Loading...
HomeMy WebLinkAboutBLD2002-00184 Cancelled Propane - BLD Permit / Conditions - 9/1/2002 MASON COUNTY DEPT. Inspection Line (360)427-7262 OF COMMUNITY ` ^ Phone: (360)427-9670, ext. 352 DEVELOPMENT - Mason County Bldg. 3 426 W. Cedar P.O. Box 186 /��''��� '`� P Shelton, WA 98584 MECHANICAL PERMIT BLD2002-00184 OWNER: CHRIS LADNER CONTRACTOR: FERRELL GAS RECEIVED: 2/21/2002 SITE ADDRESS: 1130 NE OLD BELFAIR HWY BELFAIR ISSUED: 2/21/2002 PARCEL NUMBER: I )` - — la , 63310 EXPIRES: 8/21/2002 LEGAL DESCRIPTION: TR 31-A OF E1/2 NE & W1/2 NW TR A OF SP#1373 PROJECT DESCRIPTION: DIRECTIONS TO SITE: PROPANE TANK 1.1 MILES OUT OF BELFAIR HWY TAKE A RIGHT ON DIRT ROAD TAKE FIRST DRVIEWAY ON THE RIGHT General Information Mechanical Fixtures FEES Type of Use: SF Insp. Area: Type Qty. Type By Date Amount Receipt Type of Work: MEC Fire Dist.: 2 Propane Tank 1 Mechanical Fee N.IP )i,)lignm a9, 'in SASnF Gas Outlets 2 Mechanical Base Fee NAP )/,)1/�nnq v)'Z Fn SASnA Total $44.80 BLD2002-00184 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2002-00184 CONDITIONS FOR BLD2002-00184 1) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or contractori� post the address on site prior to requesting inspections. X 2) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X v 3) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the Uniform Codes-as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be maw prior to requesting additional inspections. X 4) All propane tanks must be installed in accordance with the Uniform Fire Code and all applicable Mason County ordinances. All propane tanks filled on site must be located a minimum of 10'from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system air intake (direct vent appliance, ventilation air intake, etc), and/or any weeds, grass, brush, trash or any other similar combustible materials. Propane tanks less than 125 gallons must also be located a minimum of 5'from any building opening (foundation vents,windows, doors etc), property line or easement. If a propa dank is exposed to probable vehicular damage, protective bollards must be installed. X 5) Fuel piping shall be inspected after the installation of gas piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances to be attached to the fuel piping system shall not be used/9 X the final inspection has been performed and approved by a Mason County building inspector. 6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final i ,spection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County o inances and building regulations. X BLD2002-00184 Please refer to the following pages for conditions of this permit. 2 of 3 This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 480 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can b cup OWNER OR AGENT: L-- DATE: BLD2002-00184 Please refer to the following pages for conditions of this permit. 3 of 3 CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping =,E)C/ date b Foundation Walls date J' %-` by Set Up date by INSULATION date by BG(SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by PLUMBING Aron date by OTHER Grourxtwork date by date b D.W.V. WALLBOARD NAILING dale by date by Water Line FINAL INSPECTION date by date by date by \n co Loy-"