Loading...
HomeMy WebLinkAboutBLD2003-00482 MFG Home - BLD Permit / Conditions - 7/11/2003 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 1pr to Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2003-00482 OWNER: TED KEITH t CONTRACTOR: MARTY REYNOLDS LICENSE:AM*****986B9 EXP: 1/29/2004 RECEIVED: 4/ ISSUED: 7111/2003 11/2003 SITE ADDRESS: 1462 NE OLD BELFAIR HWY BELFAIR EXPIRES: 1/11/2004 PARCEL NUMBER: 123201201060 LEGAL DESCRIPTION: TR 6 OF N1/2 NW NE PROJECT DESCRIPTION: DIRECTIONS TO SITE: MANUFACTURED HOME NORTH ON OLD BELFAIR HWY. FROM 4-WAY STOP. PAST NEWKIRK RD. CROSS UNION RIVER BRIDGE. 2ND DRIVEWAY ON RIGHT (TED'S SHED). GO TO THE END General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 2 Type of Constr.: V-N Type of Use: MH Insp.Area: OT No. of Bathrooms: 2 Occ. Group: R-3 Lot Size: Deck: Type of Work: NEW Fire Dist.: 2 No.of Stories: 1 Occ. Load: Building:0 Valuation: Building Height: 13 Occ. Status: Primary Basement: Manufactured Home Information Setback Information Shoreline&Planning Information Make:MODULINE Length: 66 Ft. Front: W 42.0 Ft. Shoreline: Ft. Water Body: UNION RIVER Rear: SE 66.0 Ft. Slope: Ft. SEPA?: No Model:C4933H-14 Width: 41 Ft. Side 1: N 36.0 Ft. Shoreline Desig.: Rural Year:2003 Serial No.: Side 2: Ft. Comp. Plan Desig.: Urban Growth Area Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Mobile Home Submittal Fee NJP 4/23/2003 $211.05 S22003 Planning Review Fee NJP 4/23/2003 $150.00 S22003 EH Plan Review CEW 5/5/2003 $75.00 S12003 Mobile Home Issuance Fee RLS 5/5/2003 $211.05 S12003 Building State Fee RLS 5/5/2003 $4.50 S12003 Additional Plan Check Fee KS 7/11/2003 $31.50 S12003 Total $683.10 BLD2003-00482 Please referto the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2003-00482 CONDITIONS FOR BLD2003-00482 1 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-4982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X v 2) The use, handling and storage of haza s materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. 3) Th� ing residence shall be removed with 24 months of the date of final inspection and approval by Mason County. 4) ,Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland sediments from entering shoreline waters. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand, silt, and soil will damage aquatic habitat and are considered pollutants. Any discharge of sediment-laden runoff or other pollutapollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior authorization from the Department of Ecology pursuant to WAC 173-201A-110. A short-term water quality standards modification may be issued if the proponent agrees to a number of specific construction practices and techniques designed to minimize water quality impacts. All areas disturbed or newly created by construction activities must be revegetated using bioengi� chniques, clean durable riprap, or some other equivalent type of protection against erosion when other measures are not practical. 5) All upland areas disturbed or new eated by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X 6) Temporary erosion control measures must be implemented to prevent water qu lit gradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until upland vegetation has become established. X BLD2003-00482 Please referto the following pages for conditions of this permit. 2 of 5 7) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your proje Xt 8) The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including installation instructions, shall be available in thiss location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions. . 9) All mobile/manufactured home landings or decks must be freestanding (self supporting). The largest landing or deck allowed without drawings or a building permit MUST be under 30" in height from surrounding grade. NO second story decks, or decks above 30" can be built without a permit. Any landing or deck th �i 30" or more in height from walking surface to finish grade requires a Permit. Any landing or deck that has 4 or more risers requires a handrail. X 10) This permit is for the plment and installation of the manufactured home only and does not imply approval or review for any other items indidcated on the plot plan. X 11) Applicant has indicated this is a replacement unit. Prior to Mason Count slowing any occupnacy of the new proposed unit, the existing unit which is on-site and is being replaced MUST be removed from the parcel. X_r= 12) REQUIRED INSPECTIONS (Footing Inspection-prior to pour, Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the 1997 UBC, and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been discovered. I further understand that this investigation will be scheduled as time allows. Until resolution of an��oblems no occupancy(Final Inspection)will be granted for the residence. OWNER/CONTRACTOR(indicate which) Signature X 13) Any retailer, manufacturer or contractor who installs a manufactured home warrants that the manufactured home is installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work shall be certified manufactured home installers and shall be present to supervise the installation of all on-site work. An Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for each major part of the installation. RCW43-63B.090 X 14) Approved per dimensions and setbacks on submitted site plan. X C-A� 15) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department pr or ny further inspections being performed or approvals granted. Please referto the followinq pages for conditions of this permit Q of G 16) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or contractor fail o post the address on site prior to requesting inspections. X o 17) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X � t 18) The "approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" plot plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Departr�e p X � rior to any further inspections being performed or approvals granted. 19) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation�� X 20) All changes to "approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance or regulation, must be review approved by Mason County prior to construction. X 21) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to,rpquesting additional inspections. X ��// 22) All property lines shall be clearly identified at the time of foundation inspection. X 60C_ 23) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with X Mason County ordinances and buil ( g regulations. 24) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented �tion from being taken. No more than one extension may be granted. X t 25) The provisions and requirements of the Habitat Management Plan shall be adhered to throughout this development. A Planning Dept. site inspection is required to verify this compliance prior to final appSoVal. Contact Rick Mraz @ 360-427-9670 x577 to schedule the inspection. X 26) Approved per dimensions and setbacks on submitted site plan. X /— BLD2003-00482 Please referto the following pages for conditions of this permit. 4 of 5 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of co uation of w is a progr s inspection within the 180 d eriod. Final inspection must be approved before building can be occupied. OWNER OR AGE CIi Ld- GN BLD2003-00482 Please refer to the following pages for conditions of this permit. 5 of 5 r o CONCRETE MECHANICAL MANUFACTURED HOME o Footings / Setbacks Date By Ribbons SSP� i s 0 � Date By Gas Piping Date ZS/05 By K)N Foundation Walls Date By Set-up Date By INSULATION Date /D-9°-c!:0 By T B G / Slab Insulation. Floors F 2 j� Date By Date By Date /Z- 2 -oaBy FRAMING Walls FIRE DEPT Date By Date By Date By PLUMBING Attic OTHER Groundwork Date By Date By WALLBOARD NAILING D.W.V. Date By Date By FINAL INSPECTION Water Line Date By D ate By s Date By z 63 -F zl G S ['� �t �S . s C5D2 100, Z -c�� _• Z-.N LCaL CD En CD 0 8 a 0 y CD o x o y 00 d N 0 � �RoP[2 T y� L/Nt �. — BURS "WC-ILL I N4 (3 Li FGc Z `UIViDN V O � P o Cry N 'J .7Z � e-LL PUMpc� IF _ I F i�L�rJ Y CpvrtAgo `t� K c�G• APPROVED 41 z i ,j -Z N CdUNTY DCD ? AEG ' M �l Sl E PLAN iREQU1RED TO BE aN S c� a NGES SUSJECT TO APPROVAL U N U SE PRU PAR T Y v I 5 2 � i Date- a o o l� J✓ATIVE �E--ql AT►oa c� Qf- _ ut I NA-r.IRAL STATE TO . _ PLANDUNG y �1NIoN 20'R+yH-f cF wAY c R+vt R < `p ( g N PR�vA E )z�va � � _�' ,� PKOP"-rLT`1 1-/NC * 1 AA 1�0 Ae I N B U f�S UV E L I�t'J) �x HiS•r�N�I3 a FGc 2. `UA/iolJ I cc � 7� i 4 s� V) ^' \ LD LL P, i A2EA `, I I I i �CaE pUmreo t �,F�L L E iJ CL b ID -Z IA C) PRO PeR T Y I)A T I V E / TAT►o rJ �,JATURAL STATE TO O .' `� i t i� - / a!✓ MftIN TA INcI� v 7-4lRIfN'T of WA c RIVEr;IDOF H PRIVATE DRIVE P 4 LirtE_� ,1 \J s � e_r ? sue- , =-•��—v-�' � �— �_�' Maw 7245u- ' I aMWCx" . ' �xc Arco v+s -'Er am_ - ►�� f i. "moy {I — 6-4 -- —— s�roc sa_ n NOTE: TNS PR%T WST A�tWANY ORDEP — E a -- LW CKWGE CUSTOMER ' MOGULINE CUSTOM ot� - -- --- CU933h -- 1 4 PC ao,a.er- A81 r " DAI E: -PROM Do�x►n.Ut OF%m DAM as as 0 9 9 V t In m 1 II 00 TRW WE 2Lva'm rHpc UU t1t vAToN G NOTE- T14E PWG U Si AOC',CWAW ORCfR E � 11STOLkR__ `plc ` iMct PmE' MODULINE ELEVATION PLAN D y SUNDRAWC M SC%k on CU933h-14 DEALER io m m N I tD Q E -?4V _ z m 2A- L l/ 1Nn0� No ei /10S �� �ect�nf13�avL182�iy QGt�w,-cd�at•.� Case Activity Listing " - Cuaa►cb Case#: BI D2003-00482 l A CCKd' a ✓Q- �_v al a� rU 4 NW&)C- ' Assign r n. Date 3 Hold Disp To By C7pdated Updated b,n. BLDA010 Application Received 4/23/2003 4/23/2003 None DONE NJP 4/23/2003 NJP BLDB 110 Building Plan Review 4/23/2003 5/5/2003 None DONE RLS 5/5/2003 RLS Review completed sent to case manager RLS 05-05-03 BLDB200 Environmental Health Review 4/23/2003 5/5/2003 None DONE CEW 5/5/2003 CEW br and plot maps match BLDB210 Water Adequacy 4/23/2003 5/5/2003 None DONE CEW 5/5/2003 CEW well log,satis bacti and wa app on file BLDB 130 Planning Review 4/23/2003 7/9/2003 None DONE RAM RAM 7/9/2003 RAM Hold for planting/restoration plan per Resource Ordinance variance conditions. Restoration/HMP bond received 7/9/03. See conditions. BLDA100 Approved for Issuance 7/11/2003 None DONE KS 7/11/2003 KS BLDA500 Issue Building Permit 7/11/2003 None DONE KS 7/11/2003 KS BLDC200 Mobile Home Set Up 8/21/2003 8/25/2003 None PASS LDK 8/26/2003 KLW M/H FOOTING AND SETBACKS PASS. BLDC200 Mobile Home Set Up 10/8/2003 10/9/2003 None PASS TFR 10/10/2003 KLW BLDC157 Final Inspection-Failed 12/4/2003 12/5/2003 None FAIL TFR 12/8/2003 KLW 1.INSTALL BELLY BAND AND CUALK TOP EDGE,2.INSTALL TERMINATION FOR DRYER DUCT,3.INSTALL CRAWL SPACE ACCESS WELL AND PERMANENT COVER,4.INSTALL GRASPABLE HAND RAIL ON REAR PORCH W/4 RISERS,5.CONTACT RICK MRAZ ABOUT CONDITION#25,6.GRADE AWAY FROM UNIT AT 2 PERCENr AND PROVIDE DRAINAGE SWALES,7.INSTALL SPLASH PANS AT DOWN SPOUTS AND POINT AWAY FROM UNIT,OK TO OCCUPY TEMP 180 DAYS. 4 f Luc- y� - anot �G?L2 "Page 1 of f casencaviry..rpt Case Activity Listing Case#: BLD2003-00482 IP10 Assigned Done Activity Description Date I Date 2 Date 3 }lold Disp To By Updated Updated By BLDC157 Final Inspection-Failed 12/18/2003 12/19/2003 None FAIL LDK 12/22/2003 KLW FROM PREVIOUS CORRECTION ITEM I AND 4 NOT COMPLETED,@l INSTALL BELLY BAND AND CAULKTOP EDGE,#2 INSTALL GRASPABLE HANDRAIL ONBACK DECK WITH 4 STEPS,OK TO OCCUPY TEMP 180 DAYS. BLDC155 Final Inspection-Passed 12/23/2003 12/26/2003 None PASS LAW 12/30/2003 KLW OK PER LAST NOTICE. Page 2 Of 2 CaseActivity..rpt i PERMIT NO.: BLD MASON COUNTY BUILDING PERMIT APPLICATION 426 W.Cedar/P.O.Box 186,Shelton,WA 98584 Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968 APPLICANT INFORMATION CONTRACTOR INFORMATION Owner Contractor Name 4.1191-6ti Mailin�gg Address P.O. Mailing Address j'O. 4 � City ELP'A/R_ State)WA Zip Code City State JAIA Zip Code << Phone 3( GO)27,5• ?Other Ph.( Ph.( '10?<Other Ph.(3(00 ) '710 4fq Lien/Title Holder #L' - rX pRr,&9AC2c Contractor Reg. # mil' " 9�U �f h1A1�1/-5 `lGa Address �°' ' ` CJ? .. alh/R7l3 1N - Expiration �� SEPTIC/WATER SYSTEM INFORMATION-Connect to New Septic Existing Septic Connect to Sewer System Name of Sewer System Well Water System Name of Water System PARCEL INFORMATION-12 digit Tax Parcel No. / / ff i Fire District (:;,- Legal Description Site Address(Please include street name, street number and city) C OLD -LFA)& W Y. ELFAIR', . Directions to site RT14 0A1 OLID C F —r P 9 $ � AD, CROSS 16 if-I MQ5 SHCO Qn 'r,l D, Will timber be cut and sold in parcel preparation? Yes/No) Is your property within 200' of the following: Body of Water (Name) IVCR&007t4ry _GOwKa er Lake River/Creek � Pond Wetland Seasonal Runoff Stream Slopes or Bluffs PERMANENT RESIDENCE[i SEASONAL RESIDENCE❑ TYPE OF JOB New Add Alt Repair Other Use of uilding NESiDelyce Describe Work Z,yS-rtit /i4. ir121eer4 No. of Bedrooms_,,�No. of Bathrooms SQUARE FOOTAGE-1st Floors 70t" 2nd Floor 3rd Floor Loft Basement Deck Other sq. ft. Garage Attached Detached Carport Attached Detached MOBILE HOME INFORMATION-Make L/A/€'Model Model Year .07Qd Length Width Serial No. —rp D No.Sof Bedrooms No. of Bathrooms Type of Heat 00 Purchase Price $/aZO�GiAO. Replacement Unit ?(Yes/No) ./yD Installer Name AA Certification No. NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project. Acknowledgment of such is by signature below: OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without approval. first obtaining approval. I�W[Dateqm �02003 X Date FOR OFFICIAL USE BEYOND THIS POINT Accepted by G44DateLJ173Jo_5 Submittal Amount Due 2_1%,y5_Receipt No DEPARTMENTAL REVIEW. APPROVED IaENIEDID1TIfJ Building Department �j�5 �0 Occ Group Type Constr. Planning Department 's Environmental Health Department Public Works Department I Fire Marshal Valuation $ FEES Building Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbing&Base Fee Planning Review Fee Mechanical&Base Fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal ( ) TOTAL FEES