HomeMy WebLinkAboutBLD2000-01034 Final Roofs Over Temp Coolers - BLD Permit / Conditions - 4/10/2002 Line
360)47- 262
ection
MASON COUNTY DEPT. OF COMMUNITY Phn pe: (360)427(9670?ext7352
DEVELOPM ENT
Mason County Bldg. 3 426 W. Cedar P.O. Box 1 86
Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2000-01034
OWNER: JAMES PADDEN RECEIVED: 8/1 1 /2000
CONTRACTOR: LICENSE: EXP: ISSUED: 10/4/2001
SITE ADDRESS: 1080 NE OLD BELFAIR HWY BELFAIR EXPIRES: 4/4/2002
PARCEL NUMBER: 123201093290
LEGAL DESCRIPTION: TR 29 OF E1 /2 NE & W1 /2 NW EX TR 2 OF SP #1720 PCL 2 OF BLA#01-51 AF#1738852
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
BUILD ROOFS OVER TEMP COOLERS 1 MILE NORTH ON OLD BELFAIR HWY FROM 4 WAY STOP
General Information Construction & Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.: 5N
Type of Use: SF Insp. Area: No. of Bathrooms: Occ. Group: S2 Lot Size: Deck:
Type of Work: ACC Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building:506
Valuation: $12 023 Building Height: Occ: Status: Basement:
Manufactured Home Information Setback Information Shoreline & Planning Information
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body:
Rear: Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: Ft. Shoreline Desig.:
Year: Serial No.: 11 Side 2: Ft. Comp. Plan Desi .:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Adjust Plan Check Fee DLC 9/26/20( $72.1 5 1 314
Building State Fee DLC 9/26/20( $4.50 1 314
Building Permit Fee DLC 9/26/20($223.25 1314
Violation Fee DLC 9/26/20($223.25 1314
Violation Investigation Fee DLC 9/26/20( $47.00 1314
EH Plan Review KS 10/2/20( $50.00 1314
Plan Check Fee KLW 8/11/20( $72.96 1953
Planning Review Fee AHB 8/31/20( $38.00 1 314
Total $731.11
BLD2000-01034 Please refer to the following pages for conditions of this permit. 1 of 4
CASE NOTES FOR
BLD2000-01034
CONDITIONS FOR
BLD2000-01034
1) Approved per dimensions and setbacks on submitted site plan. X---------------------
2) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion
protection (silt fencing or straw matting). X-------------------------
3) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without
the approval of the Mason County Fire Marshal. X---------------------------------
4) Proposed structure or portions thereof with an projection over 30" in height from grade line, must maintain a 5' separation distance
between adjacent structures and that furthest projection. X-------------------------------
5) Proposed structure or any portion thereof greater than 30" in height from grade line, must maintain a minimum of 5' setback from all
property lines, easements and 10' from all County and State Road right of ways. X-------------------------
6) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT
adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will
meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated
for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the
installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works
Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right
of way, it is suggested to contact that office to review future planned work which may affect your project.
X-----------------------------------
7) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then
approval will not be granted. In addition, a re-inspection fee in the amount of $47.00 per hour (minimum 1 hour) will be charged and must
be collected by the Building Department prior to any further inspections being performed or approvals granted.
X--------------------------------
8) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly
visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to
calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be
assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections.
X--------------------------------
BLD2000-01034 Please refer to the following pages for conditions of this permit. 2 of 4
9) - The "approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" plot plan is not
on site, then approval will not be granted. In addition, a re-inspection fee in the amount of $47.00 per hour (minimum 1 hour) will be
charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
X--------------------------------
10) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason
County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans
and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee of $47.00 per
hour (minimum 1 hour) will be charged and shall be collected by the Building Department prior to any further inspections being performed
or approvals granted.
X---------------------------------
1 1) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by
Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change
of use or occupancy would result in permit revocation.
X---------------------------------
12) All changes to "approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason
County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
X---------------------------------
1 3) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in
conformance with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a
Mason County Building Inspector shall be made prior to requesting additional inspections.
X---------------------------------
14) All property lines shall be clearly identified at the time of foundation inspection. X----------------------------------
15) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit
expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with
Mason County as being non-compliant with Mason County ordinances and building regulations.
X----------------------------------
16) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may
extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that
circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be
granted.
X----------------------------------
BLD2000-01 034 Please refer to the following pages for conditions of this permit. 3 of 4
This permit becomes null and void if work or construction authorized is not commenced wit-hin 180 days, or if construction or work is suspended for a period
of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must
be approved before building can be occupied.
OWNER OR AGENT: ----------------------------------------------- DATE: --------------------
BLD2000-01034 Please refer to the following pages for conditions of this permit. 4 of 4
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date i by date by dates _Y 3 by
FRAMING - — �-—- _- FIRE DEPT.
date _ by dates by date by
PLUMBING 3 ---------_ OTHER
Groundwork Attic
d date by
ate b te WALLBOARD NAILING
D.date by date __ by
Water Line a — FINAL INSPECTION
date by date by date by
�i '%
N
i