HomeMy WebLinkAboutBLD2024-00844 Roof Solar - BLD Inspections - 8/28/2024 1
INSPECTION CARD
Mason County
N . 615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2024-00844 PROJECT ADDRESS 101 E Rainbow Dr Shelton, WA 98584
PARCEL# 321345000061 PROJECT DESCRIPTION Installation of roof mounted 10.00 kW DC solar P t voltaic
generation system. Valuation is for Building materia and labor
only. Labor and Industries is Electrical permit.
OWNER GRAHAM BARBARA L ADDRESS 101E RAINBOW DR PHONE
CONTRACTOR NATIONWIDE SOLAR ADDRESS 6407 NE 117TH AVE UNIT B PHONE 800.908.8992
CONTRACTOR LICENSE NATIOS"786CW LENDER
INSPECTION 65—e—
AbAcc�sNSP DATE Comments INSPECTION INSP DATE Comments
BLD-Final Inspection
MASON COUNTY 360-427-9670 Shelton ext.352
360-275-4467 Belfair ext.352
COMMUNITY DEVELOPMENT 360-482-5269 Elma ext.352
Building,Planning,Fire Marshal
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.masoncountywa.gov
CORRECTIONANSPECTION REPORT
PERMIT/CASE NUMBER:
ADDRESS/LOCATION: /0
FINDINGS•
- Aa Aca-rs S6/� s
"C' e ls., LOX 616J.,is-1
Items listed above must be corrected to gain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
Call for re-inspection when corrections are made before proceeding with any further work.
❑ Make corrections, items will be checked on the next inspection.
❑ OK to
Date: ❑ Please contact our office regarding possible
Department: L0 structural damage incurred by recent
Inspector: "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC 14.12
Mason County
Mason County - Division of Community Development
615 W. Alder St.
N C Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
FKWDC
4-00844 ROOF MOUNT SOLAR PANEL-
RESIDENTIAL
ESCRIPTION: INSTALLATION OF ROOF MOUNTED 10.00 ISSUED: 07/22/2024
AR PHOTO-VOLTAIC GENERATION SYSTEM. VALUATION
LDING MATERIALS AND LABOR ONLY. LABOR AND EXPIRES: 01/18/2025
S IS ELECTRICAL PERMIT.
ESS: 101 E RAINBOW DR SHELTON
PARCEL: 321345000061
APPLICANT: Angobung, Fabian OWNER: GRAHAM BARBARA L
PO Box 821959 101 E RAINBOW DR
Vancouver, WA 98682 SHELTON,WA 98584
8009088992
GENERAL CONTRACTOR'S LICENSE: NATIONWIDE SOLAR License: NATIOS'786CW
6407 NE 117TH AVE UNIT B Expires: 02/19/2026
VANCOUVER,WA 98662
800.908.8992
FEES: Paid Due
Solar/PV Fee $475.00 $0.00
Solar/PV Base Fee $30.00 $0.00
Final Inspection $80.00 $0.00
Technology Surcharge $1.60 $0.00
State Fee-Residential $6.50 $0.00
Totals : $593.10 $0.00
REQUIRED INSPECTIONS
BLD-Final Inspection
.... ........ .._.. .... .. .. .... .... . _.
CONDITIONS
Printed by:Brittany King on:07/23/2024 08:44 AM Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-00844
" The installation of solar(thermal or photovoltaic)energy systems to provide space heating or cooling, hot water and
swimming pool heating shall conform to Chapter 23 of the International Residential Code, Chapter 14 of the International
Mechanical Code, Uniform Plumbing Code,the International Fire Code, and be shall be listed and labeled in accordance
with UL1703.
Roof mounted panels shall weigh no more than 4 Ibs per square foot. Supports for solar panels are to be installed to spread
the dead load across as many roof-framing members as needed to ensure that no point loads in excess of 50-Ibs are
created. Panels may be installed on roof assemblies with a single layer of roofing material. Roof assemblies with more than
one roofing material layer shall require an engineered analysis demonstrating that the roof will support the additional load of
the solar panel system. Attachment to the roof shall be in accordance with manufacturer specifications provided during the
inspection by the Mason County Building Inspector.
Roof mounted equipment shall comply with the International Fire Code Section 605.11, including signage and access
pathways. Roof access points shall not be located in areas where access ladders would block window or doors openings.
Not less than two-3-foot wide access pathways shall be provided from the eave to ridge.
Ground-mounted panels and modules, installation must be in accordance with the manufacturer's instructions and be
available at time of inspection.
Inverters shall be listed and labeled in accordance with UL 1741. Systems connected to the utility grid shall use invertors
listed for the utility interaction
Collectors and thermal storage units shall be listed and labeled to show manufacturer's name, model number, serial number,
collector weight, collector maximum allowable temperatures and pressures, and the type of heat transfer fluids that are
compatible with the collector.
Connections to potable water supplies shall be provided with backflow protection in accordance with the Uniform Plumbing
Code. Solar energy systems containing pressurized fluids shall be protected with a temperature and pressure relief valve
and be protected from freeze damage. Systems shall be equipped with means to limit the maximum water temperature of
the system fluid entering or exchanging heat with any pressurized vessel inside the dwelling to 180 degrees Fahrenheit.
Solar energy collectors, controls, dampers,fans, blowers and pumps shall be accessible for inspection, maintenance, repair
and replacement. The roof shall be constructed to support the loads imposed by roof-mounted solar collectors and shall be
constructed of noncombustible materials,flashed and sealed to prevent entry of water, rodents, and insects. The building
inspector may require additional information, including an engineered design, to verify that existing roof or floor construction
are adequate to support the additional load of the solar energy equipment. When required provide an engineered design for
inspection.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
Printed by:Brittany King on:07/23/2024 08:44 AM
Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ROOF MOUNT SOLAR PANEL-RESIDENTIAL BLD2024-00844
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
" The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency
(ORCAA).
It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos
containing materials have been identified and removed from the area to be demolished.Work shall not commence on an
asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B
Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Author, d Agent: On -- L'4h_ Date: -7- 2-3- 2
Printed by:Brittany King on:07/23/2024 08:44 AM Page 3 of 3