Exemption from Shoreline Management Act
Case No.: SHX2008-00004 Substantial Development Permit Requirement
The Proposal By: MARTHA V. HILLIUS
PEARSON C HILLIUS
PO BOX 1740
BELFAIR,WA 98528-1740
To undertake the following development:
Fix Scour on Bridge Abutments. Countersink forms and pour concrete under existing abutments.
Place nine inch minus, naturally occuring cobble in excavated area next to the abutments.
Remove woody debirs lodged against abutments.
Within Kristina Creek and/or its associated wetlands is exempt from the requirement of substantial development
because the development is categorized under WAC 173-27-040(2)as being category
D-emergency construction
Please contact James Scholz at ext 294 if you have any questions.
Issued: 3/12/2008 14L ,
Expires: 3/12/2010 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL Slw�'o„+��►
Thursday, March 06, 2008 11:12 AM p.01
�N..zn F,
0.TI �n
'i
STATE OF WASIIINGTON
f.. WARTMFNT OF FCOL_OGY
PO Box 4777; • Olympia, Washingtoty 98.504-777 • (.360) 407-6.300
March 3, 2008
Mr. and Mrs_ Hillius
PO Box 1740
Belfair, WA 98528-1740
RE Joint Aquatic Resources Permit Application (JARPA) for Hillius Bridge Repair,
Kristina Creek,Mason County, Washington
Dear Mr, and Mrs. l-fillius:
Tile DepartineM of Ecology (Ecology) received the.lAKPA.for Hillius Bridge Repair on
Pebruary 26, 2008.
This letter is intended to: 1)inform you that we have received your application package,
2)provide contact information, and 3) let you know what the next steps in the permitting, process
will be.
Ecology's goal is to issue the majority of our per niLs within 90 days provided that we have all of
the infiormatiun from the applicant,zwd a determination lrom the U.S. Army Corps of Engineers
(C<nps)as to what type of pertn.it they will be issuing(ice below). Large and/or complex
Projects may require additional review time, and Ecology will discuss the timeline with the
applicant. Please be aware that our tirneliDe goal does not include the time when the applicant is
providing infonnation or responding to requests-
information Received aid Needed
With your DARPA, we also received the following; documents:
• Site Plans
• 14PA, issued by WDFW on February 9, 2008
• SEPA Determination, issued by Mason County
• Emergency Activity Response, issued by Mason County Decenibet 17,2007
• Letter of recoal mendad011, issued by MWD Consultants,dated Jaimaay 10, 2008
We will be working;with you over the course of the permitting process to identify what other
information is needed. Ecology may request additio.wd information during our detailed project
review in.order 10 provide reasonable assurance that water quality standards will be Met.
Thursday, March 06, 2008 11:12 AM p•02
Information requested by Ecology will be,dependent on the type of permit decision the torn;
in,*. es (see attachment). Please be aware that time spent waiting for information fiom you or the
Corps is in addition to the 90-day decision goal mentioned above and effectively ,-tops our clock.
Corps Permits and Appropriate Ecology Permit
Ecology must find out from the Corps the type of perinit. they will be issuing for your project
before we can determine the appropriate Ecology permit for your Project_ The Corps will issue
one of the following lbur pea-nits for your project:
1) An Individual Section 404 permit(under the Clean Water Act)
2) A Nationwide permit, issued under Section 404
.3). An._Individual Section 10 permit(under the Rivers and Harbors Appropriation Act)
4) A letter of Permission, issued under Section 10
The attachment provides information regarding these lour different types of permits that the
Corps may issue for your project and the corresponding Ecology permit_
Please be aware that a Construction Stonnwater Gene", Permit is required for all soil disturbing
activities (including grading, stuinp removal,demolition) where 1 or more acres will be
disturbed,and stormwater will be discharged to a receiving water directly (e.g., wetlands, creeks,
unnamed creeks, rivers,marine waters, ditches,estuaries), or to storrn drains that discharge to a
receiving water. If all stormwater. is retained on-site and cannot enter surface waters of the state
under any condition,you do not need permit coverage. Construction site operators must apply for
a permit 60 days prior to discharging stormwater. For more information on how to obtain this
permit,please contact the Office of kegulatory Assistance; Service Center at 1-800-9.17-0043 or
visit the Department.of Ecology, Water Quality Program Web site at
http://www.coy.wa_gov/proglamns/wq/stonnwater/constntctic)n/ .
I look forward to working with you on your proposal_ Please contact nee if you have ally
questions regarding your application or the;401 Water Quality Certification(WQC) process at
(360)407-7459 or e-mail salu461 a),ecy.wa.goy.
Sincerely,
ZJ L o
Sarah.M_ Lukas
Federal Perrni.t Manager
Shorelands and Environmental Assistance Program
SMI-An.
cc: Olivia Romano, U.S. Army Corps of Engineers
Michael Dully, MWD Consultants
MASON COUNTY DCD ^ /
Sent ftMSAX 2cd^'COCC`/to(check all that apply)on
Skokomish Tribal Nation WA Department of Ecology
Natural Resources Dept. Environmental Review Section
ATTN: Marty Ereth PO BOX 47703
N 541 Tribal Center Rd. Olympia,WA 98504-7703
Shelton, WA 98584
Quinault Indian Nation U;Z-_� U.S.Army Corps of Engineers
ATTN: Mark Mobbs SEPA Reviewer
PO Box 189 PO Box C-3755
Tahola,WA 98587 Seattle, WA 98124
a Squaxin Tribal Nation WA Dept.of Fish and Wildlite
Natural Resources Dept. ATTN: Margie Schirato(saltwater)
2952 SE Old Olympic Highway 2391 W Deegan Rd.
Shelton, WA 98584 Shelton,WA 98584
The Confederated Tribe of the Chehalis WA Dept.of Fish&Wildlife
ATTN: SEPA Reviewer ATTN:Gloria Rogers(freshwater)
420 Howanut Rd. PO Box 695
Oakville,WA 98568 Elma,WA 98541
M/Shannon Soto WA Dept.of Transportation
WA DNR South Puget Sound Re
gion egion Alana Hess, Development Review Engineer
950 Farman Avenue North P.O. Box 47440
Enumclaw,WA 98022-9282 Olympia,WA 98504-7440
j Elizabeth Ellis a City of Shelton
WA DNR,Aquatic Resources 525 West Cota St.
PO BOX 47027 Shelton,WA 98584
Olympia,WA 98504-7027
Office of Archeaology&Historic Preservation
Boyd Powers ATTN:Stephanie Kramer
WA DNR,SEPA Center P.O.Box 48343
PO BOX 47015 Olympia,WA 98504-8343
Olympia,WA 98504-7015
School District:
a Olympic Region Clean Air Agency ID
2940-B Limited Ln. NW Mason Cty Public Works ATTN:
Olympia,WA 98502
0 Mason Cty Env. Health ATTN:
Mason County Transit
PO Box 1880 Agent:
Shelton,WA 98584
Applicant: �Z
-o
Cik� 2Q � � �`f0
i . :5 U Y ,7j) g ♦0U W 4
AGENCY USE ONLY JARPA FORM LAST UPDATED:March 19,2007
r vgency Reference t!: Date Received: Diddoirculated by: (local govt.or agency) a1��13Aoject Tracking Number:
Washington State JOINT AQUATIC RESOURCES PERMIT APPLICATION JARPA) Plorm
Step 1:Get Ready Step 2: Complete Form Step 3: Check Work Step 4: Copy an In
Go to www.epgrrni .orp Use black ink. Use internet"Help" Use final review See JARPA Contacts at
for correct form and Check correct buttons to answer checklist at www.epernutting.org for
instructions. permit boxes. questions completely. www.epennitting.org. correct mailing addresses.
[] Fish Habitat Enhancement Projects per RCW 77.55.181. You must submit copy of completed JARPA form and Fish Habitat
Enhancement JARPA Addition to your Local Government Planning Dep't and WA Dep't of Fish and Wildlife(WDFW)Area Habitat
Biologist on same day. Note for Local Governments: You must submit comments to WDFW within 15 working days.
Based on instructions at www.epermittinq.org, I am sending copies of this application to the following: (check all that apply)
X❑. Local Government for Shoreline: nSubstantial Development []Conditional Use ariance EJExemption Revision
nFloodplain Management []Critical Areas Ordinance R1
XQWashington Department of Fish and Wildlife for Hydraulic Project Approval(Submit 2 copies to WDFW Region)
[]Washington Department of Ecology for 401 Water Quality Certification(to Regional Office-Federal Permit Unit)
[]Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification
[]Corps of Engineers for: nSection 404 permit FISection 10 permit
Dcoast Guard for: nGeneral Bridge Act Permit []Private Aids to Navigation(for non-bridge projects)
[]For Department of Transportation projects only: This project will be designed to meet conditions of the most current
Ecology/Department of Transportation Water Quality Implementing Agreement
PROJECT TITLE:Pete&Marty Hillius Private Bridge Abutment Repair
PROJECT DESCRIPTION.Fill void under east bridge abutment&protect creek side of both abutments with rocks
SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all
permit applications.
1. APPLICANT Pearson &Martha Hillius
MAILING ADDRESS
P.O. Box 1740, Belfair,WA 98528-1740
WORK PHONE E-MAIL ADDRESS HOME PHONE FAX#
nytesarm@msn.com 360 275-3624 360 275-3624
If an agent is acting for the applicant during the permit process, complete#2. Be sure agent signs Section C(Signature Block)for
all permit applications
IMI 2.AUTHORIZED AGENT: Michael W. Dully, P.E.
MAILING ADDRESS
221 NE Landon Road, Belfair,WA 98528
WORK PHONE E-MAIL ADDRESS HOME PHONE FAX#
(360)275-5906 1 mikedully@wav cable.com 360)275-5906 360 275-5906
3. Relationship of applicant to property: [] OWNER [] PURCHASER [] LESSEE F2 Engineer
J ' 4. Name, address and phone number of property owner(s)if other than applicant:
(applicant)
®5. Location(street address, including city, county and zip code, where proposed activity exists or will occur)
1543 NE Old Belfair Hwy, Belfair,WA 98528
Local government with jurisdiction(city or county) Mason County
Waterbody you are working in Kristina Creek Tributary of Union River? EM WRIA#
Is this waterbody on the 303(d)List ❑ YES NO
If YES,what parameter(s)?
® Shoreline designation
Zoning designation
'/.Section Section Township Range Govemment Lot �s
d IJ I �J DNR stream type.if known 1�
Latitude and Longitude: Tax Parcel Number 12320-12-01020
1
47.47173,-IC2.83015(from TerraServer)
6. Describe(a)the current use of the property, (b)structures existing on the property, and(c)existing environmental conditions.
Have you completed any portion of the proposed activity on this property? ❑ YES Q NO
For any portion of the proposed activity already completed on this property, indicate month and year of completion.
(a) Private residence.
(b) A house and the private bridge (that needs abutment repair) that provides the only access to the property.
(c) No known environmental issues.
Is the property agricultural land? ❑ YES x0 NO -1 Are you a USDA program participant? ❑ YES x0 NO
7a. Describe the proposed work that needs aquatic permits: Complete plans and specifications should be provided for all work
waterward of the ordinary high water mark or line, including types of equipment to be used. If applying for a shoreline permit,
describe all work within and beyond 200 feet of the ordinary high water mark. If you have provided attached materials to describe
your project, you still must summarize the proposed work here. Attach a separate sheet if additional space is needed.
See drawing S-1 by MWD Consultants for description of the work (attached). The only access to the residence is
across Kristina Creek on a 20' long private bridge. The extreme rainfall event in December 3, 2007 allowed the
creek to undercut (create a void space) 1 foot of the soil that supports the creek side of the east bridge
abutment. This void will be filled with concrete to reduce future erosion. The creek side of both abutments will
also be protected with 1 and 2 man rocks.
PREPARATION OF DRAWINGS: See sample drawings and guidance for completing the drawings. ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE
DRAWINGS MUST BE ATTACHED. NOTE: Applicants are encouraged to submit photographs of the project site,but these DO NOT substitute for drawings. THE CORPS
OF ENGINEERS AND COAST GUARD REQUIRE DRAWINGS ON 8-112 X 11 INCH SHEETS. LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES.
7b. Describe the purpose of the proposed work and why you want or need to perform it at the site. Please explain any specific needs
that have influenced the design.
The purpose of the project is to restore the load carrying capacity of the bridge to its design loads and to reduce
the potential of future erosion of the soil under the bridge abutments.
7c. Describe the potential impacts to characteristic uses of the water body. These uses may include fish and aquatic life,water
quality,water supply, recreation and aesthetics. Identify proposed actions to avoid, minimize, and mitigate detrimental impacts
and provide proper protection of fish and aquatic life. Identify which guidance documents you have used. Attach a separate
sheet if additional space is needed.
Most of the work can be done from the shore. Temporary cofferdams can be installed to protect the fish from the
concrete formwork during construction. The work should be done during the lower water flow seasons like the
summer and scheduled to protect the migrating Salmonids, if appropriate.
When the repair work is completed the project should have no more or less affect on characteristic uses of the
water body (creek) than when the bridge abutment was originally constructed.
7d. For in-water construction work, will your project be in compliance with the State of Washington water quality standards for
turbidity(WAC 173-201A-410)? Q YES ❑ NO
8. Will the project be constructed in stages? [J YES x� NO
Proposed starting date: Summer 2008
Estimated duration of activity: 1 week
9. Check if any temporary or permanent structures will be placed:
Waterward of the ordinary high water mark or line for fresh or tidal waters AND/OR
i] Waterward of the mean higher high water for tidal waters?
_'• 10. Will fill material (rock, fill, bulkhead, or other material) be placed:
x� Waterward of the ordinary high water mark or line for fresh waters?
If YES, VOLUME (cubic yards) 5 Cubic yards(1 cu yd concrete,4 cu yards rock) /AREA (acres)
❑ Waterward of the mean higher high water for tidal waters?
If YES, VOLUME(cubic yards) /AREA (acres)
11. VVill material be placed in wetlands? ❑ YES xJ NO
If YES:
A. Impacted area in acres:
Ia' B. Has a delineation been completed? If YES, please submit with application. ❑ YES ❑ NO
1 C. Has a wetland report been prepared? If YES, please submit with application ❑ YES ❑ NO
D. Type and composition of fill material(e.g., sand, etc.)
E. Material source:
F. List all soil series(type of soil)located at the project site, and indicate if they are on the county's list of hydric soils. Soils
information can be obtained from the natural Resources Conservation Service(NRCS).
03 G.WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ❑ YES Ox NO
If YES, IMPACTED AREA IS ACRES OF DRAINED WETLANDS.
NOTE:If your project will impact greater than 1/10 of an acre of wetland,submit a mitigation plan to the Corps and Ecology for approval along with the JARPA form.
NOTE:A 401 water quality certification may be required from Ecology in addition to an approved mitigation plan if your project wetland impacts are greater than 1/10 acre in size.
Please submit the JARPA form and mitigation plan to Ecology for 401 certification review.
12. Stormwater Compliance: This project is(or will be)designedto meet ecology's most current
stormwater manual, or an Ecology approved local stormwater manual. ❑ YES ❑ NO(No change in stormwater)
If YES—Which manual will your project be designed to meet?
CM If NO—For Clean Water Act Section 401 and 404 permits only—Please submit to Ecology for approval, along with this JARPA
application, documentation that demonstrates the stormwater runoff from your project or activity will comply with the water quality
standards,WAC 173-201 A
13. Will excavation or dredging be required in water or wetlands? x❑ YES(work behind the cofferdam) ❑ NO
If YES:
A. Volume: 0.5 (cubic yards) /area (acre)
B. Composition of material to be removed: gravel
C. Disposal site for excavated material: Contractors site
D. Method of dredging: Hand work
14. Has the State Environmental Policy Act(SEPA) been completed YES F71 NO
SEPA Lead Agency:
SEPA Decision: DNS, MDNS, EIS, Adoption, Exemption Decision Date(end of comment period)
SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION
15. List other Applications, approvals or certifications from other federal, state or local agencies for any structures, construction
discharges or other activities described in the application(i.e. preliminary plat approval, health district approval, building permit,
SEPA review, federal energy regulatory commission license(FERC), Forest practices application, etc.). Also, indicate whether
work has been completed and indicate all existing work on drawings. NOTE: For use with Corps Nationwide Permits, identify
whether your project has or will need an NPDES permit for discharging wastewater and/or stormwater.
TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION DATE OF APPLICATION DATE APPROVED COMPLETED?
NO,
Building Permit Mason County No
CO 16. Has any agency denied approval for the activity you're applying for or for any activity directly related to the activity described
herein?
❑ YES 0 NO
If YES, explain:
SECTION B - Use for Shoreline and Corps of Engineers permits only:
17a. Total cost of project. This means the fair market value of the project, including materials, labor, machine rentals, etc.
No contractor bids have been requested until repairs are approved by the building Department&WDFW
17b. If a project or any portion of a project receives funding from a federal agency,that agency is responsible for ESA consultation.
Please indicate if you will receive federal funds and what federal agency is providing those funds.
N If YES lease list the federal agency. Possible FEMA for Flood Damage to bridge
FEDERAL FUNDING ❑ YES Ox O , pg g
abutment
18. Local government with jurisdiction: Mason County
19. Provide names, addresses and telephone numbers of adjoining property owners, lessees, etc. Please note: Shoreline
Management Compliance may require additional notice—consult your local government.
NAME ADDRESS PHONE NUMBER
Helmer 1541 NE Old Belfair Hwy, Belfair,WA 98528 (360)275-4239
SECTION C- This section MUST be completed for any permit covered by this application
20. Application is hereby made for a permit or permits to authorize the activities described herein. I certify that I am familiar with the
information contained in this application, and that to the best of my knowledge and belief, such information is true, complete,
and accurate. I further certify that I possess the authority to undertake the proposed activities. I hereby grant to the agencies to
which this application is made, the right to enter the above-described location to inspect the proposed, in-progress or completed
work. I agree to start work ONLY after all necessary permits have been received.
DATE
SIG A U E OF APPLICANT
-1 J AA J /J491ZV___ DATE
SIGNATURE OF AUTHORItED AGE T 14-5-0 .
I HEREBY DESIGNATE TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR
PERMI2NDERSTAND THAT IF A FEDERAL PERMIT IS ISSUED, I MUST SIGN THE PERMIT.
SIGNATURE OF APPLICANT OATE
SIGNATURE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS, E.G. DNR)
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT, IF AN AUTHORIZED AGENT IS DESIGNATED.
18 U.S.0 §1001 provides that: Whoever, in any manner within thejurisdiction of any department or agency of the United States knowingly
falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false, fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false, fictitious, or fraudulent statement or
entry, shall be fined not more than $10,000 or imprisoned not more than 5 years or both.
COMPLETED BY LOCAL OFFICIAL
A. Nature of the existing shoreline. (Describe type of shoreline, such as marine, stream, lake, lagoon, marsh, bog, swamp, flood
plain,floodway, delta;type of beach, such as accretion, erosion, high bank, low bank, or dike; material such as sand, gravel, mud, clay,
rock, riprap; and extent and type of bulkheading, if any)
B. In the event that any of the proposed buildings or structures will exceed a height of thirty-five feet above the average grade level,
indicate the approximate location of and number of residential units, existing and potential, that will have an obstructed view:
C. If the application involves a conditional use or variance, set forth in full that portion of the master program which provides that the
proposed use may be a conditional use, or, in the case of a variance, from which the variance is being sought:
These Agencies are Equal Opportunity and Affirmative Action employers
Fors special accommodation needs, lease contact the appropriate a enc in the instructions
P Pagency
1
Thursday, March 06, 200811:12 AM p.03
Washington HYDRAULIC PROJECT APPROVAL coastal
Deparimr3nt of 48 Devonshire Road
FISH and RCW lt.55.021(1o)&(11)-Appegl Pursuant to Chapter Montesano,WA 98563
WILDLIFE
(360)249-462+3
Issue Date:February 09,2008 Control Number: 111862-1
Project Expiration Date: March 31,2008 FPA/Public Notice 9: N/A
PERMITTEE AUTHORIZED AGENT OR CONTRACTOR
Pearson and Martha Hillius Michael Dully
1543 Old Belfair Highway 221 NE Landon Road
Belfair,WA 98528 Belfair, WA 98528
360-275-5906
Fax: 360-275-3624 Fax: 360-275-5906
Project Name: Fix Scour on Bridge Abuments
Project.Description: Countersink forms and pour concrete under existing abutments. Place nine
inch minus, naturally occurring cobble, in excated area next to the
abutments. Remove woody debris lodged against abutments.
PROVISIONS
1. Work below the ordinary high water line shall only occur between February 9, 2008 and March
31, 2008.
2. Work shall be accomplished per plans and specifications approved by the Washington
Department of Fish and Wildlife, entitled Hillius Bridge Abutment Repair and faxed by Mike Dully on
February 5, 2008, except as modified by this Hydraulic Project Approval. A copy of these plans
shall be available on site during construction.
ABUTMENT PROVISIONS
3. Excavation for and placement of material shall be restricted to work necessary to protect the
eroding abutments.
4. Work shall be accomplished in a manner to minimize damage to the streambed and banks.
EQUIPMENT PROVISIONS
5. Equipment used for this project shall operate stationed on bridge or banks.
6. Equipment used for this project may operate below the ordinary high water line, provided the
drive mechanisms (wheels, tracks, tires, etc.) shall not enter or operate below the ordinary high
water line.
7. Equipment used for this project shall be free of external petroleum-based products while working
around the stream. Accumulation of soils or debris shall be removed from the drive mechanisms
(wheels, tires, tracks, etc.) and undercarriage of equipment prior to its working below the ordinary
high water line_ Equipment shall be checked daily for leaks and any necessary repairs shall be
completed prior to commencing work activities along the stream.
Page 1 of 4
Thursday, March 06, 2008 11:12 AM p.04
� >r
Washington HYDRAULIC PROJECT APPROVAL coastal
0epinnient of 48 Devnnshire Road
FISH and RCW'77.55.021(10)&(11)-Appeal Pursuant to Chapter Montesano,WA 08563
wll_nLIFF (360)249-4628
Issue Date:February 09,2008 Control Number: 111862-1
Project Expiration Date:March 31,2008 FPA/Public Notice#: N/A
WATER QUALITY PROVISIONS
8_ Fresh concrete or concrete by-products shall not be allowed to enter the stream at any time
.during this project. All forms used for concrete shall be completely sealed to prevent the possibility
of fresh concrete from getting into the stream.
9. All waste material such as construction debris, silt, excess dirt or overburden resulting from this
project shall be deposited above the limits of flood water in an upland disposal site.
10. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or
water quality problems develop(including equipment leaks or spills), immediate notification shall be
made to the Washington Military Department's Emergency Management Division at 1-800-258-
5990, and to the Area Habitat Biologist listed below.
11_ If high flow conditions that may cause siltation are encountered during this project, work shall
stop until the flow subsides.
PROJECT LOCATIONS
Location#1
WORK START: February 09, 2008 IWORK END: March 31, 2008
WRIA: Waterbody! I'fibuiaiy to:
15.0512 Unnamed Tributary Union River
1/4 SEC: Section: Township: Range: Latitude: Longitude: County:
NE 1/4 20 23 N 101 W N 47.4754 W 122.83106 Mason
i o=ion Al Driving Diractiorr —^
From Belfair.go north on Old.Beifair Hwy to...1543 NE Old Belfair Hwy on left...
APPLY TO ALL HYDRAULIC PROJECT APPROVALS
This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code,
speciricaliy Chapter 77.55 RCW(formerly RCW T7.20). Additional authorization rrom other public agencies may be
necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying
for and obtaining any additional authorization from other public agencies(local, state and/or lbdoral)that may be
necessary for this project.
This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the
person(s)to whom this Hydraulir.Project Approval is issued and operators)performing the work.
This Hydraulic Project Approval does not authorize trespass.
Page 2 of 4