HomeMy WebLinkAboutBLD2009-00583 Cancelled Additon - BLD Permit / Conditions - 8/4/2011 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY'DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County Bldg. III 426 W. Cedar P.O. Box 186 (%
Shelton, WA 98584 � I�
RESIDENTIAL BUILDING PERMIT D BLD2009-00583
OWNER: DAVID EVANS RECEIVED: 7/14/2009
CONTRACTOR: LICENSE: EXP: ISSUED: 9/11/2009
SITE ADDRESS: 140 NE COURTNEY CREEK LN BELFAIR EXPIRES: 9/28/2011
PARCEL NUMBER: 123173490030
LEGAL DESCRIPTION: TR 3 OF SE SW PTN OF TR 1 OF SP#1597
PROJECT DESCRIPTION: DIRECTIONS TO S TE:
BEDROOM ADDITION, INCREASING SIZE OF BEDROOMS ADDING LEFT 1.6 MILES D BELFAIR H LEFT COURTNEY CREEK LN .1 MI
LAUNDRY RM DRIVEWANN I HT
General Information Construction&Occupancy Informatijnj Square Footage Information
No. of Bedrooms: 2 Ty p f Con MV-
Type of Use: SF Insp.Area: No. of Bathrooms: O Gr Lot Size: Deck:
Type of Work: ADD Fire Di 2 No. of Stories: 2 O c. Lo d. Building:960
Valuation: $ 92,956.80 Building Height: c . Sta : Basement:
Manufactured Home Informa ion bac Inform Shoreline&Planning Information
Water Body:
Make: Length: Ft. Uea
E 22 0 Ft. Shoreline: Ft.
SEPA?: Unkn
Model: Width: Ft. 65.0 Ft. Slope: Ft. Shoreline Desi
N 255.0 Ft. 9 dmbApplicable
Year: Serial No.: Side 2: S 355.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Bath Tubs 1 Dryer Vent 1 Plan Check Fee TW 7/14/2009 $614.09 S120090001
Clothes Washer 1 Ventilation Fan 1 Planning Review Fee TW 7/14/2009 $205.00 S12009000(
Hosebibs 1 EH Plan Review TW 7/14/2009 $103.00 S120090001
Building State Fee LDK 8/18/2009 $4.50 S120090001
Building Permit Fee LDK 8/18/2009 $944.75 S120090001
Mechanical Permit Fee LDK 8/18/2009 $18.00 S120090001
Mechanical Base Fee LDK 8/18/2009 $28.50 S120090001
Plumbing Permit Fee LDK 8/18/2009 $23.60 S120090001
Plumbing Base Fee LDK 8/18/2009 $24.70 S120090001
Total $1,966.14
BLD2009-00583 Please refer to the following pages for conditions of this permit. Page 1 of 5
f y
CASE NOTES,FOR
BLD2009-00583
CONDITIONS FOR
BLD2009-00583
1) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
3) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
4) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be
installed and maintained until upland vegetation has become established. X
5) All construction and demolition debris must be removed from the area after project completion. Proper disposal of construction debris must be on land in
such a manner that debris cannot enter or cause water quality degredation of State waters. X
6) Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of
erosion protection (silt fencing or straw matting). X
7) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X
8) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
X
9) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
X
BLD2009-00583 Please refer to the following pages for conditions of this permit. Page 2 of 5
10) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X
11) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
X
12) Washington State Energy Code Compliance has been approved using the following:
Heat Type: Electric or other fuels, Compliance Method: Prescriptive option IV, Window(Max U-Factor):0.35, Skylight(Max U-Factor):0.58, Doors
(Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38, Vault Insulation R-38 (see exception), Slab
Insulation R-10.
Exception: R-30 insulation may be installed, up to 500 sq. ft., in single rafter or joist vaulted ceilings where the distance of the top of the ceiling and the
underside of the roof sheathing is less than 12-inches and there is 1-inch vented airspace above the insulation.
X
13) Per IRC -SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in
accordance with the applicable provisions of this section and the manufacturer's installation instructions.
X
14) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered.
A. Drainfield/ Reserve requires a 10ft setback from all footing/foundations.
B. Septic tank(s) requires 5ft setback from all footing/foundations.
C. No foundation drains within 30ft, down gradient of drainfield/reserve area.
X
15) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X
16) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
BLD2009-00583 Please refer to the following pages for conditions of this permit. Page 3 of 5
17) Installation of heating equipment in single family residences shall meet the requirements of the current Washington State Energy Code.
The furnace to be installed shall not exceed 150% of the heating and cooling design load. Heating and design load calculations for the purpose of sizing
HVAC systems are required and shall be calculated in accordance with accepted engineering practice, including infiltration and ventilation. Design
calculations shall be available for inspection during the framing inspection.
Warm-air furnaces shall have a minimum efficiency of 78%AFUE or higher or 80% combustion efficiency. All ducts shall be securely fastened and
sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems or tapes installed in accordance with manufacturers installation
instructions. Duct tape is NOT permitted as a sealant on any ducts. Ducts in unheated spaces shall be insulated to R-8.
X
18) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.
X
19) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
X
20) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall be made prior to requesting additional inspections.
X
21) All property lines shall be clearly identified at the time of foundation inspection. X
22) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
23) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X
24) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X
BLD2009-00583 Please refer to the following pages for conditions of this permit. Page 4 of 5
25) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior
to construction of the retaining wall. X
26) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X
27) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approved Site Plan" to ensure these structures are shown and meet the setback conditions listed.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any
time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be
occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate
and grants employees of Mason County access to the above described property and structure for review and inspection.
OWNER OR AGENT: DATE:
BLD2009-00583 Please refer to the following pages for conditions of this permit. Page 5 of 5
co
o CONCRETE MECHANICAL MANUFACTURED HOME
o
Footings I Setbacks Date By Ribbons N
Gas Piping
o Interior Date By Interior-Date By pate By
wExterior Date , g'�/� By Exterior-Date BSet-up
Point Load I Isolated Footings INSULATION Date By
BG I SLAB INSULATION
Date By DaCe By FIRE DEPARTMENT
Foundation Walls Floors Date By
Date By Data By DECKS
FRAMING Walls Date By
Date By Data By PROPANE TANKS
PLUMBING Vault Data By
Date By OTHER
Groundwork Attic
Data By Data By Type-
Date By
D.w.v DRYWALL Type-
Int.Brace Wall Date By
Date By Date By FINAL INSPECTION 0
v Water Line Fire Separation C
�6 Date By Date By Date By p
m to
Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments ono
ter% -lbCD
N to l I
8V,0 1 Q7J 1WLj/ r
a l C.lJ r l G
(N
O
(D
O
tia -
,— - m
o CONCRETE MECHANICAL MANUFACTURED HOME
Footings J Setbacks Gas Piping By Ribbons � Z
51)
o interior Date By Interior-Date By gate By 0
w Exterior Date B Set- V�� - A D
_�, Date By up
y �7(tPrlgr
Point Load/Isolated Foo
tings INSULATION � Date By <
BG!SLAB INSULATION 0
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Date By
Date By Data By DECKS -
FRAMING Walls Date B;
Date Ry Data By PROPANE TANKS
PLUMBING vault Date By
Date ayq^ OTHER
Groundwork Attic
Date try bate By
Type-
Data By
D.W.v DRYWALL Type.-
Date By
InL Brace Wall Date By W
v
Date By FINAL INSPECTION
W Water Line Fire 5eperation No
co
m Date By Date By Date by p
m W
Pass or Request Inspect, c
Type of Insp. Fail Date Date Done By Comments
co
CL
CD
o
1
3
I
CONCRETE MECHANICAL MANUFACTURED HOME
Footings t Setbacks Date By Ribbons
Gas Piping
Interior pate By Interior-Date By pate By
Exterior Date By Exterior-Dete By Suet-up
Point Load 1 isolated Footings INSULATION Date By
BG I SLAB INSULATION
Date By Data By FIRE DEPARTMENT
Foundation WallssFloors i Dale By
Date By Data By DECKS
FRAMING Walls Date By
Date By Data By PROPANE TANKS
PLUMBING vault matt By
_... -- Date 6y '
OTHER
Groundwarlc ,Attic
'type:
Date By Date By
Data By
D.W.v DRYWALL. Type:
Date B Y Int Brace Wall Date By
CD Date By FINAL INSPECTION
Water Line Fire Sepecation
CD
CD
Date By Dale By Data � 3d'( � By
g Pass or Request Inspect.
Type of Insp. Fail Date Date Done By Comments
m
0
S.
cm
m
y
-w
O
n
O
Cn
O_
O
O
O
C
m
I
CD
O
M
Case Activity Listing 8/3/2011
3:37:50PM
Case #: BLD2009-00583
Assigned Done IT
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA010 Application Received 7/14/2009 7/14/2009 None DONE TW 7/14/2009 I W
BLDB201 More Info Letter-EH 7/31/2009 None DONE ADR 7/31/2009 ADR
BLDB130 Planning Review 7/14/2009 8/3/2009 None DONE AHB AHB 8/3/2009 AHB
Site visit indicated that addition will be in the direction away from the stream to the south. AHB
BLDB201 More Info Letter-EH 8/13/2009 None DONE ADR 8/13/2009 ADR
BLDB110 Building Plan Review 7/14/2009 8/18/2009 None DONE LDK 8/18/2009 LDK
COMPLETED PLAN REVIEW AND SENT TO CASE MANAGER
BLDB120 WSEC Compliance Review 8/18/2009 None DONE LDK 8/18/2009 LDK
PRESCRIPTIVE IV
BLDB200 Environmental Health Review 7/14/2009 9/9/2009 None DONE ADR 9/9/2009 ADR
Need septic records and pumpers report.
8/13/2009 records provided,still need pumpers report.
9/9/2009 Satisfactory pumpers report provided.
BLDA100 Approved for Issuance 9/11/2009 None DONE GMM 9/11/2009 GMM
Called and talked with Mrs Evans,let her know that the permit is ready to be picked up,also left remaining amount due.
BLDA500 Issue Building Permit 9/11/2009 None DONE TW 9/11/2009 GMM
BLDA540 Print Inspection Card 9/11/2009 None DONE TW 9/11/2009 GMM
Page 1 of 2 CaseActivity..rpt
Case Activity Listing 8/3/
3:37:S0P11
OPM
Case#: BLD2009=-00583
Not
Assigned DonC�
Activity Description ,` Dater Date 2; Date 3 Hold Disp To By Updated updated B,y `:
BLDC105 Progress Inspection 3/9/2010 3/11/2010 None PASS PIB 3/9/2010 PIB
Progressed over the phone-excavation work done,tree removal done,beginning work on forms.
BLDC110 Footing Inspection 3/28/2010 3/28/2010 None PASS TFR 4/1/2010 PIB
Setbacks/Footings and Wall-Pass.
BLDC105 Progress Inspection 9/8/2010 9/28/2010 None PASS PIB 3/3/2011 PIB
Phone: Working on erosion control.
BLDC105 Progress Inspection 3/28/2011 3/28/2011 None DONE PIB 3/3/2011 RIB
Progress/Phone: Poured foundation.
Page 2 of 2 CaseActivity..rpt
s 11/29/2018
ase Activity Listing. 5:24:45PM
t
► �� ase#: BLD2009-00583 I
arcel#: 123173490030
Description: Bi bROOMADDITION, INCREASING SIZE OF BEDROOMS ADDING LAUNDRY RM
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA010 Application Received 7/14/2009 7/14/2009 None DONE IW 7/14/2009 TW
BLDB201 More Info Letter-EH 7/31/2009 None DONE ADR 7/31/2009 ADR
BLDB130 Planning Review 7/14/2009 8/3/2009 None DONE AHB AHB 8/3/2009 AHB
Site visit indicated that addition will be in the direction away from the stream to the south. AHB
BLDB201 More Info Letter-EH 8/13/2009 None DONE ADR 8/13/2009 ADR
BLDB110 Building Plan Review 7/14/2009 8/18/2009 None DONE LDK 8/18/2009 LDK
COMPLETED PLAN REVIEW AND SENT TO CASE MANAGER
BLDB120 WSEC Compliance Review 8/18/2009 None DONE LDK 8/18/2009 LDK
PRESCRIPTIVE IV
BLDB200 Environmental Health Review 7/14/2009 9/9/2009 None DONE ADR 9/9/2009 ADR
Need septic records and pumpers report.
8/13/2009 records provided,still need pumpers report.
9/9/2009 Satisfactory pumpers report provided.
BLDA100 Approved for Issuance 9/11/2009 None DONE GMM 9/11/2009 GMM
Called and talked with Mrs Evans,let her know that the permit is ready to be picked up,also left remaining amount due.
BLDA500 Issue Building Permit 9/11/2009 None DONE TW 9/11/2009 GMM
BLDA540 Print Inspection Card 9/11/2009 None DONE TW 9/11/2009 GMM
IVA 6 .,
Page 1 of 3 CaseActivity_rpt
x ? 14
11/29/2
Cash �V1ty Listing 5:24:45P.
Case I,D2009-00583
a >
a. Parcel#: 123173t90030 `
a r
Description: BEDRO DDITION, INCREASING SIZE OF BEDROOMSADDI UNDRY RM
Assigned Done
Activity Description Date l Date 2 Date 3 Hold Disp To By Updated Updated By
BLDC105 Progress Inspection 3/9/2010 3/1 1/2010 None PASS PIB 3/9/2010 PIB
is -
"t:
Progressed over the phone-excavation work done,tree removal done,beginning work on forms.
BLDC110 Footing Inspection 3/28/2010 3/28/2010 None PASS TFR 4/1/2010 PIB
i
Setbacks/Footings and Wall-Pass.
BLDC105 Progress Inspection 3/28/2011 3/28/2011 None DONE PIB 3/3/2011 PIB
Progress/Phone: Poured foundation.
BLDC105 Progress Inspection 9/8/2010 9/28/2010 None PASS PIB 3/3/2011 PIB
Phone: Working on erosion control.
BLDA510 Reprint Building Permit 8/4/2011 None DONE DLC 8/4/2011 DLC
Reprint for inspection
BLDC105 Progress Inspection 8/3/2011 8/4/2011 None PASS TFR TFR 8/5/2011 KS
P T PLATE DOWN,JOISTS INSTALLED AND SOME DECKING,RIM JOIST NOT ON BREMERTON END.
BLDC105 Progress Inspection 1/10/2012 1/11/2012 None DONE KS KS 1/11/201I2 KS
JOIST 2ND FLOOR
BLDC105 Progress Inspection 6/21/2012 6/21/2012 None DONE TW 6/21/20 12 TW
second floor wall,trusses and vauge and facia.
BLDC105 Progress Inspection 11/20/2012 11/20/2012 None DONE KS KS 11/20/20l2 KS
ROOF SEATED,WALL SHEARED
BLDC105 Progress Inspection 5/13/2013 5/20/2013 None DONE PIB 5/13/20 13 PIB
Progress/Phone: Comp roof on
BLDC105 Progres+Ins ection 9/16/2013 9/16/2013 None DOI� MB 9/16/20 3 MB
Progress/Phone:U �gir-framing
done
e 2 0f 3 CaseA t
�• ' ; x, Case Activity L eg 11/29/2018
5:24:45PM
! Case#: BLD2009 83
�• Parcel#: 12317 30
Descriploon: BEDROOM ADDITION, (CREASING SIZE OF BED`.,OMSADDING LAUNDRY RM i
Assigned Done
J44ivity Desch lift— � k -. � ';;,;Date I Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA560 Permit Cancelled 4/3/2015 None DONE MJD 4/3/2015 i MJD
Permit cancelled,last contact(9/16/2013).Inactivity of over'180 days has invalidated this permit.Please contact the Mason County building department with any questions 1.360.427.9670 ext 352
BLDC140 Framing/Plumbing/Mechanical 3/23/2018 None DONE DEC 3/28/2018 JAK
BLDC145 Insulation Inspection 4/13/2018 None PASS DEK 4/16/2018 JAK
i
i
� Y
Page 3 of 3 �,'