Loading...
HomeMy WebLinkAboutMEP2007-00087 - MEP Permit / Conditions - 8/22/2007 PERMIT NO.: W44� 0- � DATE RECEIVED: MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE ORDINANCE (Chapter 17.01 MCC) 411 N. 5TH Street/ P.O. Box 279, Shelton, WA 98584 RECEIVED ENVIRONMENTAL PERMIT APPLICATION r 2 2,201 MASON ENVIRONMENTAL PERMIT [IC0NDITIONAf SE CEDR m The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. Owner: �C��{7 Owner Mailin Address: oL /6 5P Site Address: - City: �L�'j¢ . A.- State�_Zip_jqi�b d' City: States&LA_Lip: _ Lien/Title Ho l r Phone: Daytirnq_2�o ) 02 7_j Q g 7 Address: Fire District#: City: ,,¢ 1,4— State:�� Zip:Af se Signature: 2. Parcel Number: cd Ul f d Legal description: Parcel Size: 3. Directions to site: �1 \ v /1- AJ State what sections require a permit: In-Holding Lands, Chapter 17.01.062 ❑ 4. Long-Term Commercial Forest, Chapter 17.10.060 ❑ Wetlands, Chapter 17.01.070 ❑ Mineral Resource Lands, Chapter 17.01.066 ❑ Frequently Flooded Areas, Chapter 17.01.090 ❑ Aquifer Recharge Areas, Chapter 17.01.080 ❑ Landslide Hazard Areas, Chapter 17.01.100 ❑ Erosion Hazard Areas, Chapter 17.01.104 ❑ Seismic Hazard Areas, Chapter 17.01.102 ❑ Fish and Wildlife Habitat Conservation Areas, Chapter 17.01.110 I/ W 5. Identify current use of property with existing improvements: 6. Identify and describe the proposed project,including the type of materials to be used, construction methods,principle dimensions and other pertinent information(Attach additional sheets if needed): —_r J 7. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No 8. Any water on or adjacent to property: Saltwater 0 Lake ❑ River Pond ❑ Wetland ❑ Seasonal Runoff ❑ Other 9. If septic is located on project site,include records. /V e Connect to septic? ❑ Community Septic? 0 Public Water Supply? ❑ Well? 0 10. / Type of Job: New VAdd ❑ Alt ❑ Repair ❑ Demolition ❑ Other This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. MASON ENVIRONMENTAL PERMIT: $510.00/$305.00(with another permit) MASON CONDITIONAL USE ENVIR.PERMIT: $1,225.00 HABITAT MANAGEMENT PLAN: $360.00 L\PLANNING\C&R\ENVIRONMENTAL REVISED 09-14-05 y c -SALMON C'.F.!►g:Nf GROUP _ August 11, 2007 Teresa A. Eturaspe SEPA/NEPA Coordinator WDFW Habitat Program Teresa, Enclosed is the SEPA checklist with updated plan as well as information you requested. It seems that there has been some misconception about what this project has evolved into. As you look through the checklist I hope you will find that it still might fall under the JARPA protocols. If not then please continue with the SEPA process as we have discussed. As you can see we are constructing a by-pass channel and not realigning the channel. The total amount of removal for the channel (less than 60 feet)will be less than 50 cubic yards with the addition of 14 cubic yards of streambed gravel. The wood will be used to stabilize the bank and help direct the stream as well as create additional habitat. I hope this will help with your determination on this project. Thank you for your assistance, W4**- Neil W. Werner Executive Director Hood Canal Salmon Enhancement Group PO Box 2169 * Belfair, Washington 98528 * Phone(360) 275-3575 * FAX(360)275-0648 (8/20/2007) Charles McCoy III - Re: Bear Creek Suggestions! Page 1 j From: "Teresa Eturaspe" <eturatae@DFW.WA.GOV> To: "Jeff Davis" <DAVISJPD@DFW.WA.GOV>, "Gloria Rogers" <rogergsr@DFW.WA.GOV... Date: 8/17/2007 12:00 PM Subject: Re: Bear Creek Suggestions! CC: <chuckm@co.mason.wa.us> Doris, I left a message for Neil today. Based on Bob Barnards findings I am hand delivering the SEPA checklist to Chuck McCoy this afternoon. The County will be lead agency on this SEPA. I had hoped we could tweek this to fit under the Streamlined process but it does not appear that we can. Teresa A. Eturaspe SEPA Responsible Official Washington State Fish &Wildlife Habitat Program 600 Capitol Way North Olympia, WA 98501-1091 (360)902-2575 (360)902-2946 FAX <etu ratae@dfw.wa.gov> >>> Doris Small 08/17/2007 11:50:16 AM >>> I spoke with Teresa on Wednesday&we both communicated with Neil on Thursday. Teresa suggested to Neil two options to move things along: 1. Re-design to meet streamline permit criteria. She seemed to think that Gloria & BobB had ideas on how this could be done. I'm not getting that impression from the emails included in this message though. She thought she could immediately process if the right changes were made. 2. Find out if permits were required from Mason Co. (putting the county as lead agency) and get that going asap. If no permits from Mason Co, let's get that in writing asap so that we can move things along on our end. Neil seemed to be going down the revised project path, but I'm not feeling confident based on emails below. I'm "involved" as the agency liason to the RFEG but trying not to interfere with the permit process. Please keep me informed & let me know how to help this project move forward. It's not a great project overall, but the HCSEG wants to do it primarily to start working with an important landowner in the overall goal of protection & restoration of the Union River watershed. From that angle, I hope they are able to get it done this summer. Doris J. Small WDFW Watershed Steward 502 High Street, Suite 112 Port Orchard, WA 98366 360.895.4756w 360.710.1215c >>> Gloria Rogers 08/17/07 10:21 AM >>> Jeff et all, It is my understanding that if this application does not meet the criteria for a streamlined permit, Mason County has lead agency status. Any work within or above the OHWL, Mason County(according to their resource ordinances) requires SEPA and at a minimum a Mason Environmental Permit(MEP). If the project is located on or within 200 feet of shorelines then the applicant needs to go through the shoreline (8/20/2007)Charles McCoy III - Re: Bear Creek Suggestions! Page 2 process as well. Gloria Rogers Area Habitat Biologist Washington Department of Fish and Wildlife 48 Devonshire Rd Montesano, WA 98563 360-249-4628 x 249 >>>Jeff Davis 8/17/2007 10:03 AM >>> It is my understanding that WDFW is putting this through SEPA, so it has been denied as a Fish Habitat Enhancement project. It will be important that we provide Teresa these comments and that Gloria provision the HPA accordingly. Doris is also involved in this project, so we need to keep her in the communication loop. Jeff Jeff Davis Assistant Regional Habitat Program Manager WA. Dept. of Fish &Wildlife 502 High St., Suite 112 Port Orchard, WA 98366 (360)895-3965 (360)876-1894 fax davisjpd@dfw.wa.gov >>>Gloria Rogers 08/17/2007 9:54 AM >>> Bob, I can't thank you enough for all of your help and review of this project. But here goes....THANKS!!!!!!!!!!!!!!!!!! Gloria >>>"Bob Barnard" < BARNARJB@DFW.WA.GOV> 8/17/2007 9:23 AM >>> I think I've talked to everyone I can about this project(Marty, Richard B., Rich, Gloria). I don't have time to go out there to look at this, so this will have to do. I understand that this is a depositional area and that there may be a tendency for the ck to move off to the right. Digging a relief channel (the current proposal) may reduce flood elevations and keep more of the water in the current alignment. My intuition tells me that it will be short-lived, increasing deposition by splitting flow. Other alternatives include creating a dike along the roadway(fewer impacts than the original dike proposal)or raising the road.Another is to realign the stream down the path that the flood flows take now(I admit that I know nothing about the topography here and this may be impossible). These other alternatives would require a whole new design effort and probably a new permit/funding cycle. As a temporary, inexpensive, possibly successful design, I support the current proposal. I don't think this project meets RCW 77.55.181 specified tasks. The LWD is small and an ancillary addition to the project. One could view the stranding of fish as a "blockage," but certainly not in the common use of (8/20/2007)Charles McCoy III - Re: Bear Creek Suggestions! Page 3 the term. Bob Bob Barnard, P.E. Habitat Engineering Technical Assistance Washington Dept. of Fish and Wildlife 600 Capitol Way N Olympia, WA 98501-1091 360-902-2611 >>>'Rich Geiger" < rjgeiger@masoncd.org > 08/16/2007 2:17 PM >>> Hi to both of you - Neil called and said you have suggestions on how to re-work this project so it is truly a fish passage restoration - Let me know so we can draw it up -Thanks! - Rich (8/17/2007) Charles McCoy III - Re: Bear Creek Suggestions! Page 1 From: "Gloria Rogers" <rogergsr@DFW.WA.GOV> To: "Jeff Davis" <DAVISJPD@DFW.WA.GOV> Date: 8/17/2007 10:22 AM Subject: Re: Bear Creek Suggestions! CC: <chuckm@co.mason.wa.us>, "Teresa Eturaspe" <eturatae@DFW.WA.GOV>, "Doris... Jeff et all, It is my understanding that if this application does not meet the criteria for a streamlined permit, Mason County has lead agency status. Any work within or above the OHWL, Mason County(according to their resource ordinances) requires SEPA and at a minimum a Mason Environmental Permit(MEP). If the project is located on or within 200 feet of shorelines then the applicant needs to go through the shoreline process as well. Gloria Rogers Area Habitat Biologist Washington Department of Fish and Wildlife 48 Devonshire Rd Montesano, WA 98563 360-249-4628 x 249 >>>Jeff Davis 8/17/2007 10:03 AM >>> It is my understanding that WDFW is putting this through SEPA, so it has been denied as a Fish Habitat Enhancement project. It will be important that we provide Teresa these comments and that Gloria provision the HPA accordingly. Doris is also involved in this project, so we need to keep her in the communication loop. Jeff Jeff Davis Assistant Regional Habitat Program Manager WA. Dept. of Fish &Wildlife 502 High St., Suite 112 Port Orchard, WA 98366 (360) 895-3965 (360) 876-1894 fax davisjpd@dfw.wa.gov >>> Gloria Rogers 08/17/2007 9:54 AM >>> Bob, I can't thank you enough for all of your help and review of this project. But here goes....THANKS!!!!!!!!!!!!!!!!!! Gloria >>>"Bob Barnard" <BARNARJB@DFW.WA.GOV> 8/17/2007 9:23 AM >>> I think I've talked to everyone I can about this project(Marty, Richard B., Rich, Gloria). I don't have time to go out there to look at this, so this will have to do. (8/17/2007)Charles McCoy III - Re: Bear Creek Suggestions! Page 2 I understand that this is a depositional area and that there may be a tendency for the ck to move off to the right. Digging a relief channel (the current proposal) may reduce flood elevations and keep more of the water in the current alignment. My intuition tells me that it will be short-lived, increasing deposition by splitting flow. Other alternatives include creating a dike along the roadway(fewer impacts than the original dike proposal)or raising the road.Another is to realign the stream down the path that the flood flows take now(I admit that I know nothing about the topography here and this may be impossible). These other alternatives would require a whole new design effort and probably a new permit/funding cycle. As a temporary, inexpensive, possibly successful design, I support the current proposal. I don't think this project meets RCW 77.55.181 specified tasks. The LWD is small and an ancillary addition to the project. One could view the stranding of fish as a "blockage," but certainly not in the common use of the term. Bob Bob Barnard, P.E. Habitat Engineering Technical Assistance Washington Dept. of Fish and Wildlife 600 Capitol Way N Olympia, WA 98501-1091 360-902-2611 >>> "Rich Geiger" <rjgeiger@masoncd.org> 08/16/2007 2:17 PM >>> Hi to both of you - Neil called and said you have suggestions on how to re-work this project so it is truly a fish passage restoration - Let me know so we can draw it up -Thanks! - Rich (8/17/2007) Charles McCoy III Re: Bear Creek Suggestions! Page 1 From: "Doris Small" <smalldjs@DFW.WA.GOV> To: "Jeff Davis"<DAVISJPD@DFW.WA.GOV>, "Gloria Rogers" <rogergsr@DFW.WA.GOV> Date: 8/17/2007 11:51 AM Subject: Re: Bear Creek Suggestions! CC: <chuckm@co.mason.wa.us>, "Teresa Eturaspe" <eturatae@DFW.WA.GOV> I spoke with Teresa on Wednesday&we both communicated with Neil on Thursday. Teresa suggested to Neil two options to move things along: 1. Re-design to meet streamline permit criteria. She seemed to think that Gloria & BobB had ideas on how this could be done. I'm not getting that impression from the emails included in this message though. She thought she could immediately process if the right changes were made. 2. Find out if permits were required from Mason Co. (putting the county as lead agency)and get that going asap. If no permits from Mason Co, let's get that in writing asap so that we can move things along on our end. Neil seemed to be going down the revised project path, but I'm not feeling confident based on emails below. I'm "involved"as the agency liason to the RFEG but trying not to interfere with the permit process. Please keep me informed & let me know how to help this project move forward. It's not a great project overall, but the HCSEG wants to do it primarily to start working with an important landowner in the overall goal of protection & restoration of the Union River watershed. From that angle, I hope they are able to get it done this summer. Doris J. Small WDFW Watershed Steward 502 High Street, Suite 112 Port Orchard, WA 98366 360.895.4756w 360.710.1215c >>> Gloria Rogers 08/17/07 10:21 AM >>> Jeff et all, It is my understanding that if this application does not meet the criteria for a streamlined permit, Mason County has lead agency status. Any work within or above the OHWL, Mason County(according to their resource ordinances) requires SEPA and at a minimum a Mason Environmental Permit(MEP). If the project is located on or within 200 feet of shorelines then the applicant needs to go through the shoreline process as well. Gloria Rogers Area Habitat Biologist Washington Department of Fish and Wildlife 48 Devonshire Rd Montesano, WA 98563 360-249-4628 x 249 >>>Jeff Davis 8/17/2007 10:03 AM >>> It is my understanding that WDFW is putting this through SEPA, so it has been denied as a Fish Habitat Enhancement project. It will be important that we provide Teresa these comments and that Gloria provision the HPA accordingly. (8/17/2007) Charles McCoy III - Re: Bear Creek Suggestions! Page 2 Doris is also involved in this project, so we need to keep her in the communication loop. Jeff Jeff Davis Assistant Regional Habitat Program Manager WA. Dept. of Fish &Wildlife 502 High St., Suite 112 Port Orchard, WA 98366 (360) 895-3965 (360) 876-1894 fax davisjpd@dfw.wa.gov >>> Gloria Rogers 08/17/2007 9:54 AM >>> Bob, I can't thank you enough for all of your help and review of this project. But here goes....THANKS!!!!!!!!!!!!!!!!!! Gloria >>>"Bob Barnard"<BARNARJB@DFW.WA.GOV>8/17/2007 9:23 AM >>> I think I've talked to everyone I can about this project(Marty, Richard B., Rich, Gloria). I don't have time to go out there to look at this, so this will have to do. I understand that this is a depositional area and that there may be a tendency for the ck to move off to the right. Digging a relief channel (the current proposal)may reduce flood elevations and keep more of the water in the current alignment. My intuition tells me that it will be short-lived, increasing deposition by splitting flow. Other alternatives include creating a dike along the roadway(fewer impacts than the original dike proposal)or raising the road. Another is to realign the stream down the path that the flood flows take now(I admit that I know nothing about the topography here and this may be impossible). These other alternatives would require a whole new design effort and probably a new permit/funding cycle. As a temporary, inexpensive, possibly successful design, I support the current proposal. I don't think this project meets RCW 77.55.181 specified tasks. The LWD is small and an ancillary addition to the project. One could view the stranding of fish as a"blockage," but certainly not in the common use of the term. Bob Bob Barnard, P.E. Habitat Engineering Technical Assistance Washington Dept. of Fish and Wildlife 600 Capitol Way N Olympia, WA 98501-1091 360-902-2611 >>> "Rich Geiger" <rjgeiger@masoncd.org> 08/16/2007 2:17 PM >>> Hi to both of you - Neil called and said you have suggestions on how to re-work this project so it is truly a fish passage restoration - Let me know so we can draw it up-Thanks! - Rich (8/17/2007)Charles McCoy III - Re: Bear Creek Suggestions! Page 11 From: "Teresa Eturaspe" <eturatae@DFW.WA.GOV> To: "Jeff Davis" <DAVISJPD@DFW.WA.GOV>, "Gloria Rogers" <rogergsr@DFW.WA.GOV... Date: 8/17/2007 12:00 PM Subject: Re: Bear Creek Suggestions! CC: <chuckm@co.mason.wa.us> Doris, I left a message for Neil today. Based on Bob Barnards findings I am hand delivering the SEPA checklist to Chuck McCoy this afternoon. The County will be lead agency on this SEPA. I had hoped we could tweek this to fit under the Streamlined process but it does not appear that we can. Teresa A. Eturaspe SEPA Responsible Official Washington State Fish &Wildlife Habitat Program 600 Capitol Way North Olympia, WA 98501-1091 (360)902-2575 (360)902-2946 FAX <etu ratae@dfw.wa.gov> >>> Doris Small 08/17/2007 11:50:16 AM >>> I spoke with Teresa on Wednesday&we both communicated with Neil on Thursday. Teresa suggested to Neil two options to move things along: 1. Re-design to meet streamline permit criteria. She seemed to think that Gloria & BobB had ideas on how this could be done. I'm not getting that impression from the emails included in this message though. She thought she could immediately process if the right changes were made. 2. Find out if permits were required from Mason Co. (putting the county as lead agency)and get that going asap. If no permits from Mason Co, let's get that in writing asap so that we can move things along on our end. Neil seemed to be going down the revised project path, but I'm not feeling confident based on emails below. I'm "involved" as the agency Iiason to the RFEG but trying not to interfere with the permit process. Please keep me informed & let me know how to help this project move forward. It's not a great project overall, but the HCSEG wants to do it primarily to start working with an important landowner in the overall goal of protection & restoration of the Union River watershed. From that angle, I hope they are able to get it done this summer. Doris J. Small WDFW Watershed Steward 502 High Street, Suite 112 Port Orchard, WA 98366 360.895.4756w 360.710.1215c >>>Gloria Rogers 08/17/07 10:21 AM >>> Jeff et all, It is my understanding that if this application does not meet the criteria for a streamlined permit, Mason County has lead agency status.Any work within or above the OHWL, Mason County(according to their resource ordinances) requires SEPA and at a minimum a Mason Environmental Permit(MEP). If the project is located on or within 200 feet of shorelines then the applicant needs to go through the shoreline (8/17/2007)Charles McCoy III - Re: Bear Creek Suggestions! Page 2 !. process as well. Gloria Rogers Area Habitat Biologist Washington Department of Fish and Wildlife 48 Devonshire Rd Montesano, WA 98563 360-249-4628 x 249 >>> Jeff Davis 8/17/2007 10:03 AM >>> It is my understanding that WDFW is putting this through SEPA, so it has been denied as a Fish Habitat Enhancement project. It will be important that we provide Teresa these comments and that Gloria provision the HPA accordingly. Doris is also involved in this project, so we need to keep her in the communication loop. Jeff Jeff Davis Assistant Regional Habitat Program Manager WA. Dept. of Fish &Wildlife 502 High St., Suite 112 Port Orchard, WA 98366 (360)895-3965 (360)876-1894 fax davisjpd@dfw.wa.gov >>> Gloria Rogers 08/17/2007 9:54 AM >>> Bob, I can't thank you enough for all of your help and review of this project. But here goes....THANKS!!!!!!!!!!!!!!!!!! Gloria >>>"Bob Barnard" < BARNARJB@DFW.WA.GOV> 8/17/2007 9:23 AM >>> think I've talked to everyone I can about this project(Marty, Richard B., Rich, Gloria). I don't have time to go out there to look at this, so this will have to do. understand that this is a depositional area and that there may be a tendency for the ck to move off to the right. Digging a relief channel (the current proposal)may reduce flood elevations and keep more of the water in the current alignment. My intuition tells me that it will be short-lived, increasing deposition by splitting flow. Other alternatives include creating a dike along the roadway(fewer impacts than the original dike proposal)or raising the road.Another is to realign the stream down the path that the flood flows take now (I admit that I know nothing about the topography here and this may be impossible). These other alternatives would require a whole new design effort and probably a new permit/funding cycle. As a temporary, inexpensive, possibly successful design, I support the current proposal. don't think this project meets RCW 77.55.181 specified tasks. The LWD is small and an ancillary addition to the project. One could view the stranding of fish as a "blockage," but certainly not in the common use of (8/17/2007)Charles McCoy III - Re: Bear Creek Suggestions! Page 3 the term. Bob Bob Barnard, P.E. Habitat Engineering Technical Assistance Washington Dept.of Fish and Wildlife 600 Capitol Way N Olympia, WA 98501-1091 360-902-2611 >>> 'Rich Geiger"< rjgeiger@masoncd.org > 08/16/2007 2:17 PM >>> Hi to both of you -Neil called and said you have suggestions on how to re-work this project so it is truly a fish passage restoration - Let me know so we can draw it up -Thanks! - Rich