal Allowed YJat1s for Ertenor Total Proposed Y.'at15
f
r�
��JJ
f
GLAZING
Plan Reviewer-Fill out this glazing section or attach a window schedule to this checklist. nspector- Verify window
information during field inspections. Include skylights, glass doors and all other glazing on this form. Use rough opening
area for calculations.
Date
Size uantity Area S . Ft. U-Value Manufacturer Rev. Insp.
v2 i ( — C)
� 8l
4/0
)4
�3 0�5D / 16-
G/O ya
Z/
Total glazing area:
Total conditioned area: a 53 611I "
��'
Percentage glazing: S Verified:
DOORS
Plan Reviewer-List opaque doors by type(solid cone,insulated,etc.)quantity,U-value,and manufacturer. Lnsnector-
Verify door information during field inspection.
Date
Type/Quantity U-Value Manufacturer Rev. Insp.
Signature of Building Inspector: __ Date of Final Inspection: __
oh
i
o,4`2
o�
f� e
e�
ni
o f
e i
�Q
el
h-�
� l
E;JMASON COUNTY
DEPARTMENT of GENERAL SERVICES
Mason County Bldg. III 426 W.Cedar
P.O. Box 186 Shelton,Washington 98584
(206)427-9670
BUILDING PARKS& RECREATION FAIR/CONVENTION CENTER ADMINISTRATION
RE: Permit Number 'yfo_-OQI `T
During a recent plan review for your proposed project, it was determined
that the following information needs to be submitted prior to the building permit
being processed for approval:
`13vildirk,
Pa C10rrQe4i_-" . iLl y':Izlt�
huijr�;VY, Pr � ' fP ,G;.I� :�I�r>c} -�-� p �r�o► o
"(6 arg
Y�PVI�W
Once the information has been received by our department, the project
will continue to be processed.
If you should have any questions, please contact me between the hours
of 8:00am-9:00am, Monday-Friday at (206) 427-9670 ext . If you can
not make contact between those hours, please call and leave a message and
I will return your call as soon as possible.
Thank You,C✓Iv, LOY)
Building Inspector l,4- . A--,Zp
cc: Property File
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Mason County Bldg. III 426 W.Cedar
P.O. Box 186 Shelton,Washington 98584
(360)427-9670
BUILDING PARKS& RECREATION FAIR/CONVENTION CENTER ADMINISTRATION
November 13, 1995
Earl Lincoln
P.O. Box 368 �n
Belfair, WA 98528
RE: Building permit # 95-0764
Dear Mr. Lincoln:
Our department has received your file for review of the 1994 Nonresidential
Energy Code. During the review, it was determined:that the following information
needs to be submitted before the review can be com]67�eted. Please submit the
information listed below: 3aru bo^,,�(J
1. Building Mechanical System: ��� cam"
a. Capacity of equipment / �oL�
b. Cooling capacity,.,/ C
c. Efficiency (HSPF & COP)- Uag kkO
$� (P Id. Mechanical ventilation plan � (C economizer
etc)
e. Control information (include setback info-T-__?30 7
f. Indicate zones for equipment,
g. Duct lay-out-]-
2. Lighting informationi�
a. Schedule of interior lights, including lamp and
ballast wattage.
Gov b. Schedule of exterior lights, including lamp and
ballast wattage.
7j C. Revised switching detail showing compliance to
� � daylight requirements of the 1994 NREC. See
attached.
When the information is received by the energy code dept. , we will continue with
the energy code review.
If you have any questions, please contact me or Toni Hermansen at 427-9670 ext.
284.
Thank you,
Debbera Coker
Energy Code Specialist
encl: NREC daylighting info.
PURVEYOR CERTIFICATE OF WATER ADEQUACY
Revised 09/01/92
I. iuTATSR sysTRM ZDzNTIFICATIOH
Name of Water System
WFI Identification Number e 5 3 S el o
Name of System Manager
IZ. SRR icz ARBa IDHNTIFICATION
Total Number of Service Connections Approved by DOH "t2 /;rr„ ,��✓
Specific Lots Provided with Service Connections at Full Buildout of
Subdivision
STATAmzNT of ADSQuAcY
I am manager of the above referenced water system. The water system
has DOH approval for the number of service connections specified above.
The system does not and will not serve any parcels other than those
listed above. Capacity of the system has been determined by the Wash-
ington Department of Health to be sufficient to provide adequater water
to applicants for determinations of water adequacy whose parcels are
listed above. Service of water to these applicants for domestic pur-
poses is consistent with both the water system plan and the water right
permit presently in effect. Water lines are available to all parcels
served by this water system or adequate arrangements, such as easements
and covenants, have been made to allow water service to all parcels
served by this water system.
' 41 /
9yst Manager's SignatuareDa e
V
Page No. 1 CASE HISTORY FOR CASE NO.: BLD95-076 �1
EARL LINCOROUTE 3
NE23554 STATE ROUTE 3 BELFAIR
04/08/96 �O
Action Description Req/ Schd/ End/ Action Notes isp By Upde Upd
Code Sent Done Done Date By
r`
V`
BLDA010 Application received / / / /,i /08/95 C ,W06/08/95 KW
BLDA200 (H) Hold / / 11/13/95 / / need ore informa ion nothing provided ONE DH 11/13/95 DWH
yet.
sent 3rd letter out today, folder are in
hold bin.....
BLDA600 File Possession 11/14/9 / / 11/14/95 placed in E.H. Hold bin until DONE CAH 11/14/95 CAJ
structural, energy, and E.H the
e
BLDA920 Miscellaneous action / / / / 09/27/95 sent another letter requesting more PEND DH 09/27/95 DWH
information on plans.
BLDB009 Fire Marshal Review 09/27/95 / / 10/03/95 give back to Dana for review. DONE DLS 10/03/95 DLS
BLDB110 Structural Plan Review 09/01/95 / / 01/25/96 need more information, sent letter on DONE DH 01/25/96 DWH
09/07/95.
01/25/96. DONE. SENT BACK TO ENERGY
BLDB120 WSEC Compliance Review 09/07/95 / / / / send back to structural. HOLD DC 11/13/95 DLC
11/13 MAILED LETTER REQUESTING ADDT'L
INFO. MECHANICAL
(CAPACITY,EFFICIENCY,MECHANICAL INFO,
CONTROLS, ZONE, DUCT LAY-OUT)
BLDB120 WSEC Compliance Review 01/25/96 / / 02/27/96 SENT TO ENERGY. DONE TDH 02/28/96 TDH
BLDB130 Planning Review 06/13/95 / / 09/08/95 this is first of two buildings to be DONE AHB 09/11/95 AHB
built on this parcel; as proposed a 2590
sq. ft. area of bldg. and professional
or business use merits these parking
requirements: 17 spaces (a space per 150
sq. ft. area) and a minimum of 6 spaces
for employees. ahb
BLDB134 RLC Checklist Review / / / / 09/08/95 N/A AHB 09/11/95 AHB
BLDB135 Addressing / / / / 06/16/95 DONE GMM 06/16/95 GMM
BLDB200 Environmental Health Review 06/08/95 / / 06/13/95 need approved design. psd HOLD PSD 06/13/95 PSD
BLDB200 Environmental Health Review 11/13/95 / / 11/14/95 still need approved design HOLD CAJ 11/14/95 CAJ
BLDB200 Environmental Health Review 02/27/96 / / 02/29/96 Need approved design. I called the HOLD PSD 02/29/96 PSD
applicant and he informed me that the
design was submitted with the building
permit. I looked in the file and there
was three copies of the design. I gave
the design to Trish to imput and file
the file in EH hold bin.psd
BLDB210 Water Adequacy 06/08/95 / / 06/13/95 Need water adequacy application. psd HOLD PSD 06/13/95 PSD
BLDB210 Water Adequacy 11/14/95 / / 11/14/95 still need water adequacy application HOLD CAJ 11/14/95 CAJ
BLDB210 Water Adequacy 02/29/96 / / 02/29/96 Belfair water system is ok.psd DONE PSD 02/29/96 PSD
soMASON COUNTY FIRE MARSHAL
Mason County Bldg, III 426 W. Cedar
P.O. Box 186 Shelton,Washington 98584
(360)427-9670
CODE ENFORCEMENT FIRE INSPECTIONS FIRE INVESTIGATION PUBLIC EDUCATION
May 30, 1995
TO: Allan Borden
Planning
FROM: Dave Salzer
Fire Marshal
SUBJ: Earl Lincoln Office Building
Fire Protection Issues
THE PROJECT:
1. The proposed development is located on SR 3 , on a one acre+-
parcel, between the Peninsula Credit Union and Belfair Auto Paint.
2 . The project involves a 5500 square foot, two-story office
building and a 2400 square foot, single-story office building.
3 . The project is served by the Belfair Water District. Available
fire flow adjacent to the site is 2013 gpm, at 20 psi residual
pressure.
4 . The nearest fire hydrant is located adjacent to SR 3 , on the
Peninsula Credit Union property.
5. The fire flow requirement for the 5500 square foot building is
2790 gpm. The fire flow requirement for the 2400 square foot
building is 1744 gpm. The Belfair Water System can supply required
fire flow for the smaller building, but not the larger one.
6. Access to the project is off of SR 3 , on a 20 foot wide access
road, which serves the parking lots of each building. The distance
from SR 3 to the back parking lot is 400' +-. The site plan does
not indicate any fire department turnaround.
FIRE PROTECTION MITIGATION ISSUES:
1. Provide a monitored NFPA 13 sprinkler system in the 5500 square
foot building. This will reduce the fire flow demand to 1395 gpm.
\� 2 . Provide a monitored NFPA 72 automatic fire alarm system in the
t"R02400 square foot building.
3 . Provide a fire hydrant in an area near the parking island
N
between the two buildings. Exact location will be determined upon
q) approval of civil drawings.
1
4 . Provide a KNOX BOX emergency key box at a location approved by
,�,L-e"' Mason County FD 2 .
cc: FD 2 , Belfair Water District
Cl '(l0Q/17- C7-0Oa
Z• v D Y'C`1 O e/7G
7 `tl
6cro loses Iler�r / Loac/C foao psi`= ���C���� As
STAAD-MATE RETAINING WALL DESIGN ope 421-s G �Ga w4'
0.67
-------------------------'-'----------
.25 1
9.75 3 BAR 11491
ELEV. TOP OF RETAINING WALL (FT) = 10.25 �- AT 0 ' R�(%1S'TL-
ELEV. OF SOIL, RETAINED SIDE (FT) = 9.75 �L R S�ONAl-
ELEV. OF SOIL, OPEN SIDE (FT) = 1 .00
WATER TABLE, RETAINED SIDE (FT) = 0.00 ~ C
WATER TABLE, OPEN SIDE (FT) = 0.00 F
WALL THICKNESS AT BASE (FT) = 0.67 d)� s
WALL THICKNESS AT TOP (FT) = 0.67 Y
SLAB THICKNESS (FT) = 1 .00 v J _ M 3 BARS
J J AT 5.00 IN O.C.
MINIMUM DIMENSION OF HEEL (FT) = 2.83 J < �/p
FIXED DIMENSION OF TOE (FT) _ 1 .00 3 Z 'AV �Lf $arS
WEIGHT DENSITY OF SOIL (PCF) = 120.00 H
K FACTOR FOR LATERIAL PRESSURE = 0.27 Z
W ALLOWABLE SOIL PRESSURE (PSF) = 6000.00 < W
W Z
SOIL FRICTION COEFFICIENT = 0.50 T 0
W FACTOR OF SAFETY (SLIDING) = 1 .63
FACTOR OF SAFETY (OVERTURNING) = 2.40 11 1 .00 ggrr
J♦
DEPTH OF SURCHARGE (FT) = 0.00 0 N o �\
Q► 4 BARS AT 7.00 IN
r{ BACKFILL ANGLE (ALPHA) (DEG) = 0.00
= * 3 BARS AT 7.00 IN * 4 BARS AT 7.00 IN
FIXED DEPTH OF SHEAR KEY (FT) 0.00
WIND LOAD (PSF) = 0.00 r "2--" S.0 , 0.6 1 .00
1/3 INCREASE (WIND) (1=Y,O=N) = 0.00 S8 3-39
r� FC (KSI) = 4.00 / BASE PRESSURE '
U FY (KSI) - 60.00 3.50
SLAB CLEAR COVER (IN) = 3.00
r{
WALL CLEAR COVER (IN) = 1 .50 MOMENT IN SLAB (K+FT/FT)
LOAD FACTOR FOR CONCRETE DESIGN = 1 .50
II MAX SOIL PRESSURE (PSF) = 1994.80 0.60 L
W 1 .
MAX FACTORED MOMENT (LB*FT/FT) = 5426.37 1 55 0.756L
a
H PRIMARY AS (WALL) (SQ IN/FT) = 0.2341
PRIMARY AS (SLAB) (SQ IN/FT) = 0.3325
SECONDARY AS (WALL) (SQ IN/FT) = 0. 1264 '
p SECONDARY AS (SLAB) (SQ IN/FT) = 0. 1795 SHEAR IN SLAB (KIP) A
J�uS ��y� /C a/
N pj d o
1 1�
.80
W 0.75 L
E-+
I
Q
E-�
WATTSUN 5. 5 1994 WA STATE ENERGY CODE COMPLIANCE REPORT 1 i i/ 17/?5
FILE: C: \\WATTSUN5\\LINCOLN. WS HOUSE IN
Struc Mass Light Frame, Sheetrock:-walls^---- --M- 3. 000�--2590
___---N7770
_-
--------------------------------------___---_-__--_--__-_-----_--------------c-------
HEATING/COOLING/VENT'ILATING SYSTEMS
PROPOSED
Heating System Type: Heat Pump: Air Source
Make: THANE
Model : TWR03i iC 10 yA/'TWV030B 140(-)
System Efficiency: 7„ 1 HSF'F
Backup AFUE: 100. 0% (Electric)
Modified Efficiency: 175 „/„
Design ACH: 0. 60
Design Load (at 53F dt) : 45893 Btu/hr
Duct Losses (% Dsn Load) : 6799 Btu/hr ( 15„/„)
Total Load: 52692 Btu/hr.
System Size (Output) : 52500 Btu/hr (100%)
Outdoor Unit Size: 2. 5 Tons Q47F)
Auxiliary Size: 10.2 kW ( 100 )
HP Balance Point: 35 F
Average Annual Heat: 16300 kWh
Annual Cost: $ 900 -
Ventilation System: Integrated Spot
& Whole House
Cooling System: THANE
SEER: 10. 0 (Ducted)
3ooling Load (at 5F dt) : 11559 Btu/hr
System Size (%Over) : 1 . 1 tans (@100%)
Annual Cool Requirement: 6(.:yQ F:;Wh/y r
Solar Access: Partially Shaded
PROPOSED DUCT SYSTEM
Location Avg Rvalue Surface Area
-------------------------------------------------
SUPPLY Vented crawlspace R•••- 8. 0 518. 0 f•l:"r
RETURN Attic or garage R- 8. 0 103. 6 f t '
---------------------------------------------------------------------------------
Page 2
-
=============================================================================^
` WATTSUN 5. 5 1994 WA STATE ENERGY CODE COMPLIANCE REPORT 10/ 17�1
FILE: C: \\WATTSUN5\\LINCOLN. WS HOUSE ID:
______________________________________________________________________________
GLAZING ORIENTATION
PROPOSED PROPOSED �
South : ft2 North : 397. 0ft2
Southeast : Northwest :
, East : West :
Northealt : Southwest :
Eff S Glz: 3. 2%
_______________________________________________________________________________
,
-
`
° ~
Economic and energy consumption estimates are designed for comparative
purposes only. Actual cost for heating will vary depending on weather
conditions~ occupant lifestyle and other factors.
===================================== Page 3 =================================
k
x.ros occs-.,ou oc
I
o
....
V OF
z
00
z
0
ti
m
m
m
m
Y n}
T
iJ
pt
MODEL2662A /}.,�1 ,,r„ ,CQI�► REPROOM
2 BEDROOMS, 2 BATHS d •.` -" '
X.902 SO. FT °`'` '
APPROX. ( - i
&bCtf '-076ct
urn, �3
hve� 17
w��Pf I b
1
WA | buw 5.
` HOUSE ID:
FILE: C: \\WATTSUN5\\LINCOLN.WS=================================================
Site: Analyst:
Jurisdiction:
Utility:
Owner/Builder Earl Lincoln Coost, Bldg. Type: Offices
. Floor Area: 2590 G},
Weather Data: Olympia WA
,Buil�er: '
. Climate Zone: 1
==============================================================================
�
|
| The PROPOSED design *COMPLIES* with 1994 WA State Energy Code. |
|
|
\ REFERENCE PROPOSED �
{ COMPONENT PERFORMANCE 599 584 Btu/hr-F
| ENERGY BUDGET 4.35 4. 33 kWh/ft2-yr !
|
/
REFERENCE DESIGN
Reference
Component Value X Area = UA
_ ___________________________________________________�________________
On Grade Slab ^F-0 540 172ft 92.9
2
U-0 041 30 1 .
Floor ^ 5 252^��
�
U-0 650 388
Glazing @15% ^ ^
U-0 390 1 0 0. 6
Doors ^ ^
^
AG Wall
U-0 062 3309 205' 1
'
' 2 U-0 036 1310 47
Ceiling, Attic ^ '
Infiltration ACH-0. 350 23310ft3( 149. 3)
` Reference UA 599
`
________________________________________________________________________________
PROPOSED DESIGN COMPONENTS
Component Description ' - Value X` Area = UA
---------------------------------------------------------��- �������������������
On Grade Slab R10 2 ' horizontal F-0. ^ 0` 172ft 120. 4
Floor R19 vented Joist 16oc U-0. 041 30 1 .2
Glazing @15% 291 Wood/Vinyl <1/2" , Ar+LoE U-0. 530 397. 0 210' 4
Doors Wood 1 3/8" , solid panel U-0. 570 1 ~ 0 0. 6
AG Wall R19 STD Lap Wood U-0. 062 3300 204. 6
Ceiling R30 blown Attic STD baffled U-0.036 1310 47. 2
lnfiltration Standard Air Sealing ACH-0. 350 23310ft3 ( 149' 3)
------------------------------
Proposed UA 584
================================================================================